About this file
This is an Addendum #1 to a Request for Proposals issued by Lamar University, an agency of The Texas State University System, for the design and turnkey installation of a freestanding LED video marquee display system on its Beaumont, Texas campus. The project involves the manufacture, installation, supply, delivery, labor, testing, and documentation of a double-sided LED marquee with two outdoor 6mm video displays measuring 16 feet 11 inches tall by 9 feet 7 inches wide, each with minimum resolution of 860 by 486 pixels and 7,500 nits brightness. The scope includes all foundations, primary and secondary steel framing, catwalks, ladders, mounting hardware, cladding, electrical distribution, low-voltage cabling, permits, stamped electrical drawings, redundant LED processors, redundant digital media players with automatic failover capability, a 15-minute runtime Uninterruptible Power Supply (UPS) for the Content Management System rack, operating system housed in environmental enclosures at the display with two years of cellular connectivity, Acme Brick Garnet Modular scratch face base, and a pan-tilt-zoom (PTZ) camera with cloud monitoring on a post not exceeding three feet in height. The proposal submittal deadline is February 11, 2026, at 2:00 p.m. CST, with substantial completion required by July 24, 2026, and installation permitted anytime prior to that date. Respondents must submit a project schedule with their RFP response.
The addendum clarifies that remote power is not required, confirms redundant processing and control systems with primary and secondary components, mandates cloud-monitored camera systems on both sides of the marquee with cellular connectivity transferable to the University upon plan expiration, and specifies that the project is tax-exempt. Qualified bidders must demonstrate experience with a minimum of five facilities completed within the last three years and two additional facilities at least five years old with equivalent brand, size, and scope, provide 100 percent payment and performance bonds, maintain local service capability with 24-hour response time, and provide a 24-month warranty on labor and materials including two annual on-site system checks and a 7-year guarantee against systemic parts failures. All respondents, including those certified as Historically Underutilized Businesses (HUBs), must complete and submit a HUB Subcontracting Plan demonstrating good faith effort in utilizing Texas-certified HUB vendors. The evaluation criteria are weighted as follows: statement of qualifications and availability (7.5%), ability to provide services (7.5%), qualifications and experience of construction team (12.5%), performance on past TSUS or similar representative projects (20%), project planning and scheduling (12.5%), post-project support (10%), and pricing and delivery proposal (30%), with award notification anticipated by March 1, 2026.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSALS
FOR
FREESTANDING LED VIDEO MARQUEE
RFP #734-01052026-KM
ADDENDUM 1
Submittal Due Date:
Wednesday February 11, 2026
2:00 p.m. CST
Project:Lamar Freestanding Marquee Discipline: LED Displays Question Response Please confirm if remote power will be required for this project? Remote power is not required Please confirm a primary and redundant LED processor is required. Confirmed Please confirm a primary and redundant digital media player with the ability for automatic failover is required.
Confirmed. Include all player licensing.
Please confirm if a UPS will be required for the CMS rack. Confirmed - 15 min runtime required
Please confirm if the operating system will live at the display with a cellular modem or if the system will be housed at Boomtown Museum. If the operating system will live at the display, how many years of cellular signal should be included in the bid?
Operating system to be housed in environmental enclosures at the display. Include 2 years of cellular connectivity and ensure plan has the ability to be transferred to University at expiration.
Does the university have the product specifications of the brick proposed for the base of the marquee?
Acme Brick - Garnet Modular "scratch face". If discontinued, provide similar samples to University for review and approval.
Does the university have the contact information for the mason that has completed the other brick marquees on campus?
No current company University works with.
AJP Technical Specifications - Section 3.6 E - Please confirm onsite event requirements, post installation.
On-site vent can be removed from the requirements.
Is the project tax exempt? Yes The AJP Bid form references a camera package, however the technical specs and rendering package do not mention or show a camera. Should a confindence camera be included in the bid for both sides of the marquee? If so, please provide specs for the requirements.
Yes, provide camera, with cloud monitoring - use same cellularr connectivity as operating system.
Provide post at top of display with a PTZ camera that can be remotedly panned and tilted to view entore display. Post should not extend past 3'
What is the installation window and substantial completion date? July 24?
July 24th, 2026 is Substantial Completion. Install window is anytime prior. Submit a schedule with RFP response.