This is a Final Concept Package for the Hays County Eastside Campus in Kyle, Texas, dated August 5, 2025, prepared for an RFP 2026-P03 Construction Manager at Risk (CMAR) project. The document outlines a conceptual design for a campus facility with a total building footprint of 21,900 square feet and site area of 27,700 square feet. The package includes program specifications, a conceptual site plan, architectural character renderings, and implementation strategies. The design incorporates a tax drive-up feature and emphasizes sustainable construction methodologies, particularly the use of mass timber as the primary structural material.
The project prioritizes mass timber construction for its multiple performance and sustainability advantages, including environmental benefits through use of a renewable, carbon-sequestering resource, reduced construction time through prefabricated panels manufactured off-site with minimal waste, enhanced fire safety through char insulation of wood structures, seismic resilience design, reduced structural weight to minimize foundation requirements and associated costs, superior thermal performance leveraging wood's natural insulating properties, and biophilic design benefits. The concept package indicates cost neutrality has been achieved through Integrated Project Delivery (IPD) and public tender approaches via holistic consideration of materials, finishes, and schedule. The document includes a project schedule and budget overview, with comprehensive architectural character studies and timber opportunity analyses supporting the construction approach.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hays County
Eastside Campus Kyle, Texas 5 August 2025
Final Concept Package
08.05.2025 Program
08.05.2025 Program
27,700 SF
21,900 SF
21,900 SF
Building Footprint
Building Footprint
08.05.2025 Concept Site Plan
08.05.2025 Site Plan
Tax Drive Up
08.05.2025 Architectural Character
08.05.2025 Timber Opportunities
Environmental Impact:
100 percent renewable carbon-sequestering resource
Speed of Construction:
Easily modified on site and produces little waste.
Prefabricated panels manufactured off site.
Safety and Performance:
In the event of a fire, char allows wood structure to be insulated from the fire. Seismic resilience is factored-in.
Reduced Structural Weight:
Saves on foundation > materials, time & cost
Thermal Performance:
Wood’s natural insulating properties = strong thermal performance.
Cost Neutral:
In IPD delivery and public tender, we have achieved cost neutrality through holistic consideration of material, finishes and schedule.
Biophilic Design Benefits:
Exposure to natural elements = good. Raw material is fully finished.
Presenter Notes Presentation Notes Why is mass timber really different?
It has a lot of advantages. Bookended between ecological advantages, and how much we like to be in wood buildings are other-performance based advantages.
So why is mass timber different from other forms of construction, and how does that relate to recyclability? Let’s take a brief walk through the history of buildings to put it in perspective.
08.05.2025 Schedule
| Slide Number 1 |
| Table of Contents |
| Program |
| Program |
| Concept Site Plan |
| Site Plan |
| Architectural Character |
| Architectural Character |
| Architectural Character |
| Timber Opportunities |
| Architectural Character |
| Architectural Character |
| Architectural Character |
| Architectural Character |
| Architectural Character |
| Budget |
| Schedule |
| Q & A |