ESBD_463589_1761048227225_ESBD ATTACHMENT 5.docx
DOCX document 42 KB Posted
- Attached to
- Request for Proposals for Statewide Environmental Consulting Services – Hazardous Materials
- Solicitation number
- 601CT0000005604
- Issued by
- Travis County, Austin City, Texas
About this file
This is an Attachment 5 instruction document for a Texas Commission on Environmental Quality (TCEQ) solicitation that establishes requirements for proposers to demonstrate firm and team experience across six project categories. Proposers must complete forms for each relevant project type listed in Attachment B Appendix-2, with documentation limited to the maximum number of projects requested for each category. The six project categories include Initial Site Assessments, Investigation of Confirmed Underground Storage Tank (UST) Releases, Affected Property Assessments Reports, Contamination/Waste Materials Management Plans, Third Party Oversight/Inspections, and Asbestos-Containing Materials (ACM) Inspections. For each project submission, proposers must provide project identification information, team member details with precertification numbers where applicable, client entity information with contact details, location data, and descriptions not exceeding 75 words per project.
Documentation requirements vary by project category, with certain categories requiring attached TCEQ approval documentation for successful completion demonstration. Specifically, UST Release investigations and site closures require TCEQ approval documentation, while Affected Property Assessments Reports must include TCEQ-approved documentation with preference given to projects including No Further Action letters from TCEQ. Contamination/Waste Materials Management Plans and Third Party Oversight/Inspections require identification of whether projects qualify as infrastructure, along with attached TCEQ documentation. ACM Inspections require only final report details with no supporting TCEQ documentation specified. Award determination will be based in part on qualifications demonstrated in this section, with failure to meet minimum qualifications resulting in lower evaluation scores. Any projects submitted beyond the maximum number specified will not be considered during evaluation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ESBD_463589_1762528765449_576SG001 Addenda 2.pdf | ||
| ESBD_463589_1762962647169_576SG001 Addenda 3.pdf | ||
| ESBD_463589_1761923899804_576SG001 Addenda 1.pdf | ||
| ESBD_463589_1761047962702_FINAL SG RFP.pdf | ||
| ESBD_463589_1761048177304_ESBD ATTACHMENT 3.docx | DOCX document | |
| ESBD_463589_1761048101775_ESBD ATTACHMENT 1.docx | DOCX document | |
| ESBD_463589_1761048200496_ESBD ATTACHMENT 4.docx | DOCX document | |
| ESBD_463589_1761048125167_ESBD ATTACHMENT 2.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 5
FIRM AND TEAM EXPERIENCE
INSTRUCTIONS
Complete a form in the format below for the FIRM AND TEAM EXPERIENCE listed in Attachment B Appendix-2. Duplicate form as necessary. Attach TCEQ documentation to each form as necessary. Proposers shall not submit documentation for projects beyond the maximum requested. Additional projects that are submitted beyond the maximum number stated will not be considered during the evaluation process. Award will be based in part on the qualifications in this section. Failure to meet minimum qualifications for a criterion will result in a lower score.
Initial Site Assessments
| Team Member Name: |
| Precertification No.: |
| Team Member Name: |
| Precertification No.: |
Initial Site Assessments
| Project #: |
| Date of Report (within five years of RFP solicitation posting date): |
| Project Name: |
| Location: |
Team Member (Company) performing project:
Team Member’s Role in the Project:
| Client Entity Name: |
| Client Contact Name: |
Contact Phone Number:
No Attached Supporting Documentation Required, just relevant client contact information.
Description: Report name, date, TCEQ ID #, author, etc. and brief description of project. Maximum length of description is 75 words per project.
Investigation of Confirmed UST Releases
Project #:
| Project Name: |
| Location: |
Team Member (Company) performing project:
Team Member’s Role in the Project:
| Client Entity Name: |
| Client Contact Name: |
Contact Phone Number:
*Demonstration of successful completion for an investigation and for a site closure must include documentation from TCEQ approving the site investigation and closure (can be separate documents).
Description: Report name, date, TCEQ ID #, author, etc. for final report and brief description of project. Maximum length of description is 75 words per project.
Affected Property Assessments Reports
Project #:
| Project Name: |
| Location: |
Team Member (Company) performing project:
Team Member’s Role in the Project:
| Client Entity Name: |
| Client Contact Name: |
Contact Phone Number:
*Demonstration of successful completion for a project must include documentation from TCEQ approving the APAR.
*Preferred projects shall include documentation of No Further Action from the TCEQ (can be separate documents).
Description: Report name, date, TCEQ ID #, author, etc. for final report and brief description of project. Maximum length of description is 75 words per project. Attach TCEQ documentation.
Contamination/ Waste Materials Management Plans
| Project #: |
| Date: |
| Project Name: |
| Location: |
Team Member (Company) performing project:
Team Member’s Role in the Project:
| Client Entity Name: |
| Client Contact Name: |
Contact Phone Number:
Infrastructure Project (Yes/No):
(Infrastructure – The basic public works facilities, services, and installations needed for the functioning of a community or society).
Description: Report name, date, TCEQ ID #, author, etc. for final report and brief description of project. Maximum length of description is 75 words per project. Attach TCEQ documentation.
Third Party Oversight/Inspections
| Project #: |
| Date: |
| Project Name: |
| Location: |
Team Member (Company) performing project:
Team Member’s Role in the Project:
| Client Entity Name: |
| Client Contact Name: |
Contact Phone Number:
Infrastructure Project (Yes/No):
(Infrastructure – The basic public works facilities, services, and installations needed for the functioning of a community or society).
Description: Report name, date, TCEQ ID #, author, etc. for final report and brief description of project. Maximum length of description is 75 words per project. Attach TCEQ documentation.
ACM Inspections
| Project #: |
| Date: |
| Project Name: |
| Location: |
Team Member (Company) performing project:
Team Member’s Role in the Project:
| Client Entity Name: |
| Client Contact Name: |
Contact Phone Number:
Description: Report name, date, author, etc. for final report and brief description of project. Maximum length of description is 75 words per project.
5FTE Page 3 of X 576SG001-5604
File details come from the government source that posted it. Updated .