ESBD_393688_1738702541104_HHS0015184 Attachment H-2d.pdf

PDF 8 MB Posted

Attached to
Project 24-207-SAH, Alamo Hall Geriatric MSU Renovations, San Antonio, TX
Solicitation number
HHS0015184
Issued by
Texas

About this file

This is an asbestos abatement specification document prepared by Terracon Consultants, Inc. for the Texas Health and Human Services Commission regarding Building 598 at the San Antonio State Hospital. The project involves the removal of various asbestos-containing materials including: approximately 4,900 square feet of floor tile and mastic containing 7-12% Chrysotile asbestos, 2,250 square feet of HVAC duct mastic containing 10% Chrysotile, 150 linear feet of wall caulking containing 2% Chrysotile, 900 linear feet of window frame caulking containing 2% Chrysotile, 900 linear feet of exterior door/window frame caulking containing 2% Chrysotile, 2,000 linear feet of window glazing compound containing 2% Chrysotile, and 2,450 linear feet of water line insulation with associated debris and contaminated soil in crawl spaces.

The specification details extensive work practices and safety requirements including respiratory protection, protective clothing, containment/temporary facilities construction, and specific removal procedures for each type of material. The document mandates that all work must be performed by properly licensed personnel in accordance with Federal, State and Municipal regulations. Required containment measures include negative pressure environments, three-chamber decontamination units, and specific poly sheeting barrier requirements. The contractor must verify all material quantities prior to submitting pricing, as quantities listed are estimates only.

View the file

Other files

File Type Posted
ESBD_393688_1738699998320_HHS0015184 Attachment H-1f.pdf PDF
ESBD_393688_1738703430357_HHS0015184 Attachment H-3c.pdf PDF
ESBD_393688_1738699995334_HHS0015184 Attachment H-1g.pdf PDF
ESBD_393688_1738699992490_HHS0015184 Attachment H-1c.pdf PDF
ESBD_393688_1738699993254_HHS0015184 Attachment H-1a.pdf PDF
ESBD_393688_1738702536322_HHS0015184 Attachment H-2e.pdf PDF
ESBD_393688_1738699999440_HHS0015184 Attachment H-1e.pdf PDF
ESBD_393688_1738698135480_HHS0015184 Attachments.zip ZIP file
ESBD_393688_1738699994376_HHS0015184 Attachment H-1d.pdf PDF
ESBD_393688_1738699996382_HHS0015184 Attachment H-1i.pdf PDF
ESBD_393688_1738702539922_HHS0015184 Attachment H-2b.pdf PDF
ESBD_393688_1738702537792_HHS0015184 Attachment H-2g.pdf PDF
ESBD_393688_1738698012370_HHS0015184 RFP final.pdf PDF
ESBD_393688_1738699997302_HHS0015184 Attachment H-1h.pdf PDF
ESBD_393688_1738698053000_HHS0015184 Exhibits.zip ZIP file
ESBD_393688_1738702537061_HHS0015184 Attachment H-2f.pdf PDF
ESBD_393688_1738703429313_HHS0015184 Attachment H-3a.pdf PDF
ESBD_393688_1738699991716_HHS0015184 Attachment H-1b.pdf PDF
ESBD_393688_1738702542122_HHS0015184 Attachment H-2c.pdf PDF
ESBD_393688_1738703428621_HHS0015184 Attachment H-3b.pdf PDF
ESBD_393688_1738702538751_HHS0015184 Attachment H-2a.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

.teve ooay zcro ervices, Inc. tSUIK ii.soestos inaiysis neet TDH License No. 30-0084 EPA Method 40 CFR, Ch. 1. Pt. 763. Subpt. F. App. A NVLAP Lab No. 102056

Client: Environmental Resource Consultants Overall Asbestos Percent None Detected - Floor Tile

Project: ‘DMHMR Austin, San Antonio State Hospital No Mastic

Project#: 96-0456-D Lab Job#: xOB-0016 Sample#: 598-025

Client Sample Description: 12” x 12” Resilient Floor Tile (White) over Page 1 of I 9” x 9” Resilient Floor Tile (Grey), North Hall, East Ladies Rm.

Layer 1 Floor Tile

Prep/treatment: heat I melt Asbestos Content: None Detected

Comments: Analyst: Robert W. Miracle Date Analyzed: 114/00

Lab Job#: xOB-0016 Sample#: 598-025

Stereoscopic Exam Color Texture ‘Homogeneous? % Fibrous % Asbestos/a of Sample

Light Tan Hard YES ND ND I 100 PLM Examination

‘ Color Parallel Perpendicular Extinction Sign of Components % ÷1- Morphology / Pleochroism Ref. Index Ref. Index Biref Angle Elongation çalcitelVinyl Binders 10 I Non-fibrous I I high

NVLAP Lab No. 102056

Client: Environmental Resource Consultants Overall Asbestos Percent None Detected - Floor Tile

Project: tDMHMR Austin, San Antonio State Hospital Insufficient Mastic

Project 14: 96-0456-D Lab Job# : xOB-001 6 Sample # : 598-026

Client Sample Description: 12” x 12” Resilient Floor Tile (White) over Page 1 of I 9” x 9” Resilient Floor Tile (Grey), North Hall, East Ladies Rm.

Layer I Floor Tile

Prep/treatment: heat I melt Asbestos Content: None Detected

Comments: Analyst:

Date Analyzed:

Robert W. Miracle 1/4100

Jviouc4y ivi;cru .Jrv,cey, inc.

TDH License No.30-0084 DU1I. tUCSLiJS iU1Oiy1S DIICeL

EPA Method 40 CFR. Ch. 1. Pt. 763. Subot. F Ann. A

Stereoscopic Exam Color Texture Homogeneous? % Fibrous 1% Asbestos% of Sampl

Light Tan Hard YES ND ND 100 PLM Examination

Color Parallel Perpendicular Extinction Sign of Components % +/- Morphology / Pleochroism Ref. Index Ref. Index Biref Angle Elongation I çalcitelVinyl Binders 10 Non-fibrous high I I

Lab Job#: xOB-0016 Sample #: 598-026

I3UIK I’kSOeSLOS trnaiysis nee EPA Method 40 CFR, Ch. 1, Pt. 763, Subpt. F, App. A

Client: Environmental Resource Consultants

Project: .TDMHMR Austin, San Antonio State Hospital

Project #: 96-0456-D Lab Job#: xOB-0016 Sample #: 598-030

Client Sample Description: 2’ x 2 Suspended Acoustical Tiles (Fissures & Pinholes), Rehab Room

Comments: Analyst: Robert W. Miracle Date Analyzed : 114100 eve ivioouy iviicro cervices, inc.

TDH License No.30-0084 NVLAP Lab No. 102056

Layer I Ceiling Tile

Page 1 of I

Stereoscopic Exam

Color Texture Homogeneous?% Fibrous% Asbestosi% of Samp Light Grey Fibrous YES 80 ND I 100

PLM Examination Color Parallel Perpendicularl Extinction Sign of

Components % +1- Morphology / Pleochroism Ref. Index Ref. Index Biref Angle I Elongation Fellulose Fibers 5 ribbons high vIineral Wool Fibers 3 Rods I 0 E’erlite 20 Glass Foam 0

Prep/treatment: mechanical separation Asbestos Content: None Detected

Lab Job#: xOB-0016 Sample #: 598-030

NVLAP Lab No. 102056

Client: Environmental Resource Consultants

Project: JDMHMR Austin, San Antonio State Hospital

Project#: 96-0456-D Lab Job#: xOB-0016 Sample#: 598-031

Client Sample Description: 2’ x 2’ Suspended Acoustical Tiles (Lava), Page 1 of 1 State School Wing, South Front Foyer

Layer I Ceiling Tile

Comments Analyst: Robert W. Miracle Date Analyzed: Il 4100 tev 1VIUUUJ’ ivitciu JFViLS, Inc.

TDH License No. 3 0-0084 uiic 1-suesLos i-iJiwysis nee

EPA Method 40 CFR Ch. L Pt. 761 Suhnt. F, App. A

Stereoscopic Exam Color Texture Homogeneous?j% Fibrous % Mbestos% of Saniple

Off-White Fibrous YES 95 ND PLM Examination

Color Parallel Perpendicular Extinction Sign of Components % +1- Morphology I Pleochroism Ref. Index Ref. Index Biref Angle Elongation

1ineral Wool Fibers 9 Rods 0 Binders I Fillers Non-fibrous

Layer 2 Paper I Foil Backing

Prep/treatm&nt: mechanical separation Asbestos Content: None Detected

Stereoscopic Exam Color Texture Homogeneous? % Fibrous % Asbestosl% of Sampl

Tan! Silver J Fibrous I Hard NO 60 ND I 5

Prep/treatment: mechanical separation

PLM Examination j Color Parallel Perpendicular Extinction Sign of

Components % +1- Morphology I Pleochroism Ref. Index Ref. Index Biref Angle Elongation Dellulose Fibers 69 ribbons high Vletal Foil 4 Non-fibrous

Asbestos Content: None Detected

Lab Job#: xOB-0016 Sample #: 598-031

Client: Environmental Resource Consultants

Project: DMHMR Austin, San Antonio State Hospital

Project #: 96-0456-D Lab Job# : xOB-001 6 Sample # : 598-032

Client Sample Description: 2’ x 2 Suspended Acoustical Tiles (Lava), Page 1 of I State School Wing, West Central Conference Room

Layer 1 Ceiling Tile

Prep/treatment: mechanical separation

Layer 2 Paper! Foil Backing

Prep/treatment: mechanical separation

Stereoscopic Exam Color Texture Homogeneous? % Fibrous % Asbestosj% of Sample:

Off-White Fibrous YES 95 ND 95

Asbestos Content: None Detected

Stereoscopic Exam Color Texture Homogeneous?% Fibrous% Asbestos/o of Sanip1

Tan! Silver Fibrous I Hard NO 60 ND I 5

Asbestos Content: None Detected

Comments: Analyst: Robert W. Miracle Date Analyzed: Il 4100

Lab Job#: xOB-001 6 Sample #: 598-032

—I— .

TDH License No. 30-0084 EPA Method 40 CFR. Ch. 1. Pt. 763. Subpt. F. Am,. A

PLM Examination Color Parallel Perpendicular Extinction Sign of

Components % +1- Morphology / Pleochroism Ref. Index Ref. Index Biref Angle Elongation 1ineral Wool Fibers 9 Rods 0 Binders I Fillers Non-fibrous

PLM Examination

[ Color Parallel Perpendicular Extinction Sign of Components % +1- Morphology / Pleochroism Ref. Index Ref. Index Biref Angle Elongation ellulose Fibers 60i ribbons high Metal Foil I 40 Non-fibrous I

-. NVLAP Lab No. 102056

Project: EFDMHMR Austin, San Antonio State Hospital

Project #: 96-0456-D Lab Job#: xOB-0016 Sample #: 598-033

Client Sample Description: 2’ x 2 Suspended Acoustical Tiles (Lava), Page 1 of I State School Wing, NE Classroom

Layer 1 Ceiling Tile

Prep/treatment: mechanical separation

Layer 2 Paper! Foil Backing

Prep/treatment: mechanical separation

Asbestos Content: None Detected

Asbestos Content: None Detected

Comments: Analyst: Robert W. Miracle Date Analyzed: 1! 4100

Lab Job#: xOB-0016 Sample #: 598-033 xeve iviooay iviicro .ervices, inc.

TDH License No. 3 0-0084 bUlK isoestos inaiysis sneet EPA Method 40 CFR, Ch. I, Pt. 763, Subpt. F. Any. A

Stereoscopic Exam Color Texture Homogeneous?% Fibrous% Asbesto&% of SampIe

Off-White Fibrous YES I 95 ND 95 PLM Examination

I Color Parallel ‘Perpendicular Extinction Sign of Components +/- Morphology / Pleochroism Ref. Index Ref. Index Biref Angle Elongation

‘v1ineral Wool Fibers 9& Rods 0 inders I Fillers Non-fibrous I

Stereoscopic Exam Color Texture Homogeneous?% Fibrous % Asbestosl% of Sampld

Tan! Silver Fibrous I Hard I NO 60 ND 5 PLM Examination

I Color Parallel Perpendicular Extinction Sign of Components % +/- Morphology I Pleochroism Ref. index Ref. Index Biref Angle Elongation I ellulose Fibers 6 ribbons I high etal Foil 4c Non-fibrous I

Project: JDMHMR Austin, San Antonio State Hospital

Project #: 96-0456-D Lab Job#: xOB-0016 Sample #: 598-034

Client Sample Description: Steam Condensate Pipe Insulation 6, Main Mechanical Room Page 1 of I

Layer I Yellow Thermal

Prep/treatment: mechanical separation

Layer 2 Paper / Foil Wrap

Prep/treatment: mechanical separation

Layer 3 White Mastic

Prep/treatment: heat! melt

Asbestos Content: None Detected

Asbestos Content: None Detected

Stereoscopic Exam Color I Texture Homogeneous? % Fibrous % Mbestos% of Sampl White Rubbery YES ND ND I 10

Asbestos Content: None Detected

Comments: Analyst: Robert W. Miracle Date Analyzed: Il 4100 ev lvwoc4y jviicru cervices, inc.

TDH License No. 3 0-0084 IU1K I-suesLoS /-nalys1s neet

EPA Method 40 CFR, Ch 1,Pt. 763, Subpt. F, App. A NVLAP Lab No. 102056

Stereoscopic Exam Color I Texture Homogeneous?’% Fibrous 1% Asbestos1% of Sample

Yellow Fibrous I YES 95 ND 7 PLM Examination

Color Parallel Perpendicular Extinction Sign of Components % +/- Morphology / Pleochroism Ref. Index Ref. Index Biref Angle Elongation

1ineral Wool Fibers 95 Rods 0 Resin Binders Non-fibrous

Stereoscopic Exam Color Texture Homogeneous?% Fibrous% Asbestos6 of Sampl

Tan! Silver Fibrous! Hard NO 70 ND 15 PLM Examination

Color Parallel Perpendicular Extinction Sign of Components % +1- Morphology / Pleochroism Ref. Index Ref. Index Biref Angle Elongation

Fellulose Fibers 5 ribbons high lass Wool Fibers 20 Rods 0 I

Vletal Foil 3 Non-fibrous I

PLM Examination

Color Parallel Perpendicular Extinction Sign of Components % +1- Morphology / Pleochroism Ref. Index Ref. Index Biref Angle Elongation gent! Binders 10( Non-fibrous I I

Lab Job#: xOB-0016 Sample #: 598-034

- NVLAP Lab No. 102056

Project: JDMHMR Austin, San Antonio State Hospital

Project#: 96-0456-D Lab Job#: xOB-0016 Sample#: 598-035

Client Sample Description: Steam Condensate Fitting Insulation 6, Main Mechanical Room Page 1 of I

Layer I Yellow Therma’

Prep/treatment: mechanical separation

Layer 2 Paper! Foil Wrap

Prep/treatment: mechanical separation

Layer 3 Vinyl Wrap

Prep/treatment: heat I melt

Layer 4 White Mastic

Asbestos Content: None Detected

Asbestos Content: None Detected

Asbestos Content: None Detected

Prep/treatment: heat I melt Asbestos Content: None Detected

Comments: Analyst: Robert W. Miracle Date Analyzed : Il 4100

Lab Job#: xOB-001 6 Sample #: 598-035 cve iviovay JvJicu crvices, Inc.

TDH License No. 3 0-0084 nuuc rsuesws i-ulaiysis neet

EPA Method 40 CFR, Ch. 1. Pt. 763. Suhnt F, App. A

Stereoscopic Exam Color Texture Homogeneous?% Fibrous % Mbestos% of Samplej

Yellow Fibrous YES I 95 ND I 80 PLM Examination

Color Parallel Perpendicular Extinction Sign of Components % +1- Morphology / Pleochroism Ref. Index Ref. Index Biref Angle Elongation

1ineral Wool Fibers 95 Rods 0 esin Binders I Non-fibrous

Stereoscopic Exam Color Texture Homogeneous?I% Fibrous % Asbestos j% of Sampl

Tan! Silver Fibrous! Hard NO 70 ND 5 PLM Examination

Color Parallel Perpendicular Extinction Sign of Components % +/- Morphology / Pleochroism Ref. Index Ref. Index Biref Angle Elongation eIlulose Fibers 5 ribbons high lass Wool Fibers 2 Rods 0 VIetaI Foil 30 I Non-fibrous I

Stereoscopic Exam Color I Texture Homogeneous?% Fibrous% Asbestosl% of Sampl White Tough YES ND ND I 10

PLM Examination

I I Color Parallel Perpendicular Extinction Sign of Components % +/- Morphology I Pleochroism Ref Index Ref Index Biref Angle Elongation

/inyl Binders 10 Non-fibrous I

Stereoscopic Exam r Color Texture Homogeneous? % Fibrous % Asbestosl% of Sampl White Rubbery YES ND ND I 5

PLM Examination

I Color Parallel Perpendicular Extinction Sign of

I Components % +1- Morphology / Pleochroism Ref Index Ref. Index Biref Angle Elongation igmentI Binders 10( Non-fibrous I

Project: TDMHMR Austin, San Antonio State Hospital

Project #: 96-0456-D Lab Job#: xOB-001 6 Sample #: 598-036

Client Sample Description: Thermal Building Insulation, Main Mechanical Room Page 1 of I

Layer 1 Thermal Insulation

Prep/treatment: mechanical separation Asbestos Content: None Detected

Comments: Analyst: Robert W. Miracle Date Analyzed: 1! 4/00

Lab Job#: xOB-001 6 Sample #: 598-036 ceve iviooay iviicrc ôervices, Inc.

TDH License No. 30-0084 bUlK jisoestos inaiysis neet

EPA Method 40 CFR. Ch. 1, Pt. 763, Subpt. F. App. A

Stereoscopic Exam Color Texture Homogeneous? % Fibrous % Asbestosl% of Sampl White Fibrous YES 75 I ND 100

PLM Examination

I Color Parallel Perpendicular Extinction Sign of Components +1- Morphology / Pleochroism Ref. Index Ref. Index Biref Angle Elongation ellulose Fibers . 7 ribbons high Binders I Fillers 2 Non-fibrous I

Project: JDMHMR Austin, San Antonio State Hospital

Project II: 96-0456-D Lab Job#: xOB-001 6 Sample #: 598-037

Client Sample Description: Chilled Water Pipe Insulation +6, Main Mechanical Room Page 1 of I

Layer 1 Glass Foam

Prep/treatment: mechanical separation

Layer 2 Paper I Foil Wrap

Comments: Analyst: Robert W. Miracle Date Analyzed: 1! 4100

‘ve iviovay iviicro jervwes, Inc.

TDH License No. 3 0-0084 bUlK ASD5tOS naiysis sneet

EPA Method 40 CFR, Ch. 1, Pt. 763, Subpt. F, App. A

Stereoscopic Exam Color Texture Homogeneous?’% Fibrous % Asbestosl% of Sampj Black Hard YES ND ND 95 J

PLM Examination

I Color Parallel Perpendicular Extinction Sign of Components % +1- Morphology I Pleochroism Ref. Index Ref. Index Biref Angle Elongation

3Iass Foam 10 Closed Cells : 0

Asbestos Content: None Detected

Stereoscopic Exam Color I Texture Homogeneous?% Fibrous % Asbestosl% of Sampl

Tan I Silver Fibrous I Hard NO 70 ND I 5

Prep/treatment: mechanical separation

PLM Examination Color Parallel Perpendicular Extinction Sign of

Components % +1- Morphology / Pleochroism Ref. Index Ref. Index Biref Angle Elongation ellulose Fibers 5 ribbons high 3lass Wool Fibers 20 Rods 0 letal Foil 3 Non-fibrous I I

Asbestos Content: None Detected

Lab Job#: xOB-0016 Sample #: 598-037

NVLAP

Lab No. 102056

Client: Environmental Resource Consultants

Project: JDMHMR Austin, San Antonio State Hospital

Project #: 96-0456-D Lab Job#: xOB-0016 Sample #: 598-038

Client Sample Description: Chilled Water Fitting Insulation +6, Main Mechanical Room Page 1 of I

Stereoscopic Exam Color Texture Homogeneous? % Fibrous % Asbestos% of Sampl Black Hard YES ND ND 85

PLM Examination Color Parallel Perpendicular Extinction Sign of

I Components % +1-, Morphology I Pleochroism Ref. Index Ref. Index Biref Angle Elongation 3lass Foam 100 Closed Cells 0

Prep/treatment: mechanical separation Asbestos Content: None Detected

Stereoscopic Exam Color Texture Homogeneous? % Fibrous % Asbestos/o of Sampl White Tough YES ND ND 15

Layer 2 Vinyl Wrap

PLM Examination

I Color Parallel Perpendicular Extinction Sign of I Components % +/- Morphology / Pleochroism Ref. Index Ref. Index Biref Angle Elongation !inyl Binders I 1001 Non-fibrous

Comments: Analyst: Robert W. Miracle Date Analyzed: 1! 4100 f2A—

Lab Job#: xOB-0016 Sample #: 598-038

Sieve Moody Micro Services, inc.

TDH License No. 3 0-0084

Bulk Asbestos Analysis Sheet EPA Method 40 CFR. Ch. I. Pt. 763. Subot. F. Ann. A

Layer 1 Glass Foam

Prep/treatment: heat I melt Asbestos Content: None Detected

Laboratory Bulk Sample Analysis Summary report: labsampl.frx

681 - San Antonio State Hospital run date:08/21/2000

Sample Analysis list of all samples by Field Sample ID

600 SUPPLYANNEX

Lab ID Area ID Area Description Layer! Asbestos Field ID Mat Code Material Description Material Content

B97-5916 COl 12x12 LARGE PIN HOLE CEILING TILES 1: 0%

001 SAT Suspended acoustical tiles (Iay-in,conceal spline)

B97-5917 COl 12x12 LARGE PIN HOLE CEILING TILES 1: 0%

002 SAT Suspended acoustical tiles (Iay-in,conceal spline)

B97-5918 COl 12x12 LARGE PIN HOLE CEILING TILES 1: 0%

003 SAT Suspended acoustical tiles (Iay-in,conceal spline)

B97-5919 MCi WINDOW CAULKING 1: 0%

004 SAT Suspended acoustical tiles (lay-inconceal spline)

End of List for Building

Laboratory Sample List Page 1

Texas Department of Mental Health and Mental Retardation Ver: 1.7 Project Number: 97-000-682

Homogeneous Area List 681 - San Antonio State Hospital List of all Homogeneous Areas By Building report: area-Li .frx run date:08/21/2000

600 SUPPLYANNEX

Area

ID

Col

Area Description Material Code/type i2xi2 LARGE PIN HOLE CEILING TILES

SAT Suspended acoustical tiles (lay-inconceal spline)

MOi WINDOW CAULKING

MISC Miscellaneous material not fitting other category

End of List for Building

Homogeneous Area List Page 1

Texas Department of Mental Health and Mental Retardation Ver: 1 .7 Project Number: 97-000-682

ACM Surveyed Hazard / Drawing Status Quantity Response ID

No 0 0/0 600-iC

No 0 0/0 600-

‘-Ju1I

Cily An1yLica1

TX Dept of Mental Health & Mental Retardation 909 W 45th St. Building 3 Austin, Texas 78756

August 28, 1997

ATTENTION: Victor Moore RE: Bldg 600

Ceiling tile

Rosalva Gomez

MICROSCOPIST

Method: EPA-6001M4—82—020 alnterim Method for the Determination of Asbestos in Bulk Insulation Samples;E

EPA/600/R-93/116 Method for the Determination of Asbestos in Bulk Building Materials, July 1993. Assigned percentages are based on visual volume procedures and chart aides, corresponding to an approximatestandard error of + or — 57. for (1—107. range) and + or — lox for (11—907. range). All aicroscopists are graduates of McCrone Research Institute’s Microscopical Identification of Asbestos, Chicago, Ill or equivalent. National Voluntary Laboratory Accreditation Progra: (NYLAP) Lab ID 101870-0.

Corporate Officcs 1409 Moutana Aviue El Paso, Texas 79902

(915) 5334840 Fax (915)5334843

Sl6Chania N.E. Suite D Mhuquerque, New Mexico 87108

(505) 255-4673 Fax (505) 255-0989

2817 John Bai cpard Pkwy fluik A, Suite 201 Odessa, Texas 79762

(915) 362-9887 Fax (915) 367-6904

LAB NOt SAMPLE NUMBER DESCRIPTION MATRIX FIBROUS ASBESTIFORM

897-5916 SH600-O0l Beige, Blue Quartz Cellulose 1—37. None Detected Friable Window caulking

897—5917 SH600—002 Brown, White Binder Cellulose 50—557. None Detected Friable Ceiling tile

B97—5918 SH600—003 Brown, White Binder Cellulose 40—457. None Detected Friable Ceiling tile

897-5919 9H600—004 Brown, White Binder Cellulose 45-507. None Detected Friable

L A

B

)R Y

S am pl er

N am e (P ri nt

C H

A

IN

U S

T O

D Y

C li en t:

A dd re ss

(n um be r st re et

C or po ra te O ff ic es

M on ta na A ve nu e E l P as o, T ex as

(9

3-

F ax (9

3-

C ha m a

N .E

. S ui te D

A lb uq ue rq ue

, N .M

(5

5-

Fa x (5

6-

N th A ve

S ui te

P eo ri a, A ri zo na

(6

3-

F ax (6

3-

Jo hn

B en

S he pa rd

Pk w y B ui ld in g

A ,S ui te

O de ss a, T ex as

(9

2-

F ax (9

7-of

S am pl er

S ig na tu re P ro je ct N am e/

N o

C it y

S ta te

Z ip

C od e

T ur n A ro un d T im e:

I I

S A

M P

L E

T Y

P E

F ax hr s R eg ul ar O th er

IL

A N

A L

Y S

E S

R E

Q U

IR

E

D

J P

R E

S E

R V

A T

IV

E

Y es

N o a

S A

M P

L E

ID

D A

T E

L O

C A

T

IO

N /D

E S

C R

IP

T

IO

N

C O

M M

E N

T S

R el in qu is he d B y:

D at e:

T im e:

R ec ei ve d B y:

D at e:

T im e:

R el in qu is he d B y:

fD a te

J T im e

R ec ei ve d B y:

D at e:

T im e:

R el in qu is he d B y:

D at e:

T im e:

R ec ei ve d

B y:

D at e:

T im e:

P ho ne N o:

F ax N o.

C on ta ct P er so n:

tU fl

Ci ty na yU ca

In c.

W H

IT

E

LA

B Y

E L

L O

W

FI

L

E

PI

N K

C

L

IE

N T

J-6 Building Drawings

126.

1”

O

H

ST

F

F

F .7

E N

V

IR

O N

M E

N T

A L

R E

S O

U R

C E

C O

N S

U L

T A

N T

S

N C

E N

T R

A L

E X

P W

Y surr

D A

LLA

S.

TX

75231

214— 692—

FAX

214— 692—

CRC

PR

O J

NO:

96—

0456— D

IDC

DATE:

.1

.117 i

B U

ILD

IN

G 598—

FIR

ST

FLO

O

R

FLO

O R

IN

G

M A

TER

IA

L

PLA

N

VET

BU

ILD

IN

G

SAN ANTONIOSTATE

SA

N

A N

TO

N

IO

TEX

A

S

TXM

HM

R

PR

O J

N O

97—

023—

DATE:

29D

E C

REV:15A

PR

A

LE

NAM

E:

S A

F 15981

G

RA

PH

IC

SCA

LE

IN

F

F

S o

A

PPRO

X

SCA

LE:

1 2

N O

TH

DRAW

iNG N

U M

BER:

-IF

r I qw liii! liii

‘IL)

Ui co Ffl r

OLI)

Zq

I

I U

I0I

EL

-\ç\ a (.J /

4,.

-ri -r) o a

I) -4

-9

C

HEALTH

IE

NTENAHCE&O

O

W

T

H A

U

STIN

TEX

A S

I2

O

O

F

M A

N A

G

IN

G C

E N

V

IR

O R

E S

O C

O N

S U

N C

E

SUITE

O

OAL

-8

O

I

C P

R O

N O

O C

)T l:

CONSULTING

ARC

•A naY

3I.:

E n v aro n m en t4 o i

E l

P eso

(916) 5a— e84O

X M

N M

R f3.JL

D N

O

V E

T Bt.

SAM

AMTQMIQ

SA

N

A N

TO

I

T(M H

M R

P N

O N

O

OATi:

16A

P R

L E

N iM

E

G R

A P1C

SC

A

LE

N

I

C A th

N O

TH

O

R M

N C

N

LJIM

111?

B U

IL

D

IN

C

FIR

ST

FL

O

O R

C E

IL

IN

G M

A

TER

IA

L

PLA

N

J1L

C

ASBESTOS ABATEMENT

SPECIFICATIONS

SAN ANTONIO STATE HOSPITAL, BUILDING 598

6711 SOUTH NEW BRAUNFELS AVENUE

SAN ANTONIO, TEXAS

May 1, 2024 | Terracon Project No. 90237451

Prepared for:

Texas Health and Human Services Commission

Austin, Texas

San Antonio, Texas

Prepared by:

Terracon Consultants, Inc.

TDSHS Consultant Agency License No. 100157

Will C. DeVeau

Individual Asbestos Consultant

TDSHS License No. 105734

Expires 03/10/2025

Will DeVeau

Asbestos Abatement Specifications

San Antonio State Hospital, Building 598 | San Antonio, Texas

Will C. DeVeau / TDSHS IAC # 105734 Expiration Date: 03/10/2025

TABLE OF CONTENTS

SCOPE OF WORK - ASBESTOS ABATEMENT

I. Material, Quantity and Location

II. Work Practices

III. Contractor Submittals

IV. Construction Notes

V. Products

VI. Air Monitoring Services

Attachments:

Abatement Drawings

Limited Asbestos Inspection Report

Facilities | Environmental | Geotechnical | Materials 1

SCOPE OF WORK - ASBESTOS ABATEMENT

Project: San Antonio State Hospital, Building 598

6711 South New Braunfels Avenue

Terracon Project No. 90237451

Asbestos abatement will be accomplished in one phase. Asbestos abatement is to be conducted in interior and exterior spaces to accommodate proposed renovation/demolition activities.

I. Material, Quantity and Location

The work will consist of the removal of the following materials in the approximate quantities listed at the site. All work will be conducted by properly licensed personnel in accordance with applicable Federal, State, and Municipal regulations. (Note: The material quantities listed below are estimates only. The Contractor is responsible for verifying material quantities and locations prior to submission of the price quote to the Owner. The

Contractor will perform work for the materials indicated, regardless of actual quantities. Please see the attached drawings for approximate locations.)

Building 598

◼ Resilient Floor Tile and Associated Mastic – The 9” x 9” and 1’ x 1’ floor tile materials with black mastic utilized as flooring in the majority of Building 598 were previously identified by a third party vendor to contain 7% – 12% Chrysotile asbestos. The asbestos-containing flooring and mastic materials identified were noted to be in good condition and were assessed as being non-friable. It is estimated that approximately 9,100 square feet of these materials. As designated by the Architect approximately 4,900 square feet of floor tile and mastic will be removed in the current scope of work. The specific areas to be abated are designated per the attached, drawing/figure No.1.

◼ HVAC Duct Mastic – The black/brown HVAC duct mastic materials utilized on the insulated

HVAC duct and abandoned hangers above the suspended ceiling in select areas Building 598 were found to contain 10% Chrysotile asbestos. The asbestos-containing HVAC duct mastic materials identified were noted to be in good condition and were assessed as being nonfriable. It is currently estimated that there exists approximately 3,780 square feet of these materials. As designated by the Architect approximately 2,250 square feet of

HVAC duct mastic will be removed in the current scope of work. The specific areas to be abated are designated per the attached, drawing/figure No.1.

Facilities | Environmental | Geotechnical | Materials 2

◼ Wall Caulking – The interior gray wall caulking materials utilized on walls in Rooms 137

(southeast corner, and around east window frame), 134 (southeast and southwest), 135

(northeast), 136 (northwest, southwest, and southeast), 140 (southwest and southeast), 150 (northwest and northeast), 151 (northwest and northeast), 138 (northeast and southeast), 131 (southwest and southeast), 125 (southeast), 123 (northeast and southeast), and Hallway 110 (southeast and southwest) were found to contain 2%

Chrysotile asbestos. The asbestos-containing caulking materials identified were noted to be in good condition and were assessed as being nonfriable. It is currently estimated that there exists approximately 350 linear feet of these materials. As designated by the

Architect approximately 150 linear feet of wall caulking will be removed in the current scope of work. The specific areas to be abated are designated per the attached, drawing/figure No.1.

◼ Window Frame Caulking – The interior gray window frame caulking materials utilized around the window frames of the perimeter of Building 598 were found to contain 2% Chrysotile asbestos. The asbestos-containing caulking materials identified were noted to be in good condition and were assessed as being nonfriable. It is currently estimated that there exists approximately 1,060 linear feet of these materials in the above listed area. As designated by the Architect approximately 900 linear feet of window frame caulking will be removed in the current scope of work. The specific areas to be abated are designated per the attached, drawing/figure No.1.

◼ Exterior Door/Window Frame Caulking – The gray door/window frame caulking materials utilized around the exterior door and window frames on the perimeter of Building 598 were found to contain 2% Chrysotile asbestos. The asbestos-containing exterior caulking materials identified were noted to be in good condition and were assessed as being nonfriable. It is currently estimated that there exists approximately 1,160 linear feet of these materials in the above listed area. As designated by the Architect approximately

900 linear feet of window frame caulking will be removed in the current scope of work. The specific areas to be abated are designated per the attached, drawing/figure No.1.

◼ Exterior Window Glazing Compound – The gray window glazing compound materials utilized around the exterior windowpanes on the perimeter of Building 598 were found to contain

2% Chrysotile asbestos. The asbestos-containing exterior glazing compound materials identified were noted to be in good condition and were assessed as being nonfriable. It is currently estimated that there exists approximately 5,500 linear feet of these materials in the above listed area. As designated by the Architect approximately 2,000 linear feet of window frame caulking will be removed in the current scope of work. The specific areas to be abated are designated per the attached, drawing/figure No.1.

Facilities | Environmental | Geotechnical | Materials 3

◼ Water Line Insulation with Mastic and Residual Insulation Mastic Debris and Assumed

Contaminated Soil – The water line insulation mastic and residual insulation mastic debris materials observed in select areas within the crawlspace were sampled and found to contain

10% to 25% Chrysotile asbestos by a third party vendor. The mixture of soil materials and previously referenced residual insulation mastic debris observed in select areas within the crawlspace were assumed to be contaminated with asbestos. The mixture of assumed asbestos-containing residual insulation mastic debris and soil materials identified were noted to be in poor condition and were assessed as being friable. It is estimated that approximately

2,450 linear feet of water line insulation on pipe and 2,045 cubic feet of residual debris/contaminated soil will be removed from the designated areas within the crawlspace to facilitate appropriate access in the path of the planned plumbing renovation and/or demolition activities by others. The Architect will determine the actual quantities of water line insulation mastic, water line insulation mastic debris, and assumed contaminated soil to be removed. The specific areas of the ACM in the crawlspace is designated per the attached, drawing/figure No.1 as indicated by a third party vendor.

Additional quantities may be present in the crawlspace path of construction and should be field verified by the abatement contractor prior to submission of a bid.

◼ Residual Mastic – The black residual mastic materials utilized on the floor in Mechanical

Room 111 (east) and Mechanical Room 105 were found to contain 5% Chrysotile asbestos.

The asbestos-containing black mastic materials identified were noted to be in good condition and were assessed as being nonfriable. It is currently estimated that there exists approximately 360 square feet of these materials in the above listed area. The residual mastic materials are not currently in the Scope of Work for this project.

II. Work Practices

A. Respiratory Protection:

During the removal of any asbestos-containing materials (ACM) from the building, half-face respirators, equipped with filter cartridges designed for asbestos-containing dusts and mists, vapors, and color coded in accordance with

ANSI Z228.2 (1980), will be employed by all workers working within the regulated area(s). Certification that the workers have been fit tested in accordance with current OSHA guidelines will be provided as part of Worker

Documentation. The Abatement Contractor shall ensure use of the appropriate respiratory protection for the work being performed and recognizes that these requirements are only minimum acceptable standards. The Contractor will furnish respirator filter cartridges as required by the Consultant.

Facilities | Environmental | Geotechnical | Materials 4

B. Protective Clothing

During removal of the interior flooring/mastic, HVAC duct mastic, window caulking, and wall caulking; single protective suits, as a minimum, will be worn by the workers and boots, gloves, eye protection, and hard hats will be available to each worker as needed. Each suit will be properly disposed of at the conclusion of each work period. The Contractor will furnish protective suits for the Consultant’s use during the project. The workers performing the abatement will decontaminate through a three-chambered wet decontamination system which will be constructed as an integral part of the containment.

During any Resilient Floor Covering Institute (RFCI) method, glove bag method, or component removal activities of asbestos-containing floor tile/mastic, HVAC duct mastic, and water line insulation mastic/contaminated soil, within regulated work areas (if conducted outside of the full containment areas for the majority of abatement activities as described in the paragraph above) or during removal of exterior door/window frame caulking and exterior window glazing compound materials from the building exterior regulated work areas, double protective suits will be worn by the workers and boots and gloves will be available to each worker as needed. The workers will remove the outer suit within the regulated work area and will proceed directly to the decontamination area. Each suit will be properly disposed of at the conclusion of the work period. The workers performing the abatement will decontaminate through a single-chambered wet decontamination system which will be constructed in a remote location easily accessible by workers who will proceed to the decontamination area after removing the outer suit within the regulated work area.

C. Containment/Temporary Facilities

The interior floor tile/mastic, HVAC duct/hangar mastic, wall caulking, and window frame caulking is intended to be removed using wet removal techniques under negative pressure within a contained area which has an integral three-chamber wet decontamination unit. The full containment will consist of a double layer of 4-mil poly covering all walls not scheduled for removal (extend on floor area beyond wall-to-floor joints at least 12 inches; no seams on wall-to-floor joints; overlap floor sheeting), and a double layer of 6-mil poly covering all floor areas (extend up sidewalls at least 12 inches; no seams on wall-to-floor joints) within the contained area. A single layer of 6-mil polyethylene shall be secured with tape and/or spray adhesive atop any areas of flooring scheduled for removal in the vicinity of the HVAC duct/hangar mastic, wall caulking, and window frame caulking removal (as a drop sheet). If there are areas where the only materials to be removed are flooring and the walls are moisture resistant and may be wet wiped, a modified containment may be utilized. The containment will consist of a single layer of 6-mil poly covering the lower four (4) feet of all wall areas

Facilities | Environmental | Geotechnical | Materials 5 within the contained area. Critical barriers consisting of 6-mil poly will be installed on all building openings. Inverted prep (single layer of 4-mil poly) will be required if ceilings consist of porous materials (i.e. spray-on texturizer and suspended acoustical ceiling tile). When a critical barrier is placed over a large opening such as a corridor entrance or when isolating a portion of a hallway or a room, the critical barrier becomes the containment wall and full wall prep will be required (critical barrier plus two layers of 4-mil poly; three total layers of poly).

Negative pressure (minimum of -0.020 in/H20) will be maintained in all work areas. A functioning manometer will be required to show proof of appropriate pressure. Any remaining furnishings and/or contents will be removed from the work area prior to commencement of work. In crawlspace containment/regulated work areas constructed for the removal of water line insulation mastic, water line insulation mastic debris, and assumed contaminated soil, the walls and floors will consist of a double layer of 6-mil poly. The poly walls will be attached by spray adhesive and duct tape to manageable sections of lumber, PVC pipes, or an equivalent material to allow a secure attachment point at the wall/ceiling areas of the crawlspace containment/regulated work areas.

Due to limited access, the level of negative pressure will likely not be maintained at or above –0.020 in/H2O in the regulated work areas; however, the Contractor shall utilize HEPA equipped air filtration equipment in the work areas by connecting reinforced flexible tubing to a manifold adapter installed at the front plate (intake side) of each HEPA unit and then extending the reinforced flexible tubing into the designated crawlspace work areas to provide air changes and air scrubbing during containment/work area barrier preparation activities, removal, and during final clearance air sampling.

The Contractor will construct a three-chambered wet decontamination system consisting of a serial arrangement of connected rooms or spaces (Changing

Room, Shower Room, and Equipment Room), with overlapping door flaps, constructed as an integral part of any containment. The Decontamination

System shower chamber will consist of a hard enclosure with drain and water supply fittings designed for the purpose rather than a disposable/pop up chamber. Disposable/pop up chamber units are acceptable for the clean and dirty room portions of the decontamination system. The Contractor shall require all persons without exception to pass through this decontamination unit for entry into and exiting from the work area for any purpose. Do not allow parallel routes for entry or exit.

Changing Room (clean room): Provide a room that is physically and visually separated from the rest of the building for the purpose of changing into protective clothing. Construct using polyethylene sheeting, at least 6 mil in thickness, to provide an airtight seal between the Changing Room and the rest of the building. Locate so that access to Work Area from Changing Room is through

Facilities | Environmental | Geotechnical | Materials 6

Shower Room. Separate Changing Room from the building by a polyethylene overlapping flapped doorway. Maintain the floor of the changing room in a dry and clean condition at all times. Do not allow overflow water from shower to wet the floor in the changing room. Damp wipe all surfaces after each shift change with a disinfectant solution.

Provide a continuously adequate supply of disposable bath towels.

Provide all mandated warning signage and posted information for all emergency phone numbers and procedures.

Shower Room: Provide a completely watertight, design built operational shower to be used for transit by appropriately dressed workers heading into the Work

Area from the Changing Room, or for showering by workers headed out of the

Work Area after undressing in the Equipment Room.

Construct room by providing a shower pan and 2 shower walls in a configuration that will cause water running down walls to drip into pan. Install a freely draining floor in the shower pan at an elevation that is at the top of pan.

Separate this room from the Changing and Equipment Rooms with moveable overlapping flaps fabricated of 6 mil polyethylene.

Provide splash-proof entrances to Changing and Equipment Rooms with 2 doors arranged in the following configuration:

At each entrance to the Shower Room construct a doorframe out of lumber, PVC

Pipe, or equivalent. Attach to this door frame two overlapping flaps fastened at the head (top) and jambs (sides). Overlap the flaps that present a shingle-like configuration to the water stream from the shower. Arrange so that any air movement out of the Work Area will cause the flaps to seal against the door frame.

Provide shower head and controls. Provide temporary extensions of existing hot and cold water and drainage, as necessary for a complete and operable shower.

Provide a continuously adequate supply of soap and maintain the area in a sanitary condition. Arrange so that water from showering does not splash into the Changing or Equipment Rooms.

Provide flexible hose showerhead. Pump wastewater to a sanitary sewer drain or to storage for use in amended water. If pumped to a sanitary sewer drain, provide 20 micron and 5 micron wastewater filters in line to drain or waste water storage. Change filters daily or more often if necessary. Provide Hose Bib.

Facilities | Environmental | Geotechnical | Materials 7

Equipment Room (contaminated area): Require work equipment, footwear, and additional contaminated work clothing to be left here. This is a change and transit area for workers. Separate this room from the work area by a 6 mil polyethylene overlapping flap doorway. Separate this room from the rest of the building with airtight walls fabricated of 6 mil polyethylene. Separate this room from the Shower Room and Work Area with airtight walls fabricated of 6 mil overlapping flapped polyethylene.

Work Area: Separate work area from the Equipment Room by polyethylene barriers. If the airborne asbestos level in the work area is expected to be high, add an intermediate cleaning space between the Equipment room and the Work area. Damp wipe clean all surfaces after each shift change. Provide one additional floor layer of 6 mil polyethylene per shift change and remove contaminated layer after each shift.

Waste Load Out Area: where applicable, the Contractor will construct a waste load out chamber separately from the three chambered personnel decontamination unit. The waste load out chamber will be connected to the work area, and ingress and egress will be through an overlapping flapped doorway constructed of six millimeter polyethylene sheeting. The exit of the waste load out area will also be constructed with six millimeter polyethylene overlapping flapped doorway. The water generated during the waste load out procedures as a result of cleaning the outside of the bags will be properly filtered and/or containerized prior to discharge into the sanitary sewer.

In interior/exterior regulated areas (including Glove-

Bag/RFCI/Component Removal) Locations Where Materials are to be removed (asbestos-containing flooring, HVAC duct mastic/hangars, window glazing compound/door/window caulking, and water line insulation mastic materials), the work area will be Regulated with appropriate barrier tape and the

Contractor shall display all appropriate OSHA and TDSHS signage. The Workers shall be in proper protective equipment and decontaminate through a wet decontamination unit erected in a central location accessible to the workers. The materials will be removed in a regulated area with a double layer of 6-mil polyethylene covering the area in the vicinity/below the work areas utilizing wet methods.

In the crawlspace area (containment/work area), the asbestos-containing water line insulation mastic/water line insulation mastic debris, and assumed contaminated soil materials will be removed using wet removal techniques under

HEPA filtration (not strict negative pressure) within a work area Regulated with appropriate barrier tape and the Contractor shall display all appropriate OSHA and TDSHS signage. Critical barriers will consist of a double layer of 6-mil

Facilities | Environmental | Geotechnical | Materials 8 polyethylene (walls and floors) associated with the containment/work barrier.

The Workers shall be in proper protective equipment and decontaminate through a wet three-chamber decontamination unit erected in the access/egress location.

The Contractor shall remove any thermal insulation mastic utilizing wet methods.

D. Removal

The Contractor will perform the removal and disposal in accordance with current local, state and federal regulations.

1. Work Area Barrier Construction in the Crawlspace: During the pre-cleaning activities the workers will be required to wear, as a minimum, half-face respirators and double protective suits. Boots, gloves, eye protection and hard hats will be available to each worker as needed. The contractor will begin by setting up negative pressure machines inside the work area, to filter and scrub the air, and maintain a negative pressure (no minimum pressure is required at this time) inside the work areas during work area construction. The Contractor will pre-clean the work area for containment construction.

2. Asbestos-Containing Flooring and/or Black Mastic Materials: These materials are intended to be removed with wet removal techniques and remain intact with as little disturbance as possible. The materials will be removed under negative pressure within a contained area which has an integral three-chamber wet decontamination unit. The containment will consist of 6-mil polyethylene critical barriers placed on all openings between containment areas and adjacent areas, a single layer of 4-mil poly covering all suspended ceilings (if applicable;

non-porous ceiling surfaces which can be wet wiped such as plaster or drywall construction may remain uncovered), a single layer of 6-mil poly splash guards placed on the lower 4 feet of any non-porous wall areas (plaster, concrete, drywall construction, etc.) adjacent to the removal operations, and a double layer of 6-mil poly covering all floor areas not scheduled for removal within the contained area. A single layer of 6-mil polyethylene shall be secured with tape and/or spray adhesive atop any areas of flooring scheduled for removal in the vicinity of the HVAC duct mastic, wall caulk, and window frame caulk removal (as a drop sheet). Any walls in the containment area which are porous and cannot be wet wiped (if applicable) shall be covered entirely in two layers of 4-mil poly.

When a critical barrier is placed over a large opening such as a corridor entrance or when isolating a portion of a hallway or a room, the critical barrier becomes the containment wall and full wall prep will be required (critical barrier plus two layers of 4-mil poly; three total layers of poly). Negative pressure (minimum of –

0.020 in/H2O) will be maintained in all work areas throughout abatement activities. A functioning manometer will be required to show proof of appropriate pressure.

Facilities | Environmental | Geotechnical | Materials 9

The flooring materials will be addressed as follows: Spray the asbestos-containing flooring materials with amended water or removal encapsulant.

During the removal of the materials, continual wetting of the material will occur.

The flooring materials will be removed as intact as possible. For asphaltic based mastics, a low odor emulsifying type mastic remover designed for asbestos abatement purposes may be used. If a mastic remover is utilized, it will have a flash point greater than 140º F. A buffer may be utilized during non-RFCI mastic removal activities. If any flooring materials extend beneath non-load bearing walls scheduled for demolition within the contained area, the bottom plate of the walls will be removed to access the flooring materials for removal. The removed bottom wall plates will be disposed of as ACM. The removed materials will be placed in disposable bags as soon as practical, and no later than the end of the work period. Loose (unbagged) waste materials will not remain in the work area after the end of the work shift. The clean surfaces will be encapsulated after passing a visual inspection conducted by a Terracon representative. The waste resulting from the removal operations will be double bagged, labeled and disposed of in accordance with the guidelines discussed in Item E of this section.

If woven poly or burlap bags (onion sacks) are utilized for bagging of waste materials, the woven bags will be double bagged in in proper poly disposal bags prior to loading into the waste receptacle.

RFCI OPTION

In areas where only small quantities of floor tile and mastic are present (<100

Square Feet), the abatement contractor may conduct removal utilizing the

Resilient Floor Covering Institute (RFCI) removal protocol. The workers performing the RFCI Method removal shall have training in the method and be licensed Asbestos Abatement Workers. The workers shall conform to all respiratory protection and protective clothing requirements of the asbestos abatement specification and shall be required to follow typical remote decontamination protocol following removal in any area where the RFCI method is performed.

3. Asbestos-Containing HVAC Duct Mastic Materials: Comply with wet removal procedures within a contained area as specified for flooring and associated mastic materials previously listed. Where specified for removal, these materials will be removed in their entirety and disposed of as ACM. Ceiling tile and associated metal grid (except perimeter room grid channeling) and batt insulation shall be removed and disposed of as normal construction debris, prior to the commencement of abatement work. Where specified for removal, the HVAC duct mastic materials will be removed in their entirety including all associated insulation, fastening devices/hangers

Facilities | Environmental | Geotechnical | Materials 10 and disposed of as ACM. Any residual black/brown mastic observed on the substrate areas above the HVAC ducts will also be removed and disposed of as ACM.

The HVAC duct mastic materials will be addressed as follows: Spray the asbestos-containing mastic materials with amended water or removal encapsulant. During the removal of the HVAC duct mastic materials, continual wetting of the material will occur. The clean surfaces will be encapsulated after passing a visual inspection conducted by a Terracon representative. The removed materials will be placed in disposable bags or wrapped in two layers of

6-mil poly as soon as practical, and no later than the end of the work period.

Loose (unbagged) waste materials will not remain in the work area after the end of the work shift. The clean surfaces will be encapsulated after passing a visual inspection conducted by a Terracon representative. The waste resulting from the removal operations will be double-bagged or component wrapped, labeled and disposed of in accordance with the guidelines discussed in item E of this section.

Added Procedure for Component Removal of HVAC Duct Mastic

Materials: The Contractor may elect to wrap select asbestos-containing HVAC duct mastic materials in two (2) layers of polyethylene and dismantle the metal duct with insulation into manageable sections. All breaks in the HVAC duct shall be made and within a negative pressure containment as specified above. The removed materials will be placed wrapped in two layers of 6-mil poly as soon as practical, and no later than the end of the work period. The clean surfaces will be encapsulated after passing a visual inspection conducted by a Terracon representative. The waste resulting from the removal operations will be double wrapped, labeled and disposed of in accordance with the guidelines discussed in

Item E of this section.

4. Asbestos-Containing Wall Caulking Materials: Comply with wet removal procedures within a contained area as specified for floor tile and mastic materials previously listed. Where specified for removal, the wall caulking materials will be removed in their entirety and disposed of as ACM.

The wall caulk materials will be addressed as follows: Thoroughly saturate the wall caulk material with a removal encapsulant before manually removing the caulk materials. All caulk will be removed from the edges of the associated building substrate areas. Following removal of the wall caulk materials, the seam between the ceramic brick, drywall construction, and plaster shall be wet wiped or HEPA vacuumed. The removed materials will be placed in disposable bags or wrapped in poly as soon as practical, and no later than the end of the work period. Loose (unbagged) waste materials will not remain in the work area after the end of the work shift. The clean surfaces will be encapsulated after

Facilities | Environmental | Geotechnical | Materials 11 passing a visual inspection conducted by a Terracon representative. The waste resulting from the removal operations will be double bagged, labeled and disposed of in accordance with the guidelines discussed in Item E of this section.

5. Asbestos-Containing Door/Window Frame Caulk Materials: Comply with wet removal procedures within an interior contained area as specified for flooring and mastic materials listed above. Where specified for removal, interior window frame caulk materials will be removed in their entirety and disposed of as ACM.

Exterior door/window frame caulk materials are intended to be removed with wet removal procedures in regulated work areas. Workers shall wear proper protective equipment during removal and decontaminate through a remote single-chamber wet decontamination unit as a minimum, erected in a central location readily accessible to the workers. The exterior regulated work area will consist of asbestos specific barrier tape, and a double layer of 6-mil polyethylene, as a minimum, extending out a minimum of five feet (5’) on the ground area in the vicinity of and below the door/window frame caulk materials to be removed. The edges of the poly covering the ground areas will be weighted or staked to ensure that the poly remains in place during removal activities.

The door/window frame caulk materials will be addressed as follows: Thoroughly saturate the door/window frame caulk material with a removal encapsulant before manually removing the caulk materials. All caulk will be removed from the edges of the associated building substrate areas. Following removal of the door/window frame caulk materials, the seam between the wall and frame shall be wet wiped or HEPA vacuumed. The removed materials will be placed in disposable bags or wrapped in poly as soon as practical, and no later than the end of the work period. Loose (unbagged) waste materials will not remain in the work area after the end of the work shift. The clean surfaces will be encapsulated after passing a visual inspection conducted by a Terracon representative. The waste resulting from the removal operations will be double bagged, labeled and disposed of in accordance with the guidelines discussed in

Item E of this section.

6.…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .