This file contains construction drawings and specifications for renovations at Alamo Hall Geriatric MSU and Seidel facilities at the San Antonio State Hospital, commissioned by the Texas Health and Human Services Commission (Project Number 24-207-SAH). The drawings include detailed demolition plans, site plans, grading plans, and accessibility standards for renovating Building 521 (Alamo Hall) and Building 598 (Seidel). The project involves interior renovations, new security fencing, concrete work, accessibility upgrades, and mechanical/electrical/plumbing modifications. The documents show extensive demolition work required in both buildings, including removal of walls, flooring, fixtures and equipment to be either discarded or salvaged for reinstallation.
The drawings include eight alternates covering items like corridor renovations, roof replacement, lighting fixtures, and plumbing fixtures. There are also eight allowances totaling $791,000 for items such as furniture moving/installation ($140,000), interior/exterior signage ($57,000), landscaping ($40,000), and equipment installation ($322,000). The documents provide detailed code analysis, life safety requirements, and environmental safety risk assessments for the psychiatric treatment facilities. The drawings show careful consideration for patient safety features and anti-ligature requirements throughout the renovation areas.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment H-1 Project Drawings o o oo o o o o o o o o o o o o o p p p p p p p pp p p p p p p p p p l l l l l
B.R.
37 10
B.R.
KELLY A.F.B.
LA
C
K
LA
N D
A .F
.B
STINSON
FIELD
U.S.A.F.
AEROSPACE
MEDICAL CENTER
CHINA
GROVE
KIRBY
FORT SAM HOUSTON
TERRELL
HILLS
ALAMO
HEIGHTS
OLMOS
PARK
LIVE
OAK
SELMA
UNIVERSAL
CITY
SCHERTZ
RANDOLPH
A.F.B.
CONVERSE
WINDCREST
SAN ANTONIO
INTERNATIONAL
AIRPORT
HOLLYWOOD
PARK
HILL
COUNTRY
VILLAGE
CASTLE
HILLS
SHAVANO
PARK
BRACKENRIDGE
PARK
PROJECT
LOCATION
PROJECT SITE
BUILDING 521
WAHRMOND CT.
S N
E W
B R
A U
N F
E L S
A V
E
SE MILITARY DR
PECAN VALLEY DR
S P
R E
S A
ENTRY
PROJECT SITE
BUILDING 598
E R
R A
D
5 O
GER
A
H
R
E
SI
T D
RIC
S
A
T
T E
C A LH
R
G
O M
ETI
S
CT
E X
T F
E
A S
JOB NO:
DATE:
DRAWN BY:
CHECKED BY:
2024 CHESNEY MORALES PARTNERS, INC.
ALL RIGHTS RESERVED. NO PART OF THIS
DOCUMENT MAY BE REPRODUCED OR UTILIZED
IN ANY FORM WITHOUT PRIOR WRITTEN AUTHORIZATION
OF CHESNEY MORALES PARTNERS, INC.
C
SHEET
P R
O J E
C T
N U
M B
E R
-2
-S
A H
A T
S A
N A
N T
O N
IO
S
T A
T E
H O
S P
IT
A
L
D A
T E
/1 /2
:5 :5
P
M
A000
COVER SHEET
2153.A
11/15/24
CMP
CMP
A
LA
M O
H A
LL
G
E R
IA
T
R
IC
M S
U R
E N
O V
A T
IO
N
S T
E X
A S
S T
A T
E H
E A
L T
H A
N D
H U
M A
N S
E R
V
IC
E S
C O
M M
IS
S
IO
N
S
N
E W
B R
A U
N F
E L S
A V
E
S A
N A
N T
O N
IO
T E
X A
S
FINAL CONSTRUCTION DOCUMENTS
/1
/2
AT
PREPARED FOR
TEXAS HEALTH AND HUMAN SERVICES COMMISSION
PROJECT NUMBER: 24-207-SAH
6711 S. NEW BRAUNFELS AVE.
SAN ANTONIO, TEXAS 78223
SAN ANTONIO STATE HOSPITAL
ALAMO HALL GERIATRIC MSU RENOVATIONS
FINAL CONSTRUCTION DOCUMENTS
NOT TO SCALE
LOCATION MAP
NOT TO SCALE
PROJECT SITE
MAIN
DRIVE S
MAIN DRIVE N
COTTAGE RD N
MAIN DRIVE N
MAIN DRIVE N
SERVICE RD N
SERVICE RD E
C STREET
C S
TR
EE
T
S C
H O
O L R
D
ARCHITECTURAL MEP CIVIL BEHAVIORAL HEALTH TECHNOLOGY & SECURITY
DEWBERRY ARCHITECTS INC.
401 SOUTHWEST WATER STREET
SUITE 701 PEORIA, IL 61602-1530
PHONE: (309)282-8000
FAX: (309)282-8001
CONTACT: BROOKE MARTIN
EMAIL: bmartin@dewberry.com
CONTACT: CASSANDRA FRANCO
EMAIL: cfranco@dewberry.com
CHESNEY MORALES PARTNERS, INC.
4901 BROADWAY, SUITE 250
SAN ANTONIO, TEXAS 78209
(210) 828-9481
CONTACT: JASON WALTERS
EMAIL: jwalters@chesneymorales.com
STRUCTURAL
INTELLIGENT ENGINEERING SERVICES
1045 CENTRAL PARKWAY NORTH,
SUITE 200, SAN ANTONIO, TEXAS 78232
(210)349-9098
CONTACT: VINCE GUERRA
EMAIL: vguerra@ie-services.com
BAIN MEDINA BAIN, INC
7073 SAN PEDRO AVE, SAN
ANTONIO, TEXAS 78216
(210)494.7223
CONTACT: ROGER MEDINA
EMAIL: rogerm@bmbi.com
MOOSE ENGINEERS
1344 S FLORES, SUITE 203 SAN
ANTONIO, TEXAS 78204
(210)361.1400
CONTACT: AUSTIN KACE
EMAIL: austink@clearyzimmermann.com
DEWBERRY ENGINEERS INC.
401 SOUTHWEST WATER STREET
SUITE 701 PEORIA, IL 61602-1530
PHONE: (309)282-8000
FAX: (309)282-8001
CONTACT: CRAIG CLARY
EMAIL: cclary@dewberry.com
Revision Schedule
No. Description Date
CONSTRUCTION DOCUMENT ORGANIZATION
THIS SET OF CONSTRUCTION DOCUMENTS IS PRESENTED IN TWO
PARTS - A SET OF TECHNICAL SPECIFICATIONS AND A SET OF
DRAWINGS ON 24" X 36" SHEETS.
1. SPECIFICATIONS
Specifications are organized according to the 16 divisions of the UNIFORM CONSTRUCTION INDEX as follows:
Division 1 General Requirements Division 2 Existing Conditions Division 3 Concrete Division 4 Masonry Division 5 Metals Division 6 Wood, Plastics, and Composites Division 7 Thermal and Moisture Protection Division 8 Openings (This section contains door schedule and hardware schedule) Division 9 Finishes (This section contains room finish schedule) Division 10 Specialities Division 11 Equipment Division 12 Furnishings Division 13 Special Construction Division 14 Conveying Equipment Division 21 Fire Suppression Division 22 Plumbing Division 23 Heating Ventilating and Air Conditioning Division 26 Electrical Division 27 Communications Division 28 Electronic Safety and Security Division 31 Earthwork Division 32 Exterior Improvements Division 33 Utilities
2. DRAWINGS
DRAWINGS are organized according to disciplines, with each discipline describing a general aspect of the construction.
Disciplines are arranged as follows:
A - ARCHITECTURAL
Work required to produce the basic building envelope, including: floor plan(s), roof plan(s), exterior elevation, building sections, wall sections, stair details, exterior enclosure details.
M - MECHANICAL
Work related to heating, ventilating, cooling and plumbing systems.
E - ELECTRICAL
Work related to electrical systems.
P - PLUMBING
Work related to plumbing systems.
3. SHEET NUMBERING
Each sheet of drawing is numbered in the lower right hand corner.
Sheets are numbered sequentially.
4. DRAWING NUMBERING
Each drawing is numbered preceding the drawing title. Drawings are numbered first by the sheet number, then by the drawing number.
5. SYMBOLS
This symbol represents the direction of plan north.
This symbol is a key to a building section drawing taken along the straight line of the symbol. The arrow points in the direction of the view for the section. The number is a reference to the section drawing.
This symbol is a key to a detail drawn of the area within the circle. The number is a reference to the detail drawing.
This symbol is a key to an elevation drawing. The arrow points in the direction of the view for the elevation. The number is a reference to the elevation drawing.
This symbol is a key to the door schedule. All doors are keyed with a letter prefix followed by door number.
6. KEYNOTES
A system of KEY NOTES containing written description and notation is used for all architectural plan and elevation drawings.
KEY NOTES are typically located in a column along the right side of each sheet. Each note is numbered and keyed to a corresponding circled number on the appropriate drawing.
7. DRAWING NOTES
A system of DRAWING NOTES containing written description and notation is used for all section and details drawings. DRAWING NOTES are located adjacent to each drawing on the sheet.
8. PARTITION TYPE
A system of identifying different construction types of partitions.
Single square containing a number or combination of number and letter which is indicated on floor plans and the corresponding partition type is described as section detail in the partition type sheet.
9. DIMENSIONS
All plan dimensions are to the face of wall finish or face of masonry unless otherwise noted. All vertical dimensions are nominal and assume a level finish floor condition. Run all horizontal reveals level. Field verify exact vertical dimension.
A4
NORTH
A101
A101
A101
A101
PLASTIC LAMINATE (EXAMPLE)
orA4 A
This symbol is a key to a wall section drawing taken along the straight line of the symbol. The arrow points in the direction of the view for the section. The number is a reference to the section drawing.
?4
View Name 1/8" = 1'-0"
Detailed Floor Plan
A.Allowance No. 1: Include the sum of One Hundred Forty Thousand Dollars and no/100 ($140,000) to Remove, Store, and Reinstall Existing Furniture and Furnish and Install New Furniture in Alamo Hall Building 521 and Seidel Building 598 refer to Equipment / Furniture Drawings.
B.Allowance No. 2: Include the sum of Fifty-Four Thousand Dollars and no/100 ($54,000.00) to Furnish and Install interior signs to be located as determined by the Owner and Architect in Alamo Hall Building 521 and Seidel Building 598. Owner will supply to Contractor room names and number for each sign. Refer to Specification Section 101400 - Signage.
C.Allowance No. 3: Include the sum of Three Thousand Dollars and no/100 ($3,000.00) to Furnish and Install exterior signage at Seidel, Building 598, to be located as determined by the Owner and Architect.
D.Allowance No. 4: Include the sum of Sixty Thousand Dollars and no/100 ($60,000) to Remove, Store, and Reinstall Wardrobe Units in Patient Rooms. Allowance includes replacement / repair of damaged Wardrobe Units and walls caused by existing anti-pick sealant during removal. The cost of replacement / repair of other damage to Wardrobe Units caused by Contractor, will be borne by the Contractor. Contractor to move one Wardrobe Unit as mock-up.
Photographic proof of damaged Wardrobe Units caused by existing anti-pick sealant during removal will be required.
E.Allowance No. 5: Include the sum of One Hundred Thirty Two Thousand Dollars and no/100 ($132,000) to Remove, Store, and Reinstall Toilet Accessories. Allowance includes replacement of damaged Toilet Accessories and walls caused by existing anti-pick sealant during removal.
The cost of replacement / repair of other damages to Toilet Accessories caused by Contractor, will be borne by the Contractor. Photographic proof of damaged Wardrobe Units caused by existing anti-pick sealant during removal will be required.
F.Allowance No. 6: Include the sum of Forty Thousand Dollars and no/100 ($40,000) to Furnish and Install Landscaping at Alamo Hall, Building 521 and Seidel, Building 598, as determined by the Owner and Architect.
G.Allowance No. 7: Include the sum of Forty Thousand Dollars and no/100 ($40,000) to Furnish and Install Exterior Furnishings in Courtyard to west of Alamo Hall, Building 521, as determined by the Owner and Architect.
H.Allowance No. 8: Include the sum of Three Hundred and Twenty Two Thousand Dollars and no/100 ($322,000) to Furnish and install X-Ray machine, Bug Zapper, Body Scanner, Walk Through Metal Detector and Wand Equipment as indicated on Architectural Sheet 10.6 for Seidel Building 598. Refer to Equipment Plan.
SCHEDULE OF ALLOWANCE SCHEDULE OF ALTERNATES
A. Alternate No. 1: Seidel Building 598: Corridors S130, S131, S132, S133, and S134.
1.BASE BID: No Work 2.ADD ALTERNATE: Contractor to remove existing ceiling lay-in tile and grid, light fixtures, and air devices. Contractor to supply and install new ceiling lay-in tiles and grids, light fixtures, and air devices. Ceiling lay-in tiles and grid, light fixtures, and air devices are to match Staff Breakroom S101 unless noted otherwise noted on drawings. Gypsum board ceiling to remain and to be painted.
B. Alternate No. 2: Seidel, Building 598 Roof Replacement:
1.BASE BID: Roof to remain in place. Roof work consists of cutting and patching existing roof as required for installation of plumbing vents.
2.ADD ALTERNATE: Remove existing system, 2-ply-modified bitumen membrane, torched applied, over 1/2" glass-faced gypsum board in adhesive, over tapered polyisocyanurate insulation over existing flat metal deck. Install new two layers of modified bitumen plys over 1/4” cover board over tapered R-25 polyisocyanurate insulation over existing flat metal deck. Extend roof curbs, vents, and piping as required to maintain a minimum of 8” clearance between roof deck and top of pipes and bottom of curb flashing.
Install new fascia to cover new insulation. Refer to Specification Sections 075552.16 – Styrene Butadiene Styrene (SBS) Modified Bituminous Protect Membrane Roofing, Section 076200 – Sheet Metal Flashing and Trim, Section 077100 – Roof specialties, and Section 077200 – Roof Accessories.
C. Alternate No. 3: Alamo Hall Building 521, Light Fixtures:
1.BASE BID: Refer to Electrical Drawings.
2.ADD ALTERNATE: Contractor to remove existing light fixtures on Second Floor Patient Rooms of Alamo Hall. Contractor is to supply and install New Light Fixtures, per Electrical Drawings in Second Floor Patient Rooms Floor of Alamo Hall
D. Alternate No. 4: Alamo Hall Building 521, Water closets:
1.BASE BID: Reuse of Willoughby branded anti-ligature water closet and lavatories throughout Alamo Hall 521 and Seidel 598.
2.ADD ALTERNATE: Contractor to provide and install new Whitehall brnaded anti-ligature water closets and lavatories in place of reused/reinstalled Willoughby anti-ligature fixtures.
E R
R A
D
5 O
GER
A
H
R
E
SI
T D
RIC
S
A
T
T E
C A LH
R
G
O M
ETI
S
CT
E X
T F
E
A S
JOB NO:
DATE:
DRAWN BY:
CHECKED BY:
2024 CHESNEY MORALES PARTNERS, INC.
ALL RIGHTS RESERVED. NO PART OF THIS
DOCUMENT MAY BE REPRODUCED OR UTILIZED
IN ANY FORM WITHOUT PRIOR WRITTEN AUTHORIZATION
OF CHESNEY MORALES PARTNERS, INC.
C
SHEET
P R
O J E
C T
N U
M B
E R
-2
-S
A H
A T
S A
N A
N T
O N
IO
S
T A
T E
H O
S P
IT
A
L
D A
T E
/1 /2
:5 :0
P
M
A0.1
SYMBOLS, ABBREVIATIONS, INDEX
2153.A
11/15/24
IA/MC
JW/TR
A
LA
M O
H A
LL
G
E R
IA
T
R
IC
M S
U R
E N
O V
A T
IO
N
S T
E X
A S
S T
A T
E H
E A
L T
H A
N D
H U
M A
N S
E R
V
IC
E S
C O
M M
IS
S
IO
N
S
N
E W
B R
A U
N F
E L S
A V
E
S A
N A
N T
O N
IO
T E
X A
S
FINAL CONSTRUCTION DOCUMENTS
/1
/2
SHEET INDEX
SHEET
NUMBER SHEET NAME
GENERAL
A000 COVER SHEET
A0.1 SYMBOLS, ABBREVIATIONS, INDEX
A0.2 DEMO & NEW GENERAL NOTES
A0.3 CODE ANALYSIS
A0.4 CODE ANALYSIS
A0.5 ENVIRONMENTAL SAFETY RISK ASSESSMENT
A0.6 ACCESSIBILITY STANDARDS
CIVIL
C-1 EXISTING SITE PLAN
C-2 DEMOLITION PLAN
C-3 OVERALL FENCING PLAN
C-4 OVERALL AREA GRADING PLAN
C-5 AREA GRADING
C-6 AREA GRADING
C-7 AREA GRADING
C-8 FIRE PROTECTION PLAN
C-9 DETAILS
ARCHITECTURE
A1.1 DEMOLITION SITE PLAN
A1.2 ALAMO HALL BLDG 521 - DEMOLITION FIRST FLOOR PLAN
A1.2a DEMOLITION FINISH FLOOR PLAN FIRST FLOOR
A1.3 ALAMO HALL BLDG 521 - DEMOLITION SECOND FLOOR PLAN
A1.3a DEMOLITION FINISH FLOOR PLAN SECOND FLOOR
A1.4 SEIDEL BLDG 598 - DEMOLITION FIRST FLOOR PLAN
A1.5 ALAMO HALL BLDG 521 - DEMOLITION FIRST FLOOR REFLECTED CEILING PLAN
A1.6 ALAMO HALL BLDG 521 - DEMOLITION SECOND FLOOR REFLECTED CEILING PLAN
A1.7 SEIDEL BLDG 598 - DEMOLITION REFLECTED CEILING PLAN
A1.8 ALAMO HALL 521 - EXTERIOR DEMOLITION ELEVATIONS
A1.9 SEIDEL 598 - EXTERIOR DEMOLITION ELEVATIONS
A1.10 DEMOLITION DETAILS
A2.1 NEW CONSTRUCTION SITE PLAN
A2.2 ENLARGED SITE PLAN AND DETAILS
A2.2A WEST ENTRY RAMP
A2.3 FENCING SECTION AND DETAILS
A2.3A FENCING SECTION AND DETAILS
A2.4 ALAMO HALL BLDG 521 - NEW CONSTRUCTION FIRST FLOOR PLAN
A2.4A ALAMO HALL BLDG 521- NEW CONSTRUCTION FIRST FLOOR DIMENSION PLAN
A2.5 ALAMO HALL BLDG 521 - NEW CONSTRUCTION SECOND FLOOR PLAN
A2.5A ALAMO HALL BLDG 521- NEW CONSTRUCTION SECOND FLOOR DIMENSION PLAN
A2.6 SEIDEL BLDG 598 - NEW CONSTRUCTION FLOOR PLAN
A2.6A SEIDEL BLDG 598 -NEW CONSTRUCTION DIMENSION FLOOR PLAN
A2.7 SEIDEL 598 - ROOF PLAN
A2.8 WALL TYPES
A2.9 WALL TYPES
A2.10 WALL TYPES
A2.11 DOOR TYPES & SCHEDULE
A2.12 DOOR DETAILS
A2.13 DOOR DETAILS
A2.14 ELEVATOR DOOR DETAILS
A2.15 WINDOW TYPES, SCHEDULE & DETAILS
A2.16 WINDOW DETAILS
A2.17 WINDOW DETAILS
A2.18 WINDOW DETAILS
A3.1 ALAMO HALL 521 - NEW CONSTRUCTION EXTERIOR ELEVATIONS
A3.2 SEIDEL 598 - NEW CONSTRUCTION EXTERIOR ELEVATIONS
A3.3 BUILDING SECTIONS ALAMO BLDG 521
A3.4 BUILDING DETAILS
A3.6 SEIDEL 698 - BUILDING DETAILS
A4.1 ALAMO 521 ENLARGED ROOM PLANS AND ISOMETRICS
A4.2 INTERIOR ELEVATIONS
A4.3 ALAMO INTERIOR ELEVATIONS
A4.4 SEIDEL INTERIOR ELEVATIONS
A5.1 MILLWORK SECTIONS
A5.2 MILLWORK SECTIONS
A6.1 ALAMO HALL BLDG 521 - NEW CONSTRUCTION FIRST FLOOR REFLECTED CEILING
A6.2 ALAMO HALL 521 - NEW CONSTRUCTION SECOND FLOOR REFLECTED CEILING
A6.3 SEIDEL BLDG 598 - NEW CONSTRUCTION FLOOR REFLECTED CEILING PLAN
A7.1 ELEVATOR RENOVATION
A8.1 PLAN DETAILS
A10.1 FURNITURE AND EQUIPMENT SCHEDULES
A10.2 ALAMO HALL BLDG 521 - FIRST FLOOR FURNITURE/ EQUIPMENT DEMOLITION PLAN
SHEET INDEX
SHEET
NUMBER SHEET NAME
ED2.2 POWER DEMOLITION SECOND FLOOR PLAN - ALAMO HALL
ED2.3 POWER DEMOLITION FLOOR PLAN - SEIDEL BUILDING
ED3.1 SPECIAL SYSTEMS DEMO FIRST FLOOR PLAN - ALAMO HALL
ED3.2 SPECIAL SYSTEMS DEMO SECOND FLOOR PLAN - ALAMO HALL
ED3.3 SPECIAL SYSTEMS DEMO FIRST FLOOR PLAN - SEIDEL
E0.1 ELECTRICAL SITE PLAN - NEW WORK
E1.1 LIGHTING FIRST FLOOR PLAN - ALAMO HALL
E1.2 LIGHTING SECOND FLOOR PLAN - ALAMO HALL
E1.3 LIGHTING FLOOR PLAN - SEIDEL BUILDING
E2.1 POWER FIRST FLOOR PLAN - ALAMO HALL
E2.1M MECHANICAL POWER FIRST FLOOR PLAN - ALAMO HALL
E2.2 POWER SECOND FLOOR PLAN - ALAMO HALL
E2.2M MECHANICAL POWER SECOND FLOOR PLAN - ALAMO HALL
E2.3 POWER FLOOR PLAN - SEIDEL BUILDING
E2.3M MECHANICAL POWER FLOOR PLAN - SEIDEL BUILDING
E3.1 SPECIAL SYSTEMS FIRST FLOOR PLAN - ALAMO HALL
E3.2 SPECIAL SYSTEMS SECOND FLOOR PLAN - ALAMO HALL
E3.3 SPECIAL SYSTEMS FLOOR PLAN - SEIDEL
E4.1 ELECTRICAL ONE-LINE DIAGRAM - ALAMO HALL
E4.2 ELECTRICAL ONE-LINE DIAGRAM - SEIDEL BUILDING
E5.1 ELECTRICAL SCHEDULES
E5.2 ELECTRICAL PANEL SCHEDULES - ALAMO HALL
E5.3 ELECTRICAL PANEL SCHEDULES - ALAMO HALL
E5.4 ELECTRICAL PANEL SCHEDULES - SEIDEL
E5.5 ELECTRICAL PANEL SCHEDULES - SEIDEL
E6.1 ELECTRICAL DETAILS
E6.2 ELECTRICAL DETAILS
E6.3 ELECTRICAL DETAILS
FP000 FIRE PROTECTION SYMBOLS & ABBREVIATIONS
FP0.1 FIRE PROTECTION SITE PLAN
FP1.1 FIRE PROTECTION FLOOR PLAN- ALAMO HALL 521 LEVEL 1
FP1.2 FIRE PROTECTION FLOOR PLAN- ALAMO HALL 521 LEVEL 2
FP1.3 FIRE PROTECTION FLOOR PLAN - SEIDEL BUILDING
P0.0 PLUMBING SYMBOLS & ABBREVIATIONS
P0.1 PLUMBING SITE PLAN
PD1.01 PLUMBING DEMOLITION PLAN - ALAMO HALL 521 - UNDERFLOOR
PD1.1 PLUMBING DEMOLITION PLAN - ALAMO HALL 521 - LEVEL 1
PD1.2 PLUMBING DEMOLITION PLAN - ALAMO HALL 521 - LEVEL 2
PD1.3 PLUMBING DEMOLITION PLAN - SEIDEL BUILDING 598
P1.0 PLUMBING UNDERFLOOR PLAN - ALAMO HALL 521
P1.01 PLUMBING UNDERFLOOR PLAN - SEIDEL BUILDING 598
P1.1 PLUMBING FLOOR PLAN - ALAMO HALL 521 - LEVEL ONE
P1.2 PLUMBING FLOOR PLAN - ALAMO HALL 521 - LEVEL TWO
P1.3 PLUMBING FLOOR PLAN - SEIDEL BUILDING 598
P2.1 PLUMBING ENLARGED PLANS - ALAMO HALL LEVEL 1
P2.2 PLUMBING ENLARGED PLANS - ALAMO HALL LEVEL 2
P2.3 PLUMBING ENLARGED PLANS - ALAMO HALL LEVEL 2
P2.4 PLUMBING ENLARGED PLANS - SEIDEL
P3.1 PLUMBING SCHEDULES
P4.1 PLUMBING RISERS - ALAMO HALL 521 DOMESTIC WATER
P4.2 PLUMBING RISERS - ALAMO HALL 521 SANITARY WASTE AND VENT
P4.3 PLUMBING RISERS - SEIDEL BUILDING 598 DOMESTIC WATER
P4.4 PLUMBING RISERS - SEIDEL BUILDING 598 SANITARY WASTE AND VENT
P5.1 PLUMBING DETAILS
P5.2 PLUMBING DETAILS
TECNHOLOGY/ SECURITY
T 0.1 TECHNOLOGY GENERAL NOTES, ABBREVIATIONS, & SYMBOLS
T1.2 DEMOLITION PLAN - FIRST FLOOR BLDG 521 - TECHNOLOGY
T1.3 DEMOLITION RCP - FIRST FLOOR BLDG 521 - TECHNOLOGY
T1.4 DEMOLITION PLAN - SECOND FLOOR BLDG 521 - TECHNOLOGY
T1.5 DEMOLITION RCP - SECOND FLOOR BLDG 521 - TECHNOLOGY
T1.7 DEMOLITION PLAN - FIRST FLOOR BLDG 598 - TECHNOLOGY
T2.1 PROPOSED PLAN - SITE - TECHNOLOGY
T2.2 PROPOSED PLAN - FIRST FLOOR BLDG 521 - TECHNOLOGY
T2.3 PROPOSED RCP - FIRST FLOOR BLDG 521 - TECHNOLOGY
T2.4 PROPOSED PLAN - SECOND FLOOR BLDG 521 - TECHNOLOGY
T2.5 PROPOSED RCP - SECOND FLOOR BLDG 521 - TECHNOLOGY
T2.6 PROPOSED PLAN - FIRST FLOOR BLDG 598 - TECHNOLOGY
T2.7 PROPOSED RCP - FIRST FLOOR BLDG 598 - TECHNOLOGY
T7.1 TECHNOLOGY DETAILS
T7.2 TECHNOLOGY DETAILS
T7.3 TECHNOLOGY DETAILS
T7.4 TECHNOLOGY DETAILS
T8.1 TECHNOLOGY DIAGRAMS
SHEET INDEX
SHEET
NUMBER SHEET NAME
A10.3 ALAMO HALL BLDG 521 - SECOND FLOOR FURNITURE/ EQUIPMENT DEMOLITION PLAN
A10.4 ALAMO HALL BLDG 521 - FIRST FLOOR FURNITURE/ EQUIPMENT PLAN
A10.5 ALAMO HALL BLDG 521 - SECOND FLOOR FURNITURE/ EQUIPMENT PLAN
A10.6 SEIDEL BLDG 598 - FURNITURE/ EQUIPMENT PLAN
A10.7 NEW SITE YARD FURNITURE AND EQUIPMENT PLAN
A11.1 ROOM FINISH SCHEDULES
A11.2 ROOM FINISH SCHEDULES
A11.3 FINISH LEGEND AND FINISH ELEVATIONS
A11.4 FIRST FLOOR FINISH PLAN
A11.5 SECOND FLOOR FINISH PLAN
A11.6 FLOOR PATTERN PLAN - FIRST FLOOR
A11.7 FLOOR PATTERN PLAN - SECOND FLOOR
A11.8 SEIDEL BLDG 598 - FINISH AND FLOOR PATTERN PLAN
STRUCTURE
S0.1 STRUCTURAL NOTES
S0.2 STRUCTURAL NOTES
S0.3 STRUCTURAL NOTES AND SPECIAL INSPECTIONS
S0.4 SPECIAL INSPECTIONS
S0.5 LIVE LOAD PLANS
S0.6 WIND LOAD PLANS
S2.1 SITE STRUCTURES LOCATION PLAN
S2.2 ALAMO HALL - BUILDING 521 - FOUNDATION PLANS
S2.3 ALAMO HALL - BUILDING 521 - FRAMING PLANS
S2.4 SEIDEL - BUILDING 598 - PLANS
S2.5 ENLARGED PLANS
S3.1 ALAMO - BUILDING 521 - BUILDING SECTIONS
S3.2 ALAMO HALL - BUILDING 521 - BUILDING SECTIONS
S3.3 ALAMO HALL - BUILDING 521 - BUILDING SECTIONS
S3.4 SEIDEL - BUILDING 598 - BUILDING SECTIONS
S3.5 SEIDEL - BUILDING 598 - BUILDING SECTIONS
S3.6 SEIDEL - BUILDING 598 - BUILDING SECTIONS
S3.7 TYPICAL STEEL BRACE DETAILS
S4.1 TYPICAL FOUNDATION DETAILS
S4.2 TYPICAL FOUNDATION DETAILS
S4.3 BASE PLATE DETAILS
S4.4 ALAMO - BUILDING 521 - FOUNDATION SECTIONS
S4.5 ALAMO - BUILDING 521 - FOUNDATION SECTIONS
S4.6 SEIDEL - BUILDING 598 - FOUNDATION SECTIONS
S5.1 TYPICAL STEEL CONNECTION DETAILS
S5.2 TYPICAL COMPOSITE STEEL DETAILS
S5.3 TYPICAL STEEL JOIST ROOF DETAILS
S5.4 ALAMO - BUILDING 521 - FLOOR & ROOF SECTIONS
S5.5 ALAMO - BUILDING 521 - ROOF SECTIONS
S5.6 SEIDEL - BUILDING 598 - ROOF SECTIONS
S6.1 CONCRETE BEAM SCHEDULES
MEP
M0.0 MECHANICAL SYMBOLS & ABBREVIATIONS
M0.1 MECHANICAL ENERGY SHEET
MD1.1 MECHANICAL DEMOLITION PLAN - ALAMO HALL 521 - LEVEL 1
MD1.2 MECHANICAL DEMOLITION PLAN - ALAMO HALL 521 - LEVEL 2
MD1.3 MECHANICAL DEMOLITION PLAN - SEIDEL BUILDING 598
MD2.1 MECHANICAL HYDRONICS DEMO - ALAMO HALL 521 - LEVEL 1
MD2.2 MECHANICAL HYDRONICS DEMO - ALAMO HALL 521 - LEVEL 2
M1.1 MECHANICAL FLOOR PLAN - ALAMO - HALL 521 - LEVEL 1
M1.2 MECHANICAL FLOOR PLAN - ALAMO - HALL 521 - LEVEL 2
M1.3 MECHANICAL FLOOR PLAN - SEIDEL BUILDING 598
M2.1 MECHANICAL HYDRONICS - ALAMO HALL 521 - LEVEL 1
M2.2 MECHANICAL HYDRONICS - ALAMO HALL 521 - LEVEL 2
M3.1 MECHANICAL SCHEDULES
M3.2 MECHANICAL SCHEDULES
M4.1 MECHANICAL CONTROLS
M4.2 MECHANICAL CONTROLS
M4.3 MECHANICAL CONTROLS
M5.1 MECHANICAL DETAILS
M5.2 MECHANICAL DETAILS
M5.3 MECHANICAL DETAILS
E0.0 ELECTRICAL SYMBOLS & ABBREVIATIONS
ED0.1 ELECTRICAL SITE PLAN - DEMOLITION
ED1.1 LIGHTING DEMOLITION FIRST FLOOR PLAN - ALAMO HALL
ED1.2 LIGHTING DEMOLITION SECOND FLOOR PLAN - ALAMO HALL
ED1.3 LIGHTING DEMOLITION FLOOR PLAN - SEIDEL BUILDING
ED2.1 POWER DEMOLITION FIRST FLOOR PLAN - ALAMO HALL
DEMOLITION GENERAL NOTES:
A. PROTECT EXISTING CONSTRUCTION INDICATED TO REMAIN AGAINST DAMAGE AND
SOILING DURING SELECTIVE DEMOLITION. WHEN PERMITTED BY THE ARCHITECT
ITEMS MAY BE REMOVED TO A SUITABLE PROTECTIVE STORAGE LOCATION ON CAMPUS
DURING SELECTIVE DEMOLITION AND THEN CLEANED AND REINSTALLED TO THEIR ORIGINAL
LOCATIONS.
B. GENERAL CONTRACTOR TO ISSUE A SCHEDULE OF SELECTIVE DEMOLITION
INDICATING THE FOLLOWING:
1) DETAILED SEQUENCE OF SELECTIVE DEMOLITION AND REMOVAL WORK, WITH
STARTING AND ENDING DATES OF EACH ACTIVITY
2) INTERRUPTION OF UTILITY SERVICES
3) COORDINATION FOR SHUT OFF, CAPPING AND CONTINUATION OF UTILITY
SERVICES
4) USE OF NO ELEVATOR AND STAIRS
5) DETAILED SEQUENCE OF SELECTIVE DEMOLITION AND REMOVAL WORK TO
UNINTERRUPTED PROGRESS OF OWNER'S ON-SITE OPERATIONS
6) LOCATIONS OF TEMPORARY PARTITIONS AND MEANS OF EGRESS
C. USE REPAIR MATERIALS IDENTICAL TO EXISTING MATERIALS:
1) WHERE IDENTICAL MATERIALS ARE UNAVAILABLE OR CANNOT BE USED FOR
EXPOSED SURFACES, USE MATERIALS THAT VISUALLY MATCH EXISTING
ADJACENT SURFACES TO THE FULLEST EXTENT POSSIBLE. GET ARCHITECTS
APPROVAL PRIOR TO SUBSTITUTION.
2) USE MATERIALS WHOSE INSTALLED PERFORMANCE EQUALS OR SURPASSES
THAT OF EXISTING MATERIALS
D. SURVEY AND FIELD VERIFY EXISTING CONDITIONS AND CORRELATE WITH
REQUIREMENTS TO DETERMINE EXTENT OF SELECTIVE DEMOLITION REQUIRED.
E. WHEN UNANTICIPATED MECHANICAL, ELECTRICAL, OR STRUCTURAL ELEMENTS
THAT CONFLICT WITH THE INTENDED FUNCTION OR DESIGN ARE ENCOUNTERED,
INVESTIGATE AND MEASURE THE NATURE AND EXTENT OF THE CONFLICT.
PROMPTLY SUBMIT A WRITTEN REPORT TO THE ARCHITECT.
F. MAINTAIN EXISTING UTILITIES INDICATED TO REMAIN IN SERVICE AND PROTECT THEM
AGAINST DAMAGE DURING SELECTIVE DEMOLITION OPERATIONS.
1) DO NOT INTERRUPT EXISTING UTILITIES SERVING THE EXISTING FACILITY,
EXCEPT WHEN AUTHORIZED IN WRITING BY OWNER AND AUTHORITIES HAVING
JURISDICTION PROVIDE TEMPORARY SERVICES DURING INTERRUPTIONS TO
EXISTING UTILITIES, AS ACCEPTABLE TO OWNER AND TO GOVERNING
AUTHORITIES.
2) PROVIDE NO LESS THAN 9 DAYS OF NOTICE TO OWNER IF SHUTDOWN OF
SERVICE IS REQUIRED DURING DEMOLITION AND NEW CONSTRUCTION.
G. CONDUCT DEMOLITION OPERATIONS AND REMOVE DEBRIS TO ENSURE MINIMUM
INTERFERENCE WITH ROADS, STREETS, WALKS, AND OTHER ADJACENT OCCUPIED
AND USED FACILITIES.
1) DO NOT CLOSE OR OBSTRUCT STREETS, WALKS, OR OTHER ADJACENT
OCCUPIED OR USED ALTERNATIVE ROUTES AROUND CLOSED OR OBSTRUCTED
TRAFFIC WAYS IF REQUIRED BY GOVERNING REGULATIONS
2) PROTECT EXISTING SITE IMPROVEMENTS, APPURTENANCES AND LANDSCAPING
TO REMAIN
3) PROVIDE PROTECTIVE WEATHER PROTECTION DURING INTERVAL BETWEEN
DEMOLITION AND REMOVAL OF EXISTING CONSTRUCTION, ON SURFACES AND
NEW CONSTRUCTION TO ENSURE THAT NO WATER LEAKAGE OR DAMAGE
OCCURS TO THE STRUCTURE OR INTERIOR AREAS
4) PROTECT CEILING, WALLS, FLOORS AND OTHER EXISTING FINISH WORK THAT
ARE TO REMAIN AND ARE EXPOSED DURING SELECTIVE DEMOLITION
OPERATIONS.
H. GENERAL CONTRACTOR TO PROVIDE TEMPORARY PARTITION AND BARRICADE
AT AREAS OF WORK. COORDINATE ACCESS WITH BUILDING USERS. ERECT AND MAINTAIN
DUST- PROOF PARTITIONS AND TEMPORARY ENCLOSURES TO LIMIT DUST AND DIRT
MIGRATION AND TO SEPARATE AREAS FROM FUMES AND NOISE, IN OCCUPIED AREAS
ONLY.
1) CONSTRUCT DUST PARTITIONS OF NO LESS THAN NORMAL 6-INCH STUDS, 3/4"
PAINTED PLYWOOD ON OCCUPIED SIDE.
2) INSULATE PARTITION TO PROVIDE NOISE PROTECTION TO OCCUPIED AREAS ONLY
3) SEAL JOINTS AND PERIMETER EQUIPMENT PARTITIONS WITH DUST PROOF
DOORS AND SECURITY LOCKS
4) PROTECT AIR-HANDLING EQUIPMENT, CHANGE FILTERS FOR AHU'S FREQUENTLY
DURING DEMOLITION AND NEW CONSTRUCTION. AT THE END OF THE PROJECT
CONTRACTOR SHALL INSTALL NEW FILTERS AT EACH AHU.
5) WEATHERSTRIP OPENINGS
6) COORDINATE THE A/E, PM AND OWNER FOR THE LOCATION OF ALL BARRIER PORTIONS
I. USE TEMPORARY ENCLOSURES AND OTHER SUITABLE METHODS TO LIMIT THE SPREAD
OF DUST AND DIRT TO COMPLY WITH GOVERNING ENVIRONMENTAL PROTECTION
REGULATIONS. DO NOT USE WATER WHEN IT MAY DAMAGE THE EXISTING
CONSTRUCTION OR CREATE HAZARDOUS OR OBJECTABLE CONDITIONS, SUCH AS, ICE,
FLOODING AND POLLUTION.
J. DEMOLISH AND REMOVE EXISTING CONSTRUCTION ONLY TO THE EXTENT REQUIRED
BY NEW CONSTRUCTION AS INDICATED. USE METHODS REQUIRED TO COMPLETE
WORK WITHIN LIMITATIONS OF GOVERNING REGULATIONS AS FOLLOWS:
1) NEATLY CUT OPENINGS AND HOLES PLUMB, SQUARE, AND TRUE TO DIMENSION
REQUIRED. USE CUTTING METHODS LEAST LIKELY TO DAMAGE CONSTRUCTION
TO REMAIN OR ADJOINING CONSTRUCTION. TO MINIMIZED DISTURBANCE OF
ADJACENT SURFACES, USE HAND OR SMALL POWER TOOLS DESIGNED FOR
SAWING, GRINDING, NOT HAMMERING OR CHOPPING. TEMPORARILY COVER
OPENINGS TO REMAIN.
2) CUT OR DRILL FROM THE EXPOSED OR FINISHED SIDE INTO CONCEALED
SURFACES TO AVOID MARRING EXISTING FINISHED SURFACES.
3) DO NOT USE CUTTING TORCHES UNTIL WORK IS CLEAR OF FLAMMABLE
MATERIALS. AT CONCEALED SPACES SUCH AS PIPE AND DUCT INTERIOR,
VERIFY CONDITIONS AND CONTENTS OF HIDDEN SPACE BEFORE STARTING
FLAME-CUTTING OPERATIONS.
4) MAINTAIN ADEQUATE VENTILATION WHEN USING CUTTING TORCHES.
5) REMOVE DECAYED, VERMIN-INFESTED, OR OTHERWISE DANGEROUS OR
UNSUITABLE MATERIAL AND PROMPTLY DISPOSE OF OFF-SITE.
6) DISPOSE OF DEMOLISHED ITEMS AND MATERIALS PROMPTLY. ON-SITE STORAGE
OR SALE OF REMOVED ITEMS IS PROHIBITED
7) RETURN ELEMENTS OF CONSTRUCTION AND SURFACES TO REMAIN TO
CONDITION EXISTING BEFORE START OF SELECTIVE DEMOLITION OPERATIONS
K. DEMOLISH CONCRETE AND MASONRY IN SMALL SECTIONS. CUT CONCRETE AND
MASONRY AT JUNCTURES WITH CONSTRUCTION TO REMAIN USING POWER-DRIVEN
MASONRY SAW OR HAND TOOLS. DO NOT USE POWER-DRIVEN IMPACT TOOLS.
L. PROMPTLY PATCH AND REPAIR HOLES AND DAMAGED SURFACES CAUSED TO
EXISTING CONDITIONS DUE TO SELECTIVE DEMOLITION OPERATIONS.
M. WHERE REPAIRS TO EXISTING SURFACES ARE REQUIRED, PATCH TO PRODUCE
SURFACES SUITABLE FOR NEW MATERIALS. COMPLETELY FILL HOLES AND
DEPRESSIONS IN EXISTING MASONRY WALLS TO REMAIN WITH AN APPROVED
MASONRY PATCHING MATERIAL, APPLIED ACCORDING TO MANUFACTURER'S
PRINTED RECOMMENDATIONS.
N. RESTORE EXPOSED FINISHED OR PATCHED AREAS AND EXTEND FINISHED
RESTORATION INTO ADJOINING CONSTRUCTION TO REMAIN IN A MANNER THAT
ELIMINATES EVIDENCE OF PATCHING AND REFINISHING.
O. PATCH AND REPAIR FLOOR AND WALL SURFACES IN THE NEW SPACE WHERE
DEMOLISHED WALLS OR PARTITIONS EXTEND FROM ONE FINISHED AREA INTO
ANOTHER. PROVIDE A FLUSH AND EVEN SURFACE OF UNIFORM COLOR AND
APPEARANCE.
1) CLOSELY MATCH TEXTURE AND FINISH OF EXISTING ADJACENT SURFACE
2) PATCH WITH DURABLE SEAMS THAT ARE AS INVISIBLE AS POSSIBLE, COMPLY
WITH SPECIFIED TOLERANCES
3) WHERE PATCHING SMOOTH, PAINTED SURFACES, EXTEND FINAL PAINT COAT
OVER ENTIRE UNBROKEN SURFACE CONTAINING THE PATCH AFTER THE
SURFACE HAS RECEIVED PRIMER AND SECOND COAT
4) REMOVE EXISTING FLOOR AND WALL COVERINGS AND REPLACE WITH NEW
MATERIALS, IF NECESSARY, TO ACHIEVE UNIFORM COLOR AND APPEARANCE.
5) INSPECT AND TEST PATCHED AREAS TO DEMONSTRATE INTEGRITY OF THE
INSTALLATION WHERE FEASIBLE
P. PATCH, REPAIR, OR RE-HANG EXISTING CEILINGS AS NECESSARY TO PROVIDE AN
EVEN-PLANE SURFACE OF UNIFORM APPEARANCE.
Q. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER DISPOSAL
OF ALL DEBRIS, AND SHALL NOT ALLOW THE ACCUMULATION OF DEBRIS DURING
DEMOLITION. THE GENERAL CONTRACTOR SHALL CONTINUALLY CLEAN THE
PROJECT.
R. CHANGE FILTERS IN AIR-HANDLING EQUIPMENT UPON COMPLETION OF SELECTIVE
DEMOLITION OPERATIONS AND AFTER FINAL COMPLETION.
S. PHOTOGRAPH OR VIDEOTAPE (SUFFICIENTLY DETAILED) EXISTING CONDITIONS
TO BE REMODELED AND EXISTING ADJOINING CONSTRUCTION AND SITE
IMPROVEMENTS THAT MIGHT BE MISCONSTRUED AS DAMAGE CAUSED BY
SELECTIVE DEMOLITION OPERATIONS. PHOTOGRAPHS / VIDEOTAPES WILL BE
SUBMITTED TO THE ARCHITECT / OWNER.
T. RECORD DRAWINGS AT PROJECT CLOSEOUT. IDENTIFY AND ACCURATELY
LOCATE CAPPED UTILITIES AND OTHER SUBSURFACE STRUCTURAL, ELECTRICAL
OR MECHANICAL CONDITIONS.
U. CONDUCT DEMOLITION OPERATIONS TO PREVENT INJURY TO PEOPLE AND
DAMAGE TO ADJACENT BUILDINGS AND FACILITIES TO REMAIN. ENSURE SAFE
PASSAGE OF PEOPLE AROUND SELECTIVE DEMOLITION AREA. ERECT
TEMPORARY PROTECTION, SUCH AS WALKS, FENCES, RAILINGS, CANOPIES AND
COVERED PASSAGEWAYS WHERE REQUIRED BY AUTHORITIES HAVING
JURISDICTION. INSURE ALL DUMPSTERS ARE LOCATED INSIDE THE FENCED AREAS.
V. VERIFY WITH OWNER FOR THE RELOCATION, SALVAGE, OR DISPOSAL OF ANY ITEMS.
ALL SALVAGEABLE ITEMS TO BE RETURNED TO OWNER UNLESS OTHERWISE
DIRECTED BY OWNER. CONTRACTOR IS RESPONSIBLE FOR REMOVAL OF REMAINING
ITEMS SCHEDULED FOR DEMOLITION.
W. CONTRACTOR SHALL TAKE EVERY PRECAUTION TO COORDINATE AND
BARRICADE ALL DEMOLITION WORK AS NOT TO DISRUPT ADJACENT ROOMS,
WHICH WILL REMAIN ACTIVE. NOTE THAT SOME MEP SYSTEMS WILL NEED TO
REMAIN ACTIVE.
X. ALL DEMOLITION WORK ON THE DEMOLITION SHEETS ILLUSTRATES PRIMARY
ARCHITECTURE ELEMENTS TO BE REMOVED. CONTRACTOR MUST JOINTLY
REFER TO ARCHITECTURAL, MECHANICAL, ELECTRICAL, PLUMBING AND OTHER
CONTRACT DOCUMENTS TO COORDINATE THEIR DEMOLITION REQUIREMENTS,
EITHER EXPRESSED OR IMPLIED, NECESSARY TO RECEIVE NEW CONSTRUCTION.
Y. GENERAL CONTRACTOR TO COORDINATE THE RELOCATION OF ALL ITEMS
BETWEEN DEMOLITION AND NEW CONSTRUCTION. ASSURE 100% FUNCTION OF
ADJACENT ROOMS AT ALL TIMES. COORDINATE ALL INFRASTRUCTURE
REQUIREMENTS PRIOR TO START OF WORK. COORDINATION WITH
OWNER/USERS WILL BE REQUIRED. COORDINATE ANY IMPACT OF MEP WORK
WITH EXISTING AREAS NOT IN SCOPE.
Z. WHERE REQUIRED REMOVE EXISTING TILE, VCT, RESILIENT SHEET FLOORING,
AND RUBBER BASE, PREPARE FLOOR TO RECEIVE NEW FINISH. EXISTING
TERRAZZO FLOORING TO REMAIN. PREP FOR NEW FLOORING AS SCHEDULED. REFER
TO FINISH LEGEND, ROOM FINISH SCHEDULES, AND NEW FINISH FLOOR PATTERN
PLANS FOR NEW SELECTIONS AND LOCATIONS.
AA. REMOVE EXISTING MILLWORK, SHELVING, AND ANY RELATED WALL ITEMS AS
REQUIRED FOR NEW CONSTRUCTION.
NEW CONSTRUCTION GENERAL NOTES:
P. THE USE OF THE WORDS "PROVIDE" OR "PROVIDED" IN CONNECTION WITH
ANY ITEM SPECIFIED, IS INTENDED TO MEAN UNLESS NOTED OTHERWISE,
THAT SUCH ITEM SHALL BE FURNISHED AND INSTALLED, AND CONNECTED
WHERE SO REQUIRED BY THE GENERAL CONTRACTOR.
Q. WHERE THE TERMS "APPROVED EQUAL," "EQUAL TO," "ACCEPTABLE"
OR OTHER GENERAL QUALIFYING TERMS ARE IN THE CONTRACT
DOCUMENTS SHALL BE UNDERSTOOD THAT THE REFERENCE IS MADE
IN ACCORDANCE WITH THE DECISION OF THE OWNER AND ARCHITECT/
ENGINEER.
R. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY PROTECTION AT
THE EXISTING BUILDING AND DURING NEW CONSTRUCTION FOR THIS
WORK UNTIL TURNED OVER TO THE OWNER.
S. THE CONSTRUCTION NOTES AND/OR DRAWINGS ARE TO ILLUSTRATE
THE DESIGN AND THE GENERAL TYPE OF CONSTRUCTION DESIRED AND
ARE INTENDED TO IMPLY THE FINEST QUALITY OF CONSTRUCTION
MATERIAL AND WORKMANSHIP THROUGHOUT.
T. THE GENERAL CONTRACTOR SHALL BRING AS-BUILT DRAWINGS TO THE
MONTHLY VOUCHER MEETING. THE CONTRACTOR SHALL ALSO KEEP
AND MAINTAIN A CURRENT AND COMPLETE SET OF CONSTRUCTION
DRAWINGS AND SPECIFICATIONS INCLUDING BUT NOT LIMITED TO
CHANGE ORDERS, ASI'S, RFI'S AND FIELD REVISIONS AT THE
CONSTRUCTION SITE DURING ALL PHASES OF CONSTRUCTION FOR USE
OF ALL TRADES AS WELL AS FOR REFERENCE.
U. THE GENERAL CONTRACTOR UPON ACCEPTANCE OF THE
CONSTRUCTION CONTRACT ASSUMES FULL RESPONSIBILITY FOR THE
CONSTRUCTION, MATERIALS AND WORKMANSHIP OF THE WORK
DESCRIBED IN THE NOTES, DRAWINGS AND SPECIFICATIONS. THE
GENERAL CONTRACTOR WILL BE EXPECTED TO COMPLY WITH THE
INTENT AS WELL AS THE LETTER OF THE DRAWINGS AND
SPECIFICATIONS IN WHICH THEY ARE WRITTEN.
V. THE DRAWINGS ARE NOT TO BE SCALED, ONLY DIMENSIONS AND
NOTES ARE TO BE USED. ALL DIMENSIONAL DISCREPANCIES SHALL BE
CALLED TO THE ARCHITECT'S ATTENTION. ALL DIMENSIONS SHALL BE
VERIFIED BEFORE STARTING WORK BY THE RESPECTIVE
SUBCONTRACTOR WHO SHALL BE RESPONSIBLE FOR HIS PHASE OF
THE WORK AND BY THE GENERAL CONTRACTOR WHO IS RESPONSIBLE
FOR THE PROJECT.
A. GENERAL CONTRACTOR SHALL CAREFULLY READ THE WHOLE SPECIFICATIONS
OF THE CONTRACT DOCUMENTS AS HE/SHE WILL BE RESPONSIBLE FOR
MEETING ALL REQUIREMENTS.
B. ALL WORK SHALL CONFORM TO THE STATE OF TEXAS AND THE HEATH AND HUMAN
SERVICE COMMISSION CURRENT CODE REQUIREMENTS AND AMENDMENTS AND
ALL AUTHORITIES HAVING JURISDICTION.
C. ALL WORK SHALL COMPLY WITH ALL NATIONAL, STATE, AND LOCAL CODES.
REFER TO SHEET A0.3 & A0.4 FOR APPLICABLE CODES.
D. THE GENERAL CONTRACTOR SHALL CAREFULLY STUDY AND COMPARE THE
CONTRACT DOCUMENTS WITH EACH OTHER AND WITH INFORMATION FURNISHED BY
THE OWNER. THE CONTRACTOR SHALL IMMEDIATELY CONTACT THE ARCHITECT
FOR CLARIFICATION SHOULD ANY ERRORS, INCONSISTENCIES OR OMISSIONS BE
DISCOVERED. FOR CLARIFICATION OF THE CONTRACT DOCUMENTS THE A/E SHALL
BE THE FINAL AUTHORITY AND INTERPRETER OF THE DOCUMENTS. IF THE
CONTRACTOR ASSUMES THE RESPONSIBILITY TO INTERPRET THE DRAWINGS WHEN
THERE IS CONFUSION OVER THE DRAWINGS. AND IF THE CONTRACTOR DOES NOT
CONTACT THE A/E FOR CLARIFICATION AND INTERPRETATION AND THE WORK WAS
DONE INCORRECTLY THE CONTRACTOR WILL CORRECT THE DEFICIENCY (S) AT NO
COST TO THE OWNER.
E. GENERAL CONTRACTOR SHALL VISIT THE SITE AND INCLUDE IN THEIR SCOPE OF
WORK ALL ADJUSTMENTS AND COSTS AFFECTING ALL NEW AND EXISTING
BUILDING UTILITY SERVICES, I.E. WATER LINES, WASTE LINES, SPRINKLER MAIN,
GAS LINES, BUILDING SYSTEMS ELECTRICAL SERVICE AND TELEPHONE / DATA
LINES THAT ARE APPLICABLE TO THE PROJECT.
F. GENERAL CONTRACTOR SHALL VISIT THE SITE AND TAKE FIELD MEASUREMENTS
AND VERIFY EXISTING FIELD CONDITIONS. CONTRACTOR SHALL CAREFULLY
COMPARE SUCH FIELD MEASUREMENTS AND CONDITIONS AND OTHER
INFORMATION KNOWN TO THE CONTRACTOR WITH THE CONTRACT DOCUMENTS
BEFORE COMMENCING ANY WORK. THE CONTRACTOR SHALL IMMEDIATELY
CONTACT THE ARCHITECT FOR CLARIFICATION SHOULD ANY ERRORS,
INCONSISTENCIES OR OMISSIONS BE DISCOVERED.
G. GENERAL CONTRACTOR SHALL SUPERVISE AND DIRECT THE WORK, USING THE
CONTRACTOR'S BEST SKILL AND ATTENTION. THE CONTRACTOR SHALL BE
SOLELY RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES,
SEQUENCES, PROCEDURES AND PHASES, AND FOR COORDINATING ALL TRADES,
AND ALL PORTIONS OF THE WORK UNDER THE CONTRACT, UNLESS CONTRACT
DOCUMENTS GIVE OTHER SPECIFIC INSTRUCTIONS.
H. GENERAL CONTRACTOR SHALL REPORT TO THE OWNER AND THE ARCHITECT ANY
UNFORESEEN FIELD CONDITIONS, ERRORS, INCONSISTENCIES, OR OMISSIONS
DISCOVERED AT ANY TIME DURING DEMOLITION AND NEW CONSTRUCTION. UPON
SUCH DISCOVERY THE CONTRACTOR SHALL IMMEDIATELY CONTACT THE
ARCHITECT FOR CLARIFICATION IN WRITING BEFORE PROCEEDING OR CONTINUING
WITH THAT PORTION OF THE WORK OR ANY PORTION RELATED THERE TO. SUBMIT
(RFI) REQUEST FOR INFORMATION TO ARCHITECT.
I. GENERAL CONTRACTOR SHALL BE RESPONSIBLE TO THE OWNER FOR ACTS AND
OMISSIONS OF THE CONTRACTOR'S EMPLOYEES, SUBCONTRACTORS AND THEIR
AGENTS AND EMPLOYEES, AND OTHER PERSONS PERFORMING PORTIONS OF
THE WORK UNDER A CONTRACT WITH THE GENERAL CONTRACTOR.
J. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO PROJECT
SITE, EXISTING IMPROVEMENTS SCHEDULED TO REMAIN, AND EXISTING UTILITIES
CAUSED BY THIS WORK ON THIS PROJECT AND SHALL QUICKLY REPLACE OR
REPAIR THAT DAMAGE AT NO COST TO THE OWNER.
K. WHEN A CHANGE IS REQUESTED BY OWNER, THE ARCHITECT SHALL ISSUE AN
APPROPRIATE PROPOSAL REQUEST, WHICH THE GENERAL CONTRACTOR SHALL
PRICE OUT COMPLETELY & RETURNED TO ARCHITECT WITHIN 20 DAYS FROM
BEING ISSUED. NO WORK SHALL COMMENCE WITHOUT WRITTEN APPROVAL BY
OWNER AND ARCHITECT/ ENGINEER.
L. GENERAL CONTRACTOR, SUBCONTRACTORS, SUPPLIERS AND MANUFACTURERS
ARE TO CERTIFY THAT ALL MATERIALS AND PRODUCTS USED IN CONSTRUCTION
OF THIS PROJECT DO NOT CONTAIN ASBESTOS IN ANY AMOUNT IN ACCORDANCE
WITH THE TOXIC SUBSTANCE CONTROL ACT.
M. SUBMITTALS / SHOP DRAWINGS / PRODUCT DATA IS TO BE APPROVED BY
ARCHITECT /ENGINEER BEFORE ORDERING MECHANICAL EQUIPMENT,PLUMBING
FIXTURES, LIGHT FIXTURES, DOOR HARDWARE APPLICABLE ACCESSORIES,
MATERIALS OR PRODUCTS, COLORS AND FINISHES.
N. GENERAL CONTRACTOR SHALL VERIFY EXISTING ELECTRICAL SERVICE
VOLTAGES PRIOR TO ORDERING ELECTRICAL EQUIPMENT. GENERAL
CONTRACTOR SHALL VERIFY ALL UTILITY SERVICES PRIOR TO TAPPING INTO.
COORDINATE WITH OWNER AND ARCHITECT/ ENGINEER.
O. THE GENERAL CONTRACTOR, HIS SUB-CONTRACTORS, AND ANY OTHER
CONTRACTOR INVOLVED IN THIS PROJECT SHALL AGREE THAT ANY COST
CAUSED BY DEFECTIVE OR POORLY-TIMED WORK, AS A RESULT OF, BUT
NOT LIMITED TO, INFERIOR WORKMANSHIP OR MATERIALS, IMPROPER
SCHEDULING OR DELINQUENT ORDERING SHALL BE BORNE BY THE PARTY
RESPONSIBLE.
AA. "TYPICAL" MEANS TYPICAL FOR ALL SIMILAR CONDITIONS, UNLESS
NOTED OTHERWISE.
BB. THE GENERAL CONTRACTOR SHALL DO ALL CUTTING, FITTING AND
PATCHING OF WORK THAT MAY BE REQUIRED TO MAKE ALL PARTS
COME TOGETHER AND FIT, TO RECEIVE OR BE RECEIVED BY WORK OF
ALL CONTRACTORS SHOWN UPON OR REASONABLY IMPLIED BY
DRAWINGS, SPECIFICATIONS AND NOTES. ALL CUTS SHALL BE
FINISHED OUT TO A WEATHERPROOFED AND LIKE NEW CONDITION.
CC. UPON PROJECT COMPLETION AN INDEPENDENT REGISTERED
ACCESSIBILITY SPECIALIST WILL VISIT THE SITE FOR TDLR
CONFORMANCE. GENERAL CONTRACTOR TO ENSURE THAT ALL TEXAS
ACCESSIBILITY STANDARDS ARE MET.
DD. INTERIOR DIMENSIONS ON FLOOR PLAN ARE FROM FINISH FACE OF
PARTITION TO FINISH FACE OF PARTITION OR CENTER OF PARTY WALL
UNLESS OTHERWISE NOTED.
EE. WHERE MOUNTING HEIGHTS ARE NOT INDICATED INSTALL
COMPONENTS USING MANUFACTURER'S OR INDUSTRY STANDARDS AND
ADA STANDARD'S. WHERE STANDARDS DO NOT EXIST, NOTIFY THE
ARCHITECT FOR CLARIFICATION, COORDINATE WITH ACCESSIBLE
REQUIREMENTS.
FF. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR FIRE
CAULKING ALL OPEN NEW OR EXISTING PENETRATIONS INTO THE
PROJECT AREA.
GG. OCCUPIED BUILDINGS DURING CONSTRUCTION, IN THE AREAS OF
DEMOLITION OR FOR CONSTRUCTION, SHALL BE BLOCKED OFF AND/OR
SEPARATED FROM THE AREAS OF OCCUPATION AS SHOWN ON THE
PLANS. (SEE INFECTION CONTROL SPECIFICATIONS SECTION 1000)
HH. OWNER SHALL HAVE AN APPROVED SUPERINTENDENT ON SITE DURING
WORKING HOURS AND THROUGH THE DURATION OF THE PROJECT. THE
SUPERINTENDENT MAY NOT BE REMOVED FROM THE PROJECT
WITHOUT PRIOR APPROVAL OF THE FACILITY, A/E AND THE PROJECT
MANAGER.
II. GENERAL CONTRACTOR SHALL PROVIDE A FULL SET OF DRAWINGS TO ALL
SUBCONTRACTORS, INCLUDING ALL CHANGE ORDERS, ASI, RFI, ADDENDA,
ETC. SUBCONTRACTORS ARE RESPONSIBLE TO COMPARE THEIR DRAWINGS
/ SCOPE OF WORK WITH ALL OTHER TRADES AND DISCIPLINES.
JJ. GENERAL CONTRACTOR SHALL RELOCATE ALL EXISTING FURNITURE, PLUG
EXITING HOLES IN SLAB, AND MOVE TO WHERE HHSA WOULD LIKE TO
RELOCATE FURNITURE. IF THE GENERAL CONTRACTOR IS ASKED BY THE
OWNER TO STORE THIS FURNITURE IN A WAREHOUSE IT NEEDS TO BE
INSURED AND BONDED, CONTRACTOR WILL REPLACE ALL FURNITURE THAT
IS DAMAGED SCRATCHES,ETC. AND IN A BONDED WAREHOUSE OTHERWISE
FURNITURE DAMAGED SCRATCHED IN ANY WAY SHALL BE REPLACED AT NO
COST TO THE OWNER.
W. THE GENERAL CONTRACTOR SHALL BE FULLY AND SOLELY
RESPONSIBLE FOR THE REMOVAL, REPLACEMENT AND RECTIFICATION
OF ALL DAMAGED AND DEFECTIVE MATERIALS AND WORKMANSHIP IN
CONNECTION WITH THE CONTRACT WORK HE SHALL REPLACE OR
REPAIRS AS DIRECTED BY THE ARCHITECT AND THE OWNER ALL SUCH
DAMAGE OR DEFECTIVE MATERIALS OR WORKMANSHIP WHICH
APPEARS WITHIN A PERIOD OF ONE YEAR FROM THE DATE OF
SUBSTANTIAL COMPLETION.
Y. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE
PROPER DISPOSAL OF ALL DEBRIS, AND SHALL NOT ALLOW THE
ACCUMULATION OF DEBRIS ON SITE DURING CONSTRUCTION SINCE
THE SPACES ADJACENT THE PROJECT WILL BE OCCUPIED. THE
GENERAL CONTRACTOR SHALL CONTINUALLY CLEAN THE PROJECT
SITE.
Z. ALL MATERIALS AND EQUIPMENT SHALL BE NEW. ANY MATERIAL OR
PRODUCT'S INDICATED IN THE CONSTRUCTION DOCUMENTS WITH AN
"OR EQUAL" MAY BE SUBMITTED IN THE MATERIAL OR PRODUCT HAS
BEEN APPROVED BY THE ARCHITECT/ ENGINEER AND THE OWNER.
CONTRACTOR SHALL SUBMIT SUBSTITUTION REQUEST PER PROJECT
MANUAL FOR APPROVAL PRIOR TO ORDERING.
E R
R A
D
5 O
GER
A
H
R
E
SI
T D
RIC
S
A
T
T E
C A LH
R
G
O M
ETI
S
CT
E X
T F
E
A S
JOB NO:
DATE:
DRAWN BY:
CHECKED BY:
2024 CHESNEY MORALES PARTNERS, INC.
ALL RIGHTS RESERVED. NO PART OF THIS
DOCUMENT MAY BE REPRODUCED OR UTILIZED
IN ANY FORM WITHOUT PRIOR WRITTEN AUTHORIZATION
OF CHESNEY MORALES PARTNERS, INC.
C
SHEET
P R
O J E
C T
N U
M B
E R
-2
-S
A H
A T
S A
N A
N T
O N
IO
S
T A
T E
H O
S P
IT
A
L
D A
T E
/1 /2
:5 :0
P
M
A0.2
DEMO & NEW GENERAL NOTES
2153.A
11/15/24
IA/MC
JW/TR
A
LA
M O
H A
LL
G
E R
IA
T
R
IC
M S
U R
E N
O V
A T
IO
N
S T
E X
A S
S T
A T
E H
E A
L T
H A
N D
H U
M A
N S
E R
V
IC
E S
C O
M M
IS
S
IO
N
S
N
E W
B R
A U
N F
E L S
A V
E
S A
N A
N T
O N
IO
T E
X A
S
FINAL CONSTRUCTION DOCUMENTS
/1
/2
DN
UP
UP
UP
UP
UP
DN
UP
DN
UPUP
UP
UP
X X
X X
X X
X X
X
X XX X X X X X X X X X X
X X
X X
X XX X X X X X X X X X X X X X
XX XX
X XX
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X XX X X
X X
X X
XX XXXXXXXXXXXXXX
X XX X XX
X X
X X
X X
X X
O O
O O
OO OOO
O O
O O
O O
O O
O O
O OO O O O O
O O
O O
O O
O O
O O
O O
O O
CC C
X X
X X
V V
V V V V
X X
X XX X X X
X X
X X
X
C C
C C
C C
C
C CC C C
C CC
C C
X X
X X
X XX X X X X X X X X X X
X
O OO O OO
O OOO OO
CC CC
X X
X
C C
X
X X
X X
X XX X X X X X X X X
X X
X
X XX X
X
X
X X
X X
XX XXXX
X XX
XX
X XX
XX X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
XX X
X X
X X
X X
UP
UP
UP
DN
X X
X X
X
X X
X X
X
X X X X X X X
X
X
XXXXXX
EGRESS LEGEND FIRE SAFETY LEGEND
1 HOUR FIRE RATED SMOKE
BARRIER
1 HOUR FIRE RATED WALL
EXISTING 1 HOUR FIRE
RATED WALL
PATH OF TRAVEL AND
TRAVEL DISTANCE
EXIT ROUTE
REQUIRED EXITEXIT WIDTH
(IN INCHES) SMOKE PARTITION WALL
REF
CHILLER
YARD
MODIFIED MECH. YARD
CHILLER
YARD
LOBBY/SCREENING
100ADMIN OFFICE
EXAM ROOM
CONSULT 1
PNA OFFICE
OFFICE
DOCTOR'S
OFFICE
SOCIAL OFFICE
PATIENT
CORRIDOR
ELEC. ROOM
124MECH. ROOM
122 ELEV. MACH.
ROOM
CONSULT 3
COMFORT
ROOM
MECH ROOM
146 IT / SERVER
SERVERY/
NOURISHMENT
MECH ROOM
SECURE
RECEIVING
EVS SUPPLY
STAFF T/R
PSYCHOLOGISTS
DOCTOR'S
OFFICE
CONFERENCE
TREATMENT
PLANNING &
TELEHEALTH
STORAGE
PATIENT
CORRIDOR
INCENTIVE
THERAPY
EXAM TOILET
FRONT PORCH
100A
NEW ELEVATOR
FIRE RISER
ROOM
STORAGE
PROGRAM
COORDINATOR
CONSULT 2
STAFF TOILET
STAIRS S2
STAIRS
120B
STAIRS
NORTH PORCH
GROUP
STAIRS
94' - 0"
21 sec
94' - 0"
21 sec
69' - 7"
16 sec
52' - 5"
12 sec
100' - 4"
23 sec
49' - 0"
11 sec
42' - 11"
10 sec
61' - 3"
14 sec
61' - 3"
14 sec
GROUP
EXISTING MECHANICAL YARD
EXISTING
MECHANICAL
BUILDING
NOT IN CONTRACT
NOT IN CONTRACT
NOT IN CONTRACT
NOT IN CONTRACT
167' - 11"
38 sec
70' - 9"
16 sec
76' - 7"
17 sec
85' - 1"
19 sec
E R
R A
D
5 O
GER
A
H
R
E
SI
T D
RIC
S
A
T
T E
C A LH
R
G
O M
ETI
S
CT
E X
T F
E
A S
JOB NO:
DATE:
DRAWN BY:
CHECKED BY:
2024 CHESNEY MORALES PARTNERS, INC.
ALL RIGHTS RESERVED. NO PART OF THIS
DOCUMENT MAY BE REPRODUCED OR UTILIZED
IN ANY FORM WITHOUT PRIOR WRITTEN AUTHORIZATION
OF CHESNEY MORALES PARTNERS, INC.
C
SHEET
P R
O J E
C T
N U
M B
E R
-2
-S
A H
A T
S A
N A
N T
O N
IO
S
T A
T E
H O
S P
IT
A
L
D A
T E
/1 /2
:5 :1
P
M
A0.3
CODE ANALYSIS
2153.A
11/15/24
IA/MC
JW/TR
A
LA
M O
H A
LL
G
E R
IA
T
R
IC
M S
U R
E N
O V
A T
IO
N
S T
E X
A S
S T
A T
E H
E A
L T
H A
N D
H U
M A
N S
E R
V
IC
E S
C O
M M
IS
S
IO
N
S
N
E W
B R
A U
N F
E L S
A V
E
S A
N A
N T
O N
IO
T E
X A
S
FINAL CONSTRUCTION DOCUMENTS
/1
/2 4D A
T E
/0 /2
SCALE : 1" = 20'-0"
BUILDING 521 & 598 LIFE SAFETY SITE PLAN
CODE SUMMARY
A. Occupancy Requirements
1. Existing Building Use (NOT APPLY) NOT APPLY
1. Building Occupancy (NOT APPLY) NOT APPLY
2. New Renovated Building Use
1. Building Occupancy Alamo Hall (521) Group I-2 (Section 308.3)
Seidel (598) Group B (Section 304.1)
3. Occupancy Separation (508 and 509)
1. Between B occupancy and I-2 2 hour, Sprinkled ( Table 508.4)
2. Between Accessories occupancy and I-2 No separation required ( Section 508.2.4)
3. Interior Stairs 1 hour separation
4. Waste and Linen collection rooms in Group I-2 occupancies 1 hour separation (Table 509)
5. Waste and Linen collection rooms over 100 s.f. 1 hour separation or provide sprinkler system.( Table 509)
6. Laboratories and vocational rooms not classified as Group H 1 hour separation or provide sprinkler system ( Table 509)
Located in a Group E or I-2 occupancy .
7. Second Flr at sleeping areas since the occupant load is greater than 50 1 Hr. fire rated smoke barrier.
1 Hr. fire rated smoke barrier
4. Building Area (Square Footages)
a. Existing Total Building Area 22,280 s.f. (11,140 s.f. per floor)
1. New Renovated Construction Area 22,280 s.f. ( 11,140 s.f. per floor)
5B. Total New Renovated Construction Requirements (IBC 2015 U.N.O)
1. Finish-out of interior of existing Alamo building: Group I-2 (building is sprinkled)
a. Construction Type Type II A,
b. Area Allowed Per Floor for Type II-A 44,000 s.f. per floor ( Table 503)
c. Number of Floors Allowed for Type II-A 2 stories. (Table 504.4)
2. Finish-out of interior of existing Seidel building: Group B (building is sprinkled)
a. Construction Type Type II B,
b. Area Allowed Per Floor for Type II-B 23,000 s.f. per floor ( Table 506.2)
c. Number of Floors Allowed for Type II-B 3 stories. (Table 504.4)
3. Fire-Resistive Ratings (Table 601 and 602)
a. Primary Structural Frame I 1 Hr.
b. Bearing Walls- Exterior 0 Hr. ( Table 602 separation distance)
c. Bearing Wall- Interior 1 Hr.
d. Nonbearing Walls-Exterior 0 Hr. ( Table 602 separation distance)
e. Nonbearing Walls-Interior 0 Hr.
f. Floor Construction 1 Hr.
g. Roof Construction 1 Hr.
4. Corridors (Section 407.3) Group I-2 and Group B Non Fire Rated Smoke Partitions (Section 710)
5. Smoke Barriers – Alamo Hall Only a: First Floor: To separate treatment/vocational areas of more than 50 occupants 1 Hr. (NFPA 101) b: Second Floor: To separate sleeping areas with more than 50 occupants. 1 Hr. (NFPA 101)
C. Occupant Load
1. Alamo Hall - Building 521
a. First Floor (11,140 s.f. / 100 s.f. / occupant = 112 occupants
b. Second Floor (11,140 s.f. /120 sf / occupant = 93 occupants
c. Total Occupant Load ( 22,280 s.f. /120 s.f. / occupant = 205 occupants
2. Seidel Hall - Building 598
a. First Floor 17,300 s.f. / 100 s.f. / occupant = 173 occupants
D. Egress Requirements
1. Maximum Travel Distance (from any room door to an exit) (NFPA 101)
a. Alamo Hall - Group I-2 150 Feet + 50 Feet = 200 Feet (NFPA 101)
b. Seidel group B 200 Feet (NFPA 101)
2. Maximum Common Path of Egress Travel Distance 10.16,2
a. Alamo Hall - Group I-2 100 feet (NFPA 101) Sprinklered
b. Seidel - Group B 75 Feet (NFPA 101) Non-Sprinklered
3. Distance between Exits (IBC 2021 Section 1007):
a. Alamo Hall - 1/3 the diagonal: 153/3=51' Separation is 108'
b. Seidel - 1/2 the diagonal: 103 / 2 = 52" Separation is 90'
4. Controlled egress door in Group I-2 (1010.1.9.6)
a. Exception 1 - Items 1 thru 4 shall not comply to doors to areas occupied by persons who, because of clinical needs, requires restraint or containment as part of the function of the psychiatric treatment area.
5. Egress Width (IBC 1012)
a. Corridor Egress Width .20 inches per occupant.
• Alamo Hall: 112 X .2 = 23"
• Seidel: 173 X .2 = 35" (Using 6' Corridors NFPA 101 Section 18.2.2.5)
b. Stair Egress Width .30 inches per occupant.
• Alamo Hall 112 X .3 = 34"
6. Maximum Dead End (NFPA 1011018.4)
a. No exception for Alamo Hall - Group I-2 20 Feet
b. Seidel 50 Feet
7. Minimum Number of Exits (Table 1006.2.1 100.3.1) Alamo Hall: 112 Occupants (Per Floor) - 2 Exits Required Seidel: 173 Occupants (Per Floor) - 2 Exits Required
8. Maximum distance from any point in a room to an exit : 200 feet (101) (IBC Table 1017.2 and Sprinklers)
9. Maximum distance from any point in a room to an exit access door 50 feet (NFPA 101) (IBC Section 407.4.2)
E. Plumbing Fixture Count ( IBC 2021 Table 2902.1 ) 1: Alamo Hall: I-2 Hospital 1 per room * Lavatories: 1 per room * Bathtubs/Showers: 1 per 15 186 occupants/15 = 12.4 bathtubs/showers
* Refer to Exception C : a single occupant toilet room with one water closet and one lavatory serving not more than two adjacent patient sleeping units shall be permitted provided that each patient sleeping unit has direct access to the toilet room and provision for privacy for the toilet room user is provided
Drinking Fountain: 1 per 100 186 occupants/100 = 2 drinking fountains Service Sink: 1 2: Alamo Hall: I-2 Employees Water Closet: 1 per 25 Estimated 25 employees: = 1 water closet Lavatories: 1 per 35 Estimated 25 employees: = 2 lavatories Drinking Fountains: 1 per 100 Estimated 25 employees: = 1 drinking fountain 3: Alamo Hall: I-2 Visitors Water Closets: 1 per 75 Estimated 40 visitors = 1 wc, 1 lav, 1 drinking fountain Lavatories: 1 per 100 4: Seidel - B occupants
a. Water closets: Women 87 employees = 3 water closets Men 87 employees = 3 water closets
b. Lavatories: 4 women / women
c. Drinking Fountains: 173 employees / 100 = 2 drinking fountains
Drinking Fountains 1 per 500
F. Window area in patient rooms: To be minimum 8% of patient room square footage.
APPLICABLE CODES
Building Codes (permit thru local jurisdiction not required):
1. International Building Code (2021 edition)
2. International Mechanical Code (2021 edition)
3. International Plumbing Code (2021 edition)
Safety Codes (mandated by Centers for Medicare/Medicare Services (CMS) and/or The Joint commission (TJC) and HHSC Regulatory Services:
1. NFPA 101 Life Safety Code (2012 edition)
2. NFPA 99 Health Care Facilities Code (2012 edition)
3. NFPA 70 National Electric Code (2020 edition)
4. NFPA 10 Portable Fire Extinguishers (2010 edition)
5. NFPA 13 Installation of Sprinkler Systems (2010 edition)
6. NFPA 72 National Fire Alarm Code (2010 edition)
7. NFPA 80 Fire Doors and Other Opening Protectives (2010 edition)
8. NFPA 90A Installation of Air Conditioning and Ventilating Systems (2012 edition)
9. NFPA 105 Smoke Door Assemblies and Other Opening Protectives (2010 edition) 10.NFPA 110 Emergency and Standby Power Systems (2010 edition)
Fire Codes (required by the State Fire Marshals Office):
1. NFPA 1 Fire Code ( 2015 edition)
2. International Fire Code (2021 edition)
Accessibility (state facilities fall under Title II - patient programs must be accessible):
1. Texas Accessibility Standards (2012 edition)
Energy Standards (required by SECO - State Energy Conservation Office):
1. ANSI/ASHARE 90.1 Energy Standards for Buildings Except Low-Rise Residential Buildings (2016 edition)
2. Texas Water Conservation Standards (standards and compliance form are on the SECO website https://comptroller.texas.gov/programs/seco/code/state-funded.php)
3. Review rainwater harvesting to determine is economically feasible for the project (per the SECO website).
4. International Energy Conservation Code (2018…