ESBD_373719_1726002023557_Q&A - RFP730-24084 Air Cooled Chiller Replacement REBID.pdf
PDF 58 KB Posted
- Solicitation number
- RFP730-24084
- Issued by
- Fort Bend County, Texas
About this file
This document is a Q&A related to a Request for Proposal (RFP) issued by the University of Houston for the turnkey replacement of an air-cooled chiller. The RFP, identified as RFP730-24084, is for the replacement of an existing air-cooled chiller at the University of Houston's Sugar Land campus. The replacement chiller must fit within the existing pad and utilize the existing electrical service. The University requires a 5-year full maintenance agreement with the replacement chiller, which should include quarterly preventative maintenance and an annual heat exchanger cleaning. The University is exempt from city permitting, and the work can be conducted during normal business hours.
The RFP requires the submission of a General Information Questionnaire and specific exhibits as part of the proposal. The University has indicated that no additional vibration reduction measures are required for the replacement chiller. Bidders are also advised to match the existing piping materials and flanges, and not use PVC. The contract will be awarded to a single vendor to provide a turnkey replacement of the air-cooled chiller.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q&A - RFP730-24084 Air Cooled Chiller Replacement REBID
1. What is the maximum length the replacement chiller can overhang the roof supports/pad?
Answer: Chiller Skid must fit within the existing Pad similar to the existing installed chillers.
2. What needs to be included in the 5 year maintenance agreement?
Answer: This will be a full maintenance (FM) no cost to the owner (Parts/Material). Bid will identify this as a separate line item (add alternate). Payment will be by an annualized schedule of value paying one year in advance.
3. What warranties need to be included and for what duration, i.e., parts, labor, compressor, refrigerant?
Answer: Full Maintenance Agreement, no cost/risk to owner for all OEM recommended PM and any required corrective maintenance and refrigerant. PM shall include 3 quarterly PM and an annual to include HX cleaning.
4. What is the maximum electrical service for the existing chiller?
Answer: Utilize the existing Chiller Breaker as the maximum available.
5. Will the isolation valves need to be replaced? And for further clarification, does the University want new thermometers, pressure gauges, Pete’s T&P plugs, flex connectors, y-strainers and thermowells or are we to reuse all existing specialties that are currently onsite?
Answer: Use existing piping, gauges, and attachments. If you have a best value improvement recommendation, include as an add alternate.
6. Upon review of the existing chiller on the existing roof supports there are no equipment vibration spring isolators or even neoprene vibration isolation pads. Will there be a requirement from TxDOT to install some type of vibration isolation pads when replacing the chiller or is the new chiller to sit directly onto the existing roof supports like the previous one?
Answer: Direct replacement, no additional vibration reduction required.
7. During the site visit it was noted that the chiller next to the one for REBID has currently been replaced and the piping material utilized was PVC Schedule 80. Is there a piping specification that we could receive, or could the University indicate what materials would be acceptable for piping the new chiller back into the existing piping system?
Answer: Like kind replacement, match existing piping materials and flanges (No PVC).
8. Please clarify if all work can be conducted during normal working hours or will there be a requirement to work nights, weekends and/or holidays?
Answer: Normal working hours.
9. Will Mechanical Permits be required from the awarded vendor? Or is the University exempt from City Permitting?
Answer: Exempt from city permitting. UH Electrical shop and HVAC shop will inspect installation.
10. May we please receive a list of all REQUIRED documents that need to be submitted with the bid package?
Answer:
a. GENERAL INFORMATION QUESTIONNAIRE (section 8) – answer all the questions.
b. Exhibits marked as required on the last page of the RFP. Exhibits C and D are for firms to review; only the awarded firm will need to sign/discuss during contracting.
Exhibit F is optional.