About this file

This document is a geotechnical investigation report containing piezo boring logs and laboratory test results for the Eastern Oregon University (EOU) West Steam Tunnel System Improvements project in La Grande, Oregon. The report documents two boreholes (B-1 and B-2) drilled on July 18, 2022, by Western States Soil Conservation, Inc., using mud rotary boring methods with a 4 7/8-inch diameter boring bit. Both boreholes were completed to depths of approximately 25 feet and included the installation of 2-inch Schedule 40 PVC well casing with 0.020-inch slot width screens set at 25.0 feet and 24.5 feet respectively, topped with flush-mount monuments and concrete surface seals. The boring logs identified subsurface soil conditions consisting of fill materials near the surface transitioning to very dense gravels with silt and sand at depth, with moisture content percentages ranging from 7 to 18 percent.

Laboratory analysis of samples from both boreholes included grain-size testing and Atterberg limits determinations. Boring B-1 samples from 7.5 feet and 20.0 feet depths showed P200 values of 11 percent and 15 percent respectively, while Boring B-2 samples from 10.0 feet and 20.0 feet depths exhibited P200 values of 20 percent and 9 percent respectively. The grain-size analysis indicated that soils at both locations consisted primarily of gravel and sand with varying percentages of silt and clay components. This subsurface investigation provides critical geotechnical data to support the design and construction planning for the steam tunnel system improvements, including the selective demolition, trenching, backfill, and new distribution piping and vault installation planned for the project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ehedberg Callout Piezometer B-1 ehedberg Callout Piezometer B-2 ehedberg Ellipse ehedberg Callout Approx.

Sump Pit ehedberg Text Box G Avenue ehedberg Text Box 8th Street ehedberg Text Box 7th Street ehedberg Ellipse ehedberg Ellipse

Flush-mount monument with 1 foot of concrete surface seal

2-inch Schedule 40 PVC well casing

Bentonite chips

12/20 filter pack sand

2-inch Schedule 40 PVC screen, 0.0.20-inch slot width

Driller Comment:

Change out of gravel at 11.5 feet.

Rig chatter at 17.5 feet.

P200 = 11%

Well #011-2161151 set at 25.0 feet

Surface elevation was not measured at the time of exploration.

11.5

17.5

25.3

.9 f e e t o n

/1

/2

SIEV

P200

Very dense, brown, silty GRAVEL with sand (GM), trace organics; moist, gravel is subrounded to subangular, weak to moderate cementation.

without organics at 7.5 feet

Very stiff, brown with orange and gray mottled, sandy SILT (ML); moist, sand is fine.

Very dense, brown-gray GRAVEL with silt and sand (GP-GM); moist, gravel is subrounded to subangular.

Exploration completed at a depth of

25.3 feet.

Hammer efficiency factor is 77.5 percent.

INSTALLATION AND

COMMENTS

MOISTURE CONTENT %

CORE REC%RQD%

BLOW COUNT

BORING B-1

COMPLETED: 07/18/22

FIGURE A-1

BORING BIT DIAMETER: 4 7/8 inches

LA GRANDE, OR

EOU-4-02

EOU STEAM TUNNEL SYSTEM IMPROVEMENTS

MATERIAL DESCRIPTION

T

ES

T

IN

G

DEPTH

FEET

LOGGED BY: H. Herinckx

SEPTEMBER 2022

BORING METHOD: mud rotary (see document text)

DRILLED BY: Western States Soil Conservation, Inc.

G R A

PH

IC

L O

G

SA

M

PL

E

EL

EV

A T

IO

N

D

EP

T H

B O

R

IN

G L

O G

N

V

P

ER

P A

G E

E O

U -4

-0

-B

_2 .G

P J

G D

I_ N

V

.G D

T

P R

IN

T

D A

T E:

/2

/2

:K

T

23-46-50/4"

11-50/4"

50/5"

50/3"

0 50 100

0 50 100

0.0

2.5

5.0

7.5

10.0

12.5

15.0

17.5

20.0

22.5

25.0

27.5

30.0

Flush-mount monument with 1 foot of concrete surface seal

2-inch Schedule 40 PVC well casing

Bentonite chips

12/20 filter pack sand

P200 = 15%

2-inch Schedule 40 PVC screen, 0.0.20-inch slot width

P200 = 9%

Well #011-2161188 set at 24.5 feet

Hole caved approximately 0.5 foot after flushing out.

Surface elevation was not measured at the time of exploration.

4.5

7.0

15.0

25.4

.6 f e e t o n

/1

/2

P200

P200

Soft to medium stiff, dark brown SILT with sand (ML), trace gravel and organics; moist, sand is fine to medium, gravel is angular - FILL.

Medium dense, dark brown, silty GRAVEL (GM), minor sand; moist, gravel is subangular - FILL.

Very dense, brown with yellow mottled, silty GRAVEL with sand (GM); moist, gravel is subrounded to subangular, sand is fine to coarse, weak to moderate cementation.

gray-brown at 10.0 feet

Very dense, brown-gray GRAVEL with silt and sand (GP-GM); moist, gravel is subrounded to subangular.

Exploration completed at a depth of

25.4 feet.

Hammer efficiency factor is 77.5 percent.

INSTALLATION AND

COMMENTS

MOISTURE CONTENT %

CORE REC%RQD%

BLOW COUNT

BORING B-2

COMPLETED: 07/18/22

FIGURE A-2

BORING BIT DIAMETER: 4 7/8 inches

LA GRANDE, OR

EOU-4-02

EOU STEAM TUNNEL SYSTEM IMPROVEMENTS

MATERIAL DESCRIPTION

T

ES

T

IN

G

DEPTH

FEET

LOGGED BY: H. Herinckx

SEPTEMBER 2022

BORING METHOD: mud rotary (see document text)

DRILLED BY: Western States Soil Conservation, Inc.

G R A

PH

IC

L O

G

SA

M

PL

E

EL

EV

A T

IO

N

D

EP

T H

B O

R

IN

G L

O G

N

V

P

ER

P A

G E

E O

U -4

-0

-B

_2 .G

P J

G D

I_ N

V

.G

IN

T

D A

T E:

/2

/2

:K

T

21-50/5"

46-50/1"

50/3"

50/5"

0 50 100

0 50 100

0.0

2.5

5.0

7.5

10.0

12.5

15.0

17.5

20.0

22.5

25.0

27.5

30.0

0.0010.010.11101001,000

COARSE

FINES

BOULDERS

D10

COARSE

GRAIN SIZE IN MILLIMETERS

P E R

C E N

T F

IN

E R

B Y

W E

IG

H T

SAND

(PERCENT)

7.5

SILT

D60

3/4" 40

MEDIUM

GRAVEL

(PERCENT)

FINE

4 10 20

D30

MOISTURE CONTENT

(PERCENT)

D5

SAMPLE DEPTH

(FEET)

U.S. STANDARD SIEVE NUMBERS

3"

FINE

COBBLES

CLAY

(PERCENT)

D50

3/8"

CLAY

EXPLORATION

NUMBER

1 1/2"

SILT

(PERCENT)

KEY

GRAIN-SIZE TEST RESULTS

100 200

SANDGRAVEL

18 4.72 2.71 0.71B-1

FIGURE

EOU STEAM TUNNEL SYSTEM IMPROVEMENTS

LA GRANDE, OR

EOU-4-02

AUGUST 2022

_GRAIN SIZE NO P200 EOU-4-02-B1_2.GPJ GEODESIGN.GDT PRINT DATE: 8/25/22:

B-1 7.5 18 40 48 12

B-1 20.0 20 11

B-2 10.0 20 15

B-2 20.0 18 9

GRAVEL

(PERCENT)

SAMPLE

DEPTH

(FEET)

SUMMARY OF LABORATORY DATA

ELEVATION

(FEET)

P200

(PERCENT)

SIEVE

PLASTIC

LIMIT

PLASTICITY

INDEX

ATTERBERG LIMITS

MOISTURE

CONTENT

(PERCENT)

SAMPLE INFORMATION

EXPLORATION

NUMBER

SAND

(PERCENT)

DRY

DENSITY

(PCF)

LIQUID

LIMIT

EOU-4-02

AUGUST 2022

EOU STEAM TUNNEL SYSTEM IMPROVEMENTS

LA GRANDE, OR

FIGURE

L A

B S

U M

M A

R Y

G D

I- N

V

E O

U -4

-0

-B

.G P J

G D

I_ N

V

.G

IN

T

D A

T E

File details come from the government source that posted it. Updated .