About this file

Large Potable Water Valve Replacement Project Summary

This is a design and construction document set prepared by the Long Beach Public Utilities Department for the Large Potable Water Valve Replacement Project (EO-3674, WD-16-24) in Long Beach, California. The project involves the replacement of large potable water gate valves and associated infrastructure at five locations: Orange Avenue and 57th Street, Wardlow Road and Woodruff Avenue, Stearns Street and Palo Verde Avenue, Stearns Street and De Ora Way, and El Dorado Park/Tarma Street. The design documents include comprehensive mechanical and site plans for valve demolition and installation, isolation diagrams, utility coordination drawings, and traffic control plans. The document set was prepared by JIG Consultants (318 W. Katella Avenue, Suite A, Orange, CA) and submitted by Robert J. Verceles, with project management by Joseph Gutierrez, Director of Water/Sewer Engineering. The design was finalized on September 23, 2025, and approved on October 2, 2025.

The project encompasses detailed specifications for valve replacements ranging from 20-inch to 36-inch diameter units at multiple intersections. Construction notes specify requirements for dewatering (ranging from 580 to 7,050 gallons depending on site), thrust block construction, pipeline isolation procedures, and mechanical connections. Traffic control plans are provided for all five work sites with details on temporary railing, portable delineators, flashing arrow signs, tubular markers, and changeable message sign placement. The project requires coordination with multiple public agencies including the City of Long Beach Engineering Department, Verizon, Southern California Edison, LB Energy, and Long Beach Fire Department, as identified in the utility coordination section of the plans.

View the file

Other files

File Type Posted
EO-3674-TCP_signed.pdf PDF
Notice of Intent to Award Contract_WD-54-22_Toro Enterprises.pdf PDF
EO-3674-Final Specs_signed.pdf PDF
UD-26-297_T_ItemExport.csv CSV file
EO3674_Addendum 1.pdf PDF
Addendum 2_r1 EO3674.pdf PDF
Seller Guidance V3~41.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LONG BEACH PUBLIC UTILITIES DEPARTMENT

LONG BEACH, CALIFORNIA

SUBMITTED BY:

ROBERT J. VERCELES

PROJECT MANAGER:

(EXPIRES: DECEMBER 31, 2026)

JOSEPH GUTIERREZ R.C.E. 55604 DATE

DIRECTOR OF WATER/SEWER ENGINEERING

TITLE SHEET AND SHEET INDEX

PROJECT

SITE

PROJECT

SITES

PROJECT

SITES

LOCATION MAP

N.T.S.

DIRECTOR OF WATER/SEWER ENGINEERING

MANAGER OF ENGINEERING

APPROVED

RECOMMENDED

DEPARTMENT DATE

BY CK'D.

CITY ENG.

VERIZON

EDISON CO.

LB ENERGY

FIRE

INPUT BY

AS-BUILT BY

POSTED GIS

CONSTRUCTED BY

GIS TILE

SPEC. NO

SECTION MAP

SERVICE ATLAS PAGE

GATE VALVES REC.

AS SHOWNSCALE

N/A

CONTRACT NO.

CHECKED BY

DESIGNED BY

DATE

DATE

CORRECTED BY

DATE

DATE

DATE

DATE

DATE 9/23/25

VARIOUS

DESCRIPTIONDATEREV.

EO - 3674

DRAWING / FILE NUMBER:

DATE

DATE

B. Anatole Falagán

GENERAL MANAGER

LONG BEACH UTILITIES DEPARTMENT

LARGE POTABLE WATER VALVE

REPLACEMENT PROJECT

RJO

JOE G.

FI

LE

N

AM

E:

M c_ dw g D

ES

IG

N B

Y:

N/A

MUNIS PROJECT: 6002010011

SHEET OF SHEETSDWG.

318 W. KATELLA AVENUE, SUITE A

ORANGE, CA 92867

(714) 978-4407 www.jigconsultants.com

9/23/25

SHEET INDEX

SHT # DWG # SHEET TITLE

1 G-01 TITLE SHEET AND SHEET INDEX

2 G-02 GENERAL NOTES, PUBLIC AGENCIES & UTILITIES, BENCHMARK & BASIS OF BEARINGS, AND UTILITY LEGEND

C-02

C-03

C-04

C-05

C-06

C-08 STEARNS STREET AND DE ORA WAY SITE PLAN

C-07

ORANGE AVENUE AND 57TH STREET SITE PLAN

ORANGE AVENUE AND 57TH STREET MECHANICAL PLAN AND SECTION

WARDLOW ROAD AND WOODRUFF AVENUE SITE PLAN

WARDLOW ROAD AND WOODRUFF AVENUE MECHANICAL PLAN AND SECTION

STEARNS STREET AND PALO VERDE AVENUE SITE PLAN

STEARNS STREET AND PALO VERDE AVENUE MECHANICAL PLAN AND SECTION

C-01 VALVE AND PIPELINE ISOLATION DIAGRAMS3

C-09 STEARNS STREET AND DE ORA WAY MECHANICAL PLAN AND SECTION11

C-10 EL DORADO PARK AND TARMA STREET SITE PLAN12

C-11 EL DORADO PARK MECHANICAL PLAN AND SECTION13

TCP TRAFFIC CONTROL PLANS15-19

C-12 TARMA STREET MECHANICAL PLAN AND SECTION14

9/23/25

10/2/2025

GENERAL NOTES, PUBLIC AGENCIES & UTILITIES, BENCHMARK

& BASIS OF BEARINGS, AND UTILITY LEGEND

SURVEY INFORMATION

INTERSECTION BASIS OF BEARINGS BENCHMARK

DIRECTOR OF WATER/SEWER ENGINEERING

MANAGER OF ENGINEERING

APPROVED

RECOMMENDED

DEPARTMENT DATE

BY CK'D.

CITY ENG.

VERIZON

EDISON CO.

LB ENERGY

FIRE

INPUT BY

AS-BUILT BY

POSTED GIS

CONSTRUCTED BY

GIS TILE

SPEC. NO

SECTION MAP

SERVICE ATLAS PAGE

GATE VALVES REC.

AS SHOWNSCALE

N/A

CONTRACT NO.

CHECKED BY

DESIGNED BY

DATE

DATE

CORRECTED BY

DATE

DATE

DATE

DATE

DATE 9/23/25

VARIOUS

DESCRIPTIONDATEREV.

EO - 3674

DRAWING / FILE NUMBER:

DATE

DATE

B. Anatole Falagán

GENERAL MANAGER

LONG BEACH UTILITIES DEPARTMENT

LARGE POTABLE WATER VALVE

REPLACEMENT PROJECT

RJO

JOE G.

FI

LE

N

AM

E:

M c_ dw g D

ES

IG

N B

Y:

N/A

MUNIS PROJECT: 6002010011

SHEET OF SHEETSDWG.

318 W. KATELLA AVENUE, SUITE A

ORANGE, CA 92867

(714) 978-4407 www.jigconsultants.com

9/23/25

VALVE AND PIPELINE ISOLATION DIAGRAMS

ORANGE AVENUE - VALVE REPLACEMENT

J34-WVA-030

WARDLOW RD & WOODRUFF AVE - VALVE REPLACEMENT

S23-WVA-020

STEARNS ST & PALO VERDE AVE - VALVE REPLACEMENT

S16-WVA-076

STEARNS ST & DE ORA WAY - VALVE REPLACEMENT

P16-WVA-038

EL DORADO PARK - VALVE REPLACEMENT

W22-WVA-046

DIRECTOR OF WATER/SEWER ENGINEERING

MANAGER OF ENGINEERING

APPROVED

RECOMMENDED

DEPARTMENT DATE

BY CK'D.

CITY ENG.

VERIZON

EDISON CO.

LB ENERGY

FIRE

INPUT BY

AS-BUILT BY

POSTED GIS

CONSTRUCTED BY

GIS TILE

SPEC. NO

SECTION MAP

SERVICE ATLAS PAGE

GATE VALVES REC.

AS SHOWNSCALE

N/A

CONTRACT NO.

CHECKED BY

DESIGNED BY

DATE

DATE

CORRECTED BY

DATE

DATE

DATE

DATE

DATE 9/23/25

VARIOUS

DESCRIPTIONDATEREV.

EO - 3674

DRAWING / FILE NUMBER:

DATE

DATE

B. Anatole Falagán

GENERAL MANAGER

LONG BEACH UTILITIES DEPARTMENT

LARGE POTABLE WATER VALVE

REPLACEMENT PROJECT

RJO

JOE G.

FI

LE

N

AM

E:

M c_ dw g D

ES

IG

N B

Y:

N/A

MUNIS PROJECT: 6002010011

SHEET OF SHEETSDWG.

318 W. KATELLA AVENUE, SUITE A

ORANGE, CA 92867

(714) 978-4407 www.jigconsultants.com

9/23/25

ORANGE AVE

PHILLIPS ST 57TH ST

WARDLOW RD

W O

O D

R U

FF

A

VE

STEARNS ST

PA

LO

V

ER

D E

AV

E

STEARNS ST

DE ORA WAY

EL DORADO

PARK

FREEWAY

TARMA ST

ORANGE AVENUE AND 57TH STREET

SITE PLANDIRECTOR OF WATER/SEWER ENGINEERING

MANAGER OF ENGINEERING

APPROVED

RECOMMENDED

DEPARTMENT DATE

BY CK'D.

CITY ENG.

VERIZON

EDISON CO.

LB ENERGY

FIRE

INPUT BY

AS-BUILT BY

POSTED GIS

CONSTRUCTED BY

GIS TILE

SPEC. NO

SECTION MAP

SERVICE ATLAS PAGE

GATE VALVES REC.

AS SHOWNSCALE

N/A

CONTRACT NO.

CHECKED BY

DESIGNED BY

DATE

DATE

CORRECTED BY

DATE

DATE

DATE

DATE

DATE 9/23/25

VARIOUS

DESCRIPTIONDATEREV.

EO - 3674

DRAWING / FILE NUMBER:

DATE

DATE

B. Anatole Falagán

GENERAL MANAGER

LONG BEACH UTILITIES DEPARTMENT

LARGE POTABLE WATER VALVE

REPLACEMENT PROJECT

RJO

JOE G.

FI

LE

N

AM

E:

M c_ dw g D

ES

IG

N B

Y:

N/A

MUNIS PROJECT: 6002010011

SHEET OF SHEETSDWG.

318 W. KATELLA AVENUE, SUITE A

ORANGE, CA 92867

(714) 978-4407 www.jigconsultants.com

9/23/25

E PHILLIPS ST E 57TH ST

ORANGE AVE

C-03

C-03

C-01

ORANGE AVENUE AND 57TH STREET

MECHANICAL PLAN AND SECTION

DIRECTOR OF WATER/SEWER ENGINEERING

MANAGER OF ENGINEERING

APPROVED

RECOMMENDED

DEPARTMENT DATE

BY CK'D.

CITY ENG.

VERIZON

EDISON CO.

LB ENERGY

FIRE

INPUT BY

AS-BUILT BY

POSTED GIS

CONSTRUCTED BY

GIS TILE

SPEC. NO

SECTION MAP

SERVICE ATLAS PAGE

GATE VALVES REC.

AS SHOWNSCALE

N/A

CONTRACT NO.

CHECKED BY

DESIGNED BY

DATE

DATE

CORRECTED BY

DATE

DATE

DATE

DATE

DATE 9/23/25

VARIOUS

DESCRIPTIONDATEREV.

EO - 3674

DRAWING / FILE NUMBER:

DATE

DATE

B. Anatole Falagán

GENERAL MANAGER

LONG BEACH UTILITIES DEPARTMENT

LARGE POTABLE WATER VALVE

REPLACEMENT PROJECT

RJO

JOE G.

FI

LE

N

AM

E:

M c_ dw g D

ES

IG

N B

Y:

N/A

MUNIS PROJECT: 6002010011

SHEET OF SHEETSDWG.

318 W. KATELLA AVENUE, SUITE A

ORANGE, CA 92867

(714) 978-4407 www.jigconsultants.com

9/23/25

WARDLOW ROAD AND WOODRUFF AVENUE

MANAGER OF ENGINEERING

APPROVED

RECOMMENDED

DEPARTMENT DATE

BY CK'D.

CITY ENG.

VERIZON

EDISON CO.

LB ENERGY

FIRE

INPUT BY

AS-BUILT BY

POSTED GIS

CONSTRUCTED BY

GIS TILE

SPEC. NO

SECTION MAP

SERVICE ATLAS PAGE

GATE VALVES REC.

AS SHOWNSCALE

N/A

CONTRACT NO.

CHECKED BY

DESIGNED BY

DATE

DATE

CORRECTED BY

DATE

DATE

DATE

DATE

DATE 9/23/25

VARIOUS

DESCRIPTIONDATEREV.

EO - 3674

DRAWING / FILE NUMBER:

DATE

DATE

B. Anatole Falagán

GENERAL MANAGER

LONG BEACH UTILITIES DEPARTMENT

LARGE POTABLE WATER VALVE

REPLACEMENT PROJECT

RJO

JOE G.

FI

LE

N

AM

E:

M c_ dw g D

ES

IG

N B

Y:

N/A

MUNIS PROJECT: 6002010011

SHEET OF SHEETSDWG.

318 W. KATELLA AVENUE, SUITE A

ORANGE, CA 92867

(714) 978-4407 www.jigconsultants.com

9/23/25

C-05

C-05

WARDLOW RD

WOODRUFF AVE

C-01

WARDLOW ROAD AND WOODRUFF AVENUE

DIRECTOR OF WATER/SEWER ENGINEERING

MANAGER OF ENGINEERING

APPROVED

RECOMMENDED

DEPARTMENT DATE

BY CK'D.

CITY ENG.

VERIZON

EDISON CO.

LB ENERGY

FIRE

INPUT BY

AS-BUILT BY

POSTED GIS

CONSTRUCTED BY

GIS TILE

SPEC. NO

SECTION MAP

SERVICE ATLAS PAGE

GATE VALVES REC.

AS SHOWNSCALE

N/A

CONTRACT NO.

CHECKED BY

DESIGNED BY

DATE

DATE

CORRECTED BY

DATE

DATE

DATE

DATE

DATE 9/23/25

VARIOUS

DESCRIPTIONDATEREV.

EO - 3674

DRAWING / FILE NUMBER:

DATE

DATE

B. Anatole Falagán

GENERAL MANAGER

LONG BEACH UTILITIES DEPARTMENT

LARGE POTABLE WATER VALVE

REPLACEMENT PROJECT

RJO

JOE G.

FI

LE

N

AM

E:

M c_ dw g D

ES

IG

N B

Y:

N/A

MUNIS PROJECT: 6002010011

SHEET OF SHEETSDWG.

318 W. KATELLA AVENUE, SUITE A

ORANGE, CA 92867

(714) 978-4407 www.jigconsultants.com

9/23/25

STEARNS STREET & PALO VERDE AVENUE

MANAGER OF ENGINEERING

APPROVED

RECOMMENDED

DEPARTMENT DATE

BY CK'D.

CITY ENG.

VERIZON

EDISON CO.

LB ENERGY

FIRE

INPUT BY

AS-BUILT BY

POSTED GIS

CONSTRUCTED BY

GIS TILE

SPEC. NO

SECTION MAP

SERVICE ATLAS PAGE

GATE VALVES REC.

AS SHOWNSCALE

N/A

CONTRACT NO.

CHECKED BY

DESIGNED BY

DATE

DATE

CORRECTED BY

DATE

DATE

DATE

DATE

DATE 9/23/25

VARIOUS

DESCRIPTIONDATEREV.

EO - 3674

DRAWING / FILE NUMBER:

DATE

DATE

B. Anatole Falagán

GENERAL MANAGER

LONG BEACH UTILITIES DEPARTMENT

LARGE POTABLE WATER VALVE

REPLACEMENT PROJECT

RJO

JOE G.

FI

LE

N

AM

E:

M c_ dw g D

ES

IG

N B

Y:

N/A

MUNIS PROJECT: 6002010011

SHEET OF SHEETSDWG.

318 W. KATELLA AVENUE, SUITE A

ORANGE, CA 92867

(714) 978-4407 www.jigconsultants.com

9/23/25

PALO VERDE AVE

STEARNS ST

C-07

C-07

C-01

STEARNS STREET AND PALO VERDE AVENUE

DIRECTOR OF WATER/SEWER ENGINEERING

MANAGER OF ENGINEERING

APPROVED

RECOMMENDED

DEPARTMENT DATE

BY CK'D.

CITY ENG.

VERIZON

EDISON CO.

LB ENERGY

FIRE

INPUT BY

AS-BUILT BY

POSTED GIS

CONSTRUCTED BY

GIS TILE

SPEC. NO

SECTION MAP

SERVICE ATLAS PAGE

GATE VALVES REC.

AS SHOWNSCALE

N/A

CONTRACT NO.

CHECKED BY

DESIGNED BY

DATE

DATE

CORRECTED BY

DATE

DATE

DATE

DATE

DATE 9/23/25

VARIOUS

DESCRIPTIONDATEREV.

EO - 3674

DRAWING / FILE NUMBER:

DATE

DATE

B. Anatole Falagán

GENERAL MANAGER

LONG BEACH UTILITIES DEPARTMENT

LARGE POTABLE WATER VALVE

REPLACEMENT PROJECT

RJO

JOE G.

FI

LE

N

AM

E:

M c_ dw g D

ES

IG

N B

Y:

N/A

MUNIS PROJECT: 6002010011

SHEET OF SHEETSDWG.

318 W. KATELLA AVENUE, SUITE A

ORANGE, CA 92867

(714) 978-4407 www.jigconsultants.com

9/23/25

STEARNS STREET AND DE ORA WAY

MANAGER OF ENGINEERING

APPROVED

RECOMMENDED

DEPARTMENT DATE

BY CK'D.

CITY ENG.

VERIZON

EDISON CO.

LB ENERGY

FIRE

INPUT BY

AS-BUILT BY

POSTED GIS

CONSTRUCTED BY

GIS TILE

SPEC. NO

SECTION MAP

SERVICE ATLAS PAGE

GATE VALVES REC.

AS SHOWNSCALE

N/A

CONTRACT NO.

CHECKED BY

DESIGNED BY

DATE

DATE

CORRECTED BY

DATE

DATE

DATE

DATE

DATE 9/23/25

VARIOUS

DESCRIPTIONDATEREV.

EO - 3674

DRAWING / FILE NUMBER:

DATE

DATE

B. Anatole Falagán

GENERAL MANAGER

LONG BEACH UTILITIES DEPARTMENT

LARGE POTABLE WATER VALVE

REPLACEMENT PROJECT

RJO

JOE G.

FI

LE

N

AM

E:

M c_ dw g D

ES

IG

N B

Y:

N/A

MUNIS PROJECT: 6002010011

SHEET OF SHEETSDWG.

318 W. KATELLA AVENUE, SUITE A

ORANGE, CA 92867

(714) 978-4407 www.jigconsultants.com

9/23/25

C-09

C-09

DE ORA WAY

STEARNS ST

C-01

STEARNS STREET AND DE ORA WAY

DIRECTOR OF WATER/SEWER ENGINEERING

MANAGER OF ENGINEERING

APPROVED

RECOMMENDED

DEPARTMENT DATE

BY CK'D.

CITY ENG.

VERIZON

EDISON CO.

LB ENERGY

FIRE

INPUT BY

AS-BUILT BY

POSTED GIS

CONSTRUCTED BY

GIS TILE

SPEC. NO

SECTION MAP

SERVICE ATLAS PAGE

GATE VALVES REC.

AS SHOWNSCALE

N/A

CONTRACT NO.

CHECKED BY

DESIGNED BY

DATE

DATE

CORRECTED BY

DATE

DATE

DATE

DATE

DATE 9/23/25

VARIOUS

DESCRIPTIONDATEREV.

EO - 3674

DRAWING / FILE NUMBER:

DATE

DATE

B. Anatole Falagán

GENERAL MANAGER

LONG BEACH UTILITIES DEPARTMENT

LARGE POTABLE WATER VALVE

REPLACEMENT PROJECT

RJO

JOE G.

FI

LE

N

AM

E:

M c_ dw g D

ES

IG

N B

Y:

N/A

MUNIS PROJECT: 6002010011

SHEET OF SHEETSDWG.

318 W. KATELLA AVENUE, SUITE A

ORANGE, CA 92867

(714) 978-4407 www.jigconsultants.com

9/23/25

EL DORADO PARK

MANAGER OF ENGINEERING

APPROVED

RECOMMENDED

DEPARTMENT DATE

BY CK'D.

CITY ENG.

VERIZON

EDISON CO.

LB ENERGY

FIRE

INPUT BY

AS-BUILT BY

POSTED GIS

CONSTRUCTED BY

GIS TILE

SPEC. NO

SECTION MAP

SERVICE ATLAS PAGE

GATE VALVES REC.

AS SHOWNSCALE

N/A

CONTRACT NO.

CHECKED BY

DESIGNED BY

DATE

DATE

CORRECTED BY

DATE

DATE

DATE

DATE

DATE 9/23/25

VARIOUS

DESCRIPTIONDATEREV.

EO - 3674

DRAWING / FILE NUMBER:

DATE

DATE

B. Anatole Falagán

GENERAL MANAGER

LONG BEACH UTILITIES DEPARTMENT

LARGE POTABLE WATER VALVE

REPLACEMENT PROJECT

RJO

JOE G.

FI

LE

N

AM

E:

M c_ dw g D

ES

IG

N B

Y:

N/A

MUNIS PROJECT: 6002010011

SHEET OF SHEETSDWG.

318 W. KATELLA AVENUE, SUITE A

ORANGE, CA 92867

(714) 978-4407 www.jigconsultants.com

9/23/25

WARDLOW RD

C-11

FREEWAY

C-01

EL DORADO

PARK

TARMA ST

C-12

C-11

C-12

EL DORADO PARK

MECHANICAL PLAN AND SECTIONDIRECTOR OF WATER/SEWER ENGINEERING

MANAGER OF ENGINEERING

APPROVED

RECOMMENDED

DEPARTMENT DATE

BY CK'D.

CITY ENG.

VERIZON

EDISON CO.

LB ENERGY

FIRE

INPUT BY

AS-BUILT BY

POSTED GIS

CONSTRUCTED BY

GIS TILE

SPEC. NO

SECTION MAP

SERVICE ATLAS PAGE

GATE VALVES REC.

AS SHOWNSCALE

N/A

CONTRACT NO.

CHECKED BY

DESIGNED BY

DATE

DATE

CORRECTED BY

DATE

DATE

DATE

DATE

DATE 9/23/25

VARIOUS

DESCRIPTIONDATEREV.

EO - 3674

DRAWING / FILE NUMBER:

DATE

DATE

B. Anatole Falagán

GENERAL MANAGER

LONG BEACH UTILITIES DEPARTMENT

LARGE POTABLE WATER VALVE

REPLACEMENT PROJECT

RJO

JOE G.

FI

LE

N

AM

E:

M c_ dw g D

ES

IG

N B

Y:

N/A

MUNIS PROJECT: 6002010011

SHEET OF SHEETSDWG.

318 W. KATELLA AVENUE, SUITE A

ORANGE, CA 92867

(714) 978-4407 www.jigconsultants.com

9/23/25

TARMA STREET

MECHANICAL PLAN AND SECTIONDIRECTOR OF WATER/SEWER ENGINEERING

MANAGER OF ENGINEERING

APPROVED

RECOMMENDED

DEPARTMENT DATE

BY CK'D.

CITY ENG.

VERIZON

EDISON CO.

LB ENERGY

FIRE

INPUT BY

AS-BUILT BY

POSTED GIS

CONSTRUCTED BY

GIS TILE

SPEC. NO

SECTION MAP

SERVICE ATLAS PAGE

GATE VALVES REC.

AS SHOWNSCALE

N/A

CONTRACT NO.

CHECKED BY

DESIGNED BY

DATE

DATE

CORRECTED BY

DATE

DATE

DATE

DATE

DATE 9/23/25

VARIOUS

DESCRIPTIONDATEREV.

EO - 3674

DRAWING / FILE NUMBER:

DATE

DATE

B. Anatole Falagán

GENERAL MANAGER

LONG BEACH UTILITIES DEPARTMENT

LARGE POTABLE WATER VALVE

REPLACEMENT PROJECT

RJO

JOE G.

FI

LE

N

AM

E:

M c_ dw g D

ES

IG

N B

Y:

N/A

MUNIS PROJECT: 6002010011

SHEET OF SHEETSDWG.

318 W. KATELLA AVENUE, SUITE A

ORANGE, CA 92867

(714) 978-4407 www.jigconsultants.com

9/23/25

TRAFFIC CONTROL GENERAL NOTES

1. WORKING HOURS SHALL BE 8:00AM TO 4:00PM, MONDAY THRU FRIDAY, UNLESS OTHERWISE

APPROVED BY THE CITY OF LONG BEACH, NO EXCEPTIONS.

2. ALL SIGNS, DELINEATORS, ETC. SHALL CONFORM TO THE LATEST EDITIONS OF THE STATE OF

CALIFORNIA STANDARD PLANS AND SPECIFICATIONS (LATEST EDITION), THE CALIFORNIA MANUAL

ON UNIFORM TRAFFIC CONTROL DEVICES (LATEST EDITION), THE PROJECT SPECIFICATIONS, AND

THESE PLANS.

3. ALL TRAFFIC CONTROL DEVICES SHALL BE KEPT IN THEIR PROPER POSITION AT ALL TIMES AND

SHALL BE REPAIRED, REPLACED, AND/OR CLEANED AS NECESSARY TO PRESERVE THEIR

APPEARANCE AND CONTINUITY.

4. THE ENGINEER RESERVES THE RIGHT TO OBSERVE THESE TRAFFIC CONTROL PLANS IN USE AND

MAKE ANY CHANGES NECESSITATED BY FIELD CONDITIONS. ALL SUCH CHANGES SHALL

SUPERCEDE THESE PLANS AND WILL BE DONE SOLELY AT THE CONTRACTOR'S EXPENSE

5. UPON COMPLETION OF THIS PROJECT, THE CONTRACTOR SHALL REMOVE ALL TEMPORARY TRAFFIC

CONTROL DEVICES AND RESTORE PERMANENT SIGNING AND STRIPING IMPACTED BY

CONSTRUCTION TO THEIR ORIGINAL CONDITION. CONTRACTOR RESPONSIBLE FOR THE REPAIR OF

ALL DAMAGED TRAFFIC LOOPS WITHIN 72 HOURS OF DAMAGE TO THEM.

6. ALL STRIPING, PAVEMENT MARKINGS, AND LEGENDS SHALL CONFORM TO CALTRANS STANDARD

PLANS A20A-A20D AND A24A-A24E.

7. SIGNS SHALL CONFORM TO THE CURRENT SIGN SPECIFICATIONS. SIGN SIZE SHALL BE THE

STANDARD SIZE NOTED IN THE SIGN SPECIFICATIONS UNLESS OTHERWISE NOTED IN THESE PLANS.

8. ALL TEMPORARY STRIPING, PAVEMENT MARKINGS, AND LEGENDS SHALL BE IN PAINT.

9. CONSTRUCTION OPERATIONS SHALL BE CONDUCTED IN SUCH A MANNER AS TO CAUSE AS LITTLE

INCONVENIENCE AS POSSIBLE TO ABUTTING PROPERTY OWNERS. ALL PROPERTIES THAT HAVE

ACCESS ADJACENT TO THE WORK AREA SHALL BE NOTIFIED IN WRITING 48 HOURS MINIMUM

BEFORE THE START OF WORK. THE NOTIFICATION SHALL DESCRIBE THE ACCESS LIMITATIONS, DATES OF LIMITATION, AND GIVE THE APPROXIMATE DATE AND TIME OF ACCESS RESTRICTION. NO

ACCESS SHALL BE RESTRICTED DURING NON-WORKING HOURS, EXCEPT AS APPROVED BY THE

ENGINEER.

10. TRAFFIC CONTROL SHOWN IN THESE PLANS IS INTENDED TO BE INSTALLED FOR THE DURATION OF

THE CONSTRUCTION FOR EACH SITE. I.E. 24 HOURS PER DAY.

11. TRENCHES SHALL BE BACKFILLED OR COVERED WITH STEEL TRAFFIC TRENCH PLATES DURING

NONWORKING HOURS.

12. THE FOLLOWING AGENCIES SHALL BE NOTIFIED 72 HOURS IN ADVANCE OF ANY DETOUR AND/OR

CONSTRUCTION ACTIVITIES:

PUBLIC WORKS:

CITY OF LONG BEACH (562) 570-6383

PUBLIC SAFETY:

CITY OF LONG BEACH POLICE DEPARTMENT (562) 435-6711

TRANSIT:

LONG BEACH TRANSIT (OPERATIONS) (562) 591-2301

LEGEND

SHEET INDEX

PAGE NO. SHEET DESCRIPTION

15 TC-01 TITLE SHEET

16 TC-02 ORANGE AVENUE AND EAST 57TH STREET

17 TC-03 EAST WARDLOW ROAD AND WOODRUFF AVENUE

18 TC-04 EAST STEARNS STREET & PALO VERDE AVENUE

19 TC-05 EAST STEARNS STREET & EAST DE ORA WAY

PROJECT SITE MAP

NOT TO SCALE

TRAFFIC CONTROL SIGNS

PROJECT

SITE(S)

DIRECTOR OF WATER/SEWER ENGINEERING

MANAGER OF ENGINEERING

APPROVED

RECOMMENDED

DEPARTMENT DATE

BY CK'D.

CITY ENG.

VERIZON

EDISON CO.

LB ENERGY

FIRE

INPUT BY

AS-BUILT BY

POSTED GIS

CONSTRUCTED BY

GIS TILE

SPEC. NO

SECTION MAP

SERVICE ATLAS PAGE

GATE VALVES REC.

AS SHOWN

SCALE

N/A

CONTRACT NO.

CHECKED BY

DESIGNED BY

DATE

DATE

CORRECTED BY

DATE

DATE

DATE

DATE

DATE 9/22/25

VARIOUS

DESCRIPTION

DATE

REV.

EO - 3674

DRAWING / FILE NUMBER:

DATE

DATE

B. Anatole Falagan

GENERAL MANAGER

LONG BEACH UTILITIES DEPARTMENT

LARGE POTABLE WATER VALVE

REPLACEMENT PROJECT

LLC

AGR

F I L E

N

A M

E

M c d w g

D

S

I G

N

B

Y

P R

E F

I N

M

I L

E S

T O

N E

N/A

MUNIS PROJECT:

SHEET OF SHEETSDWG.

9/22/25

HUNTINGTON BEACH

5622 RESEARCH DR, UNIT A

HUNTINGTON BEACH, CA 92649

TEL:(714)723-0401 FAX:(714)723-6220

1-855-222-T2UE | WWW.T2UE.COM

PORTABLE DELINEATOR FLASHING ARROW SIGN (FAS)

FAS SUPPORT OR TRAILER

WORK ZONE

TEMPORARY TRAFFIC

CONTROL SIGN

TYPE III BARRICADE

S

TYPE K-RAIL

TRAFFIC CONTROL PLANS

FOR WATERLINE CONSTRUCTION

AT THE INTERSECTIONS OF

ORANGE AVENUE & EAST 57TH STREET,

EAST WARDLOW ROAD AND WOODRUFF AVENUE,

EAST STEARNS STREET AND PALO VERDE AVENUE,

AND EAST STEARNS STREET AND EAST DE ORA WAY,

IN THE CITY OF LONG BEACH, CALIFORNIA TRAFFIC CONTROL CONSTRUCTION NOTES

FURNISH AND INSTALL TEMPORARY RAILING (TYPE-K) PER CALTRANS STD

PLANS T3A & T3B.

TITLE SHEET

L O

G

B

A

C H

V

D

C H

E R

R Y

V E

A T

L A

N T

E

L A

K E

W O

O

V

D

C L

A R

K

A

V E

B E

L L

F L

O W

V

D

P A

R

E

CARSON ST

ARTESIA BLVD

WARDLOW RD

SPRING ST

WILLOW ST

O R

A N

E

DEL AMO BLVD

S

T

O

N

R E

D O

N D

O

A

V E

STEARNS ST

L

S

Y

A

W O

O D

R U

F F

E

PROJECT SITE

CONTACT LONG BEACH

TRANSIT AT (562) 591-2301 72

HOURS PRIOR TO START OF

WORK FOR TEMPORARY

RELOCATION OF BUS STOP

PCMS

DIRECTION OF TRAVEL

SCREEN 1

M A J WOR K

S T R E E T

N A M E

FURNISH AND INSTALL 36-INCH HIGH SURFACE MOUNTED TUBULAR

MARKER(S) PER MUTCD, CH 6F, FIGURE 6F-102(CA), DETAIL HEREON.

FURNISH AND INSTALL PORTABLE CHANGEABLE MESSAGE SIGN (PCMS).

DISPLAY MESSAGE(S) PER HEREON.

PORTABLE CHANGEABLE MESSAGE SIGN NOTES

1. CONTRACTOR SHALL PROGRAM EACH SCREEN OF ALL PCMS TO DISPLAY

FOR TWO (2) SECONDS.

SCREEN 2

X X / X X / X X

T O

X X / X X / X X

SCREEN 2

U S E

A L T

R O U T E S

TWO (2) WEEKS PRIOR

TO CONSTRUCTION

DURING CONSTRUCTION

FURNISH AND INSTALL 36-INCH HIGH PORTABLE DELINEATOR(S) PER

MUTCD, CH 6F, FIGURE 6F-102(CA), DETAIL HEREON.

PCMS

P C

M S

P C

M S

PCMS

PCMS

PCMS

PCMS

PCMS

SCREEN 1

M A J WOR K

S T R E E T

N A M E

SIGNALIZED INTERSECTION

PORTABLE CHANGEABLE

MESSAGE SIGN

P C

M S

P C

M S

PORTABLE DELINEATOR DETAIL

3 inches Minimum

Retroreflective

Bands

Less than 42 inches;

36 inches Minimum

2 inches Maximum

3 inches

3 inches

2-6 inches

Weighted Base

NOT TO SCALE

TUBULAR MARKER DETAIL

Less than 42 inches;

28 inches Minimum

Surface Mount

NOT TO SCALE

2 inches Maximum

3 inches

3 inches

2-6 inches

Retroreflective

Bands

TUBULAR MARKER

W20-3

R3-5R

G20-2

W20-1

125' SHIFTING TAPER

250' BUFFER ZONE

50' LANE

CONTROL

100' WORK ZONE125' SHIFTING TAPER

54' LANE

CONTROL

W20-3

R3-5R

G20-2

W20-1

G20-2

W20-1

9'

9'

17'

10'

PROPOSED WATERLINE

CL

R/W

CL

G20-2

W20-1

R/W

R/W

R/W

W20-1

G20-2

C20(RT)

W1-4

(LT)

W1-4(RT)

R3-2

R3-2

C30 C30

TRAFFIC STRIPING

INSTALL T.A.N.P.A.T. ON THIS SIDE OF THE STREET ONLY

PROPOSED

LINESTOP(S)

250' 250' 250'

250'

R3-5R R3-5R

R3-5R R3-5R

DIRECTOR OF WATER/SEWER ENGINEERING

MANAGER OF ENGINEERING

APPROVED

RECOMMENDED

DEPARTMENT DATE

BY CK'D.

CITY ENG.

VERIZON

EDISON CO.

LB ENERGY

FIRE

INPUT BY

AS-BUILT BY

POSTED GIS

CONSTRUCTED BY

GIS TILE

SPEC. NO

SECTION MAP

SERVICE ATLAS PAGE

GATE VALVES REC.

AS SHOWN

SCALE

N/A

CONTRACT NO.

CHECKED BY

DESIGNED BY

DATE

DATE

CORRECTED BY

DATE

DATE

DATE

DATE

DATE 9/22/25

VARIOUS

DESCRIPTION

DATE

REV.

EO - 3674

DRAWING / FILE NUMBER:

DATE

DATE

B. Anatole Falagan

GENERAL MANAGER

LONG BEACH UTILITIES DEPARTMENT

LARGE POTABLE WATER VALVE

REPLACEMENT PROJECT

LLC

AGR

F I

M

E

M c d

S

I G

N

B

Y

P R

E F

I N

L

E S

T O

N E

N/A

MUNIS PROJECT:

SHEET OF SHEETSDWG.

9/22/25

HUNTINGTON BEACH

5622 RESEARCH DR, UNIT A

HUNTINGTON BEACH, CA 92649

TEL:(714)723-0401 FAX:(714)723-6220

1-855-222-T2UE | WWW.T2UE.COM

TRAFFIC CONTROL SIGNS

E PHILLIPS ST

ORANGE AVENUE AND EAST 57TH STREET

TRAFFIC CONTROL PLAN

SCALE: 1"=40'

40' 40'20'

ORANGE AVENUE

(SPEED LIMIT = 35MPH)

E 57TH ST

E 56TH ST

TRAFFIC CONTROL CONSTRUCTION NOTES

FURNISH AND INSTALL TEMPORARY RAILING (TYPE-K) PER CALTRANS STD

PLANS T3A & T3B.

FURNISH AND INSTALL 36-INCH HIGH SURFACE MOUNTED TUBULAR

MARKER(S) PER MUTCD, CH 6F, FIGURE 6F-102(CA), DETAIL HEREON.

FURNISH AND INSTALL 36-INCH HIGH PORTABLE DELINEATOR(S) PER

MUTCD, CH 6F, FIGURE 6F-102(CA), DETAIL HEREON.

LEGEND

PORTABLE DELINEATOR FLASHING ARROW SIGN (FAS)

FAS SUPPORT OR TRAILER

WORK ZONE

TEMPORARY TRAFFIC

CONTROL SIGN

TYPE III BARRICADE

S

TYPE K-RAIL

DIRECTION OF TRAVEL

SIGNALIZED INTERSECTION

TUBULAR MARKER

72' WORK AREA100' END TAPER

INSTALL T.A.N.P.A.T. ON THIS SIDE OF THE STREET ONLY

140' WORK AREA

INSTALL T.A.N.P.A.T. ON THIS SIDE OF THE STREET ONLY

125' SHIFTING TAPER

250' BUFFER ZONE 245' MERGING TAPER

G20-2

W20-1

250' 250' 250'

250'

35'

17'

35'

G20-2

W20-1

G20-2

W20-1

G20-2

W20-1

G20-2

W20-1

W20-1

G20-2

W20-1

W20-1

G20-2

G20-2

W20-1

G20-2

R3-18

R3-5R

R3-5R

G20-2

W20-1

C20(LT)W4-2(LT)

C30C30

C30

PROPOSED

WATERLINE

PROPOSED

LINESTOP

PROPOSED

WATER LINESTOP

CL

R/W R/W

R/W

R/W

TRAFFIC STRIPING

TRAFFIC STRIPING

R4-7A

C30

DIRECTOR OF WATER/SEWER ENGINEERING

MANAGER OF ENGINEERING

APPROVED

RECOMMENDED

DEPARTMENT DATE

BY CK'D.

CITY ENG.

VERIZON

EDISON CO.

LB ENERGY

FIRE

INPUT BY

AS-BUILT BY

POSTED GIS

CONSTRUCTED BY

GIS TILE

SPEC. NO

SECTION MAP

SERVICE ATLAS PAGE

GATE VALVES REC.

AS SHOWN

SCALE

N/A

CONTRACT NO.

CHECKED BY

DESIGNED BY

DATE

DATE

CORRECTED BY

DATE

DATE

DATE

DATE

DATE 9/22/25

VARIOUS

DESCRIPTION

DATE

REV.

EO - 3674

DRAWING / FILE NUMBER:

DATE

DATE

B. Anatole Falagan

GENERAL MANAGER

LONG BEACH UTILITIES DEPARTMENT

LARGE POTABLE WATER VALVE

REPLACEMENT PROJECT

LLC

AGR

F I

M

E

M c d

S

I G

N

B

Y

P R

E F

I N

L

E S

T O

N E

N/A

MUNIS PROJECT:

SHEET OF SHEETSDWG.

9/22/25

HUNTINGTON BEACH

5622 RESEARCH DR, UNIT A

HUNTINGTON BEACH, CA 92649

TEL:(714)723-0401 FAX:(714)723-6220

1-855-222-T2UE | WWW.T2UE.COM

EAST WARDLOW ROAD AND WOODRUFF AVENUE

TRAFFIC CONTROL PLAN

TRAFFIC CONTROL SIGNS

EAST WARDLOW ROAD

(SPEED LIMIT = 35MPH)

SCALE: 1"=40'

40' 40'20'

FAUST AVEWOODRUFF AVE

S

TRAFFIC CONTROL CONSTRUCTION NOTES

FURNISH AND INSTALL TEMPORARY RAILING (TYPE-K) PER CALTRANS STD

PLANS T3A & T3B.

FURNISH AND INSTALL 36-INCH HIGH SURFACE MOUNTED TUBULAR

MARKER(S) PER MUTCD, CH 6F, FIGURE 6F-102(CA), DETAIL HEREON.

FURNISH AND INSTALL 36-INCH HIGH PORTABLE DELINEATOR(S) PER

MUTCD, CH 6F, FIGURE 6F-102(CA), DETAIL HEREON.

LEGEND

PORTABLE DELINEATOR FLASHING ARROW SIGN (FAS)

FAS SUPPORT OR TRAILER

WORK ZONE

TEMPORARY TRAFFIC

CONTROL SIGN

TYPE III BARRICADE

S

TYPE K-RAIL

DIRECTION OF TRAVEL

SIGNALIZED INTERSECTION

TUBULAR MARKER

110' WORK AREA

PROPOSED WATERLINE

' B

U

F F

E R

Z O

N

E

' S

H

IF

T

IN

G

T A

P E

R

M

E

R

G

I

T

P

E

R

W20-1

C20(RT)

W4-2(RT)

G20-2

G20-2

W20-1

G20-2

W20-1

R9-11A(RT)

R9-11A(LT)

TRAFFIC STRIPING

CL

R/W

R/W

R/W

R/W

C30

PROPOSED

LINESTOP

C30

C30

C30

C30

C30

R4-8

E

X T

E N

D E

D

B

U F

F E

R

Z

O N

E

125' SHIFTING TAPER

R3-2

R3-2

R4-7A

250'

17'

TRAFFIC STRIPING

C30

245' BUFFER ZONE

250'250'250'

390' EXTENDED BUFFER ZONE

W20-1

C20(RT)

W4-2(RT)

G20-2

W20-1

G20-2

G20-2

W20-1

35'

35'

G20-2

W20-1

TRAFFIC STRIPING

C30

C30

TRAFFIC CONTROL SIGNS

EAST STEARNS STREET

(SPEED LIMIT = 35MPH)

SCALE: 1"=40'

40' 40'20'

PALO VERDE AVE

DIRECTOR OF WATER/SEWER ENGINEERING

MANAGER OF ENGINEERING

APPROVED

RECOMMENDED

DEPARTMENT DATE

BY CK'D.

CITY ENG.

VERIZON

EDISON CO.

LB ENERGY

FIRE

INPUT BY

AS-BUILT BY

POSTED GIS

CONSTRUCTED BY

GIS TILE

SPEC. NO

SECTION MAP

SERVICE ATLAS PAGE

GATE VALVES REC.

AS SHOWN

SCALE

N/A

CONTRACT NO.

CHECKED BY

DESIGNED BY

DATE

DATE

CORRECTED BY

DATE

DATE

DATE

DATE

DATE 9/22/25

VARIOUS

DESCRIPTION

DATE

REV.

EO - 3674

DRAWING / FILE NUMBER:

DATE

DATE

B. Anatole Falagan

GENERAL MANAGER

LONG BEACH UTILITIES DEPARTMENT

LARGE POTABLE WATER VALVE

REPLACEMENT PROJECT

LLC

AGR

F I

M

E

M c d

S

I G

N

B

Y

P R

E F

I N

L

E S

T O

N E

N/A

MUNIS PROJECT:

SHEET OF SHEETSDWG.

9/22/25

HUNTINGTON BEACH

5622 RESEARCH DR, UNIT A

HUNTINGTON BEACH, CA 92649

TEL:(714)723-0401 FAX:(714)723-6220

1-855-222-T2UE | WWW.T2UE.COM

EAST STEARNS STREET & PALO VERDE AVENUE

TRAFFIC CONTROL PLAN

MATCH LINE - SEE ABOVE

M A

T C

H

L I N

E

S

L O

W

PALO VERDE AVENUE

(SPEED LIMIT = 35MPH)

WOODRUFF AVEWOODRUFF AVE

405 NORTH OFF / ON RAMP

S

SS

TRAFFIC CONTROL CONSTRUCTION NOTES

FURNISH AND INSTALL TEMPORARY RAILING (TYPE-K) PER

CALTRANS STD PLANS T3A & T3B.

FURNISH AND INSTALL 36-INCH HIGH SURFACE MOUNTED TUBULAR

MARKER(S) PER MUTCD, CH 6F, FIGURE 6F-102(CA), DETAIL HEREON.

FURNISH AND INSTALL 36-INCH HIGH PORTABLE DELINEATOR(S) PER

MUTCD, CH 6F, FIGURE 6F-102(CA), DETAIL HEREON.

LEGEND

PORTABLE DELINEATOR FLASHING ARROW SIGN (FAS)

FAS SUPPORT OR TRAILER

WORK ZONE

TEMPORARY TRAFFIC

CONTROL SIGN

TYPE III BARRICADE

S

TYPE K-RAIL

DIRECTION OF TRAVEL

SIGNALIZED INTERSECTION

TUBULAR MARKER

100' WORK ZONE250' BUFFER ZONE50' TAPER250'250'250'250' 50' TAPER 50'

250' 250' 250' 250'50'

PROPOSED WATERLINE

W3-4

G20-2

C9A

W20-4

W20-1

W3-4

G20-2

C9A

W20-4

W20-1

W3-4

G20-2

C9A

W20-4

W20-1

17'

10'

10'

17'

C30 C30 C30

W3-4

C9A

W20-4

G20-2

W20-1

INSTALL T.A.N.P.A.T. ON BOTH SIDES OF THE STREET

R/W

R/W

CL

PROPOSED LINESTOP

TRAFFIC STRIPING

R3-5R

TRAFFIC CONTROL SIGNS

EAST STEARNS STREET

(SPEED LIMIT = 35MPH)

SCALE: 1"=40'

40' 40'20'

E DE ORA WY

DIRECTOR OF WATER/SEWER ENGINEERING

MANAGER OF ENGINEERING

APPROVED

RECOMMENDED

DEPARTMENT DATE

BY CK'D.

CITY ENG.

VERIZON

EDISON CO.

LB ENERGY

FIRE

INPUT BY

AS-BUILT BY

POSTED GIS

CONSTRUCTED BY

GIS TILE

SPEC. NO

SECTION MAP

SERVICE ATLAS PAGE

GATE VALVES REC.

AS SHOWN

SCALE

N/A

CONTRACT NO.

CHECKED BY

DESIGNED BY

DATE

DATE

CORRECTED BY

DATE

DATE

DATE

DATE

DATE 9/22/25

VARIOUS

DESCRIPTION

DATE

REV.

EO - 3674

DRAWING / FILE NUMBER:

DATE

DATE

B. Anatole Falagan

GENERAL MANAGER

LONG BEACH UTILITIES DEPARTMENT

LARGE POTABLE WATER VALVE

REPLACEMENT PROJECT

LLC

AGR

F I

M

E

M c d

S

I G

N

B

Y

P R

E F

I N

L

E S

T O

N E

N/A

MUNIS PROJECT:

SHEET OF SHEETSDWG.

9/22/25

HUNTINGTON BEACH

5622 RESEARCH DR, UNIT A

HUNTINGTON BEACH, CA 92649

TEL:(714)723-0401 FAX:(714)723-6220

1-855-222-T2UE | WWW.T2UE.COM

EAST STEARNS STREET & EAST DE ORA WAY

TRAFFIC CONTROL PLAN

CONTRACTOR SHALL COORDINATE

DAILY ACCESS RESTRICTIONS WITH

THE RESIDENTS OF:

4900, 4902, 4908, & 4910

EAST STEARNS STREET

TRAFFIC CONTROL CONSTRUCTION NOTES

FURNISH AND INSTALL TEMPORARY RAILING (TYPE-K) PER CALTRANS STD

PLANS T3A & T3B.

FURNISH AND INSTALL 36-INCH HIGH SURFACE MOUNTED TUBULAR

MARKER(S) PER MUTCD, CH 6F, FIGURE 6F-102(CA), DETAIL HEREON.

FURNISH AND INSTALL 36-INCH HIGH PORTABLE DELINEATOR(S) PER

MUTCD, CH 6F, FIGURE 6F-102(CA), DETAIL HEREON.

LEGEND

PORTABLE DELINEATOR FLASHING ARROW SIGN (FAS)

FAS SUPPORT OR TRAILER

WORK ZONE

TEMPORARY TRAFFIC

CONTROL SIGN

TYPE III BARRICADE

S

TYPE K-RAIL

DIRECTION OF TRAVEL

SIGNALIZED INTERSECTION

TUBULAR MARKER

Sheets and Views
LON0290_G-01-G-01
1
LON0290_G-02-G-02
1
LON0290_C01_Isolation Diagrams-C-01
LON0290_C02_Site1_Plan-C-02
LON0290_C03_Site1_Mechanical-C-03
LON0290_C04_Site2_Plan-C-04
LON0290_C05_Site2_Mechanical-C-05
LON0290_C06_Site3_Plan-C-06
LON0290_C07_Site3_Mechanical-C-07
LON0290_C08_Site4_Plan-C-08
LON0290_C09_Site4_Mechanical-C-09
LON0290_C10_Site5_Plan-C-10
LON0290_C11_Site5_Mechanical-C-11
LON0290_C12_Site5_Mechanical-C-12
T2ue TCP (EO-3674) - 09.22.2025.pdf
Sheets and Views
LON0290 TRAF-CONT-TC-01
LON0290 TRAF-CONT-TC-02
LON0290 TRAF-CONT-TC-03
LON0290 TRAF-CONT-TC-04
LON0290 TRAF-CONT-TC-05

File details come from the government source that posted it. Updated .