ADDENDUM NO. 2 - LARGE POTABLE WATER VALVE REPLACEMENT PROJECT

This is Addendum No. 2 to the contract documents for the Large Potable Water Valve Replacement Project issued by the Long Beach Public Utilities Department on December 2, 2025. The project involves the replacement of large potable water valves at five locations: Orange Avenue & 57th Street, Wardlow Road & Woodruff Avenue, Stearns Street & Palo Verde Avenue, De Ora Way, and El Dorado Park. The contract duration has been revised to 210 calendar days after issuance of Notice to Proceed #2 to accommodate long lead times for large butterfly valves, which currently require approximately 28 weeks for delivery. The addendum addresses 15 bidder questions and clarifies project requirements, including confirmation that traffic control devices will remain in place 24 hours per day, seven days per week at each site. Work must be performed consecutively at one location before moving to the next, with Stearns Street and De Ora Way scheduled during summer months (July to August). Two Notice to Proceeds will be issued: NTP #1 for administrative activities such as permit processing and material ordering, and NTP #2 for mobilization and field work, with no public right-of-way work permitted until NTP #2 is received.

The addendum provides significant clarifications regarding materials and methods. Native material is approved for trench backfill provided it meets LBUD Standard WDS-406 requirements and receives third-party geotechnical engineering approval at the contractor's expense. The term "restrained flange coupling adapter" can be satisfied either by manufactured units such as Ebaa Iron Megaflange Series 2100 for smaller diameters or by standard flange coupling adapters restrained using external harness-style systems or tie rods per AWWA M-11 for larger pipe diameters. Bacteriological testing is required and shall be provided by the contractor; most locations will use swabbing for disinfection while Palo Verde and Stearns locations require full disinfection due to replacement classification. The work at El Dorado Park and Tarma Street is considered a single site, allowing concurrent work by separate crews at these locations. A site trailer is not mandatory, and potholing operations must submit separate traffic control plans to the City of Long Beach Public Works for approval. Revised specifications, bid pages, traffic control plans, and site plans for Stearns Street and De Ora Way are included as attachments to this addendum.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AD2-1

1800 E. Wardlow Road Long Beach, CA 90807

562.570.2300 │LBUtilities.org

December 2, 2025

ADDENDUM NO. 2

TO THE CONTRACT DOCUMENTS

Long Beach Public Utilities Department Long Beach, California Specifications No. WD-16-24 Drawing No. EO-3674

LARGE POTABLE WATER VALVE REPLACEMENT PROJECT

ORANGE AVENUE & 57TH STREET / WARDLOW ROAD & WOODRUFF AVENUE /

STEARNS STREET & PALO VERDE AVENUE / DE ORA WAY / EL DORADO PARK

TO ALL PLAN HOLDERS

The following amendment is hereby made a part of the Contract Documents of the subject project as fully and completely as if the same were set forth therein. This Addendum No.

2 consists of pages AD2-1 to AD2-5.

BIDDER QUESTIONS

1. Question: Please confirm traffic control devices/equipment will remain in place 24 hours a day/7 day a week at each project site until completion of work at each site (I.E. One time setup and one time removal of traffic control equipment/devices at each project site). Please see Traffic Control General Note #10 on sheet TC-01.

Answer: Yes. Traffic control devices/equipment will remain in place 24 hours a day/7 days a week because of the linestop towers which will extend past the street grade.

See revised Traffic Control Plans.

2. Question: It seems the flagman legend is missing in traffic control plans. I see only on drawing TC-05 flagman legend/symbol. I assumed 3 flagmen on sheet TC-05 will be required. Please confirm/clarify. If flagmen are required, are they supposed to be present 24 hours a day/7 day a week for duration of work?

Answer: See revised Traffic Control Plans.

3. Question: Can we use an area at El Dorado Park as contractor’s staging area if agreed by the Long Beach Utilities? We will secure staging area and repair any damage if any to staging area and restore it to original condition.

2 | P a g e

AD2-2

Answer: No, the Contractor is not allowed to use El Dorado Park as a staging area unless prior authorization is received. The Contractor can reach out to City of Long Beach Parks, Recreation & Marine to obtain authorization.

4. Question: On page 6 of the bid documents, the line stops are referenced. Please confirm if these are intended to be butterfly valves for the manufacturer and model number to be provided

Answer: The intent of Item A is to specify lead time for long lead items. The intent of Item B is to specify manufacturers (or subcontractor for linestop installation). See revised Page 5 and 6 of the Bid Documents

5. Question: Given that the lead time for large butterfly valves is currently approximately

28 weeks, please confirm whether the contract duration can be adjusted to accommodate these material lead times.

Answer: Contract duration has been adjusted to 210 calendar days.

6. Question: Are we doing bacteria test on these sections of work?

Answer: Yes. Bacteriological testing is required and shall be provided by the Contractor. See Section 33 13 00, Part 3.2.

7. Question: Is swabbing method approved for disinfection? If not, who will be responsible for sampling?

Answer: Most of these locations are considered repair therefore swabbing for disinfection is acceptable. The Work at Palo Verde and Stearns is considered replacement therefore full disinfection is required. The Contractor is responsible for collecting the samples and laboratory testing for all locations.

8. Question: Will the work be done consecutively? Meaning finishing one location and starting next location immediately.

Answer: Yes. Only one location can be worked on and must be completed before moving on to the next location. The work on Stearns Street and De Ora Way will also need to be scheduled during the summer months (July to August). See Section 01 10 01 for Sequence of Construction.

9. Question: Confirm traffic control plans for potholing will be different than the traffic control plans provided for valve replacements?

Answer: The Contractor will need to submit traffic control plans for potholing operations to the City of Long Beach Public Works for approval. The traffic control plans included in the plan set are for construction work when k-rails are in place. See Section 01 55 26, Part 1.4-A.

3 | P a g e

AD2-3

10. Question: Is native dirt approved for backfill?

Answer: Native material can be used for trench backfill according to LBUD Standard WDS-406 provided it meets specific requirements (suitable soil material) according to Section 31 23 33. Native material shall be tested for use in trench zone by third party Geotechnical Engineer, at Contractor’s expense. Recommendation to use native material shall be approved by LBUD, prior to use for any trench backfill.

11. Question: Is a site trailer mandatory?

Answer: No.

12. Question: Are we allowed to work concurrently at 2 separate job sites?

Answer: See response to Question 8.

13. Question: We assumed work at Tarma Street and El Dorado Park can be performed at the same time utilizing 2 separate crews working concurrently. Please confirm/advise.

Answer: The Work at El Dorado Park and Tarma Street is considered one site therefore separate crews working concurrently at these locations is allowed.

14. Question: Per Supplementary General Conditions SGC-2.3, we assumed 2 Notice

To Proceeds (NTP’s) will be issued. The administrative NTP (First NTP) will allow contractor to begin administrative project activities such as permits and submittal process and potholing. Due to current market condition and long lead time for material procurement, we assumed potholing will also be allowed during administrative NPT for field measurement of existing piping and for exposing any other possible utility conflicts, etc. Contract time will start after potholing. Please confirm/clarify.

Answer: See revision to SGC-2.3 which includes the two Notice to Proceeds. No work is allowed in the public right-of-way until the Contractor receives NTP #2. Potholing will be performed after receiving NTP #2.

15. Question: The manufacturers are telling us that they do not make flange coupling adapters over 12”, please see attached cut sheet and advise on an alternative the agency would like to use.

Answer: The term “restrained flange coupling adapter” can be interpreted as: 1) a manufactured restrained flange coupling adapter such as Ebaa Iron Megaflange Series 2100, or 2) a standard flange coupling adapter, restrained using supplemental means (i.e. external harness-style systems, tie rods per AWWA M-11). For larger pipe diameters, the latter option is the preferred alternative. See revisions to Section 33 05 33.

4 | P a g e

AD2-4

CONTRACT DOCUMENTS

The following clarifications, additions, and deletions are made to the Specifications and Construction Plans as stated below:

SPECIFICATIONS:

1. Notice Inviting Bids – Completion of Work

REVISE the paragraph to read as follows:

“COMPLETION OF WORK: The Work must be completed within Two Hundred and Ten (210) calendar days after the commencement date stated in Notice to Proceed #2.

2. Bid To The Board of Public Utilities Commissioners of the City of Long Beach

DELETE Bid – Page 4 and 5 and REPLACE with revised Page 4 and 5 (attached).

3. Supplementary General Conditions

REVISE SGC-2.3 Commencement of Contract Time; Notice to Proceed, to read as follows:

“Add the following section:

The City will issue two Notice to Proceeds (NTP). The NTP #1 will be for administrative duties. NTP #1 will allow the Contractor to begin administrative activities, such as permit processing, and preparing submittals for long lead items

(large butterfly valves), ordering long lead items, and receiving long lead items.

NTP #2 will be issued at initial mobilization or when the longest lead items are received, whichever is earlier. Contract Time will begin after the issue of NTP #2.”

4. Section 33 05 33 – Couplings, Tie Rods, Flange Connectors, and Unions

DELETE Section 33 05 33 in its entirety and REPLACE with revised Section 33 05 33 (attached).

5 | P a g e

AD2-5

CONSTRUCTION PLANS:

1. Drawing G-02 – General Notes, Public Agencies & Utilities, Benchmark & Basis of

Bearings, and Utility Legend

ADD General Note 39 to read as follows:

“39. Contractor to coordinate with LBUD representative to observe turn counts for large butterfly valves from fully open to fully close. This work will be performed by the Contractor with the valves above ground and prior to installation.”

2. Drawing C-08 – Stearns Street and De Ora Way Site Plan

DELETE Drawing C-08 and REPLACE with revised Drawing C-08 (attached).

3. Drawings TC-01 through TC-05 – Traffic Control Plans

DELETE Drawings TC-01 through TC-05 and REPLACE with revised Drawings TC-01 through TC-05 (attached).

A signed copy of the Addenda Acknowledgement form provided in Part 1 of the Bidding Requirements and a copy of this addendum must accompany the Bid Submittal.

Questions regarding the project shall be directed to Valeri Karakanov at (562) 570-2331.

Sincerely, Robert J. Verceles, P.E.

Director of Water/Sewer Engineering

Att.

cc: Valeri Karakanov, PE – Senior Civil Engineer, LBUD Joseph Gutierrez, PE – Engineer of Record, JIG Consultants wadepew Image

Board of Public Utilities Commissioners Bid of the City of Long Beach Page 5 of 12

STATEMENTS BY BIDDER

LARGE POTABLE WATER VALVE REPLACEMENT PROJECT

ORANGE AVENUE & 57TH STREET, WARDLOW ROAD & WOODRUFF AVENUE,

STEARNS STREET & PALO VERDE AVENUE / DE ORA WAY, EL DORADO PARK

PER SPECIFICATION WD-16-24

Bidder shall indicate opposite each item listed below the name of the manufacturer and product model number proposed to be used for the Work. An award to the Bidder will not imply approval by the Owner of a manufacturer or supplier listed by the bidder. However, if a manufacturer or supplier is acceptable to the Owner, the Bidder shall furnish the items from the manufacturer or supplier indicated. Any manufacturer or supplier listed in the Contract may be substituted, changed, or omitted by the successful bidder, subject to the approval of the Owner, without subjecting the Owner to any liability for the substitution, change or omission.

The listing of any manufacturer or supplier in the Contract does not, and is not intended to grant any right, title, or interest in the Contract for the benefit of the named manufacturer or supplier. Each Bidder shall inform in writing each named manufacturer or supplier that the named manufacturer or supplier is listed for information purposes only and that the manufacturer or supplier may be substituted, changed or omitted by the Bidder in accordance with the law and subject to the approval of the Owner, without subjecting the Owner to any liability for the substitution, change or omission. The Bidder shall reimburse the Owner for any expenses incurred by the Owner as a result of the Bidder’s failure to notify each named manufacturer or supplier.

The listing of lead times for delivery is for informational purposes only and will not affect the Contract Time(s) specified herein or entitle the Bidder, who becomes the Contractor, to extensions(s) of time. The Bidder is responsible for obtaining delivery of all items at times that will ensure completion within the Contract Time(s).

A. Lead time for delivery from date of signing the Contract shall be as follows:

Large Diameter Steel Pipe

36-inch Butterfly Valve

30-inch Butterfly Valve

20-inch Butterfly Valve

Board of Public Utilities Commissioners Bid of the City of Long Beach Page 6 of 12

B. The Bidder intends to furnish materials supplied by the following manufacturers:

(Bidder shall list one manufacturer only for each item.)

Item Manufacturer Model Number

Large Diameter Steel Pipe _____ _____

Butterfly Valves _____ _____ ____

Linestop Fittings _____ _____ ____

Linestop Subcontractor _____ _____ ____

C. Person who inspected site of the Work for the Bidder:

Name__________________________ Date of Inspection:__________________

Name__________________________ Date of Inspection:__________________

D. It is agreed that, if requested by the Owner, the Bidder shall furnish a notarized financial statement, references, and other information, sufficiently comprehensive to permit an appraisal of Bidder’s current financial condition.

E. The Bidder shall furnish the following information. Failure to comply with this requirement will render the Bid non-responsive and may cause its rejection.

Additional sheets may be attached if necessary.

1) Street Address ________________________________________________

2) Type of Firm: Individual _____________________________________

Partnership _____________________________________ Limited__________ General_________

Limited Liability Company__________ State___________

Joint Venture_____________________________________

Corporation _____________________________________

State of Incorporation or Partnership __________________

3) Telephone ________________________________________________

4) Contractor’s license: Primary Class______ Lic. No. ____________________

Supplemental classifications held, if any:_______________________________

5) DIR Public Works Contractor Registration No. ___________________________

Large Potable Water Valve Replacement Project (EO-3674) 33 05 33 – Couplings, Tie Rods, Flange Connectors and Unions - 1 of 6

SECTION 33 05 33

COUPLINGS, TIE RODS, FLANGE CONNECTORS, AND UNIONS

PART 1 - GENERAL

1.1 Work Included

A. Materials, testing, and installation of bolted sleeve-type couplings, tie rods, flange coupling adaptors, unions, and appurtenant joint and coating systems.

B. Refer to Long Beach Utilities Department Standard Drawing WDS104 and WDS105 for requirements for tie-rod bars and clamps for pipe 4”-12”.

1.2 Related Work

A. Section 01 22 00: Unit Prices B. Section 01 33 00: Submittal Procedures C. Section 01 40 00: Quality Requirements D. Section 01 66 00: Product Shipment, Storage, and Handling Requirements E. Section 09 90 00: Painting and Coating in SCAQMD F. Section 09 96 56: Epoxy Protective Coating System G. Section 33 05 31: Piping Joint Materials H. Section 33 11 19: Coating, Mastic and Tape-Wrap Systems for Metal Pipe I. Section 33 11 20: Polyethylene Encasement for Iron Pipe, Fittings, Couplings, and Valves

1.3 System Description

A. Furnish and install complete functional coupling, joint or joint-restraint system including appurtenant structural, and mechanical mountings, thrust restraints, or connections and coatings required for compliance with Manufacturer’s installation requirements, and compliance with AWWA and other applicable standards.

1.4 Quality Assurance

A. Use adequate numbers of skilled workmen trained and experienced in necessary trades and crafts and completely familiar with specified requirements and methods for proper performance of Work of this section.

B. Products coming into contact with potable water shall contain no more than 0.25% lead by average weight in compliance with Section 116875 of California Health and Safety Code.

C. Verify outside pipe diameter by field measuring pipe circumference before ordering materials. Factory testing shall include:

ITEM TEST FOR

TEST STANDARD

(ASTM OR OTHER

TEST STANDARD) FREQUENCY

FIRST

TEST PAID

FOR BY

RETESTS

PAID FOR

BY

Bolted Sleeve-Type Couplings and Flanged Coupling Adaptors

Proof-of-Design Test

Refer to AWWA C219 §5.2.2

1 prototype of each item

Contractor Contractor

Bolted Split-Sleeve Couplings

Proof-of-Design Test

Refer to AWWA C227 §5.2.2

1 prototype of each item

Contractor Contractor

Fusion-Bonded Epoxy Linings

Holidays and Lining Thickness

Refer to Section 09 96

1 each item Contractor Contractor

1.5 References

A. Reference publications below form part of this specification to extent referenced and are referred to within text by basic designation only.

1. ASME/ANSI B16.5 Steel Pipe Flanges and Flanged Fittings (Including ratings for Class 150, 300, 400, 600, 900, 1500, and 2500)

2. ASME/ANSI B16.39 Malleable Iron Threaded Pipe Unions

3. ASSE 1079 Dielectric Pipe Unions

4. ASTM A193 Alloy Steel and Stainless Steel Bolting Materials for High-Temperature or High Pressure Service and

Large Potable Water Valve Replacement Project (EO-3674) 33 05 33 – Couplings, Tie Rods, Flange Connectors and Unions - 2 of 6

Other Special Purpose Applications

5. ASTM A283 Low and Intermediate Tensile Strength Carbon Steel Plates

6. ASTM A536 Ductile Iron Castings

7. ASTM C1173 Flexible Transition Couplings for Underground Piping Systems

8. ASTM D2464 Threaded Poly(Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 80

9. AWWA C105 Polyethylene Encasement for Ductile-Iron Pipe Systems

10. AWWA C207 Steel Pipe Flanges for Waterworks Service – Sizes 4” through 144”

11. AWWA C111 Rubber-Gasket Joints for Ductile-Iron Pressure Pipe and Fittings

12. AWWA C219 Bolted Sleeve Type Couplings for Plain End Pipe

13. AWWA C227 Bolted Split-Sleeve Couplings

14. AWWA C550 Protective Interior Coatings for Valves and Hydrants

15. AWWA M11 Steel Pipe, A Guide for Design and Installation

16. NFPA 24 Installation of Private Fire Service Mains and Their Appurtenances

17. NSF/ANSI 61 Drinking Water System Components – Health Effects

18. NSF/ANSI 372 Drinking Water System Components – Lead Content (Formerly NSF/ANSI 61 Annex G)

1.6 Submittals

A. Furnish the following submittals:

SUBMITTAL DESCRIPTION

Product Data Submit per Product Data requirements.

Show lining and coating data and thicknesses on items 4” and larger

Installation Instructions Submit per Installation Instruction requirements.

Warranty Furnish one-year warranty from date of final acceptance

B. Refer to Section 01 33 00 for definition of requirements for Product Data, and Installation Instructions,

1.7 Delivery, Storage, and Handling

A. Refer to Section 01 66 00 for delivery, storage, and handling requirements.

B. Strictly follow Manufacturer’s instructions and warranty requirements for delivery, storage, and handling of materials.

C. Refer to AWWA C219 §6 for additional requirements for delivery, storage, and handling of bolted sleeve-type couplings.

1.8 Unit Prices

A. Refer to Section 01 22 00 for measurement and payment clauses for couplings, tie rods, flange connectors, and unions.

PART 2 - PRODUCTS

2.1 Acceptable Manufacturers

A. Acceptable Manufacturers for cast iron bolted sleeve-type couplings include:

ITEM MANUFACTURER MANUFACTURER LOCATION

Restrained Couplings – Cast Bolted Sleeve Extended Range Type for Identical or Different Pipe Materials on Each Side

Romac Industries (Alpha) Bothell, WA (800) 426-9341 EBAA Iron Megacoupling Series 3800 Eastland, TX (800) 433-1716 Smith Blair, Inc. / Xylem Texarkana, AR (800) 643-9705

Orange, CA (714) 505-7079 Accepted Equal

B. Acceptable Manufacturers for flanged coupling adaptors include:

ITEM MANUFACTURER MANUFACTURER LOCATION

Unrestrained Couplings – Flanged Coupling Adaptor for Steel Pipe

Dresser Piping Specialties (Style 128) Bradford, PA (814) 362-9200 Ford Meter Box Co Inc. (FCA) Wabash, IN (260) 563-3171 JCM Industries, Inc. (Style 303) or (Style 304) Nash, TX (800) 527-8482 Romac Industries (FC400) Bothell, WA (800) 426-9341 Smith Blair, Inc. / Xylem (Style 913) 3”-24” Texarkana, AR (800) 643-9705

Orange, CA (714) 505-7079 Accepted Equal

Large Potable Water Valve Replacement Project (EO-3674) 33 05 33 – Couplings, Tie Rods, Flange Connectors and Unions - 3 of 6

ITEM MANUFACTURER MANUFACTURER LOCATION

Restrained Couplings – Flanged Coupling Adaptor

Dresser Piping Specialties (Style 167) Bradford, PA (814) 362-9200 EBAA Iron Megaflange Series 2100 3”-48” Eastland, TX (800) 433-1716 Ford Meter Box Co Inc. Uni-Flange (Restrained Flange Adaptor with UFR 1400) 3”-24”

Wabash, IN (260) 563-3171

JCM Industries, Inc. (Style 301 Restrained) Nash, TX (800) 527-8482 Romac Industries (RFCA) Bothell, WA (800) 426-9341 Smith Blair, Inc. / Xylem (Style 912 “Flange- Lock” DIP 3”-12”, Style 913 “Flange-Lock” Steel or Style 920 PVC) with anchor studs 3”-24”

Texarkana, AR (800) 643-9705 Orange, CA (714) 505-7079

Tyler Pipe / McWane (Union Adapter Flange) Tyler, TX (903) 862-5511 Accepted Equal

Restrained Couplings – Flanged Coupling Adaptor Extended Range

Romac Industries (Alpha) Bothell, WA (800) 426-9341 Smith Blair, Inc. / Xylem Texarkana, AR (800) 643-9705

Orange, CA (714) 505-7079 Accepted Equal

C. Acceptable Manufacturers for external harness-style systems include:

ITEM MANUFACTURER MANUFACTURER LOCATION

External Joint Restraint Systems – Restraint Lug and Eyebolt

Romac Industries Duc Lug & 90° Eye-Bolt Bothell, WA (800) 426-9341 Accepted Equal

External Joint Restraint Systems – Restraint Plate and Tie Rod

Smith Blair, Inc. / Xylem (Style 907) Texarkana, AR (800) 643-9705 Orange, CA (714) 505-7079

Accepted Equal

D. Refer to sections for applicable pipe materials for requirements for follower-gland-type and harness-type mechanical joint restraints.

2.2 Materials

A. Materials for bolted-sleeve-type couplings shall conform to AWWA C219 and shall be:

ITEM MATERIAL SPECIFICATION

NSF Listing Parts Exposed to Potable Water

Provide NSF 61 listed products and conform to NSF/ANSI 372 lead threshold for potable water applications.

Sleeve Ductile Iron Conform to ASTM A536 65-45-12 Coupling and Harness Bolts Stainless Steel Refer to Section 33 05 31.

Gasket EPDM Conform to AWWA C111

Suitable for exposure to petroleum products, solvents, and temperatures up to 180°F

Sleeve Lining (couplings 3” and larger)

Fusion-Bonded Epoxy Refer to Section 09 96 56.

AWWA C550 12-mil minimum DFT Not required for stainless steel sleeves

Exterior Finish Coat Fusion-Bonded Epoxy Refer to Section 09 96 56.

Not required for stainless steel sleeves

Polyethylene Encasement for Buried Couplings and Appurtenances

Polyethylene Sheet Conform to AWWA C105 Refer to Section 33 11 20

B. Materials for flanged coupling adaptors shall conform to AWWA C219 and shall be:

ITEM MATERIAL SPECIFICATION

NSF Listing Parts Exposed to Potable Water

Provide NSF 61 listed products and conform to NSF/ANSI 372 lead threshold for potable water applications.

Flanges Ductile Iron Conform to ASME/ANSI B16.42 Class 150 Raised or plain faced

Flange Alignment Horizontal Pipelines Boltholes shall straddle horizontal and vertical centerlines of pipe run to which valves are attached.

Vertical Pipelines Boltholes shall straddle plant North-South and plant East-West centerlines of pipe run to which valves are attached.

Sleeve Steel Conform to ASTM A283 Grade C or carbon steel with minimum 30-ksi yield

Large Potable Water Valve Replacement Project (EO-3674) 33 05 33 – Couplings, Tie Rods, Flange Connectors and Unions - 4 of 6

ITEM MATERIAL SPECIFICATION

Coupling and Harness Bolts

Stainless Steel SAE Type 316 Refer to Section 33 05 31.

Gasket EPDM Conform to AWWA C111 Lining (couplings 3” and larger)

Fusion-Bonded Epoxy Refer to Section 09 96 56 Conform to AWWA C550 12-mil minimum DFT Do not coat sealing areas and bronze or stainless steel parts.

Exterior Finish Coat Fusion-Bonded Epoxy Refer to Section 09 96 56.

Polyethylene Encasement for Buried Couplings and Appurtenances

Polyethylene Sheet Conform to AWWA C105 Refer to Section 33 11 20

C. Materials for coupling restraint systems for bolted-sleeve-type couplings or flanged coupling adaptors installed on ductile iron or PVC pipe shall be:

ITEM MATERIAL SPECIFICATION

Follower Gland Ductile Iron Conform to ASTM A536 65-45-12 Wedges Ductile Iron Single tooth, heat-treated for ductile iron applications Actuating Bolts Ductile Iron Conform to ASTM A536 65-45-18 Breakaway Nuts Carbon Steel

Cast Iron Tie Rods – Stainless Steel

Stainless Steel Conform to NFPA 24 SAE Type 316

Coating for New Bolts and Nuts

Nickel-phosphate Undercoating Blue Teflon or Xylan Fluoropolymer Coating

Refer to Section 33 05 31.

Coating for Existing Bolts and Nuts

Antiseize Lubricant Refer to Section 33 05 31.

Lubrication for Above- Ground or Vault- Enclosed Steel Tie-Rod or Bolt Threads

Oil and Graphite, Blue Fluoropolymer Coating or Accepted Valve Manufacturer’s Anti-seize Coating

Refer to Section 33 05 31.

Gland Exterior Finish Coat

Fusion-Bonded Epoxy Refer to Section 09 96 56.

Coating on Buried Bolts and Nuts

Mastic

Refer to Section 33 11 19.

Polyethylene Encasement for Buried Couplings and Appurtenances

Polyethylene Sheet Conform to AWWA C105 Refer to Section 33 11 20

D. Materials for coupling restraint systems for bolted-sleeve-type couplings or flanged coupling adaptors installed on steel pipe shall be:

ITEM MATERIAL SPECIFICATION

Follower Gland Ductile Iron Conform to ASTM A536 65-45-12 Wedges Ductile Iron Single tooth, heat-treated for ductile iron applications Harness Lug Carbon Steel

Tie Rods – Stainless Steel

Stainless Steel SAE Type 316

Lubrication for Above- Ground Tie Rods and Bolt Threads

Oil and Graphite, Blue Fluoropolymer Coating or Accepted Valve Manufacturer’s Anti-seize Coating

Refer to Section 33 05 31.

Coating on Buried Bolts and Nuts

Mastic

Refer to Section 33 11 19.

Large Potable Water Valve Replacement Project (EO-3674) 33 05 33 – Couplings, Tie Rods, Flange Connectors and Unions - 5 of 6

ITEM MATERIAL SPECIFICATION

Polyethylene Encasement for Buried Couplings and Appurtenances

Polyethylene Sheet Conform to AWWA C105 Refer to Section 33 11 20

E. Materials for repair clamps shall only be used for applications with working pressures not exceeding 150 psi and shall be:

ITEM MATERIAL SPECIFICATION

Repair Clamp Stainless Steel SAE Type 316 NSF Listing Parts Exposed to

Potable Water Provide NSF 61 listed products and conform to NSF/ANSI 372 lead threshold for potable water applications.

F. Materials for unions shall be:

ITEM MATERIAL SPECIFICATION

Insulating Unions (Use restricted to pipe 2½” and smaller with dissimilar metals on each side of union)

Standard Conform to ASSE 1079 and ASTM D2464 Location Provide where dissimilar pipe materials mate

Provide within 12” of regulating equipment, water heating, conditioning tanks and similar equipment requiring service by removal in manner facilitating ready removal.

Material PVC Class Match Adjacent Pipe

Noninsulating Unions for Potable Water Service (Match adjacent pipe material)

Lead-Free Brass Conform to ASTM B584, AWWA C800, NSF 61, and NSF 372 3-part with flared copper end connections where required

Malleable Iron Conform to ASME/ANSI B16.39 Stainless Steel SAE Type 316 Grade B7

Noninsulating Unions not for Potable Water Service (Match adjacent pipe material)

Bronze Conform to ASTM B61 or B62 3-part with flared copper end connections where required

Malleable Iron Conform to ASME/ANSI B16.39 Stainless Steel SAE Type 316 Grade B7

NSF Listing Parts Exposed to Potable Water

Provide NSF 61 listed products and conform to NSF/ANSI 372 lead threshold for potable water applications.

G. Where pipeline pressures exceed 150 psi, and where pipe tap for appurtenance into main exceeds 1” diameter, provide a 2½” extra-heavy carbon steel coupling as outlet, and isolate fitting or appurtenance from main using 2” SAE Type 316 stainless steel bushing, 2” SAE Type 316 stainless steel nipple, and 2” type 316 stainless steel ball valve.

H. The following product design criteria, options and accessories are required:

ITEM DESCRIPTION

Rated Working Pressure 150 psi Coating on Buried Bolts, Nuts and Tie-Rods

Refer to Section 09 90 00.

2 coats minimum 12 mils MDFT per coat

Harness for Bolted Sleeve Type Couplings and Flange Coupling Adaptors

Design Stress Design harness and tie rods per AWWA M11 Tie rods shall withstand pressure without exceeding 50% of yield stress

I. Flanges shall conform to AWWA C207 requirements and shall mate with adjacent valves or fittings.

J. Internal bore of couplings and joints shall be as close to that of pipe system as is commercially available.

K. Coupling products referenced in this section shall be painted and coated, interior and exterior in accordance with Section 09 90 00 or 09 96 56 as applicable.

Large Potable Water Valve Replacement Project (EO-3674) 33 05 33 – Couplings, Tie Rods, Flange Connectors and Unions - 6 of 6

PART 3 - EXECUTION

3.1 Preparation

A. Make field measurements needed to install products before submitting shop drawings or ordering.

B. On buried couplings and assemblies, lubricate threaded parts including bolts and compression collars before assembling couplings and joints.

3.2 Installation

A. Furnish and install couplings, tie rods, flange connectors and unions at locations shown on Plans and Submittals.

B. The following installation standards shall be followed:

1. Applicable OSHA and Cal OSHA regulations

2. Manufacturer’s installation and warranty requirements

3. AWWA M11 Steel Pipe, A Guide for Design and Installation

4. Long Beach Water Department Standard Drawing WDS104 and WDS105 for tie-rod bar and clamp installation on pipe 4”-12”.

C. Provide appropriate equipment connection couplings and fittings between field piping systems and equipment inlet and outlet connections.

D. Unless otherwise shown, encase buried couplings and appurtenances with polyethylene wrap per Section 33 11 20.

3.3 Field Quality Control

A. Field testing shall include:

ITEM TEST FOR

TEST STANDARD

(ASTM OR OTHER TEST STANDARD) FREQUENCY

FIRST

TEST PAID

FOR BY

RETESTS

PAID FOR

BY

Couplings, Tie Rods, Flange Coupling Adaptors, and Unions

Installation & Leakage

Visual inspection of finished installation 1 inspection Owner Owner

Field Performance

Demonstrate compliance to Contract Documents and Manufacturer’s printed literature

1 test Contractor Contractor

11-month Warranty Inspection

Demonstrate compliance to Contract Documents and Manufacturer’s printed literature

1 test Owner Contractor

END OF SECTION

STEARNS STREET AND DE ORA WAY

SITE PLANDIRECTOR OF WATER/SEWER ENGINEERING

MANAGER OF ENGINEERING

APPROVED

RECOMMENDED

DEPARTMENT DATE

BY CK'D.

CITY ENG.

VERIZON

EDISON CO.

LB ENERGY

FIRE

INPUT BY

AS-BUILT BY

POSTED GIS

CONSTRUCTED BY

GIS TILE

SPEC. NO

SECTION MAP

SERVICE ATLAS PAGE

GATE VALVES REC.

AS SHOWNSCALE

N/A

CONTRACT NO.

CHECKED BY

DESIGNED BY

DATE

DATE

CORRECTED BY

DATE

DATE

DATE

DATE

DATE 11/25/25

VARIOUS

DESCRIPTIONDATEREV.

EO - 3674

DRAWING / FILE NUMBER:

DATE

DATE

B. Anatole Falagán

GENERAL MANAGER

LONG BEACH UTILITIES DEPARTMENT

LARGE POTABLE WATER VALVE

REPLACEMENT PROJECT

RJO

JOE G.

FI

LE

N A

M E

: M c_ dw g

D E

S

IG

N B

Y

P R

E -F

IN

A

L M

IL

E

S T

O N

E

N/A

MUNIS PROJECT: 6002010011

SHEET OF SHEETSDWG.

318 W. KATELLA AVENUE, SUITE A

ORANGE, CA 92867

(714) 978-4407 www.jigconsultants.com

11/25/25

C-09

C-09

DE ORA WAY

STEARNS ST

C-01 wadepew Image wadepew Image wadepew Text Box 12/02/2025 wadepew Text Box 12/02/2025

1 11/2025 ADDENDUM #2 AR

LON0290 - Drawing C-08 - Add2.pdf
Sheets and Views
C-08

File details come from the government source that posted it. Updated .