ELIN SCHEDULE PROPOSAL WORKSHEET.xlsx
XLSX spreadsheet 89 KB Posted
- Solicitation number
- N62473-25-R-1615
About this file
This is an ELIN (Exhibit Line Item Number) Schedule Proposal Worksheet detailing water and wastewater sampling requirements for Marine Corps Air Ground Combat Center (MCAGCC) in Twentynine Palms, CA. The worksheet outlines sampling requirements across a base period (2025) and five option periods through 2030, with both Firm Fixed Price (FFP) and Indefinite Delivery Indefinite Quantity (IDIQ) line items.
The sampling requirements include weekly testing of total coliform organisms, dissolved solids, and chlorine residual testing across multiple zones; monthly testing of various parameters at the treatment plant including TDS, arsenic, boron, and fluoride; quarterly well testing for contaminants like VOCs and radiological compounds; and annual testing for metals and other chemicals. The contract includes both regular sampling schedules and provisions for emergency sampling and retakes. Each contract period contains approximately 53 FFP line items for routine sampling and 33 IDIQ line items for additional services like retakes and emergency calls. The worksheet corresponds to solicitation N62473-25-R-1615, which requires ELAP accreditation and has response times of 24 hours for routine calls and 4 hours for emergencies.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6247325R1615 12.04.2024rev01.pdf | ||
| 2023 Drinking Water Quality Monitoring Plan.pdf | ||
| EXHIBIT A - RFI FORM.docx | DOCX document | |
| EXHIBIT E PPQ.docx | DOCX document | |
| EXHIBIT D.docx | DOCX document | |
| EXHIBIT C SAFETY.docx | DOCX document | |
| Appointments for the Defense Biometric Identification System.docx | DOCX document | |
| BASE ACCCESS FORM DBIDS Sponsorship Form.pdf | ||
| EXHIBIT B FINANCIAL Q.docx | DOCX document | |
| N6247325R1615 12.04.2024.pdf | ||
| WS J annex MAP INSERT.pdf | ||
| EXHIBIT E EXPERIENCE.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY
| IGE SUMMARY | 14-R-0604 FSC WATER SAMPLING | Proposal Amount |
| CLIN 0001 | Base Period - FFP 12-MONTHS | $0.00 |
| CLIN 0002 | Base Period - IDIQ NTE 12-MONTHS | $0.00 |
| CLIN 0003 | OPTION 1 - FFP 12-MONTHS | $0.00 |
| CLIN 0004 | OPTION 1 - IDIQ NTE 12-MONTHS | $0.00 |
| CLIN 0005 | OPTION 2 - FFP 12-MONTHS | $0.00 |
| CLIN 0006 | OPTION 2 - IDIQ NTE 12-MONTHS | $0.00 |
| CLIN 0007 | OPTION 3 - FFP 12-MONTHS | $0.00 |
| CLIN 0008 | OPTION 3 - IDIQ NTE 12-MONTHS | $0.00 |
| CLIN 0009 | OPTION 4 FFP 12-MONTHS | $0.00 |
| CLIN 0010 | OPTION 4 - IDIQ NTE 12-MONTHS | $0.00 |
| CLIN 0011 | OPTION 5 FFP 6 MONTHS | $0.00 |
| CLIN 0012 | OPTION 5 - IDIQ NTE 6 MONTHS | $0.00 |
| TOTAL | Base + 5 OPTIONS: | $0.00 |
FFP BASE
| CLIENT | BASE PERIOD FIRM FIXED PRICE CLIN 0001 ELIN “A0XX” | UNIT OF | UNIT | TOTAL | |
| ELIN | DESCRIPTION – CY 2025 | QTY | ISSUE | PRICE | AMOUNT |
| BASE PERIOD TWELVE (12) MONTHS - FFP | The Contractor shall provide WATER and WASTE WATER, Environmental Sampling, field testing, laboratory services and associated reporting requirements to support compliance oversight at the installation. The Contractor shall conduct timely sample collection and testing to ensure the installation complies with applicable EPA and state requirments. All sample data will be uploaded to WaterTrax. All sampling collected for the month will be loaded into WaterTrax no later than the 5th of the following month. | ||||
| Note: Type and Frequency of Source Well Monitoring requirements may VARY from year to year based on local, state, and federal requirements. |
| Water Samples | |||
| Weekly Sampling Requirements – Will be collected Tuesday of each week. | |||
| Distribution | |||
| A001 | Total Coliform Organism (Zones 1,2,3 and 4) 8 sample locations per week per schedule | 416 | Each |
| A002 | Total Dissolved Solids (Alternating Zones 1,2,3 and 4) | 52 | Each |
| A003 | Chlorine Residual Testing (Zones 1,2,3, and 4) 8 sample locations per week per schedule | 416 | Each |
| A004 | Arsenic (1 Sample per Week from EQ Tank Treated 1 & 2 alternating) | 52 | Each |
| Monthly Sampling Requirements – Will be collected by the first week of each month. | |||
| Treatment Plant | |||
| TDS (RO Influent (Raw)) (Lab analyzed) | 12 | Each | |
| TDS (Primary RO Permeate) (Lab analyzed) | 12 | Each | |
| TDS (CCD/CCRO Permeate) (Lab Analyzed) | 12 | Each | |
| Arsenic (Final RO Blend) | 12 | Each | |
| Boron (Final RO Blend) | 12 | Each | |
| Fluoride (Final RO Blend) | 12 | Each | |
| TDS (Final RO Blend) (Lab Analyzed) | 12 | Each | |
| Hexavalent Chromium (Final RO Blend) | 12 | Each | |
| LSI (Langelier Saturation Index at Source Temperature and 60°C) (Final RO Blend) | 12 | Each | |
| pH (Final RO Blend) (Lab analyzed) | 12 | Each | |
| Conductivity (Final RO Blend) (Lab analyzed) | 12 | Each | |
| Calcium (Final RO Blend) (Lab analyzed) | 12 | Each | |
| Alkalinity (Final RO Blend) (Lab analyzed) | 12 | Each | |
| Distribution | |||
| A005 | General Physical (Color, Odor, Turbidity) (Alternating Zones 1,2,3 and 4) | 12 | Each |
| Water Temperature (At 7 Lead and Copper sample sites) | 84 | Each | |
| LSI (Langelier Saturation Index at Source Temperature and 60°C) (At 7 Lead and Copper sample sites) | 84 | Each | |
| Conductivity (At 7 Lead and Copper sample sites) | 84 | Each | |
| Calcium (At 7 Lead and Copper sample sites) | 84 | Each | |
| Alkalinity (At 7 Lead and Copper sample sites) | 84 | Each | |
| pH (At 7 Lead and Copper sample sites) | 84 | Each |
| Quarterly Sampling Requirements – Will be collected in the first month of each quarter. | |||
| TREATMENT PLANT | |||
| Total Coliform as MPN (Primary RO Permeate) | 4 | Each | |
| HPC (Primary RO Permeate) | 4 | Each | |
| Total Coliform as MPN (CCD/CCRO Permeate) | 4 | Each | |
| HPC (CCD/CCRO Permeate) | 4 | Each | |
| Manganese (Final RO Blend) | 4 | Each | |
| Iron (Final RO Blend) | 4 | Each | |
| Wells | |||
| A006 | Total Coliform Organism (All Wells) | 52 | Each |
| A007 | Arsenic (Well 5A Only) | 4 | Each |
| Manganese (Wells 2A and 5A) | 8 | Each | |
| Iron (Fe) (Wells 2A, 5A, and 11A) | 12 | Each | |
| VOC- Volatile Organic Chemicals (DM-1 and DM2) | 8 | Each | |
| SOC - Synthetic Oraganic Chemicals (DM-1 and DM-2 to include EDB and DBCP) | 8 | Each | |
| Radiological (Gross Alpha) (DM-1 and DM-2) | 8 | Each | |
| Radiological (Uranium) (DM-1 and DM-2) | 8 | Each | |
| Radiological (Radium 226) (DM-1 and DM-2) | 8 | Each | |
| Radiological (Radium 228) (DM-1 and DM-2) | 8 | Each | |
| Distribution | |||
| A008 | Iron (Fe) ( EQ Tank Treated 1 & 2 alternating) | 4 | Each |
| A009 | TTHM | 2 | Each |
| A010 | HAA5 | 2 | Each |
| Annual Sampling Requirements – Will be collected in the first quarter of each year. | |||
| Wells | |||
| A011 | Nitrate (as NO3) (All Wells) | 13 | Each |
| A012 | Aluminum | 13 | Each |
| A013 | Antimony | 13 | Each |
| A014 | Asbestos | 13 | Each |
| A015 | Barium | 13 | Each |
| A016 | Beryllium | 13 | Each |
| A017 | Cadmium | 13 | Each |
| A018 | Chromium | 13 | Each |
| A019 | Cyanide | 13 | Each |
| A020 | Fluoride | 13 | Each |
| A021 | Hexavalent Chromium | 13 | Each |
| A022 | Mercury | 13 | Each |
| A023 | Nickel | 13 | Each |
| A024 | Perchlorate | 13 | Each |
| A025 | Selenium | 13 | Each |
| A026 | Thallium | 13 | Each |
| A027 | Nitrite (as N) (All Wells) | 13 | Each |
| A028 | Arsenic (All Wells) | 13 | Each |
| 3 Year Sampling Requirements – Will be collected in the first quarter of the year. | |||
| Wells | |||
| A029 | Inorganic Chemicals (All Wells) (Every 3 Years) | 0 | Each |
| A030 | General Mineral (All Wells) (Every 3 Years) | 0 | Each |
| A031 | General Physical (All Wells) (Every 3 Years) | 0 | Each |
| A032 | Methyl Tertiary Butyl Ether (MTBE) (All Wells) | 0 | Each |
| A033 | VOC- Volatile Organic Chemicals (All Wells) (Every 3 Years) | 0 | Each |
| A034 | SOC - Synthetic Oraganic Chemicals (All Wells) (Every 3 Years to include EDB and DBCP) | 0 | Each |
| LSI (Langelier Saturation Index at Source Temperature ) All Wells | 0 | Each | |
| Distribution | |||
| A035 | Lead (Various Sites) (June thru Sept. only)(Every 3 Years) | 30 | Each |
| A036 | Copper (Various Sites) (June thru Sept. only)(Every 3 Years) | 30 | Each |
| 5 Year Sampling Requirements – Will be collected in the first quarter of the year. | |||
| Distribution | |||
| A037 | Lead (Priority Areas) (Every 5 Years) | 0 | Each |
| Wastewater Samples | |||
| Daily Sampling Requirements – Will be collected every Monday - Friday. | |||
| A038 | PH (Mainside Secondary) | 262 | Each |
| A039 | Total Coliform (Disinfected Secondary) | 262 | Each |
| Bi - Weekly Sampling Requirements – Will be collected the first Thursday of each month and every other Thursday through that month. | |||
| A040 | BOD- Biochemical Oxygen Demand (Mainside)(Influent) | 26 | Each |
| A041 | BOD- Biochemical Oxygen Demand (Mainside Secondary)(Effluent) | 26 | Each |
| A042 | Suspended Solids (Mainside)(Influent) | 26 | Each |
| A043 | Suspended Solids (Mainside Secondary)(Effluent) | 26 | Each |
| Monthly Sampling Requirements - Will be collected by the first Thursday of each month. | |||
| A044 | Nitrate as N (N03-N) (Mainside Secondary)(Effluent) | 12 | Each |
| A045 | TDS-Total Dissolved Solids (Mainside Secondary)(Effluent) | 12 | Each |
| A046 | Nitrite as N (N02-N) (Mainside Secondary)(Effluent) | 12 | Each |
| A047 | Total Nitrogen (Mainside Secondary)(Effluent) | 12 | Each |
| Quarterly Sampling Requirements - Will be collected in the first month of each quarter. | |||
| A048 | TSS-Total Suspended Solids (Holding Ponds) | 4 | Each |
| A049 | BOD- Biochemical Oxygen Demand (Holding Ponds) | 4 | Each |
| A050 | DO- Dissolved Oxygen (Holding Ponds) | 4 | Each |
| Annual Sampling Requirements - Will be collected in the first quarter of each year. | |||
| A051 | VOC-Volatile Organic Compounds (Mainside Secondary) | 1 | Each |
| A052 | Travel | 262 | TRIP |
| A053 | WaterTrax | 1 | LS |
| Base Year TOTAL FFP LINE ITEMS - A001 THROUGH A053 | $ |
IDIQ BASE
| BASE PERIOD IDIQ CLIN 0002 – ELIN “A1XX” | |||||
| CLIENT ELIN | DESCRIPTION | EST | UNIT OF | UNIT | TOTAL |
| QTY | ISSUE | PRICE | AMOUNT | ||
| PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | |||||
| Price for Base Period (12_Months) for labor, material, and equipment to perform the indefinite quantity tasks listed in the schedule of Indefinite Quantity Work Below. The quantities listed below are realistic provided solely for the purpose of bid evaluation and for establishing penal sums of bonds (If required). The price for this bid item is the total of the subline items listed in the Schedule of Indefinite Quantity Work | |||||
| A101 | Retake of Bacteriological Test (Refer to J-1800000-02 Sampling Requirements, Paragraph 10.0) | 120 | Ea | ||
| A102 | Retake of Biochemical Oxygen Demand (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 15 | Ea | ||
| A103 | Retake of Suspended Solids (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 8 | Ea | ||
| A104 | Retake of PH (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 6 | Ea | ||
| A105 | Retake of Nitrate as N (NO3-N) (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 8 | Ea | ||
| A106 | Retake of Nitrate as N (NO2-N) (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 8 | Ea | ||
| A107 | Retake of Volatile Organic Compounds (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 6 | Ea | ||
| A108 | Retake of Total Nitrogen (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 6 | Ea | ||
| A109 | Retake of Arsenic (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 6 | Ea | ||
| A110 | Retake of Cadmium (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 2 | Ea | ||
| A111 | Retake of Copper (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 2 | Ea | ||
| A112 | Retake of Lead (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 2 | Ea | ||
| A113 | Retake of Mercury (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 2 | Ea | ||
| A114 | Retake of Molybdenum (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 2 | Ea | ||
| A115 | Retake of Nickel (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 2 | Ea | ||
| A116 | Retake of Selenium (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 2 | Ea | ||
| A117 | Retake of Zinc (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 2 | Ea | ||
| A118 | Retake of Fecal Coliform (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 120 | Ea | ||
| A119 | Retake of Total Coliform (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 120 | Ea | ||
| A120 | Retake of Total Petroleum Hydrocarbon (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 4 | Ea | ||
| A121 | Retake of Chromium (Cr) VI (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 2 | Ea | ||
| A122 | Retake of Methyl Tertiary Butyl Ether (MTBE) (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 2 | Ea | ||
| A123 | Retake of Dissolved Oxygen (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 2 | Ea | ||
| A124 | Retake of Total Organic Carbon (TOC) (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 2 | Ea | ||
| A125 | Retake of pH (Method 9040) (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 2 | Ea | ||
| A126 | Retake of Specific Conductance (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 2 | Ea | ||
| A127 | Retake of OiI & Grease (O &G) (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 2 | Ea | ||
| A128 | Retake of Title 22 (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 2 | Ea | ||
| A129 | Retake of Radium 228 (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 2 | Ea | ||
| A130 | Retake of Total Dissolved Solids (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 8 | Ea | ||
| A131 | Retake of Hydrogen Ion (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 1 | Ea | ||
| A132 | Emergency Service Call (Refer to 2.21.1.1) | 5 | Ea | ||
| A133 | Emergency Sampling (Refer to 2.21.1.2) | 1 | Lump Sum |
TOTAL IDIQ BASE YEAR (A101-A133)
| TOTAL BASE PERIOD CLINs 0001 AND 0002 (FFP/IDIQ) $__________________________ |
| (ELINS A001-A053 AND A101 – A133) |
FFP 1ST OPTN
| CLIENT | FIRST OPTION PERIOD FIRM FIXED PRICE CLIN 0003 ELIN “B0XX’ | UNIT OF | UNIT | TOTAL | |
| ELIN | DESCRIPTION – CY 2026 | QTY | ISSUE | PRICE | AMOUNT |
| FIRST OPTION PERIOD TWELVE (12) MONTHS - FFP | The Contractor shall provide WATER and WASTE WATER, Environmental Sampling, field testing, laboratory services and associated reporting requirements to support compliance oversight at the installation. The Contractor shall conduct timely sample collection and testing to ensure the installation complies with applicable EPA and state requirments. All sample data will be uploaded to WaterTrax. All sampling collected for the month will be loaded into WaterTrax no later than the 5th of the following month. | ||||
| Note: Type and Frequency of Source Well Monitoring requirements may VARY from year to year based on local, state, and federal requirements. |
| Water Samples | |||
| Weekly Sampling Requirements – Will be collected by Tuesday of each week. | |||
| Distribution | |||
| B001 | Total Coliform Organism (Zones 1,2,3 and 4) 8 sample locations per week per schedule | 416 | Each |
| B002 | Total Dissolved Solids (Alternating Zones 1,2,3 and 4) | 52 | Each |
| B003 | Chlorine Residual Testing (Zones 1,2,3, and 4) 8 sample locations per week per schedule | 416 | Each |
| B004 | Arsenic (1 Sample per Week from EQ Tank Treated 1 & 2 alternating) | 52 | Each |
| Monthly Sampling Requirements – Will be collected by the first week of each month. | |||
| Treatment Plant | |||
| TDS (RO Influent (Raw)) (Lab analyzed) | 12 | Each | |
| TDS (Primary RO Permeate) (Lab analyzed) | 12 | Each | |
| TDS (CCD/CCRO Permeate) (Lab Analyzed) | 12 | Each | |
| Arsenic (Final RO Blend) | 12 | Each | |
| Boron (Final RO Blend) | 12 | Each | |
| Fluoride (Final RO Blend) | 12 | Each | |
| TDS (Final RO Blend) (Lab Analyzed) | 12 | Each | |
| Hexavalent Chromium (Final RO Blend) | 12 | Each | |
| LSI (Langelier Saturation Index at Source Temperature and 60°C) (Final RO Blend) | 12 | Each | |
| pH (Final RO Blend) (Lab analyzed) | 12 | Each | |
| Conductivity (Final RO Blend) (Lab analyzed) | 12 | Each | |
| Calcium (Final RO Blend) (Lab analyzed) | 12 | Each | |
| Alkalinity (Final RO Blend) (Lab analyzed) | 12 | Each | |
| Distribution | |||
| B005 | General Physical (Color, Odor, Turbidity) (Alternating Zones 1,2,3 and 4) | 12 | Each |
| Water Temperature (At 7 Lead and Copper sample sites) | 84 | Each | |
| LSI (Langelier Saturation Index at Source Temperature and 60°C) (At 7 Lead and Copper sample sites) | 84 | Each | |
| Conductivity (At 7 Lead and Copper sample sites) | 84 | Each | |
| Calcium (At 7 Lead and Copper sample sites) | 84 | Each | |
| Alkalinity (At 7 Lead and Copper sample sites) | 84 | Each | |
| pH (At 7 Lead and Copper sample sites) | 84 | Each |
| Quarterly Sampling Requirements – Will be collected in the first month of each quarter. | |||
| TREATMENT PLANT | |||
| Total Coliform as MPN (Primary RO Permeate) | 4 | Each | |
| HPC (Primary RO Permeate) | 4 | Each | |
| Total Coliform as MPN (CCD/CCRO Permeate) | 4 | Each | |
| HPC (CCD/CCRO Permeate) | 4 | Each | |
| Manganese (Final RO Blend) | 4 | Each | |
| Iron (Final RO Blend) | 4 | Each | |
| Wells | |||
| B006 | Total Coliform Organism (All Wells) | 52 | Each |
| B00 7 | Arsenic (Well 5A Only) | 4 | Each |
| Manganese (Wells 2A and 5A) | 8 | Each | |
| Iron (Fe) (Wells 2A, 5A, and 11A) | 12 | Each | |
| VOC- Volatile Organic Chemicals (DM-1 and DM2) | 8 | Each | |
| SOC - Synthetic Oraganic Chemicals (DM-1 and DM-2 to include EDB and DBCP) | 8 | Each | |
| Radiological (Gross Alpha) (DM-1 and DM-2) | 8 | Each | |
| Radiological (Uranium) (DM-1 and DM-2) | 8 | Each | |
| Radiological (Radium 226) (DM-1 and DM-2) | 8 | Each | |
| Radiological (Radium 228) (DM-1 and DM-2) | 8 | Each | |
| Distribution | |||
| B008 | Iron (Fe) ( EQ Tank Treated 1 & 2 alternating) | 4 | Each |
| B009 | TTHM | 2 | Each |
| B010 | HAA5 | 2 | Each |
| Annual Sampling Requirements – Will be collected in the first quarter of each year. | |||
| Wells | |||
| B011 | Nitrate (as NO3) (All Wells) | 13 | Each |
| B012 | Aluminum | 13 | Each |
| B013 | Antimony | 13 | Each |
| B014 | Asbestos | 13 | Each |
| B015 | Barium | 13 | Each |
| B016 | Beryllium | 13 | Each |
| B017 | Cadmium | 13 | Each |
| B019 | Chromium | 13 | Each |
| B019 | Cyanide | 13 | Each |
| B020 | Fluoride | 13 | Each |
| B021 | Hexavalent Chromium | 13 | Each |
| B022 | Mercury | 13 | Each |
| B023 | Nickel | 13 | Each |
| B024 | Perchlorate | 13 | Each |
| B025 | Selenium | 13 | Each |
| B026 | Thallium | 13 | Each |
| B027 | Nitrite (as N) (All Wells) | 13 | Each |
| B028 | Arsenic (All Wells) | 13 | Each |
| 3 Year Sampling Requirements – Will be collected in the first quarter of the year. | |||
| Wells | |||
| B029 | Inorganic Chemicals (All Wells) (Every 3 Years) | 0 | Each |
| B030 | General Mineral (All Wells) (Every 3 Years) | 0 | Each |
| B031 | General Physical (All Wells) (Every 3 Years) | 0 | Each |
| B032 | Methyl Tertiary Butyl Ether (MTBE) (All Wells) | 0 | Each |
| B033 | VOC- Volatile Organic Chemicals (All Wells) (Every 3 Years) | 0 | Each |
| LSI (Langelier Saturation Index at Source Temperature ) All Wells | 0 | Each | |
| B034 | SOC - Synthetic Oraganic Chemicals (All Wells) (Every 3 Years to include EDB and DBCP) | 0 | Each |
| Distribution | |||
| B035 | Lead (Various Sites) (June thru Sept. only)(Every 3 Years) | 30 | Each |
| B036 | Copper (Various Sites) (June thru Sept. only)(Every 3 Years) | 30 | Each |
| 5 Year Sampling Requirements – Will be collected in the first quarter of the year. | |||
| Distribution | |||
| B037 | Lead (Priority Areas) (Every 5 Years) | 0 | Each |
| Waste Water Samples | |||
| Daily Sampling Requirements – Will be collected every Monday - Friday. | |||
| B038 | PH (Mainside Secondary) | 262 | Each |
| B039 | Total Coliform (Disinfected Secondary) | 262 | Each |
| Bi - Weekly Sampling Requirements – Will be collected the first week of each month and every other week through that month. | |||
| B040 | BOD- Biochemical Oxygen Demand (Mainside)(Influent) | 26 | Each |
| B041 | BOD- Biochemical Oxygen Demand (Mainside Secondary)(Effluent) | 26 | Each |
| B042 | Suspended Solids (Mainside)(Influent) | 26 | Each |
| B043 | Suspended Solids (Mainside Secondary)(Effluent) | 26 | Each |
| Monthly Sampling Requirements - Will be collected by the first week of each month. | |||
| B044 | Nitrate as N (N03-N) (Mainside Secondary)(Effluent) | 12 | Each |
| B045 | TDS-Total Dissolved Solids (Mainside Secondary)(Effluent) | 12 | Each |
| B046 | Nitrite as N (N02-N) (Mainside Secondary)(Effluent) | 12 | Each |
| B047 | Total Nitrogen (Mainside Secondary)(Effluent) | 12 | Each |
| Quarterly Sampling Requirements - Will be collected in the first month of each quarter. | |||
| B048 | TSS-Total Suspended Solids (Holding Ponds) | 12 | Each |
| B049 | BOD- Biochemical Oxygen Demand (Holding Ponds) | 12 | Each |
| B050 | DO- Dissolved Oxygen (Holding Ponds) | 12 | Each |
| Annual Sampling Requirements - Will be collected in the first quarter of each year. | |||
| B051 | VOC-Volatile Organic Compounds (Mainside Secondary) | 1 | Each |
| B052 | Travel | 262 | TRIP |
| B053 | WaterTrax | 1 | LS |
| 1ST OPTION TOTAL FFP LINE ITEMS - B001 THROUGH B053 | $ |
IDIQ 1ST OPTN
| 1ST OPTION PERIOD IDIQ | |||||
| CLIN 0004 – ELIN “B1XX” | |||||
| CLIENT ELIN | DESCRIPTION | EST | UNIT OF | UNIT | TOTAL |
| QTY | ISSUE | PRICE | AMOUNT | ||
| PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | |||||
| Price for FIRST Option Period (12 Months) for labor, material, and equipment to perform the indefinite quantity tasks listed in the schedule of Indefinite Quantity Work Below. The quantities listed below are realistic provided solely for the purpose of bid evaluation and for establishing penal sums of bonds (If required). The price for this bid item is the total of the subline items listed in the Schedule of Indefinite Quantity Work | |||||
| B101 | Retake of Bacteriological Test (Refer to J-1800000-02 Sampling Requirements, Paragraph 10.0) | 120 | Ea | ||
| B102 | Retake of Biochemical Oxygen Demand (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 15 | Ea | ||
| B103 | Retake of Suspended Solids (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 8 | Ea | ||
| B104 | Retake of PH (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 6 | Ea | ||
| B105 | Retake of Nitrate as N (NO3-N) (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 8 | Ea | ||
| B106 | Retake of Nitrate as N (NO2-N) (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 8 | Ea | ||
| B107 | Retake of Volatile Organic Compounds (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 6 | Ea | ||
| B108 | Retake of Total Nitrogen (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 6 | Ea | ||
| B109 | Retake of Arsenic (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 6 | Ea | ||
| B110 | Retake of Cadmium (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 2 | Ea | ||
| B111 | Retake of Copper (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 2 | Ea | ||
| B112 | Retake of Lead (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 2 | Ea | ||
| B113 | Retake of Mercury (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 2 | Ea | ||
| B114 | Retake of Molybdenum (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 2 | Ea | ||
| B115 | Retake of Nickel (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 2 | Ea | ||
| B116 | Retake of Selenium (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 2 | Ea | ||
| B117 | Retake of Zinc (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 2 | Ea | ||
| B118 | Retake of Fecal Coliform (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 120 | Ea | ||
| B119 | Retake of Total Coliform (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 120 | Ea | ||
| B120 | Retake of Total Petroleum Hydrocarbon (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 4 | Ea | ||
| B121 | Retake of Chromium (Cr) VI (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 4 | Ea | ||
| B122 | Retake of Methyl Tertiary Butyl Ether (MTBE) (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 4 | Ea | ||
| B123 | Retake of Dissolved Oxygen (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 4 | Ea | ||
| B124 | Retake of Total Organic Carbon (TOC) (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 4 | Ea | ||
| B125 | Retake of pH (Method 9040) (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 4 | Ea | ||
| B126 | Retake of Specific Conductance (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 4 | Ea | ||
| B127 | Retake of OiI & Grease (O &G) (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 4 | Ea | ||
| B128 | Retake of Title 22 (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 4 | Ea | ||
| B129 | Retake of Radium 228 (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 4 | Ea | ||
| B130 | Retake of Total Dissolved Solids (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 8 | Ea | ||
| B131 | Retake of Hydrogen Ion (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 6 | Ea | ||
| B132 | Emergency Service Call (Refer to 2.21.1.1) | 5 | Ea | ||
| B133 | Emergency Sampling (Refer to 2.21.1.2) | 1 | Lump Sum |
TOTAL IDIQ 1ST OPTION (B101-B133)
| TOTAL FIRST OPTION PERIOD CLINs 0003 AND 0004 (FFP/IDIQ) $_____________________ |
| (ELINS B001-B053 AND B101 – B133) |
FFP 2ND OPTN
| CLIENT | SECOND OPTION PERIOD FIRM FIXED PRICE CLIN 0005 ELIN “C0XX” | UNIT OF | UNIT | TOTAL | |
| ELIN | DESCRIPTION – CY 2027 | QTY | ISSUE | PRICE | AMOUNT |
| SECOND OPTION PERIOD TWELVE (12) MONTHS - FFP | The Contractor shall provide WATER and WASTE WATER, Environmental Sampling, field testing, laboratory services and associated reporting requirements to support compliance oversight at the installation. The Contractor shall conduct timely sample collection and testing to ensure the installation complies with applicable EPA and state requirments. All sample data will be uploaded to WaterTrax. All sampling collected for the month will be loaded into WaterTrax no later than the 5th of the following month. | ||||
| Note: Type and Frequency of Source Well Monitoring requirements may VARY from year to year based on local, state, and federal requirements. |
| Water Samples | |||
| Weekly Sampling Requirements – Will be collected by Tuesday of each week. | |||
| Distribution | |||
| C001 | Total Coliform Organism (Zones 1,2,3 and 4) 8 sample locations per week per schedule | 416 | Each |
| C002 | Total Dissolved Solids (Alternating Zones 1,2,3 and 4) | 52 | Each |
| C003 | Chlorine Residual Testing (Zones 1,2,3, and 4) 8 sample locations per week per schedule | 416 | Each |
| C004 | Arsenic (1 Sample per Week from EQ Tank Treated 1 & 2 alternating) | 52 | Each |
| Monthly Sampling Requirements – Will be collected by the first week of each month. | |||
| Treatment Plant | |||
| TDS (RO Influent (Raw)) (Lab analyzed) | 12 | Each | |
| TDS (Primary RO Permeate) (Lab analyzed) | 12 | Each | |
| TDS (CCD/CCRO Permeate) (Lab Analyzed) | 12 | Each | |
| Arsenic (Final RO Blend) | 12 | Each | |
| Boron (Final RO Blend) | 12 | Each | |
| Fluoride (Final RO Blend) | 12 | Each | |
| TDS (Final RO Blend) (Lab Analyzed) | 12 | Each | |
| Hexavalent Chromium (Final RO Blend) | 12 | Each | |
| LSI (Langelier Saturation Index at Source Temperature and 60°C) (Final RO Blend) | 12 | Each | |
| pH (Final RO Blend) (Lab analyzed) | 12 | Each | |
| Conductivity (Final RO Blend) (Lab analyzed) | 12 | Each | |
| Calcium (Final RO Blend) (Lab analyzed) | 12 | Each | |
| Alkalinity (Final RO Blend) (Lab analyzed) | 12 | Each | |
| Distribution | |||
| Water Temperature (At 7 Lead and Copper sample sites) | 84 | Each | |
| LSI (Langelier Saturation Index at Source Temperature and 60°C) (At 7 Lead and Copper sample sites) | 84 | Each | |
| Conductivity (At 7 Lead and Copper sample sites) | 84 | Each | |
| Calcium (At 7 Lead and Copper sample sites) | 84 | Each | |
| Alkalinity (At 7 Lead and Copper sample sites) | 84 | Each | |
| pH (At 7 Lead and Copper sample sites) | 84 | Each | |
| C005 | General Physical (Color, Odor, Turbidity) (Alternating Zones 1,2,3 and 4) | 12 | Each |
| Quarterly Sampling Requirements – Will be collected in the first month of each quarter. | |||
| TREATMENT PLANT | |||
| Total Coliform as MPN (Primary RO Permeate) | 4 | Each | |
| HPC (Primary RO Permeate) | 4 | Each | |
| Total Coliform as MPN (CCD/CCRO Permeate) | 4 | Each | |
| HPC (CCD/CCRO Permeate) | 4 | Each | |
| Manganese (Final RO Blend) | 4 | Each | |
| Iron (Final RO Blend) | 4 | Each | |
| Wells | |||
| C006 | Total Coliform Organism (All Wells) | 52 | Each |
| C00 7 | Arsenic (Well 5A Only) | 4 | Each |
| Manganese (Wells 2A and 5A) | 8 | Each | |
| Iron (Fe) (Wells 2A, 5A, and 11A) | 12 | Each | |
| VOC- Volatile Organic Chemicals (DM-1 and DM2) | 8 | Each | |
| SOC - Synthetic Oraganic Chemicals (DM-1 and DM-2 to include EDB and DBCP) | 8 | Each | |
| Radiological (Gross Alpha) (DM-1 and DM-2) | 8 | Each | |
| Radiological (Uranium) (DM-1 and DM-2) | 8 | Each | |
| Radiological (Radium 226) (DM-1 and DM-2) | 8 | Each | |
| Radiological (Radium 228) (DM-1 and DM-2) | 8 | Each | |
| Distribution | |||
| C0 08 | Iron (Fe) ( EQ Tank Treated 1 & 2 alternating) | 4 | Each |
| C009 | TTHM | 2 | Each |
| C010 | HAA5 | 2 | Each |
| Annual Sampling Requirements – Will be collected in the first quarter of each year. | |||
| Wells | |||
| C011 | Nitrate (as NO3) (All Wells) | 13 | Each |
| C012 | Aluminum | 13 | Each |
| C013 | Antimony | 13 | Each |
| C014 | Asbestos | 13 | Each |
| C015 | Barium | 13 | Each |
| C016 | Beryllium | 13 | Each |
| C017 | Cadmium | 13 | Each |
| C018 | Chromium | 13 | Each |
| C019 | Cyanide | 13 | Each |
| C020 | Fluoride | 13 | Each |
| C021 | Hexavalent Chromium | 13 | Each |
| C022 | Mercury | 13 | Each |
| C023 | Nickel | 13 | Each |
| C024 | Perchlorate | 13 | Each |
| C025 | Selenium | 13 | Each |
| C026 | Thallium | 13 | Each |
| C027 | Nitrite (as N) (All Wells) | 13 | Each |
| C028 | Arsenic (All Wells) | 13 | Each |
| 3 Year Sampling Requirements – Will be collected in the first quarter of the year. | |||
| Wells | |||
| C029 | Inorganic Chemicals (All Wells) (Every 3 Years) | 13 | Each |
| C030 | General Mineral (All Wells) (Every 3 Years) | 13 | Each |
| C031 | General Physical (All Wells) (Every 3 Years) | 13 | Each |
| C032 | Methyl Tertiary Butyl Ether (MTBE) (All Wells) | 13 | Each |
| C033 | VOC- Volatile Organic Chemicals (All Wells) (Every 3 Years) | 13 | Each |
| C034 | SOC - Synthetic Oraganic Chemicals (All Wells) (Every 3 Years to include EDB and DBCP) | 13 | Each |
| LSI (Langelier Saturation Index at Source Temperature ) All Wells | 13 | Each | |
| Distribution | |||
| C035 | Lead (Various Sites) (June thru Sept. only)(Every 3 Years) | 0 | Each |
| C036 | Copper (Various Sites) (June thru Sept. only)(Every 3 Years) | 0 | Each |
| 5 Year Sampling Requirements – Will be collected in the first quarter of the year. | |||
| Distribution | |||
| C037 | Lead (Priority Areas) (Every 5 Years) | 0 | Each |
| Waste Water Samples | |||
| Daily Sampling Requirements – Will be collected every Monday - Friday. | |||
| C038 | PH (Mainside Secondary) | 262 | Each |
| C039 | Total Coliform (Disinfected Secondary) | 262 | Each |
| Bi - Weekly Sampling Requirements – Will be collected the first week of each month and every other week through that month. | |||
| C040 | BOD- Biochemical Oxygen Demand (Mainside)(Influent) | 26 | Each |
| C041 | BOD- Biochemical Oxygen Demand (Mainside Secondary)(Effluent) | 26 | Each |
| C042 | Suspended Solids (Mainside)(Influent) | 26 | Each |
| C043 | Suspended Solids (Mainside Secondary)(Effluent) | 26 | Each |
| Monthly Sampling Requirements - Will be collected by the first week of each month. | |||
| C044 | Nitrate as N (N03-N) (Mainside Secondary)(Effluent) | 12 | Each |
| C045 | TDS-Total Dissolved Solids (Mainside Secondary)(Effluent) | 12 | Each |
| C046 | Nitrite as N (N02-N) (Mainside Secondary)(Effluent) | 12 | Each |
| C047 | Total Nitrogen (Mainside Secondary)(Effluent) | 12 | Each |
| Quarterly Sampling Requirements - Will be collected in the first month of each quarter. | |||
| C048 | TSS-Total Suspended Solids (Holding Ponds) | 12 | Each |
| C049 | BOD- Biochemical Oxygen Demand (Holding Ponds) | 12 | Each |
| C050 | DO- Dissolved Oxygen (Holding Ponds) | 12 | Each |
| Annual Sampling Requirements - Will be collected in the first quarter of each year. | |||
| C051 | VOC-Volatile Organic Compounds (Mainside Secondary) | 1 | Each |
| C052 | Travel | 262 | TRIP |
| C053 | WaterTrax | 1 | LS |
| Second Option Year TOTAL FFP LINE ITEMS - C001 THROUGH C053 | $ |
IDIQ 2ND OPTN
| 2ND OPTION PERIOD IDIQ CLIN 0006 ELIN “C1XX” | |||||
| CLIENT ELIN | DESCRIPTION | EST | UNIT OF | UNIT | TOTAL |
| CLIENT ELIN | DESCRIPTION | EST | UNIT OF | UNIT | TOTAL |
| QTY | ISSUE | PRICE | AMOUNT | ||
| PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | |||||
| Price for SECOND Option Period (12 Months) for labor, material, and equipment to perform the indefinite quantity tasks listed in the schedule of Indefinite Quantity Work Below. The quantities listed below are realistic provided solely for the purpose of bid evaluation and for establishing penal sums of bonds (If required). The price for this bid item is the total of the subline items listed in the Schedule of Indefinite Quantity Work | |||||
| C101 | Retake of Bacteriological Test (Refer to J-1800000-02 Sampling Requirements, Paragraph 10.0) | 120 | Ea | ||
| C102 | Retake of Biochemical Oxygen Demand (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 15 | Ea | ||
| C103 | Retake of Suspended Solids (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 8 | Ea | ||
| C104 | Retake of PH (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 6 | Ea | ||
| C105 | Retake of Nitrate as N (NO3-N) (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 8 | Ea | ||
| C106 | Retake of Nitrate as N (NO2-N) (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 8 | Ea | ||
| C107 | Retake of Volatile Organic Compounds (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 6 | Ea | ||
| C108 | Retake of Total Nitrogen (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 6 | Ea | ||
| C109 | Retake of Arsenic (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 6 | Ea | ||
| C110 | Retake of Cadmium (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 2 | Ea | ||
| C111 | Retake of Copper (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 2 | Ea | ||
| C112 | Retake of Lead (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 2 | Ea | ||
| C113 | Retake of Mercury (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 2 | Ea | ||
| C114 | Retake of Molybdenum (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 2 | Ea | ||
| C115 | Retake of Nickel (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 2 | Ea | ||
| C116 | Retake of Selenium (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 2 | Ea | ||
| C117 | Retake of Zinc (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 2 | Ea | ||
| C118 | Retake of Fecal Coliform (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 120 | Ea | ||
| C119 | Retake of Total Coliform (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 120 | Ea | ||
| C120 | Retake of Total Petroleum Hydrocarbon (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 4 | Ea | ||
| C121 | Retake of Chromium (Cr) VI (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 4 | Ea | ||
| C122 | Retake of Methyl Tertiary Butyl Ether (MTBE) (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 4 | Ea | ||
| C123 | Retake of Dissolved Oxygen (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 4 | Ea | ||
| C124 | Retake of Total Organic Carbon (TOC) (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 4 | Ea | ||
| C125 | Retake of pH (Method 9040) (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 4 | Ea | ||
| C126 | Retake of Specific Conductance (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 4 | Ea | ||
| C127 | Retake of OiI & Grease (O &G) (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 4 | Ea | ||
| C128 | Retake of Title 22 (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 4 | Ea | ||
| C129 | Retake of Radium 228 (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 4 | Ea | ||
| C130 | Retake of Total Dissolved Solids (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 8 | Ea | ||
| C131 | Retake of Hydrogen Ion (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 6 | Ea | ||
| C132 | Emergency Service Call (Refer to 2.21.1.1) | 5 | Ea | ||
| C133 | Emergency Sampling (Refer to 2.21.1.2) | 1 | Lump Sum |
TOTAL IDIQ 2ND OPTION (C101-C133)
| TOTAL SECOND OPTION PERIOD CLINs 0005 AND 0006 (FFP/IDIQ) $_____________________ |
| (ELINS C001-C053 AND C101 – C133) |
FFP 3RD OPTN
| CLIENT | THIRD OPTION PERIOD FIRM FIXED PRICE CLIN 0007 ELIN “D0XX” | UNIT OF | UNIT | TOTAL | |
| ELIN | DESCRIPTION – CY 2028 | QTY | ISSUE | PRICE | AMOUNT |
| THIRD OPTION PERIOD TWELVE (12) MONTHS - FFP | The Contractor shall provide WATER and WASTE WATER, Environmental Sampling, field testing, laboratory services and associated reporting requirements to support compliance oversight at the installation. The Contractor shall conduct timely sample collection and testing to ensure the installation complies with applicable EPA and state requirments. All sample data will be uploaded to WaterTrax. All sampling collected for the month will be loaded into WaterTrax no later than the 5th of the following month. | ||||
| Note: Type and Frequency of Source Well Monitoring requirements may VARY from year to year based on local, state, and federal requirements. |
| Water Samples | |||
| Weekly Sampling Requirements – Will be collected by Tuesday of each week. | |||
| Distribution | |||
| D001 | Total Coliform Organism (Zones 1,2,3 and 4) 8 sample locations per week per schedule | 416 | Each |
| D002 | Total Dissolved Solids (Alternating Zones 1,2,3 and 4) | 52 | Each |
| D003 | Chlorine Residual Testing (Zones 1,2,3, and 4) 8 sample locations per week per schedule | 416 | Each |
| D004 | Arsenic (1 Sample per Week from EQ Tank Treated 1 & 2 alternating) | 52 | Each |
| Monthly Sampling Requirements – Will be collected by the first week of each month. | |||
| Treatment Plant | |||
| TDS (RO Influent (Raw)) (Lab analyzed) | 12 | Each | |
| TDS (Primary RO Permeate) (Lab analyzed) | 12 | Each | |
| TDS (CCD/CCRO Permeate) (Lab Analyzed) | 12 | Each | |
| Arsenic (Final RO Blend) | 12 | Each | |
| Boron (Final RO Blend) | 12 | Each | |
| Fluoride (Final RO Blend) | 12 | Each | |
| TDS (Final RO Blend) (Lab Analyzed) | 12 | Each | |
| Hexavalent Chromium (Final RO Blend) | 12 | Each | |
| LSI (Langelier Saturation Index at Source Temperature and 60°C) (Final RO Blend) | 12 | Each | |
| pH (Final RO Blend) (Lab analyzed) | 12 | Each | |
| Conductivity (Final RO Blend) (Lab analyzed) | 12 | Each | |
| Calcium (Final RO Blend) (Lab analyzed) | 12 | Each | |
| Alkalinity (Final RO Blend) (Lab analyzed) | 12 | Each | |
| Distribution | |||
| Water Temperature (At 7 Lead and Copper sample sites) | 84 | Each | |
| LSI (Langelier Saturation Index at Source Temperature and 60°C) (At 7 Lead and Copper sample sites) | 84 | Each | |
| Conductivity (At 7 Lead and Copper sample sites) | 84 | Each | |
| Calcium (At 7 Lead and Copper sample sites) | 84 | Each | |
| Alkalinity (At 7 Lead and Copper sample sites) | 84 | Each | |
| pH (At 7 Lead and Copper sample sites) | 84 | Each | |
| D005 | General Physical (Color, Odor, Turbidity) (Alternating Zones 1,2,3 and 4) | 12 | Each |
| Quarterly Sampling Requirements – Will be collected in the first month of each quarter. | |||
| TREATMENT PLANT | |||
| Total Coliform as MPN (Primary RO Permeate) | 4 | Each | |
| HPC (Primary RO Permeate) | 4 | Each | |
| Total Coliform as MPN (CCD/CCRO Permeate) | 4 | Each | |
| HPC (CCD/CCRO Permeate) | 4 | Each | |
| Manganese (Final RO Blend) | 4 | Each | |
| Iron (Final RO Blend) | 4 | Each | |
| Wells | |||
| D006 | Total Coliform Organism (All Wells) | 52 | Each |
| D0007 | Arsenic (Well 5A Only) | 4 | Each |
| Manganese (Wells 2A and 5A) | 8 | Each | |
| Iron (Fe) (Wells 2A, 5A, and 11A) | 12 | Each | |
| VOC- Volatile Organic Chemicals (DM-1 and DM2) | 8 | Each | |
| SOC - Synthetic Oraganic Chemicals (DM-1 and DM-2 to include EDB and DBCP) | 8 | Each | |
| Radiological (Gross Alpha) (DM-1 and DM-2) | 8 | Each | |
| Radiological (Uranium) (DM-1 and DM-2) | 8 | Each | |
| Radiological (Radium 226) (DM-1 and DM-2) | 8 | Each | |
| Radiological (Radium 228) (DM-1 and DM-2) | 8 | Each | |
| Distribution | |||
| D008 | Iron (Fe) ( EQ Tank Treated 1 & 2 alternating) | 4 | Each |
| D009 | TTHM | 2 | Each |
| D010 | HAA5 | 2 | Each |
| Annual Sampling Requirements – Will be collected in the first quarter of each year. | |||
| Wells | |||
| D011 | Nitrate (as NO3) (All Wells) | 13 | Each |
| D012 | Aluminum | 13 | Each |
| D013 | Antimony | 13 | Each |
| D014 | Asbestos | 13 | Each |
| D015 | Barium | 13 | Each |
| D016 | Beryllium | 13 | Each |
| D017 | Cadmium | 13 | Each |
| D018 | Chromium | 13 | Each |
| D019 | Cyanide | 13 | Each |
| D020 | Fluoride | 13 | Each |
| D021 | Hexavalent Chromium | 13 | Each |
| D022 | Mercury | 13 | Each |
| D023 | Nickel | 13 | Each |
| D024 | Perchlorate | 13 | Each |
| D025 | Selenium | 13 | Each |
| D026 | Thallium | 13 | Each |
| D027 | Nitrite (as N) (All Wells) | 13 | Each |
| D028 | Arsenic (All Wells) | 13 | Each |
| 3 Year Sampling Requirements – Will be collected in the first quarter of the year. | |||
| Wells | |||
| D029 | Inorganic Chemicals (All Wells) (Every 3 Years) | 0 | Each |
| D030 | General Mineral (All Wells) (Every 3 Years) | 0 | Each |
| D031 | General Physical (All Wells) (Every 3 Years) | 0 | Each |
| D032 | Methyl Tertiary Butyl Ether (MTBE) (All Wells) | 0 | Each |
| D033 | VOC- Volatile Organic Chemicals (All Wells) (Every 3 Years) | 0 | Each |
| D034 | SOC - Synthetic Oraganic Chemicals (All Wells) (Every 3 Years to include EDB and DBCP) | 0 | Each |
| LSI (Langelier Saturation Index at Source Temperature ) All Wells | 13 | Each | |
| Distribution | |||
| D035 | Lead (Various Sites) (June thru Sept. only)(Every 3 Years) | 30 | Each |
| D036 | Copper (Various Sites) (June thru Sept. only)(Every 3 Years) | 30 | Each |
| 5 Year Sampling Requirements – Will be collected in the first quarter of the year. | |||
| Distribution | |||
| D037 | Lead (Priority Areas) (Every 5 Years ) | 0 | Each |
| Waste Water Samples | |||
| Daily Sampling Requirements – Will be collected every Monday - Friday. | |||
| D038 | PH (Mainside Secondary) | 262 | Each |
| D039 | Total Coliform (Disinfected Secondary) | 262 | Each |
| Bi - Weekly Sampling Requirements – Will be collected the first week of each month and every other week through that month. | |||
| D040 | BOD- Biochemical Oxygen Demand (Mainside)(Influent) | 26 | Each |
| D041 | BOD- Biochemical Oxygen Demand (Mainside Secondary)(Effluent) | 26 | Each |
| D042 | Suspended Solids (Mainside)(Influent) | 26 | Each |
| D043 | Suspended Solids (Mainside Secondary)(Effluent) | 26 | Each |
| Monthly Sampling Requirements - Will be collected by the first week of each month. | |||
| D044 | Nitrate as N (N03-N) (Mainside Secondary)(Effluent) | 12 | Each |
| D045 | TDS-Total Dissolved Solids (Mainside Secondary)(Effluent) | 12 | Each |
| D046 | Nitrite as N (N02-N) (Mainside Secondary)(Effluent) | 12 | Each |
| D047 | Total Nitrogen (Mainside Secondary)(Effluent) | 12 | Each |
| Quarterly Sampling Requirements - Will be collected in the first month of each quarter. | |||
| D048 | TSS-Total Suspended Solids (Holding Ponds) | 12 | Each |
| D049 | BOD- Biochemical Oxygen Demand (Holding Ponds) | 12 | Each |
| D050 | DO- Dissolved Oxygen (Holding Ponds) | 12 | Each |
| Annual Sampling Requirements - Will be collected in the first quarter of each year. | |||
| D051 | VOC-Volatile Organic Compounds (Mainside Secondary) | 1 | Each |
| D052 | Travel | 262 | TRIP |
| D053 | WaterTrax | 1 | LS |
| Third Option Year TOTAL FFP LINE ITEMS - D001 THROUGH D053 | $ |
IDIQ 3RD OPTN
| 3RD OPTION PERIOD IDIQ CLIN 0008 ELIN “D1XX” | |||||
| CLIENT ELIN | DESCRIPTION | EST | UNIT OF | UNIT | TOTAL |
| CLIENT ELIN | DESCRIPTION | EST | UNIT OF | UNIT | TOTAL |
| QTY | ISSUE | PRICE | AMOUNT | ||
| PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | |||||
| Price for THIRD Option Period (12 Months) for labor, material, and equipment to perform the indefinite quantity tasks listed in the schedule of Indefinite Quantity Work Below. The quantities listed below are realistic provided solely for the purpose of bid evaluation and for establishing penal sums of bonds (If required). The price for this bid item is the total of the subline items listed in the Schedule of Indefinite Quantity Work | |||||
| D101 | Retake of Bacteriological Test (Refer to J-1800000-02 Sampling Requirements, Paragraph 10.0) | 120 | Ea | ||
| D102 | Retake of Biochemical Oxygen Demand (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 15 | Ea | ||
| D103 | Retake of Suspended Solids (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 8 | Ea | ||
| D104 | Retake of PH (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 6 | Ea | ||
| D105 | Retake of Nitrate as N (NO3-N) (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 8 | Ea | ||
| D106 | Retake of Nitrate as N (NO2-N) (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 8 | Ea | ||
| D107 | Retake of Volatile Organic Compounds (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 6 | Ea | ||
| D108 | Retake of Total Nitrogen (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 6 | Ea | ||
| D109 | Retake of Arsenic (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 6 | Ea | ||
| D110 | Retake of Cadmium (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 2 | Ea | ||
| D111 | Retake of Copper (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 2 | Ea | ||
| D112 | Retake of Lead (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 2 | Ea | ||
| D113 | Retake of Mercury (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 2 | Ea | ||
| D114 | Retake of Molybdenum (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 2 | Ea | ||
| D115 | Retake of Nickel (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 2 | Ea | ||
| D116 | Retake of Selenium (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 2 | Ea | ||
| D117 | Retake of Zinc (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 2 | Ea | ||
| D118 | Retake of Fecal Coliform (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 120 | Ea | ||
| D119 | Retake of Total Coliform (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 120 | Ea | ||
| D120 | Retake of Total Petroleum Hydrocarbon (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 4 | Ea | ||
| D121 | Retake of Chromium (Cr) VI (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 4 | Ea | ||
| D122 | Retake of Methyl Tertiary Butyl Ether (MTBE) (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 4 | Ea | ||
| D123 | Retake of Dissolved Oxygen (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 4 | Ea | ||
| D124 | Retake of Total Organic Carbon (TOC) (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 4 | Ea | ||
| D125 | Retake of pH (Method 9040) (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 4 | Ea | ||
| D126 | Retake of Specific Conductance (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 4 | Ea | ||
| D127 | Retake of OiI & Grease (O &G) (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 4 | Ea | ||
| D128 | Retake of Title 22 (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 4 | Ea | ||
| D129 | Retake of Radium 228 (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 4 | Ea | ||
| D130 | Retake of Total Dissolved Solids (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 8 | Ea | ||
| D131 | Retake of Hydrogen Ion (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 6 | Ea | ||
| D132 | Emergency Service Call (Refer to 2.21.1.1) | 5 | Ea | ||
| D133 | Emergency Sampling (Refer to 2.21.1.2) | 1 | Lump Sum |
TOTAL IDIQ 3RD OPTION (D101-D133)
| TOTAL THIRD OPTION PERIOD CLINs 0007 AND 0008 (FFP/IDIQ) $_____________________ |
| (ELINS D001-D053 AND D101 – D133) |
FFP 4TH OPTN
| CLIENT | FOURTH OPTION PERIOD FIRM FIXED PRICE CLIN 0009 ELIN “E0XX” | UNIT OF | UNIT | TOTAL | |
| ELIN | DESCRIPTION – CY 2029 | QTY | ISSUE | PRICE | AMOUNT |
| FOURTH OPTION PERIOD TWELVE (12) MONTHS - FFP | The Contractor shall provide WATER and WASTE WATER, Environmental Sampling, field testing, laboratory services and associated reporting requirements to support compliance oversight at the installation. The Contractor shall conduct timely sample collection and testing to ensure the installation complies with applicable EPA and state requirments. All sample data will be uploaded to WaterTrax. All sampling collected for the month will be loaded into WaterTrax no later than the 5th of the following month. | ||||
| Note: Type and Frequency of Source Well Monitoring requirements may VARY from year to year based on local, state, and federal requirements. |
| Water Samples | |||
| Weekly Sampling Requirements – Will be collected Tuesday of each week. | |||
| Distribution | |||
| E001 | Total Coliform Organism (Zones 1,2,3 and 4) 8 sample locations per week per schedule | 416 | Each |
| E002 | Total Dissolved Solids (Alternating Zones 1,2,3 and 4) | 52 | Each |
| E003 | Chlorine Residual Testing (Zones 1,2,3, and 4) 8 sample locations per week per schedule | 416 | Each |
| E004 | Arsenic (1 Sample per Week from EQ Tank Treated 1 & 2 alternating) | 52 | Each |
| Monthly Sampling Requirements – Will be collected by the first week of each month. | |||
| Treatment Plant | |||
| TDS (RO Influent (Raw)) (Lab analyzed) | 12 | Each | |
| TDS (Primary RO Permeate) (Lab analyzed) | 12 | Each | |
| TDS (CCD/CCRO Permeate) (Lab Analyzed) | 12 | Each | |
| Arsenic (Final RO Blend) | 12 | Each | |
| Boron (Final RO Blend) | 12 | Each | |
| Fluoride (Final RO Blend) | 12 | Each | |
| TDS (Final RO Blend) (Lab Analyzed) | 12 | Each | |
| Hexavalent Chromium (Final RO Blend) | 12 | Each | |
| LSI (Langelier Saturation Index at Source Temperature and 60°C) (Final RO Blend) | 12 | Each | |
| pH (Final RO Blend) (Lab analyzed) | 12 | Each | |
| Conductivity (Final RO Blend) (Lab analyzed) | 12 | Each | |
| Calcium (Final RO Blend) (Lab analyzed) | 12 | Each | |
| Alkalinity (Final RO Blend) (Lab analyzed) | 12 | Each | |
| Distribution | |||
| Water Temperature (At 7 Lead and Copper sample sites) | 84 | Each | |
| LSI (Langelier Saturation Index at Source Temperature and 60°C) (At 7 Lead and Copper sample sites) | 84 | Each | |
| Conductivity (At 7 Lead and Copper sample sites) | 84 | Each | |
| Calcium (At 7 Lead and Copper sample sites) | 84 | Each | |
| Alkalinity (At 7 Lead and Copper sample sites) | 84 | Each | |
| pH (At 7 Lead and Copper sample sites) | 84 | Each | |
| E005 | General Physical (Color, Odor, Turbidity) (Alternating Zones 1,2,3 and 4) | 12 | Each |
| Quarterly Sampling Requirements – Will be collected in the first month of each quarter. | |||
| TREATMENT PLANT | |||
| Total Coliform as MPN (Primary RO Permeate) | 4 | Each | |
| HPC (Primary RO Permeate) | 4 | Each | |
| Total Coliform as MPN (CCD/CCRO Permeate) | 4 | Each | |
| HPC (CCD/CCRO Permeate) | 4 | Each | |
| Manganese (Final RO Blend) | 4 | Each | |
| Iron (Final RO Blend) | 4 | Each | |
| Wells | |||
| Manganese (Wells 2A and 5A) | 8 | Each | |
| Iron (Fe) (Wells 2A, 5A, and 11A) | 12 | Each | |
| VOC- Volatile Organic Chemicals (DM-1 and DM2) | 8 | Each | |
| SOC - Synthetic Oraganic Chemicals (DM-1 and DM-2 to include EDB and DBCP) | 8 | Each | |
| Radiological (Gross Alpha) (DM-1 and DM-2) | 8 | Each | |
| Radiological (Uranium) (DM-1 and DM-2) | 8 | Each | |
| Radiological (Radium 226) (DM-1 and DM-2) | 8 | Each | |
| Radiological (Radium 228) (DM-1 and DM-2) | 8 | Each | |
| E006 | Total Coliform Organism (All Wells) | 52 | Each |
| E007 | Arsenic (Well 5A Only) | 4 | Each |
| Distribution | |||
| E008 | Iron (Fe) ( EQ Tank Treated 1 & 2 alternating) | 4 | Each |
| E009 | TTHM | 2 | Each |
| E010 | HAA5 | 2 | Each |
| Annual Sampling Requirements – Will be collected in the first quarter of each year. | |||
| Wells | |||
| E011 | Nitrate (as NO3) (All Wells) | 13 | Each |
| E012 | Aluminum | 13 | Each |
| E013 | Antimony | 13 | Each |
| E014 | Asbestos | 13 | Each |
| E015 | Barium | 13 | Each |
| E016 | Beryllium | 13 | Each |
| E017 | Cadmium | 13 | Each |
| E018 | Chromium | 13 | Each |
| E019 | Cyanide | 13 | Each |
| E020 | Fluoride | 13 | Each |
| E021 | Hexavalent Chromium | 13 | Each |
| E022 | Mercury | 13 | Each |
| E023 | Nickel | 13 | Each |
| E024 | Perchlorate | 13 | Each |
| E025 | Selenium | 13 | Each |
| E026 | Thallium | 13 | Each |
| E027 | Nitrite (as N) (All Wells) | 13 | Each |
| E028 | Arsenic (All Wells) | 13 | Each |
| 3 Year Sampling Requirements – Will be collected in the first quarter of the year. | |||
| Wells | |||
| E029 | Inorganic Chemicals (All Wells) (Every 3 Years) | 0 | Each |
| E030 | General Mineral (All Wells) (Every 3 Years) | 0 | Each |
| E031 | General Physical (All Wells) (Every 3 Years) | 0 | Each |
| E032 | Methyl Tertiary Butyl Ether (MTBE) (All Wells) | 0 | Each |
| E033 | VOC- Volatile Organic Chemicals (All Wells) (Every 3 Years) | 0 | Each |
| E034 | SOC - Synthetic Oraganic Chemicals (All Wells) (Every 3 Years to include EDB and DBCP) | 0 | Each |
| LSI (Langelier Saturation Index at Source Temperature ) All Wells | 0 | Each | |
| Distribution | |||
| E035 | Lead (Various Sites) (June thru Sept. only)(Every 3 Years) | 0 | Each |
| E036 | Copper (Various Sites) (June thru Sept. only)(Every 3 Years) | 0 | Each |
| 5 Year Sampling Requirements – Will be collected in the first quarter of the year. | |||
| Distribution | |||
| E037 | Lead (Priority Areas) (Every 5 Years ) | 289 | Each |
| Waste Water Samples | |||
| Daily Sampling Requirements – Will be collected every Monday - Friday. | |||
| E038 | PH (Mainside Secondary) | 262 | Each |
| E039 | Total Coliform (Disinfected Secondary) | 262 | Each |
| Bi - Weekly Sampling Requirements – Will be collected the first week of each month and every other week through that month. | |||
| E040 | BOD- Biochemical Oxygen Demand (Mainside)(Influent) | 26 | Each |
| E041 | BOD- Biochemical Oxygen Demand (Mainside Secondary)(Effluent) | 26 | Each |
| E042 | Suspended Solids (Mainside)(Influent) | 26 | Each |
| E043 | Suspended Solids (Mainside Secondary)(Effluent) | 26 | Each |
| Monthly Sampling Requirements - Will be collected by the first week of each month. | |||
| E044 | Nitrate as N (N03-N) (Mainside Secondary)(Effluent) | 12 | Each |
| E045 | TDS-Total Dissolved Solids (Mainside Secondary)(Effluent) | 12 | Each |
| E046 | Nitrite as N (N02-N) (Mainside Secondary)(Effluent) | 12 | Each |
| E047 | Total Nitrogen (Mainside Secondary)(Effluent) | 12 | Each |
| Quarterly Sampling Requirements - Will be collected in the first month of each quarter. | |||
| E048 | TSS-Total Suspended Solids (Holding Ponds) | 12 | Each |
| E049 | BOD- Biochemical Oxygen Demand (Holding Ponds) | 12 | Each |
| E050 | DO- Dissolved Oxygen (Holding Ponds) | 12 | Each |
| Annual Sampling Requirements - Will be collected in the first quarter of each year. | |||
| E051 | VOC-Volatile Organic Compounds (Mainside Secondary) | 1 | Each |
| E052 | Travel | 262 | TRIP |
| E053 | WaterTrax | 1 | LS |
| Fourth Option Year TOTAL FFP LINE ITEMS - E001 THROUGH E053 | $ |
IDIQ 4TH OPTN
| 4TH OPTION PERIOD IDIQ CLIN 0010 ELIN “E1XX” | |||||
| CLIENT ELIN | DESCRIPTION | EST | UNIT OF | UNIT | TOTAL |
| QTY | ISSUE | PRICE | AMOUNT | ||
| PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | |||||
| Price for FOURTH Option Period (12 Months) for labor, material, and equipment to perform the indefinite quantity tasks listed in the schedule of Indefinite Quantity Work Below. The quantities listed below are realistic provided solely for the purpose of bid evaluation and for establishing penal sums of bonds (If required). The price for this bid item is the total of the subline items listed in the Schedule of Indefinite Quantity Work | |||||
| E101 | Retake of Bacteriological Test (Refer to J-1800000-02 Sampling Requirements, Paragraph 10.0) | 120 | Ea | ||
| E102 | Retake of Biochemical Oxygen Demand (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 15 | Ea | ||
| E103 | Retake of Suspended Solids (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 8 | Ea | ||
| E104 | Retake of PH (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 6 | Ea | ||
| E105 | Retake of Nitrate as N (NO3-N) (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 8 | Ea | ||
| E106 | Retake of Nitrate as N (NO2-N) (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 8 | Ea | ||
| E107 | Retake of Volatile Organic Compounds (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 6 | Ea | ||
| E108 | Retake of Total Nitrogen (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 6 | Ea | ||
| E109 | Retake of Arsenic (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 6 | Ea | ||
| E110 | Retake of Cadmium (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 2 | Ea | ||
| E111 | Retake of Copper (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 2 | Ea | ||
| E112 | Retake of Lead (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 2 | Ea | ||
| E113 | Retake of Mercury (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 2 | Ea | ||
| E114 | Retake of Molybdenum (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 2 | Ea | ||
| E115 | Retake of Nickel (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 2 | Ea | ||
| E116 | Retake of Selenium (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 2 | Ea | ||
| E117 | Retake of Zinc (Refer to J-1800000-02 Sampling Requirements, Paragraph 5.0) | 2 | Ea |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .