The document is a Bill of Materials (BOM) for a fiber optic network construction project issued by the Ute Mountain Ute Tribe (UMUT) in Colorado, supported by an Economic Development Administration (EDA) grant. The project involves constructing middle mile fiber infrastructure from a communication hut located at G.2 Road near Cortez to Towaoc, with two primary routes totaling approximately 57,965 linear feet of fiber optic cable installation. The project includes materials procurement and construction services, with key components such as 288-count single-mode fiber optic cable, HDPE conduit, handholes, marker posts, splice cases, and associated installation work. The bid response deadline is May 2, 2024, at 3:00 p.m. MT, with an anticipated project completion date of November 14, 2025.
The total project budget is estimated at approximately $2.5 million, with the scope encompassing comprehensive network infrastructure development. The bill of materials details specific quantities for each route, including 48,000 linear feet of 1.25" HDPE conduit, 22-24 handhole assemblies, marker posts, fiber optic cable, splice cases, and associated construction activities. The project requires extensive technical specifications, including engineering as-built documentation, construction services, material procurement, boring and duct placement, cable splicing and testing, and installation of warning markers and locate posts. The contract includes provisions for project management, construction inspection, quality control, regulatory compliance, and financial tracking, with an emphasis on community communication and collaboration during the construction process.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| 240417_EDA PROJECT #05-01-06143_Addendum 1, Responses to Questions - FINAL.pdf | ||
| EDA#05-01-06143_Environmental Assessment, Biological Report.pdf | ||
| EDA#05-01-06143_Ute Mountain Ute Tribe RFP for Fiber Construction and Materials, Cortez to Towaoc.pdf | ||
| EDA#05-01-06143_Environmental Assessment, Desktop Review_07-14-21_rev (1).pdf | ||
| EDA#05-01-06143_Ute Bid Doc Approval Ltr 3.20.24.pdf | ||
| EDA#05-01-06143_C111_Advertisement for Bids.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
Route 1 Comm Hut Rd G.2 to Middle Mile Connection Point
| Item Number | Description | Quantity | Bid Unit Price | Bid Amount | |
| 1 | Engineering Asbuilt | 42,487 | Feet | ||
| 2 | Construction | 42,487 | Feet |
| Materials | ||||
| 3 | Conduit, HDPE, 1.25“ SDR 11, Smooth Wall, Orange, No Tape, No Wire, Price per | |||
| ft, 8000‘ reel | 48,000 | Ft | ||
| 4 | 1.25“ Push Lock Coupler, SDR, 50 per Carton | 80 | Ea | |
| 5 | 1.25" Simplex Duct Plugs | 49 | Ea | |
| 6 | Fiber Warning Tags 20 per pack Caution Fiber Optic Cable Orange Tag with Black Lettering Not Custom | 20 | Ea | |
| 7 | Large Handhole Assembly - Poly Concrete Tier 22 24x36x24 | 22 | Ea | |
| 8 | Marker Post, Dome, 72“, White w/Orange Polydome, 5 Position Test Station, |
Includes Custom Route Marker: ”Warning Buried Fiber Optic Cable - Before
| Digging Call Diggers Hotline 1-800-242-8511“ | 5 | Ea | ||
| 9 | SM Fiber Optic CABLE - 288 Count | 60,000 | Ft | |
| 10 | Fosc D Splice Case | 5 | Ea | |
| 11 | Splice Tray, 36ct, TE D Case, Sold Per Pair, Price Per Each | 20 | Ea | |
| 12 | Tracer Wire | 46,736 | ||
| Construction | ||||
| 13 | Prepare Splice Case | 5 | Ea | |
| 14 | Fiber Optic Cable Splice & Test. | 720 | Ea | |
| 15 | Set 24" x 36" x 24" Handhole | 22 | Ea | |
| 16 | Set Locate Marker Post. | 5 | Ea | |
| 17 | Bore and Place 1.25" HDPE Duct. | 42,487 | Ft | |
| 18 | Rock Adder | 6,374 | Ft | |
| 19 | Place Fiber Optic Cable in 1.25" Duct with Tracer | 53,109 | Ft | |
| 20 | Other |
Route 2 Middle Mile Connection Point to Public Works
| Item Number | Description | Quantity | Bid Unit Price | Bid Amount | ||
| 1 | Engineering Asbuilt | 15,478 | Feet | |||
| 2 | Construction | 15,478 | Feet | |||
| . | ||||||
| Materials | ||||||
| 3 | Conduit, HDPE, 1.25“ SDR 11, Smooth Wall, Orange, No Tape, No Wire, Price per | |||||
| ft, 8000‘ reel | 24,000 | Ft | ||||
| 4 | 1.25“ Push Lock Coupler, SDR, 50 per Carton | 40 | Ea | |||
| 5 | 1.25" Simplex Duct Plugs | 47 | Ea | |||
| 6 | Fiber Warning Tags 20 per pack Caution Fiber Optic Cable Orange Tag with Black Lettering Not Custom | 20 | Ea | |||
| 7 | Large Handhole Assembly - Poly Concrete Tier 22 24x36x24 | 21 | Ea | |||
| 8 | Marker Post, Dome, 72“, White w/Orange Polydome, 5 Position Test Station, |
Includes Custom Route Marker: ”Warning Buried Fiber Optic Cable - Before
| Digging Call Diggers Hotline 1-800-242-8511“ | 4 | Ea | ||
| 9 | SM Fiber Optic CABLE - 288 Count | 30,000 | Ft | |
| 10 | Fosc D Splice Case | 4 | Ea | |
| 11 | Fosc D Splice Tray | 16 | Ea | |
| 12 | Tracer Wire | 17,026 | Ft | |
| Construction | ||||
| 13 | Prepare Splice Case | 4 | Ea | |
| 14 | Fiber Optic Cable Splice & Test. | 576 | Ea | |
| 15 | Set 24" x 36" x 24" Handhole | 21 | Ea | |
| 16 | Set Locate Marker Post. | 4 | Ea | |
| 17 | Bore and Place 1.25" HDPE Duct. | 15,478 | Ft | |
| 18 | Rock Adder | 2,322 | Ft | |
| 19 | Place Fiber Optic Cable in 1.25" Duct. with Tracer | 19,235 | Ft | |