240417_EDA PROJECT #05-01-06143_Addendum 1, Responses to Questions - FINAL.pdf
PDF 46 KB Posted
- Attached to
- Fiber Construction & Materials, Cortez to Towaoc State and local contract opportunity
- Solicitation number
- EDA#05-01-06143
- Issued by
- Morgan County, Colorado
About this file
This document is an Addendum 1 for the Ute Mountain Ute Tribe (UMUT) Fiber Construction and Materials project from Cortez to Towaoc, covering RFP EDA#05-01-06143. The addendum provides detailed responses to 20 specific questions from potential bidders regarding the fiber optic network construction project. Key project details include a 28% segment on tribal property, fiber optic cable installation using 288-strand single-mode cables with specific technical requirements, and a total project estimated at approximately $2.5 million with an expected completion date of November 14, 2025.
Critical project requirements include obtaining crossing permits for tribal lands ($10 per ID card), completing necessary documentation like splice-sheets and bore-logs, and following specific technical standards for materials and restoration. The project will require splicing, does not mandate tribal labor percentages, and has waived most T.E.R.O. fees except for the ID card charge. Bidders must include freight in pricing, follow the RFP's pricing template, and be prepared to negotiate storage options with the tribe. The project will involve work within CDOT rights-of-way and requires adherence to their restoration and revegetation standards.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| EDA#05-01-06143_Bill of Materials.xlsx | XLSX spreadsheet | |
| EDA#05-01-06143_Environmental Assessment, Biological Report.pdf | ||
| EDA#05-01-06143_Ute Mountain Ute Tribe RFP for Fiber Construction and Materials, Cortez to Towaoc.pdf | ||
| EDA#05-01-06143_Environmental Assessment, Desktop Review_07-14-21_rev (1).pdf | ||
| EDA#05-01-06143_Ute Bid Doc Approval Ltr 3.20.24.pdf | ||
| EDA#05-01-06143_C111_Advertisement for Bids.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum 1: Responses to Questions for Fiber Construction and
Materials, Cortez to Towaoc – RFP EDA#05-01-06143
Question 1: What are the specifications of the 288 cables?
Response: While we do not specify a particular manufacturer/part number we do request something materially similar to the following: Single Jacket/Single Armor, Gel-
Free, Stranded Loose Tube, Singlemode G.652.D and G.657.A1, Feet jacket marking, Black jacket color
Question 2: What are the tracer wire requirements?
Response: Tracer wire is required, 12 AWG, copper clad steel core is preferred
Question 3: What are the acceptable materials for the 24 x 26 x 24 HH's?
Response: Polymer Concrete is preferred over HDPE, availability notwithstanding
Question 4: Is CDOT requiring a Traffic Control Point-Man and 3rd Party TC Inspector?
Response: CDOT has not yet signaled a requirement to utilize Point-Man. We expect a
TCS will be required for all work within CDOT rights-of-way
Question 5: Can we use aerial along HWY 160/491?
Response: No
Question 6: What is the process for handling cultural resources?
Response: THPO surveys have been completed for the proposed alignment and no concerns were identified. Standard Operating Procedure will require immediate stop-work and notification of the project managers if cultural artifacts or remains are encountered, which is entirely plausible given the location of the project.
Question 7: Is there a percentage of tribal labor required?
Question 8: What is the procedure for rock-adder verification?
Response: Rock-adder. prevalence and type of rock were established by our engineering firm based on USGS desktop surveys. Verification may come in the form of bore-logs, recorded pressures, and photographic evidence.
Question 9: What are the restoration and revegetation requirements?
Response: Restoration and Revegetation within CDOT should follow CDOT standards pursuant 2 CCR 601-18, particularly section 3.4.8 generally summarized as brought to pre-construction or better conditions. Estimates have been provided on page 193 of the RFP with details on page 194.
Question 10: Are we expected to splice?
Response: Yes, splicing should be included in the responses for both bills of materials
Question 11: How do we access tribal lands?
Response: The winning bidder will be required to complete a crossing permit for each vehicle and obtain identification cards for each individual working within tribal lands. The costs are $10 per ID card. An escort is required for access without a crossing permit.
Question 12: What is the scope for the engineering as-builts?
Response: Vendor shall provide splice-sheets, bore-logs, and shapefiles of the final placement of facilities.
Question 13: Who is responsible for obtaining the necessary permits?
Response: The winning bidder will be responsible for obtaining permits. Our team will provide permit-ready prints, to include plan and profile meeting SUE QL A standards, where required.
Question 14: Should freight be included in the pricing?
Response: Freight should be included, please use the "Other" category to capture
Question 15: Is there a pricing document that should be followed?
Response: Please refer to the RFP, section 3.0.2, pages 22 and 23 for the template.
Question 16: Can we have materials delivered to the tribe?
Response: Delivery can be arranged however storage is not guaranteed. Storage options need to be negotiated with the Tribe on an individual basis. Additional storage locations exist in nearby Cortez.
Question 17: Is there a list of local subcontractors that meet the desired diversity goals?
Question 18: Is there a T.E.R.O tax?
Response: All T.E.R.O fees, except for the $10 I.D. Card fee required for each individual, have been waived by tribal resolution.
Question 19: What percent of the installation is on tribal land?
Response: The Towaoc to Public Works segment, located on tribal property, accounts for
28% of the project total footage. The remaining segment is outside tribal boundaries.
Question 20: Does this project require section 3 compliance?