BASIC ORDERING AGREEMENT (BOA)
NATIONAL DATA BUOY CENTER (NDBC)
MARINE SERVICES
REGIONAL VESSEL CLASS
SECTION I: BASIC ORDERING AGREEMENT TERMS AND CONDITIONS
The Department of Commerce, National Oceanic and Atmospheric Administration (NOAA), Acquisition and Grants Office (AGO), Eastern Acquisition Division (EAD) and ____________________ agree to the following terms and conditions of a Basic Ordering Agreement in support of the National Weather Service (NWS), National Data Buoy Center (NDBC) for Marine Services. The terms and conditions included in this Basic Ordering Agreement shall apply to all purchases made pursuant to the agreement.
1. Scope of Blanket Purchase Agreement: This Basic Ordering Agreement is entered into in order to support the NWS NDBC by providing commercially available marine vessels to deploy, service, and repair ocean observing stations in the Atlantic Ocean, Caribbean Sea, Gulf of Mexico, and the Pacific Ocean as defined in the attached Statement(s) of Work (SOW). NOAA, AGO, EAD developed this acquisition strategy to enhance customer requirement fulfillment, improve the acquisition process, and build vendor partnerships.
2. Description of Agreement: ____________ shall provide the Marine Services as described in the attached SOW(s) and subsequent order request for quotations, if and when called for, by those persons designated by the Contracting Officer to place orders in accordance with their delegated procurement authority.
3. Duration of Basic Ordering Agreement (BOA): This Basic Ordering Agreement will expire on _____________. The Government reserves the right to discontinue, at any time, this Basic Ordering Agreement, for any reason, upon 30 days written notice.
4. Obligation and Pricing: Under the terms and conditions of this Basic Ordering Agreement, the Government is obligated only to the extent of those authorized orders that are actually made against this Basic Ordering Agreement by those personnel authorized to do so.
This Basic Ordering Agreement does not obligate any funds. Funds will be obligated by placement of orders. It is anticipated that Firm-Fixed-Price Day Rate Orders will be issued under the resultant BOAs. These orders will also have a cost-reimbursement line item for Other Direct Costs (ODC). This price element will be determined at the time of order through competition provided through fair opportunity in accordance with Federal Acquisition Regulation (FAR) 16.505
5. Performance: Performance for all Marine Services requested and performed against this Basic Ordering Agreement shall be made in accordance with the terms and conditions and period of performance provided with each order placed.
EA-133W-15-RQ-0621 RAMP-ON SOLICITATION
AMENDMENT 0004 1 MAY 6, 2019
6. Volume of Purchases: The Government estimates, but does not guarantee, that the volume of purchases through this agreement will be $210,000,000.00 over the 10 year ordering period. This number will be spread across all of the Basic Ordering Agreement orders that will be issued against the three vessel classes; Global, Global Science, and Regional. If the actual quantity ordered is less than the estimate, the Government will not be liable for any costs above those properly billable in orders issued against these Basic Ordering Agreements.
7. Authorized Callers or Placement of Orders: All NOAA, AGO, EAD Contracting Officers may use this Basic Ordering Agreement in accordance with their delegated purchase authorities.
8. Issuance of Calls/Orders: Orders shall be competed among the Basic Ordering Agreement holders for a particular vessel class. These orders are subject to a small business review that will allow for set-asides to small business or other socio-economic status vendors if it is determined to be in the Government’s best interest.
9. Invoicing: The requirements for proper invoices for this Basic Ordering Agreement shall be specified in each order.
10. Place of Performance: Performance instructions shall be provided with each order placed against this Basic Ordering Agreement (BOA).
11. Point Of Contact: The points of contact for this Basic Ordering Agreement (BOA) are:
a. Jennifer A. Hildebrandt Contracting Officer and Team Leader U.S. Department of Commerce/NOAA/EAD Phone: (757) 441-3433 Email: jennifer.hildebrandt@noaa.gov
b. Kurt C. Weilbaecher Contract Specialist/Contracting Officer U.S. Department of Commerce/NOAA/ERAD Phone: (228) 688-2825 Email: kurt.weilbaecher@noaa.gov
AMENDMENT 0004 2 MAY 6, 2019
SECTION II: STATEMENT OF WORK
FOR MARINE SERVICES TO SUPPORT
MAINTENANCE FOR THE NATIONAL DATA BUOY
CENTER’S (NDBC) OCEAN OBSERVATION SYSTEM
OF SYSTEMS (NOOSS)
Regional Class Vessel Qualification for Basic Ordering Agreement
June 16, 2015
AMENDMENT 0004 3 MAY 6, 2019
1.0 SCOPE
1.1 This statement of work defines National Data Buoy Center’s (NDBC) requirements for the marine services to conduct maintenance of marine observing systems in the Atlantic Ocean, Caribbean Sea, Gulf of Mexico, and the Pacific Ocean. Network descriptions, physical characteristics and representative examples of the types of buoy systems currently operated by NDBC are contained in Attachment 1. If the vessel is required to support service on any other types of buoy systems, the requirements will not exceed those in this Statement of Work.
1.2 The contractor must furnish the vessel, crew, material, equipment, services, and facilities, as described in this Statement of Work, to permit government field service personnel to perform the buoy maintenance specified in each Request for Quote (RFQ). Vessels must be able to lift the buoy onto the deck, secure the mooring to the deck, hold position over the mooring while the buoy is being serviced or exchanged, and deploy the buoy back in the water. The vessel must also be able to retrieve entire moorings that are freed from their anchors by acoustic releases or pressure-activated line cutters.
1.3 The Regional Class vessel is primarily intended to support maintenance of Weather and Ocean Platform (WxOP) buoys and support engineering evaluation and test projects within the Exclusive Economic Zone (EEZ) of the continental United States, Alaska, and Hawaii. When operating near an adrift buoy, the vessel may be called upon to retrieve and bring aboard either of the two types of buoys described in Attachment 1, along with its mooring remnants.
1.4 The Regional Class vessel normally stages from ports in the United States and its territories.
Therefore, the vessel must be able to transport the Government Furnished Equipment (GFE) specified in this SOW from one United States port to another United States port.
1.5 The Government will verify each vessel’s compliance with the requirements of this Statement of Work through documentation review and physical inspections. Each proposed vessel must meet these requirements to be awarded a Basic Ordering Agreement (BOA). The requirements in this SOW, which generally include inherent vessel characteristics, is a subset of the requirements that the contractor must meet to be awarded a contract. The remainder of the requirements (crew qualifications, certifications, contractor services, etc.) must be satisfied in order to be awarded a contract for the services specified in an RFQ.
1.6 The Verifications section of this Statement of Work defines which requirements must be met prior to award of a Basic Ordering Agreement in the Regional class.
AMENDMENT 0004 4 MAY 6, 2019
2.0 REQUIREMENTS
2.1 GENERAL REQUIRMENTS
2.1.1 Definitions
Cruise - A portion of the activities required by the contract that encompasses departing a port and returning to the same or another port, with no embarkation or disembarkation of personnel between ports, except in an emergency situation. This may also be referred to as a “mission” or “cruise leg.”
Government field service personnel - Individuals who are either employed by the federal government, a federal government contractor, or authorized by the federal government to conduct operations or research aboard the vessel and are designated by the Contracting Officer or Contracting Officer’s Representative (COR) as essential to completion of the cruise objectives. The Contracting Officer or COR will provide the contractor with a list of essential personnel for each cruise.
The “contractor” and “vessel” are considered the same entity for the purpose of satisfying the requirements of this Statement of Work. “Contractor” refers to the offeror or the offeror’s organization and is generally used for describing a service to be provided.
“Vessel” refers to an inherent capability that the vessel must have or provide.
2.1.2 Acronyms
ABS – American Bureau of Shipping ADCP – Acoustic Doppler Current Profiler BOA – Basic Ordering Agreement BPR – DART bottom pressure recorder CFR – Code of Federal Regulations COD – Certificate of Documentation COI – U.S. Coast Guard Certificate of Inspection COR – Contracting Officer’s Representative CTD – Conductivity, Temperature, and Depth instrument DART - Deep-ocean Assessment and Reporting of Tsunamis EEZ – Exclusive Economic Zone GFE – Government Furnished Equipment GRT – Gross Register Tonnage GT ITC – Gross Tonnage ITC IMO – International Maritime Organization ITC – International Convention on the Tonnage Measurement of Ships, 1969 NDBC – National Data Buoy Center NOAA – National Oceanic and Atmospheric Administration NOOSS – NDBC Ocean Observing System of Systems PFD – Personal Flotation Device RADAR – Radio Detection and Ranging
AMENDMENT 0004 5 MAY 6, 2019
RFQ – Request for Quote SARSAT – NOAA Search and Rescue Satellite Aided Tracking SDS – Safety Data Sheet SLC – SOLAS Safety Construction Certificate SLE – SOLAS Safety Equipment Certificate SLR – SOLAS Safety Radio Certificate SOLAS - International Convention for the Safety of Life at Sea, 1974 SOW – Statement of Work (this document) SSB – Marine Single Sideband USCG – United States Coast Guard VHF – Marine Very High Frequency, 156 to 162.025 megahertz WMO – World Meteorological Organization WxOP - Weather and Ocean Platform
2.1.3 Administrative
2.1.3.1 The vessel must possess valid documentation listed in Attachment 2. This documentation must show that the vessel meets all inspection and examination requirements prior to award of the Basic Ordering Agreement.
2.1.3.2 The vessel must possess a Certificate of Inspection (COI) issued by the U.S.
Coast Guard. The COI must include a record of all vessel safety examinations and examination due dates (where applicable) for the following:
a) Hull inspection to ensure seaworthiness of vessel.
b) Main/auxiliary power inspection to ensure safe and operable machinery for vessel propulsion and emergency power.
c) Boiler or Pressure Vessel inspection to ensure that it is structurally sound with operable safety devices.
d) Electrical systems inspection to ensure satisfactory installation of wiring and equipment.
e) Lifesaving systems inspection to ensure satisfactory and adequate means to abandon ship.
f) Firefighting systems inspection to ensure fixed and portable devices are suitable for the intended space and type of fire.
g) Navigation inspection to ensure adequacy and operation of navigation equipment.
h) Pollution prevention inspection to ensure compliance with international regulations and domestic laws.
2.1.3.3 The vessel must be registered by a U.S citizen under a U.S. flag. The vessel must possess a Certificate of Documentation (COD) issued by the U.S. Coast Guard. The COD must include a “coastwise” operational endorsement.
AMENDMENT 0004 6 MAY 6, 2019
2.1.3.4 Where a requirement in this SOW specifies “USCG or SOLAS requirements,” the vessel shall meet the requirements of either USCG or SOLAS, or both, that are appropriate for the vessel size, type, construction, and area of operation.
2.1.4 Seaworthiness and Safety
2.1.4.1 The vessel must be of sufficient size, stability, and maneuverability to transit in World Meteorological Organization (WMO) Sea State Code 7 and to conduct all required buoy retrieval, servicing, and deployment operations in WMO Sea State Code 4.
2.1.4.2 The vessel must have a Stability Letter that reflects the vessel’s current configuration and intended service. The Stability Letter must be signed by a qualified individual (a recognized naval architect or naval architecture firm having been trained in and having experience in matters of stability calculations) certifying that the vessel meets intact stability requirements, taking into account the loading, over-the-side lifting, and at-sea conditions under which the vessel will reasonably be expected to operate during the charter. The stability letter must contain instructions and guidance for the vessel’s operating personnel intended to maintain satisfactory vessel stability and shall include information regarding loading constraints and operating restrictions under varying conditions. The vessel must maintain stability information aboard the vessel and operate in accordance with the vessel’s stability instructions and guidance.
2.1.4.3 The vessel must possess one or more of the following documents that reflect the vessel’s current configuration as evidence of the vessel’s material condition, structural, and watertight integrity:
a) Current vessel classification
b) SOLAS Safety Construction (SLC) Certificate
c) Loadline Certificate, or equivalent applicable Classification Society documents
d) Evidence of dry-docking examination, or underwater survey in lieu of dry-docking, and an internal structural examination, twice within all previous five-year periods with no more than three years between any two examinations and more frequently, if required per USCG regulations relevant to the size, age and use of the vessel, from a recognized marine surveying company certifying the vessel’s structural and watertight integrity
2.1.5 Egress, Fire Protection, and Flooding Control
2.1.5.1 The vessel must have two identified escape routes from all general areas. At least one of these two means shall be independent of watertight hatches and doors, except for quick-acting watertight hatches and doors giving final access to weather decks.
2.1.5.2 The vessel must have in place fully functional fire protection systems and equipment, such as portable and semi-portable fire extinguishers, fire pumps, fire mains, fixed gas extinguishing systems, and fire detection and alarm systems in accordance with USCG or SOLAS requirements. All fire protection equipment and system components installed aboard chartered vessels, and the installation details of those systems, shall meet
AMENDMENT 0004 7 MAY 6, 2019
USCG or SOLAS requirements as evidenced by a current and valid USCG inspection or SOLAS certificate. This requirement may be satisfied by the following:
a) a self-priming power-driven fire pump connected to a fixed fire main piping system with a sufficient number of hydrants to reach any part of the vessel with a single length of fire hose
b) a fixed, gaseous fire extinguishing system that serves engine compartments, machinery spaces, and other spaces where flammable liquids are stored
c) a grease extraction hood and extinguishing system that serves galley cooking equipment
d) a fire detection and alarm system or an independent modular smoke detector or fire detecting unit located in each accommodation space.
2.1.5.3 The vessel must have in place fully functional bilge piping systems, pumps, and alarms in accordance with USCG or SOLAS requirements for a vessel of its size, type, and service. This requirement may be satisfied by the following:
a) at least two means of dewatering the vessel’s watertight compartments (other than tanks and those considered small buoyancy compartments), of which one is a fixed self-priming power driven pump permanently connected to a fixed bilge piping system
b) visual and audible high water alarms located on the bridge for spaces having through hull fittings below the waterline (for spaces subject to flooding from seawater piping within the space and for spaces having non-watertight closure)
c) a visual indicator on the bridge indicating when an automatic bilge pump (if fitted) is operating.
2.1.6 Lifesaving Equipment
2.1.6.1 The vessel must carry survival craft of aggregate capacity to accommodate all of persons permitted to be aboard. Survival craft must meet USCG or SOLAS requirements based on vessel size, type, construction, and area of operation. For operations outside the Boundary Line (as delineated in 46 CFR Part 7), survival craft must be outfitted with SOLAS A-pack for ocean service. All survival craft must be stowed so as to float free and inflatable survival craft must automatically inflate in the event the vessel sinks. Each survival craft and stowage arrangement shall meet USCG or SOLAS requirements for maintenance, servicing, and certification as evidenced by a current and valid USCG inspection or SOLAS certification. The expiration date of survival craft inspection and certification must be valid for the contract period of performance.
2.1.6.2 The vessel must carry at least one Type I personal floatation device (PFD) for every person on board. The vessel must carry at least one immersion suit for each person on board. The immersion suits and PFDs must be of proper size and fit for the crew and government field service personnel and must be outfitted with ancillary equipment required by USCG regulations such as a light, a whistle, and reflective materials. The suits and PFDs must be marked in accordance with USCG regulations, must be stowed in locations accessible to working and berthing areas, must be maintained according to manufacturer’s instructions, and must be in a condition acceptable to the USCG.
AMENDMENT 0004 8 MAY 6, 2019
2.1.6.3 The vessel must carry at least one Category 1, 406/121.5 MHz float-free, automatically activated EPIRB which is detectable by satellite anywhere in the world and recognized by GMDSS. The EPIRB must be registered per the NOAA Search and Rescue Satellite Aided Tracking (SARSAT) System and shall be tested in accordance with USCG or SOLAS requirements and manufacturer’s recommendations. The EPIRB battery and hydro test certification must be valid for the contract period of performance.
2.1.6.4 The vessel must carry distress signaling devices of the type and quantity required by USCG or SOLAS requirements.
2.1.7 Navigation, Communications, and Emergency Power
2.1.7.1 The vessel must meet USCG or SOLAS requirements and international navigational rules with respect to navigational safety. The vessel must comply with The International Regulations for Preventing Collisions at Sea (72 COLREGS). The vessel must be outfitted with a fixed magnetic compass and deviation table, two RADAR systems or one RADAR system and one electronic chart/tracking system, and a fixed electronic positioning system in accordance with USCG or SOLAS requirements for inspected vessels. Aboard vessels employing a one-person bridge watch, a tamper-resistant audible watch or bridge alarm in the wheelhouse is required with an activation cycle not to exceed 15-minute intervals.
2.1.7.2 The vessel must have at least one VHF radio and one Marine Single Side-Band (SSB) radio. A single radio transceiver meeting frequency requirements of the VHF and SSB radios may be acceptable in lieu of two separate radios. If a single radio transceiver is used, then another means of communication must also be available. This requirement for a second means of communication can be satisfied by a cellular telephone or satellite communication system that is operational throughout the area of operation required by the RFQ.
2.1.7.3 The vessel must have a general alarm system capable of being activated from the bridge for notifying individuals in any accommodation or work space in case of fire, abandon ship, or emergency in accordance with current USCG or SOLAS requirements.
The vessel must have a fixed telephone system, public address system, or hand held radios that permit clear and audible two-way communication between persons on the bridge and persons located in laboratory and office spaces and on the working deck.
2.1.7.4 The vessel must have an emergency source of electrical power, independent of the main source of electrical power, to provide power to emergency loads in accordance with USCG or SOLAS requirements. Emergency power must be supplied to the following equipment: emergency lighting, navigation equipment, navigation lights, general alarm systems, and emergency communication systems. The emergency source of electrical power must be capable of supplying connected emergency loads continuously for at least three hours and must be located in a space or locker other than the main machinery space.
AMENDMENT 0004 9 MAY 6, 2019
2.1.7.5 The vessel must provide electronic mail and internet for communication between the crew and the COR on shore. Electronic mail must be able to transmit attached files up to 1Mb.
2.1.8 Pollution Control - The vessel must meet applicable international, federal, state, and local pollution control laws and regulations. Vessels shall be outfitted and operated in accordance with applicable USCG and IMO regulations for the control of pollution by air emissions, sewage, oil, trash and garbage.
2.1.9 Accommodations - The vessel must provide living accommodations for up to four government field service persons in a stateroom or staterooms separate from the vessel crew.
The vessel must provide:
a) an individual bunk and locker inside each stateroom for each person with an innerspring or foam rubber mattress that is not more than two years old.
b) a lavatory and room with showers and washbowls.
c) Showers and washbowls must be supplied with hot (105°F to 120°F) and cold fresh water
2.1.10 Potable Water - The contractor must provide evidence of bacteriological and chemical testing of shipboard potable water taken from the vessel’s storage tanks from a point-of-use plumbing fixture (sink, shower, etc.) by a certified laboratory no earlier than three months before the first day of the contract period of performance. Potable water must meet initially meet the following standards and must be maintained to these standards throughout the contract period of performance:
a) pH of 6.8 to 7.8
b) Residual halogen content of 0.2 ppm to 2.0 ppm free available chlorine (or equivalent).
c) Turbidity equal to or less than 1.0 nephelometric turbidity units (NTU)
d) Free of taste, odor, color, and turbidity that would be objectionable to the majority of the government field service personnel on board.
2.2 SPECIFIC VESSEL REQUIREMENTS
2.2.1 The vessel must possess a Certificate of Inspection specifying the Route Permitted and Conditions of Operation as “Oceans” or “Coastwise.” If “Coastwise,” the COI must allow the vessel to operate to the outer (seaward) boundary of the United States Exclusive Economic Zone.
2.2.2 The contractor may propose to operate the vessel exclusively within a pre-defined geographic region. However, the seaward boundary of this region must extend to the outer limit of the United States Exclusive Economic Zone.
2.2.3 The vessel must have a minimum range of 1,000 nautical miles at cruising speed, and a minimum endurance of 6 days. The vessel must have a minimum cruising speed of 8.0 nautical miles per hour at Maximum Continuous Rating with the ship fully loaded.
AMENDMENT 0004 10 MAY 6, 2019
2.2.4 Working Deck
2.2.4.1 The vessel must have a minimum clear working deck area of at least 1,100 square feet with a minimum loading capacity of 800 pounds per square foot, and must have a minimum of 20 tie-downs rigging points installed with a load capacity of at least 3,000 pounds each. Of the required 1,100 square feet, 200 square feet can be a covered storage deck. The storage deck area must have a vertical clearance of at least eight feet and must be at the same level as a 12 feet by 12 feet portion of the working deck to allow transfer of equipment between working and storage deck areas using a pallet jack.
2.2.4.2 The vessel must have a minimum contiguous, unobstructed area for buoy servicing operations, directly adjacent to the stern A-frame or crane, that extends 20 feet inboard of the stern A-frame or crane and is 15 feet wide.
2.2.4.3 The entire working deck shall have sufficient lighting for a person standing on the working deck to be able to read size 12 text (1/8 inch height) during night operations (between local sunset and local sunrise).
2.2.4.4 The edge of the deck under the stern A-frame or outboard of the reach of the crane must be free of bulwarks and obstructions to accommodate the deployment and retrieval of the buoys and moorings. This edge must be smooth to prevent chaffing of the nylon mooring line when the buoy is brought on board and still connected to its mooring.
This edge that the mooring line is draped over must be at least thirteen feet wide, must have a radius of at least 4 inches, and must be free of gaps or sharp edges.
2.2.4.5 The following table is a representative list of GFE that will be loaded on the ship for a single cruise. The vessel must be able to store the equipment listed in the following table on the working deck outside of the boundaries of the required 20 feet x 15 feet unobstructed area for buoy servicing operations inboard of the stern A-frame or crane:
AMENDMENT 0004 11 MAY 6, 2019
2.2.5 Cranes and Deck Equipment
2.2.5.1 The vessel must have at least one of the following
A stern-mounted A-frame that meets the following requirements.
a) Safe working load of 20,000 pounds
b) Sheave travel of 12 feet forward of the transom to 12 feet aft of the transom
c) Vertical clearance of 28 feet between the cross member and deck
d) Horizontal clearance: 15 feet between legs at deck and 12 feet between legs at cross member
OR
An articulating or knuckle boom crane that can lift a 6,800 pound load from the working deck and set it in the water at least 10 feet away from the side of the ship. This crane must also be able to lift a 4,000 pound load from the water at least 20 feet away from the side of the ship, and set the load on the working deck.
2.2.5.2 All cranes and stern mounted A-frames that satisfy the requirements of this Statement of Work must be integral to the vessel structure. Each crane and crane support structure must be permanently affixed to the deck and structure of the ship, identified in the vessel’s working plans (drawings), and certified by American Bureau of Shipping (ABS). The government will not consider portable cranes, mobile cranes, or other temporary installations.
2.2.5.3 All cranes and stern mounted A-frames that satisfy the requirements of this Statement of Work must be designed and certified for operation in WMO Sea State Code 4.
2.2.5.4 The vessel must have one horizontal winch installed on or adjacent to the working deck of the vessel. The winch shall have a reversing motor with minimum line pull of 10,000 pounds at a line speed of 33 feet per minute. The drum shall have minimum diameter of 18 inches. Each winch must have an automatic brake rated at 14,000 pounds minimum.
3.0 VERIFICATION
3.1 To be awarded a Basic Ordering Agreement, the contractor must submit documentation, certifications, or other evidence that the vessel meets all the requirements of this Statement of Work that are listed in Attachments 2 and 3.
5.0 ATTACHMENTS
ATTACHMENT 1 - Description of NDBC Buoys and Buoy Networks ATTACHMENT 2 - Regional Class Vessel Documentation Checklist ATTACHMENT 3 – Regional Class Vessel Requirements Matrix
AMENDMENT 0004 12 MAY 6, 2019
ATTACHMENT 1
DESCRIPTION OF NDBC BUOYS AND BUOY NETWORKS
Weather and Ocean Platform (WxOP) Network. NDBC currently has 110 Weather and Ocean moored buoys. The U.S. Coast Guard buoy tenders provide vessel support for servicing Weather Buoys within or near the boundaries of the U.S. Exclusive Economic Zone. Weather buoys are typically serviced every two years, and exchanged (refurbished) every three years.
Their moorings are typically inspected every two years and replaced every four to five years.
NDBC charters a Global Class Vessel each Spring to maintain the remaining 14 Weather Buoys located in the Bay of Campeche, Caribbean Sea, and South Atlantic. NDBC may charter a Global Class, Global Science Class, or Regional Class vessel to perform scheduled or discrepancy service on any WxOP buoy at any time, depending on available funding, urgency of the repair, and availability of a U.S. Coast Guard vessel. The following figure shows the geographic distribution of the WxOP network:
A complete and current listing of NDBC WxOP buoys can be found at:
http://www.ndbc.noaa.gov/wstat.shtml
WxOP Weights and Dimensions. While NDBC still operates and maintains a few large 10-meter and 12-meter discus and 6-meter NOMAD buoys, Global and Regional Class Vessels will only work with 3-meter diameter discus buoys. NDBC may use Global, Global Science, and Regional Class vessels to maintain other Weather buoy configurations in the future, but these configurations will not exceed the weight or size of a 3-meter discus buoy. The following figure depicts the configuration of a 3-meter discus buoy.
AMENDMENT 0004 13 MAY 6, 2019
WxOP Moorings. The 3-meter discus buoy uses three basic types of moorings, depending on the depth, currents, and bottom type: All-Chain, Semi-Taut, and Low-Load Compliant. All- Chain and Semi-Taut moorings are generally fully retrievable. They are brought up onto the deck of the servicing vessel for inspection every two years. The Low-Load Compliant mooring is not subject to the abrasive forces that the other two types experience and is generally not retrieved, but is inspected down to the top of the uppermost nylon section every two years. The following mooring diagrams are representative of these three mooring types:
AMENDMENT 0004 14 MAY 6, 2019
AMENDMENT 0004 15 MAY 6, 2019
AMENDMENT 0004 16 MAY 6, 2019
AMENDMENT 0004 17 MAY 6, 2019
Deep-ocean Assessment and Reporting of Tsunamis (DART®) System
The DART® system consists of an anchored seafloor bottom pressure recorder (BPR) and a companion moored surface buoy for real-time communications with the U.S. Tsunami Warning Centers. An acoustic link transmits data from the BPR on the seafloor to the surface buoy. The following figure depicts the operation of the DART® II System, which was became operational in 2005.
AMENDMENT 0004 18 MAY 6, 2019
The 39 stations in the DART network are shown in the figure below.
AMENDMENT 0004 19 MAY 6, 2019
DART Weights and Dimensions. The DART surface buoy is a fiberglass hull with a stainless steel bridle, 2.6 meters in diameter and 12 feet tall, including bridle. The assembled buoy weighs approximately 3,000 pounds. The following figure shows the DART surface buoy
AMENDMENT 0004 20 MAY 6, 2019
The DART Bottom Pressure Recorder (BPR) rests on the sea floor under the buoy. The following figure shows the BPR configuration. The lower table is the anchor. During recovery, the upper table with instruments is released from the anchor and is lifted up by a string of floats.
The BPR assembly is approximately 48 inches x 39 inches x 48 inches tall. With anchor, it weighs approximately 1,200 pounds. Some BPR’s are equipped with surface activated strobe lights for recovery at night.
DART Moorings. A DART mooring consists of an upper stainless steel chain assembly, swivel, 3/4 inch diameter fishbite-resistant Vectran line, 3/4 inch nylon rope, and a 6,000 pound double stack anchor. To ensure that buoy stays over the BPR, within the communications cone of the acoustic transducer, the mooring must be nearly vertical. DART moorings have a nominal scope of 0.97 (ratio of mooring length to water depth). The figure on the following page shows a typical DART mooring.
AMENDMENT 0004 21 MAY 6, 2019
AMENDMENT 0004
MAY 6, 2019
IMPORTANT NOTE REGARDING LIFTING NDBC BUOYS ONTO A VESSEL
The buoy weights and dimensions given in this Appendix are for clean buoys prior to deployment and do not include the weight of the attached mooring, weight of any water that may have leaked into the hull, and the weight of marine life that may have attached itself to the hull.
The actual load to be lifted from the sea surface onto the deck of the ship could be significantly more than the weight of the buoy itself. The vessel crane specifications take these additional loads into account.
AMENDMENT 0004 23 MAY 6, 2019
ATTACHMENT 2
REGIONAL CLASS VESSEL DOCUMENTATION CHECKLIST
Description Y/N Notes Required Documentation - Vessels under 300 GRT Vessel Certificate of Documentation Certificate of Inspection Stability evaluation report (or Stability Letter/Booklet) Vessel hull and material condition report Vessel description, general arrangements, and history of vessel alterations, if any Pollution prevention placards for oil and trash
Required Documentation - Vessels 300 GRT and over Vessel Certificate of Documentation Certificate of Inspection Stability Booklet Vessel hull and material condition report Vessel description, general arrangement drawings, and record of vessel alterations Pollution prevention placards and plans Pollution prevention record books
Required Documentation -Vessels 500 GT ITC Vessel Certificate of Documentation Certificate of Inspection Stability Booklet Vessel hull and material condition report Vessel description, general arrangement drawings, and record of vessel alterations Loadline Certificate Vessel Classification SOLAS Certificates (SLC, SLE, and SLR) International Oil Pollution Prevention Certificate Pollution prevention placards and plans Pollution prevention record books
AMENDMENT 0004 24 MAY 6, 2019
ATTACHMENT 3
REGIONAL CLASS VESSEL REQUIREMENTS MATRIX
General Vessel Requirements
Paragraph Number
Description Verification Method
Evidence Submitted/ Inspection Results
2.1.3.1 Vessel Documentation Document Review
2.1.3.2 Certificate of Inspection Certificate Review
2.1.4.1 Vessel Size, Stability, and
Maneuverability Document Review Vessel Inspection
2.1.4.2 Stability Letter Document Review
2.1.4.3 Vessel Material Condition, Structural, Watertight Integrity Document Review
2.1.5 Egress, Fire Protection, and
Flooding Control
Vessel Inspection
2.1.6 Lifesaving Equipment Vessel Inspection
2.1.7 Navigation, Communications, and Emergency Power Vessel Inspection
2.1.8 Pollution Control Vessel Inspection
2.1.9 Accommodations Vessel Inspection
2.1.10 Potable Water Review of Lab
Results
Specific Vessel Requirements
Paragraph Number
Description Verification Method
Evidence Submitted
2.2.1 COI Route and Conditions Certificate Review
2.2.3 Range, Endurance, Speed Vessel Inspection
2.2.4 Working Deck Vessel Inspection
2.2.5 Cranes and Deck Equipment Vessel Inspection
Document Review
AMENDMENT 0004 25 MAY 6, 2019
Section III: AGREEMENT CLAUSES
1. FEDERAL ACQUISITION REGULATION (FAR) 52.212-4 CONTRACT TERMS
AND CONDITIONS-COMMERCIAL ITEMS (OCT 2018)
(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights-
(1) Within a reasonable time after the defect was discovered or should have been discovered; and
(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.
(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.
(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at FAR 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.
(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.
(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.
(g) Invoice.
(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include-
AMENDMENT 0004 26 MAY 6, 2019
(i) Name and address of the Contractor;
(ii) Invoice date and number;
(iii) Contract number, contract line item number and, if applicable, the order number;
(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;
(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;
(vi) Terms of any discount for prompt payment offered;
(vii) Name and address of official to whom payment is to be sent;
(viii) Name, title, and phone number of person to notify in event of defective invoice; and
(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.
(x) Electronic funds transfer (EFT) banking information.
(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.
(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer-System for Award Management, or 52.232-34, Payment by Electronic Funds Transfer-Other Than System for Award Management), or applicable agency procedures.
(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.
(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C. 3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR Part 1315.
(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.
(i) Payment.-
(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.
(2) Prompt payment. The Government will make payment in accordance with the Prompt
Payment Act (31 U.S.C. 3903) and prompt payment regulations at 5 CFR Part 1315.
(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-5(b) for the appropriate EFT clause.
(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.
(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall-
(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the-
AMENDMENT 0004 27 MAY 6, 2019
(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);
(B) Affected contract number and delivery order number, if applicable;
(C) Affected contract line item or subline item, if applicable; and
(D) Contractor point of contact.
(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.
(6) Interest.
(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in 41 U.S.C. 7109 , which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.
(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.
(iii) Final decisions. The Contracting Officer will issue a final decision as required by 33.211 if-
(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;
(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or
(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see 32.607-2).
(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.
(v) Amounts shall be due at the earliest of the following dates:
(A) The date fixed under this contract.
(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.
(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on-
(A) The date on which the designated office receives payment from the Contractor;
(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or
(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.
(vii) The interest charge made under this clause may be reduced under the procedures prescribed in 32.608-2 of the Federal Acquisition Regulation in effect on the date of this contract.
(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:
(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or
AMENDMENT 0004 28 MAY 6, 2019
(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.
(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.
(l) Termination for the Government’s convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor’s records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.
(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.
(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.
(o) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.
(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.
(q) Other compliances. The Contractor shall comply with all applicable Federal, State and local laws, executive orders, rules and regulations applicable to its performance under this contract.
(r) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31 U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts; 18 U.S.C. 431 relating to officials not to benefit; 40 U.S.C. chapter 37, Contract Work Hours and Safety Standards; 41 U.S.C. chapter 87, Kickbacks; 41 U.S.C.
4712 and 10 U.S.C. 2409 relating to whistleblower protections; 49 U.S.C. 40118, Fly American;
and 41 U.S.C. chapter 21 relating to procurement integrity.
(s) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order:
(1) The schedule of supplies/services.
(2) The Assignments, Disputes, Payments, Invoice, Other Compliances, Compliance with
Laws Unique to Government Contracts, and Unauthorized Obligations paragraphs of this clause;
(3) The clause at 52.212-5.
AMENDMENT 0004 29 MAY 6, 2019
(4) Addenda to this solicitation or contract, including any license agreements for computer software.
(5) Solicitation provisions if this is a solicitation.
(6) Other paragraphs of this clause.
(7) The Standard Form 1449.
(8) Other documents, exhibits, and attachments.
(9) The specification.
(t) System for Award Management (SAM).
(1) Unless exempted by an addendum to this contract, the Contractor is responsible during performance and through final payment of any contract for the accuracy and completeness of the data within the SAM database, and for any liability resulting from the Government’s reliance on inaccurate or incomplete data. To remain registered in the SAM database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the SAM database to ensure it is current, accurate and complete. Updating information in the SAM does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.
(2)(i) If a Contractor has legally changed its business name, “doing business as” name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in FAR Subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day’s written notification of its intention to (A) change the name in the SAM database; (B) comply with the requirements ofSubpart 42.12; and (C) agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor must provide with the notification sufficient documentation to support the legally changed name.
(ii) If the Contractor fails to comply with the requirements of paragraph (t)(2)(i) of this clause, or fails to perform the agreement at paragraph (t)(2)(i)(C) of this clause, and, in the…