S0100_NOAA_Spec_Implementation_and_Conduct_of_Checkpoints.pdf

PDF 37 KB Posted

Attached to
Dockside Repairs to NOAA Ship FERDINAND HASSLER Federal contract opportunity
Solicitation number
EA-133M-16-RP-A123
Issued by
Department of Commerce National Oceanic and Atmospheric Administration

About this file

Additional Info.

View the file

Other files for this federal contract opportunity

Other files attached to Dockside Repairs to NOAA Ship FERDINAND HASSLER, newest first.
File Type Posted
SF_30 _Amend_0007.pdf PDF
AMENDMENT_0007_REFERENCE_DOCUMENTS.exe EXE file
SF_30 _Amend_0006.pdf PDF
Declaration_of_Asbestos-freesigned.pdf PDF
SF_30 _Amend_0005.pdf PDF
SF_30 _Amend_0004.pdf PDF
SF_30 _Amend_0003.pdf PDF
Section_G.pdf PDF
SF_30 _Amend_0002.pdf PDF
Section_M.pdf PDF
SF_30 _Amend_0001.pdf PDF
Section_M._Replacement_Pages.pdf PDF
Section_B._Replacement_Page.pdf PDF
RFP.pdf PDF
M286-430-PE41-001-03(As-Built).pdf PDF
635-2_Compartment_Thermal_Insulation.pdf PDF
8010-100-466_X06_R3.pdf PDF
M286-430-PE41-001-03(As-Built)_(1).pdf PDF
FC61_-_Paint_Schedule.pdf PDF
M286-430-PE41-001-03(As-Built)_(1)_(1).pdf PDF
s6900_ElecElex_General_Reqts.pdf PDF
RFP_ATTACHMENT_J.4.pdf PDF
RFP_ATTACHMENT_J.3.pdf PDF
M286-117-FC40-01-02_(PenetrationControlZones).pdf PDF
RFP_ATTACHMENT_J.2.pdf PDF
8010-100-466_X02_R3.pdf PDF
M286-085-FA11-001-07_(FIRE_CONTROL_PLAN)(As-Built).pdf PDF
NOAA_Std_Spec_S4800-2_Piping_Systems.pdf PDF
NOAA_Std_Spec_S4800-2_Piping_Systems_(1).pdf PDF
M286-085-FA02-001-15_(GARRGTS)_(As-Built).pdf PDF
M286-541-FP04-07_Fuel_Fill_Transfer_and_Service_Sys_Diag_(As.pdf PDF
RFP_ATTACHMENT_J.5.pdf PDF
FC61_-_Paint_Schedule_(1).pdf PDF
8010-100-466_X05_R3.pdf PDF
M286-529-FP01-10_(Bilge-Ballast-Fire).pdf PDF
M286-512-FP27-10(Machinery_Space_Ventilation).pdf PDF
8010-100-466_X04_R3.pdf PDF
M286-085-FA06-001-05_(FIRE_ZONE_BOUNDARY).pdf PDF
631-2D-Coating_Systems_for_Steel_Surfaces.pdf PDF
M286-635-FV10-001-03_(INSULATION).pdf PDF
IEEE_Std_45-2002.pdf PDF
8010-100-466_X03_R3.pdf PDF
M286-531-FP03-11_(Fresh_ _Potable_Water).pdf PDF
M286-301-FE08-03.pdf PDF
MOC-635-1.pdf PDF
J.1_HASSLER_FY16_DOCKSIDE_SPECIFICATION.pdf PDF
Spec_Paint_NAVSEA_Standard_Item_009-32_FY10.pdf PDF
NOT_ISSUEDM286-581-FH20-001-03_(ANCHOR_HANDLING_DETAILS)_(Asc.pdf PDF
8010-100-466_X01_R3_(1).pdf PDF
M286-505-FP25-00_(Std_Piping_Details).pdf PDF
Show all 50

Dockside Repairs to NOAA Ship FERDINAND HASSLER has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Revised August, 1994

NOAA Standard Specification - S0100

IMPLEMENTATION AND CONDUCT OF CHECK POINTS

1. CHECK POINT is a phrase inserted in a work item to establish a point in the sequence of accomplishment of work at which time the NOAA designated representative shall be notified to permit observation of a specific operation, test or inspection by the Government.

1.1 A contractor designated point of contact shall be present at operations, tests or inspections specified as CHECK

POINTs.

2. Notify the NOAA designated representative and the Ship's Repair Officer at least four hours, but not more than one working day, prior to commencing the specific requirements in the paragraph following a CHECK POINT. Notify the NOAA representative in writing at least 48 hours, but not more than 72 hours, for subcontractors whose plants are located outside a 50 mile radius from the NOAA representatives work sit. Document the date, time and identification of the NOAA representative notified.

2.1 When more than one unit, operation, test or inspection is involved, the CHECK POINT requirement applies to each.

2.2 When operations, tests or inspections follow a CHECK POINT are to be performed after normal day shift working hours, on a weekend, or a Federal holiday, the NOAA representative shall be notified at least four hours before the end of the last preceding normal day shift.

3. In the event the NOAA representative is not present at the scheduled CHECK POINT, the contractor is to proceed, provided the required advance notice has been furnished to the NOAA representative and the contractor has completed and documented his preceding tests and operations.

4. In the event that work cannot be completed to a CHECK POINT for any reason (such as late delivery of material or interfacing of related work items), and work progress would be delayed in waiting for total completion of work to the CHECK POINT, the NOAA representative, upon notification, may conduct a partial inspection of the work or item. Notify the NOAA representative when the incomplete work or item is completed and ready for the remainder of the operation, test or inspection.

Partial CHECK POINTs shall be documented as in Paragraph 2.

5. CHECK POINT requirements for operations, tests or inspections involving a subcontractor shall be invoked by the contractor's purchase order or otherwise described such that the requirements of Paragraph 2 are met.

Implementation and Conduct of Check Points S0100

5.1 A designated representative of the contractor shall witness or perform and sign for all tests and inspections within a 50 mile radius of the contractor's facility.

5.2 The contractor may delegate responsibility to subcontractors only for specific operations, tests or inspections performed at facilities located outside a 50 mile radius of the contractor's facility; however, CHECK POINT notification requirements shall not be delegated.

5.3 Submit one legible copy of the technical specification portion of those purchase orders which involve CHECK POINTs to the NOAA representative prior to the commencement of work by the subcontractor.

6. Submit a list, for NOAA reference, designating the contractor's authorized representatives who witness, perform, present and sign for CHECK POINTs, inspections and tests. The list shall indicate the type of tests, inspections or CHECK POINTs for which each representative is qualified.

7. Provide two legible copies of the check point inspection and/or test results. One copy shall be submitted to the NOAA representative and one to the Ship's Repair Officer within 24 hours of CHECK POINT completion. Reports shall identify the test / inspection conducted, acc/rej criteria and the contractor's authorized representative.

File details come from the government source that posted it. Updated .