s6900_ElecElex_General_Reqts.pdf

PDF 55 KB Posted

Attached to
Dockside Repairs to NOAA Ship FERDINAND HASSLER Federal contract opportunity
Solicitation number
EA-133M-16-RP-A123
Issued by
Department of Commerce National Oceanic and Atmospheric Administration

About this file

Additional Info.

View the file

Other files for this federal contract opportunity

Other files attached to Dockside Repairs to NOAA Ship FERDINAND HASSLER, newest first.
File Type Posted
SF_30 _Amend_0007.pdf PDF
AMENDMENT_0007_REFERENCE_DOCUMENTS.exe EXE file
SF_30 _Amend_0006.pdf PDF
Declaration_of_Asbestos-freesigned.pdf PDF
SF_30 _Amend_0005.pdf PDF
SF_30 _Amend_0004.pdf PDF
SF_30 _Amend_0003.pdf PDF
Section_G.pdf PDF
SF_30 _Amend_0002.pdf PDF
Section_M.pdf PDF
Section_M._Replacement_Pages.pdf PDF
SF_30 _Amend_0001.pdf PDF
Section_B._Replacement_Page.pdf PDF
M286-117-FC40-01-02_(PenetrationControlZones).pdf PDF
RFP_ATTACHMENT_J.2.pdf PDF
8010-100-466_X02_R3.pdf PDF
M286-085-FA11-001-07_(FIRE_CONTROL_PLAN)(As-Built).pdf PDF
NOAA_Std_Spec_S4800-2_Piping_Systems.pdf PDF
NOAA_Std_Spec_S4800-2_Piping_Systems_(1).pdf PDF
M286-085-FA02-001-15_(GARRGTS)_(As-Built).pdf PDF
M286-541-FP04-07_Fuel_Fill_Transfer_and_Service_Sys_Diag_(As.pdf PDF
RFP.pdf PDF
M286-430-PE41-001-03(As-Built).pdf PDF
635-2_Compartment_Thermal_Insulation.pdf PDF
8010-100-466_X06_R3.pdf PDF
M286-430-PE41-001-03(As-Built)_(1).pdf PDF
FC61_-_Paint_Schedule.pdf PDF
M286-430-PE41-001-03(As-Built)_(1)_(1).pdf PDF
RFP_ATTACHMENT_J.4.pdf PDF
RFP_ATTACHMENT_J.3.pdf PDF
8010-100-466_X03_R3.pdf PDF
M286-531-FP03-11_(Fresh_ _Potable_Water).pdf PDF
M286-301-FE08-03.pdf PDF
MOC-635-1.pdf PDF
J.1_HASSLER_FY16_DOCKSIDE_SPECIFICATION.pdf PDF
Spec_Paint_NAVSEA_Standard_Item_009-32_FY10.pdf PDF
NOT_ISSUEDM286-581-FH20-001-03_(ANCHOR_HANDLING_DETAILS)_(Asc.pdf PDF
8010-100-466_X01_R3_(1).pdf PDF
M286-505-FP25-00_(Std_Piping_Details).pdf PDF
M286-635-FV10-001-03_(INSULATION)_(1).pdf PDF
000-2C_Contractor_Facility_Temp_Services.pdf PDF
M286-528-FP05-07_(Ovbd_Drains_ _Sewage_Sys)_(As-Built)_(2007.pdf PDF
RFP_ATTACHMENT_J.6.pdf PDF
RFP_ATTACHMENT_J.5.pdf PDF
FC61_-_Paint_Schedule_(1).pdf PDF
S0100_NOAA_Spec_Implementation_and_Conduct_of_Checkpoints.pdf PDF
8010-100-466_X05_R3.pdf PDF
M286-529-FP01-10_(Bilge-Ballast-Fire).pdf PDF
M286-512-FP27-10(Machinery_Space_Ventilation).pdf PDF
8010-100-466_X04_R3.pdf PDF
Show all 50

Dockside Repairs to NOAA Ship FERDINAND HASSLER has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Revision A, April 1, 1987 (6/95)

NOAA Standard Specification S6900

GENERAL REQUIREMENTS FOR ELECTRICAL/ELECTRONIC ITEMS

1. SCOPE

1.1 Objective: This specification provides general requirements for work performed on electrical and electronic systems.

2. REFERENCE DOCUMENTS

2.1 Standards: IEEE STD 45-1983, Recommended Practice for

Electric Installations on Shipboard (most recent revision)

2.2 Regulations: 46 CFR Subchapter J - Electrical Engineering

3. GOVERNMENT FURNISHED EQUIPMENT (GFE)

3.1 As specified in invoking work item.

4. REQUIREMENTS

4.1 The contractor shall accomplish all work in these

specifications in accordance with the requirements of Reference

2.1 and 2.2, and using the best marine and shipbuilding practices.

4.2 All material removed from the ship, both scrap and surplus, is the property of the Government. Surplus material shall be delivered to:

NOS/Pacific Marine Center ATTN: PMC Warehouse/MOP12 1801 Fairview Avenue East Seattle, Washington 98102-3767

4.3 When the COTR determines that the contractor has damaged any materials, including removals, those materials shall be replaced with new. New material provided by the contractor shall be of the same quality, size, shape, color, and finish as the damaged materials when they were new.

4.4 All machinery, piping, wiring, ducts, insulation, paint

work, deck tile, or any other article removed, disturbed, or damaged in the process of accomplishing the work required by these specifications shall be replaced, renewed or repaired. All paneling removed shall be replaced, including any required alterations. Paneling damaged by the contractor shall be renewed equal to the original when new. All flanges and joints broken or loosened shall be properly remade using new gaskets of the proper size and material.

4.5 All electronic racks installed shall be securely fastened to

General Requirements for Electrical/Electronic Items S6900 overhead and deck structural or steel members to prevent movement.

4.6 Any painted or varnished surfaces damaged or soiled shall be cleaned, painted, and/or varnished with original type and color of paint or varnish.

4.7 Any extension of wires shall be through a junction box. Any removal of wires shall be to the nearest junction box.

4.8 All electrical junction boxes, receptacles, hangers, and

miscellaneous electrical fittings shall be equal in quality to those originally installed on the ship.

4.9 All electrical cables installed by the contractor shall be run behind paneling in existing wireways and shall be securely banded to the hangers. If existing wireways are not available, new wireways shall be established.

4.10 All cables installed by the contractor shall be identified at each end with embossed metal tags. Where wires or cables are marked within a junction or terminal box, nonconductive labels shall be used. The contractor shall number cables and wires with a marking system similar to that used on the ship.

4.11 All manufacturer's or supplier's standard warranties on

equipment installed on the ship shall be assigned in writing by the contractor to the Government.

4.12 Three (3) copies all manufacturer's technical manuals, prints, and drawings shall be delivered to the COTR. Spare parts and surplus installation materials shall be delivered to the

COTR.

5. QUALITY ASSURANCE (Tests/Inspections/Reports)

5.1 As required by the invoking work item.

5.2 All items disturbed and all devices used, repaired, altered, furnished, or installed by the contractor shall be demonstrated to be fully operational upon completion of work.

File details come from the government source that posted it. Updated .