E Schedule of Material Submittals 25-1012.xlsx

XLSX spreadsheet 56 KB Posted

Attached to
RPR Facilities Facades, MULTI
Solicitation number
FA557526B0005
Issued by

About this file

This is a Schedule of Material Submittals template for Project QUUG 25-1012, a repair facility facades project at a multi-building location. The document serves as a tracking tool for managing contractor submissions throughout the contract lifecycle, with corresponding sections in both English and Spanish.

The schedule requires 31 line items of submissions across two main sections, including warranty letters, construction and progress schedules, quality control and environmental protection plans, as-built drawings, and various material-related submittals such as sealants, primers, repair mortars, coatings, paints, and Material Safety Data Sheets (MSDS). Submission deadlines are tied to contract milestones, ranging from contract start date plus 7 days (for construction schedules and work plans) to 15 days before final inspection (for as-built drawings and operation & maintenance manuals). The template includes columns for tracking required submission dates, dates received by the contracting office, dates forwarded to Civil Engineering for review, return suspense dates, submittal numbers, approval/disapproval notifications, resubmittal numbers, final approval dates, and remarks. Key submissions with early deadlines include the Work Phasing Plan and Utilities Shut-off Plan, both due 15 days before work commencement. The document is designed to support quality assurance and compliance monitoring throughout the project execution phase.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER
QUUG 25-1012Repair Facility facades, Multi
SOLICITATION / CONTRACT NO.
(To be completed by Project Engineer)(To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTSREQUIRED SUBMISSION DATE

fergusog: Enter the due date from the Contractor (MM/DD/YY)

DATE RECEIVED IN CONTRACTING

fergusog: Enter the date received from the Contractor. (MM/DD/YY)

DATE TO CIVIL ENGINEERING

fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

RETURN SUSPENSE DATE

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

SUBMITTAL NUMBERS

fergusog: Enter the Submittal Number

DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL

fergusog: Enter Resubmittal Number

FINAL APPROVAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

REMARKS

fergusog: Enter any comments pertaining to the submittal

APPROVED

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DISAPPROVED

fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal

SECTION 01 11 01
01Warranty letter1Acceptance +15
02Construction Schedule1Contract Start +7BCE to review and approve.
03Progress Schedule1Contract Start +10
04Work Plan1Contract Start +7
05Mobility Plan1Contract Start +15
06Project Sign1Contract Start +15
07Quality Control Plan1Contract Start +15
08Environmental Protection Plan1Contract Start +15
09DD Form 13541Pre-Final Inspection -15RP needs to complete the form within 10 days after BOD
10Waste & construction debris management1Final Inspection-15
11As-Built drawings1Final Inspection -15
12Spatial Data1As-Built Drawings Approval +10Spatial data should be based on the approved As-Built drawings.
13Key Staff1Contract Start+15
14Health and safety Plan1Contract Start+15
SECTION 01 11 02
15Work Phasing Plan1Work Commencement -15
16Utilities shut off Plan1Work Commencement -15
17Salvage plan1Contract Start +15
18Operation & Maintenance (O&M) Manuals1Pre-Final Inspection -15Shops to review and provide inputs as applicable.
19Final Testing (when required)1Pre-Final Inspection -15
04 20 00
20Manufacturer Catalogue Data1
21Certificate of compliance1
07 92 00
22Sealants1
23Primers1
24Bond breakers1
09 23 241
25Repair mortar one-component1
26Repair mortar for large thickness1
27Thin layer repair mortar1
28Injection resin of low viscosity1
09 90 00
29Each type of coating and paint111
30MSDS Material Safety Data Sheet11
31Delivery tickets of the productsWhen receiving in site work

&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N

MSS Spanish

RESUMEN MUESTRAS DE MATERIALNÚMERO PROYECTO
QUUG 25-1012TÍTULO DE PROYECTO

Reparar fachadas de edificios, Multi

SOLICITACIÓN / CONTRATO NO.

(A cumplimentar por el ingeniero del proyecto)(A cumplimentar por administrador del contrato)
NÚMERO DE COPIAS REQUERIDAS
LÍNEA NÚMEROPARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓNCERTIFICADO DE CUMPLIMIENTOPLANOS DE TALLERMUESTRASSELECCIÓN DE COLORRECOMENDACIONES DEL FABRICANTEGARANTÍA DEL FABRICANTEDATOS DE CATÁLOGOINSTRUCCIONES DE FUNCIONAMIENTOPROGRAMAS, LISTADOS, INFORMES, PLANESDATOS TÉCNICOSPRUEBASINFORMES DE TRABAJOS DE CAMPOFECHA DE ENTREGA

fergusog: Enter the due date from the Contractor (MM/DD/YY)

FECHA RECEPCIÓN EN CONTRATACIÓN

fergusog: Enter the date received from the Contractor. (MM/DD/YY) FECHA EN INGENIERíA CIVIL fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

FECHA LÍMITE DE DEVOLUCIÓN

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

NÚMERO DE MUESTRA

fergusog: Enter the Submittal Number

FECHA NOTIFICACIÓN A CONTRATISTA SEGUNDA PRESENTACIÓN DEL CONTRATISTA

fergusog: Enter Resubmittal Number

APROBACIÓN FINAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

OBSERVACIONES

fergusog: Enter any comments pertaining to the submittal

APROBADO

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DESAPROBADO

fergusog: Enter date the Contractor was notified of submittal disapproval fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal

SECCIÓN 01 11 01
01Carta de garantía1Aceptación +15
02Programa de obra1Comienzo Contrato +7A revisar y aprobar por el BCE
03Programa de ejecución1Comienzo Contrato +10
04Plan de obra1Comienzo Contrato +7
05Plan de movilización1Comienzo Contrato +15
06Cartel del proyecto1Comienzo Contrato +15
07Plan de control de calidad1Comienzo Contrato +15
08Plan de protección medioambiental1Comienzo Contrato +15
09DD Forma 13541Inspección Pre-Final -15RP tiene que rellenarla en10 días después del BOD
10Gestión de residuos y escombros1Inspección Final-15
11Planos As-Builts1Inspección Final -15
12Datos espaciales1Aprobación planos As-Built +10Los datos espaciales estarán basados en los planos As-Built aprobados.
13Personal clave1Comienzo Contrato+15
14Plan de seguridad1Comienzo Contrato+15
SECCIÓN 01 11 02
15Plan de fases del trabajo1Comienzo obra -15
16Plan de cortes de suministro1Comienzo obra -15
17Plan de reciclaje1Comienzo Contrato+15
18Manuales de operación y mantenuimiento (O&M)1Inspección Pre-Final -15Los talleres lo revisarán y proveerán comentarios según se requiera.
19Pruebas finales (cuando se requira)1Inspección Pre-Final -15
04 20 00
20Catálogo del fabricante1
21Certificdado de cumplimiento1
07 92 00
22Sellantes1
23Imprimación1
24Fondo de juntas1
09 23 241
25Mortero de reparación monocomponente1
26Mortero de reparación para grandes espesores1
27mortero de reparación para espesores finos1
28Resina de inyección de baja viscosidad1
09 90 00
29Cada tipo de pintura y revestimiento111
30Hojas de seguridad11
31Albaranes de envío de los productosA la recepción en obra

&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N

File details come from the government source that posted it. Updated .