D CONSTRUCTION COST ESTIMATE 25-1012 FACADES ktor01.xlsx
XLSX spreadsheet 50 KB Posted
- Attached to
- RPR Facilities Facades, MULTI
- Solicitation number
- FA557526B0005
About this file
This is a Contractor Cost Estimate Breakdown for repair and facade work at Moron Air Base, Spain. The document contains four separate Construction Cost Estimate forms (CLINs 1-4) for the "RPR Facility Facades, Multi" project under Purchase Request Number QUUG 25-1012. Each CLIN covers repairs and finishing work on different buildings (B202, B231, B221, and B203) and includes detailed line items for labor, materials, and other direct costs with corresponding columns for quantities, unit measurements, material costs, labor hours/days, average rates, and total costs.
The work scope includes facade repair and finishing tasks such as cable removal and reinstallation, paint removal, cement mortar application, surface cleaning and disinfection, fungicide treatments, painting of steel and wood surfaces, enamel coating, masonry repair, gutter and downspout cleaning, waterproofing applications, crack repair, sealing material replacement, safety equipment provisions, and waste disposal. The document shows partial totals for CLIN 3 (B221) of 5,480 EUR in material costs, 15,350 EUR in labor costs, and 2,675 EUR in other direct costs, with all other CLINs showing zero totals, indicating the cost estimate template requires completion by contractors. The summary section references that costs, overhead, and profit percentages will be applied to any future modifications of the contract.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASIC B202
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| MORON AIR BASE, SPAIN | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| RPR FACILITY FAҪADES, MULTI | CLIN#1 BASIC PACKAGE B 202 | 0.00 | Euros | |||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 25-1012 | MORON AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| TRABAJOS DE REPARACION Y ACABADOS | ||||||||||
| REPAIR AND FINISH WORKS | ||||||||||
| 1 | (01) Removal & reinstallation of cables, accessories & other equipment. | JOB | ||||||||
| (01) Desmontaje y reinstalación de cables, accesorios y otros equipos. | ||||||||||
| 2 | (06) Paint removal | m2 | ||||||||
| (06) Eliminación de capas de pintura | ||||||||||
| 3 | (08) Cement mortar application | m2 | ||||||||
| (08) Aplicación de mortero de cemento | ||||||||||
| 4 | (11) Clean and disinfect grease and oil-impregnated surfaces with quaternary ammonium degreaser and rinse with high-pressure hot water | m2 | ||||||||
| (11) Limpiar y desinfectar superficies impregnadas de grasas y aceites con desengrasante con amonios cuaternarios Limpiar y desinfectar superficies cubiertas de hongos mediante cepillado con solución fungicida y aclarado con agua templada | ||||||||||
| 5 | (12) Clean mildew-covered surfaces by brushing with a fungicide solution and rinsing with tepid water | m2 | ||||||||
| (12)Limpiar superficies cubiertas de hongos mediante cepillado con solución fungicida y aclarado con agua templada | ||||||||||
| 6 | (14) Paint Unpainted Steel Surfaces with 2 component epoxy-polyamide primer with zinc phosphate and 2 component polyurethane acrylic enamel | m2 | ||||||||
| (14) Pintar superficies interiores y exteriores de acero con una capa de imprimación epoxi-poliamida y dos capas de esmalte de poliuretano acrílico de dos componentes | m2 | |||||||||
| 7 | (17) Enamel Painted Steel and Galvanized steel surfaces with synthetic enamel coats | m2 | ||||||||
| (17) Esmaltar superficies pintadas de acero y acero galvanizado con esmalte sintético | m2 | |||||||||
| 8 | (18) Enamel Unpainted Wood Surfaces with alkyd sealant primer and alkyd resin based synthetic enamel | m2 | ||||||||
| (18) Esmaltar superficies de madera no pintadas con imprimación selladora tipo alquídico y esmalte sintético basado en resinas alquídicas | m2 | |||||||||
| 9 | (23) Paint Exterior plaster, cement, masonry and other derivative smooth surfaces with high performance, resistance and coverage power vinyl copolymer based paint | m2 | ||||||||
| (23) Pintar superficies lisas pintadas en exteriores de cemento, albañilería y derivados con pintura plástica de elevadas prestaciones, resistencia y cubrición | m2 | |||||||||
| 10 | (36) Paint 10 cm heigth lettering on concrete surfaces | Ea | ||||||||
| (36) Pintar rótulo de 10 cm de pauta en superficies de hormigón | m2 | |||||||||
| 11 | (38) Paint 17 cm with traffic lane on asphalt floor surfaces | lm | ||||||||
| (38) Pintar lineas de tráfico de 17 cm en pavimentos de asfalto | m2 | |||||||||
| 12 | (44) Disassemble gutter & downspouts joint, prepare joint surfaces, apply new sealant and reassemble gutter joint | ea | ||||||||
| (44) Desmontar las juntas de los canalones y bajantes, preparar las superficies, aplicar sellante nuevo y volver a montar | m2 | |||||||||
| 13 | (48) Clean gutters, downspouts and splashes, readjust and replace deteriorated anchorage | lm | ||||||||
| (48) Limpiar canalones, bajantes y salpicaderos y reajustar/reponer las fijaciones | m2 | |||||||||
| 14 | (49) Remove broken exposed brick units and replace them with new units | ea | ||||||||
| (49) Desmontar piezas de ladrillo visto rotas y reponer por piezas nuevas | m2 | |||||||||
| 15 | (50) Remove broken, missing or unadhered ceramic units and replace them with new units | ea | ||||||||
| (50) Quitar piezas cerámicas rotas, perdidas o mal fijadas y reponerlas por piezas nuevas | m2 | |||||||||
| 16 | (51) Remove unadhered sealing material and backing rods, clean joints and apply new back rod, primer and sealing material | lm | ||||||||
| (51) Eliminar material de sellado no adherido y fondo de juntas, limpiar juntas y aplicar fondo de juntas, imprimación y sellado nuevos | m2 | |||||||||
| 17 | (52) Remove unadhered sealing material, clean joints and apply new primer and sealing material in roof flashing. | lm | ||||||||
| (52) Eliminar material de sellado no adherido, limpiar juntas y aplicar imprimación y sellados nuevos en remates de cubierta | m2 | |||||||||
| 18 | (54) Apply waterproofing emulsion for exterior surfaces to parapet, lintels and sill drips | ea | ||||||||
| (54) Aplicar emulsión repelente al agua para fachadas en pretiles, dinteles y alfeizares | m2 | |||||||||
| 19 | (55) Repair cracks on concrete elements as indicated | ea | ||||||||
| (55) Reparar fisuras en elementos de hormigón como se indica | m2 | |||||||||
| 20 | (56) Waterproof lintel joints as indicated. | ea | ||||||||
| (56) Impermeabilizar juntas de dinteles como se indica | m2 | |||||||||
| 21 | (57) Provide the appropriate auxiliary systems, equipment, scaffoldings, platforms and carry out the works in a safety manner in accordance with the regulations | LS | ||||||||
| (57) Proveer los medios auxiliares adecuados, equipos, andamios, plataformas y realizar los trabajos de forma segura acuerdo con las regulaciones. | m2 | |||||||||
| 22 | (59) Separate, treat, transport and delivery waste from the demolition and repairing works to authorized dump | Job | ||||||||
| (59) Separar, tratar, transportar y enviar los residuos de la demolición y los trabajos a vertedero autorizado | m2 | |||||||||
| TOTAL TRABAJOS DE REPARACION Y ACABADOS | ||||||||||
| TOTAL REPAIR AND FINISH WORKS | 0.00 | 0.00 | 0.00 | 0.00 |
TOTAL MATERIAL COSTS
TOTAL LABOR COSTS
TOTAL OTHER DIRECT COSTS
TOTAL DIRECT COSTS
OVERHEAD
SUBTOTAL
PROFIT
TOTAL PROYECTO EUROS
DATE: FIRM NAME:
TITLE: BY:
&"Times New Roman,Regular"Contractor Cost Estimate Breakdown &"Times New Roman,Regular"Page &P of &N
CLIN2 B231
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| MORON AIR BASE, SPAIN | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| RPR FACILITY FAҪADES, MULTI | CLIN#2 B231 | Euros | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 25-1012 | MORON AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| TRABAJOS DE REPARACION Y ACABADOS | ||||||||||
| REPAIR AND FINISH WORKS | ||||||||||
| 1 | (01) Removal & reinstallation of cables, accessories & other equipment. | JOB | ||||||||
| (01) Desmontaje y reinstalación de cables, accesorios y otros equipos. | ||||||||||
| 2 | (06) Paint removal | m2 | ||||||||
| (06) Eliminación de capas de pintura | ||||||||||
| 3 | (12) Clean mildew-covered surfaces by brushing with a fungicide solution and rinsing with tepid water | m2 | ||||||||
| (12)Limpiar superficies cubiertas de hongos mediante cepillado con solución fungicida y aclarado con agua templada | ||||||||||
| 4 | (13) Apply fungicide treatment on exterior plaster and concrete surface | m2 | ||||||||
| (13) Aplicar tratamiento fungicida sobre superficies exteriores de yeso o cemento | m2 | |||||||||
| 5 | (14) Paint Unpainted Steel Surfaces with 2 component epoxy-polyamide primer with zinc phosphate and 2 component polyurethane acrylic enamel | m2 | ||||||||
| (14) Pintar superficies interiores y exteriores de acero con una capa de imprimación epoxi-poliamida y dos capas de esmalte de poliuretano acrílico de dos componentes | m2 | |||||||||
| 6 | (15) Paint Unpainted Galvanized Steel Surfaces with 2 component phosphate and passivator primer with corrosion inhibitor and 2 component polyurethane acrylic enamel | m2 | ||||||||
| (15) Pintar superficies no pintadas de acero galvanizado con imprimación fosfatante y pasivante de 2 componentes con inhibidores de la corrosión y esmalte de poliuretano acrílico de 2 componentes | m2 | |||||||||
| 7 | (23) Paint Exterior plaster, cement, masonry and other derivative smooth surfaces with high performance, resistance and coverage power vinyl copolymer based paint | m2 | ||||||||
| (23) Pintar superficies lisas pintadas en exteriores de cemento, albañilería y derivados con pintura plástica de elevadas prestaciones, resistencia y cubrición | m2 | |||||||||
| 8 | (36) Paint 10 cm heigth lettering on concrete surfaces | Ea | ||||||||
| (36) Pintar rótulo de 10 cm de pauta en superficies de hormigón | m2 | |||||||||
| 9 | (48) Clean gutters, downspouts and splashes, readjust and replace deteriorated anchorage | lm | ||||||||
| (48) Limpiar canalones, bajantes y salpicaderos y reajustar/reponer las fijaciones | m2 | |||||||||
| 10 | (57) Provide the appropriate auxiliary systems, equipment, scaffoldings, platforms and carry out the works in a safety manner in accordance with the regulations | LS | ||||||||
| (57) Proveer los medios auxiliares adecuados, equipos, andamios, plataformas y realizar los trabajos de forma segura acuerdo con las regulaciones. | m2 | |||||||||
| 11 | (59) Separate, treat, transport and delivery waste from the demolition and repairing works to authorized dump | Job | ||||||||
| (59) Separar, tratar, transportar y enviar los residuos de la demolición y los trabajos a vertedero autorizado | m2 | |||||||||
| TOTAL TRABAJOS DE REPARACION Y ACABADOS | ||||||||||
| TOTAL REPAIR AND FINISH WORKS | 0.00 | 0.00 | 0.00 | 0.00 |
TOTAL MATERIAL COSTS
TOTAL LABOR COSTS
TOTAL OTHER DIRECT COSTS
TOTAL DIRECT COSTS
OVERHEAD
SUBTOTAL
PROFIT
TOTAL PROYECTO EUROS
DATE: FIRM NAME:
TITLE: BY:
&"Times New Roman,Regular"Contractor Cost Estimate Breakdown &"Times New Roman,Regular"Page &P of &N
CLIN3 B221
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| MORON AIR BASE, SPAIN | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| RPR FACILITY FAҪADES, MULTI | CLIN#3 B221 | Euros | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 25-1012 | MORON AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| TRABAJOS DE REPARACION Y ACABADOS | ||||||||||
| REPAIR AND FINISH WORKS | ||||||||||
| 1 | (01) Removal & reinstallation of cables, accessories & other equipment. | JOB | ||||||||
| (01) Desmontaje y reinstalación de cables, accesorios y otros equipos. | ||||||||||
| 2 | (04) Cement mortar removal | m2 | ||||||||
| (04) Eliminar mortero de cemento | ||||||||||
| 3 | (06) Paint removal | m2 | ||||||||
| (06) Eliminación de capas de pintura | ||||||||||
| 4 | (08) Cement mortar application | m2 | ||||||||
| (08) Aplicación de mortero de cemento | ||||||||||
| 5 | (11) Clean and disinfect grease and oil-impregnated surfaces with quaternary ammonium degreaser and rinse with high-pressure hot water | m2 | ||||||||
| (11) Limpiar y desinfectar superficies impregnadas de grasas y aceites con desengrasante con amonios cuaternarios | ||||||||||
| 6 | (12) Clean mildew-covered surfaces by brushing with a fungicide solution and rinsing with tepid water | m2 | ||||||||
| (12)Limpiar superficies cubiertas de hongos mediante cepillado con solución fungicida y aclarado con agua templada | ||||||||||
| 7 | (17) Enamel Painted Steel and Galvanized steel surfaces with synthetic enamel coats | m2 | ||||||||
| (17) Esmaltar superficies pintadas de acero y acero galvanizado con esmalte sintético | m2 | |||||||||
| 8 | (22) Paint Unpainted Exterior plaster, cement, masonry and other surfaces Or with paint in poor conditions with universal fixing-primer + water based smooth carbonation resistant -vapor permeable coating and acrylic copolymer based coats | m2 | ||||||||
| (22) Pintar superficies lisas exteriores de cemento, yeso,, albañilería y otras análogas o con pintura en mal estado con imprimación fijadora universal, revestimiento al agua resistente a la carbonatación y permeable al vapor de agua y revestimiento a base de copolímeros acrílicos | m2 | |||||||||
| 9 | (36) Paint 10 cm heigth lettering on steel surfaces | Ea | ||||||||
| (36) Pintar rótulo de 10 cm de pauta en superficies metalicas | m2 | |||||||||
| 10 | (46) Remove defective and corroded sheet metal flashings. Replace with 3 meter long 24 ga galvanized 360 mm girth, 6 break flashing | lm | ||||||||
| (46) Desmontar remates de chapa defectuosos y corroídos y reemplazarlos por nuevos galvanizados de 3 m de longitud de 24 ga de 360 mm de desarrollo y 6 pliegues | m2 | |||||||||
| 11 | (51) Remove unadhered sealing material and backing rods, clean joints and apply new back rod, primer and sealing material | lm | ||||||||
| (51) Eliminar material de sellado no adherido y fondo de juntas, limpiar juntas y aplicar fondo de juntas, imprimación y sellado nuevos | m2 | |||||||||
| 12 | (57) Provide the appropriate auxiliary systems, equipment, scaffoldings, platforms and carry out the works in a safety manner in accordance with the regulations | LS | ||||||||
| (57) Proveer los medios auxiliares adecuados, equipos, andamios, plataformas y realizar los trabajos de forma segura acuerdo con las regulaciones. | m2 | |||||||||
| 13 | (59) Separate, treat, transport and delivery waste from the demolition and repairing works to authorized dump | Job | ||||||||
| (59) Separar, tratar, transportar y enviar los residuos de la demolición y los trabajos a vertedero autorizado | m2 | |||||||||
| TOTAL TRABAJOS DE REPARACION Y ACABADOS | ||||||||||
| TOTAL REPAIR AND FINISH WORKS | 0.00 | 0.00 | 0.00 | 0.00 |
TOTAL MATERIAL COSTS
TOTAL LABOR COSTS
TOTAL OTHER DIRECT COSTS
TOTAL DIRECT COSTS
OVERHEAD
SUBTOTAL
PROFIT
TOTAL PROYECTO EUROS
DATE: FIRM NAME
TITLE: BY:
&"Times New Roman,Regular"Contractor Cost Estimate Breakdown &"Times New Roman,Regular"Page &P of &N
CLIN4 203
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| MORON AIR BASE, SPAIN | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| RPR FACILITY FAҪADES, MULTI | CLIN#4 B203 | Euros | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 25-1012 CLIN4 B203 | MORON AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| TRABAJOS DE REPARACION Y ACABADOS | ||||||||||
| REPAIR AND FINISH WORKS | ||||||||||
| 1 | (01) Removal & reinstallation of cables, accessories & other equipment. | JOB | ||||||||
| (01) Desmontaje y reinstalación de cables, accesorios y otros equipos. | ||||||||||
| 2 | (03) Repair cracked or deteriorated exterior concrete & plastered. | Lm | ||||||||
| (03) Reparar fisuras o superficies exteriores de yeso o cemento. | ||||||||||
| 3 | (06) Paint removal | m2 | ||||||||
| (06) Eliminación de capas de pintura | ||||||||||
| 4 | (12) Clean mildew-covered surfaces by brushing with a fungicide solution and rinsing with tepid water | m2 | ||||||||
| (12)Limpiar superficies cubiertas de hongos mediante cepillado con solución fungicida y aclarado con agua templada | ||||||||||
| 5 | (17) Enamel Painted Steel and Galvanized steel surfaces with synthetic enamel coats | m2 | ||||||||
| (17) Esmaltar superficies pintadas de acero y acero galvanizado con esmalte sintético | m2 | |||||||||
| 6 | (19) Enamel Painted Wood Surfaces with alkyd resin based synthetic enamel. | m2 | ||||||||
| (19) Esmaltar superficies pintadas de madera con esmalte sintético basado en resinas alquídicas | m2 | |||||||||
| 7 | (24) Paint Exterior plaster, cement, masonry and other derivative texture surfaces with water based smooth covering carbonation resistant and water vapor permeable | m2 | ||||||||
| (24) Pintar superficies rugosas pintadas en exteriores de cemento, albañilería y derivados con revestimiento liso al agua resistente a la carbonatación y permeable al vapor de agua. | m2 | |||||||||
| 8 | (35) Paint 8 cm width traffic lane on concrete floor surfaces. | lm | ||||||||
| (35) Pintar línea de tráfico de 8 cm. De ancho en pavimentos de asfalto | m2 | |||||||||
| 9 | (36) Paint 10 cm heigth lettering on concrete surfaces | Ea | ||||||||
| (36) Pintar rótulo de 10 cm de pauta en superficies de hormigón | m2 | |||||||||
| 10 | (53) Close A/C opening with perforated brick and cement mortar. | ea | ||||||||
| (53) Cerrar hueco de aire acondicionado con ladrillo perforado y mortero de cemento | m2 | |||||||||
| 11 | (57) Provide the appropriate auxiliary systems, equipment, scaffoldings, platforms and carry out the works in a safety manner in accordance with the regulations | LS | ||||||||
| (57) Proveer los medios auxiliares adecuados, equipos, andamios, plataformas y realizar los trabajos de forma segura acuerdo con las regulaciones. | m2 | |||||||||
| 12 | (59) Separate, treat, transport and delivery waste from the demolition and repairing works to authorized dump | Job | ||||||||
| (59) Separar, tratar, transportar y enviar los residuos de la demolición y los trabajos a vertedero autorizado | m2 | |||||||||
| TOTAL TRABAJOS DE REPARACION Y ACABADOS | ||||||||||
| TOTAL REPAIR AND FINISH WORKS |
TOTAL MATERIAL COSTS
TOTAL LABOR COSTS
TOTAL OTHER DIRECT COSTS
TOTAL DIRECT COSTS
OVERHEAD
SUBTOTAL
PROFIT
TOTAL PROYECTO EUROS
DATE: FIRM NAME:
TITLE: BY:
&"Times New Roman,Regular"AF Form 3052 (Computer Generated) &"Times New Roman,Regular"Page &P of &N
SUMMARY
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |||
| CONTRACTOR | ADDRESS | ||
| INDEPENDENT GOVERNMENT ESTIMATE | MORON AIR BASE, SPAIN | ||
| CONTRACT FOR (Work to be performed) | |||
| RPR FACILITY FAҪADES, MULTI | SUMMARY | ||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | |
| QUUG 25-1012 | MORON AIR BASE, SPAIN | ||
| RESUMEN DE PROYECTO INCLUYENDO GASTOS GENERALES Y BENEFICIO INDUSTRIAL | |||
| PROYECT SUMMARY WITH OVERHEAD AND PROFIT INCLUDED |
| CLIN #01 PAQUETE BÁSICO - EDIFICIO 202 | 0.00 € |
| CLIN #01 BASIC PACKAGE - BUILDING 202 |
| CLIN #02 ADDITIVE ITEM 01 - BUILDING 231 | CLIN #02 ADDITIVE ITEM 01 - BUILDING 231 | 0.00 € | |||
| CLIN #02 PARTIDA ADICIONAL 01 - EDIFICIO 231 | CLIN #02 PARTIDA ADICIONAL 01 - EDIFICIO 231 | ||||
| CLIN #3 B 221 PARTIDA ADICIONAL #02 | |||||
| CLIN #3 EDIF 221 ADDITIVE ITEM #02 | 5,480 | 15,350 | 2,675 | ||
| CLIN #02 ADDITIVE ITEM 03 - BUILDING 221 | 0.00 € | ||||
| CLIN #03 PARTIDA ADICIONAL 02 - EDIFICIO 221 |
| 5,480 | 15,350 | 2,675 | ||
| CLIN #04 ADDITIVE ITEM 04 - BUILDING 203 | 0.00 € | |||
| CLIN #04 PARTIDA ADICIONAL 04 - EDIFICIO 203 |
| IMPORTE TOTAL DEL PROYECTO | 0.00 € | |
| TOTAL PROJECT SUMMARY | ||
| PREPARED BY: |
PREPARADO POR:
REVISED BY:
REVISAADO POR:
APPROVED BY:
APROBADO POR:
| These costs, overhead and profit percentages will be applied in any possible furute modifications | |
| These costs, overhead and profit percentages will be applied in any possible furute modifications |
&"Times New Roman,Regular"INDEPENDENT GOVERNMENT ESTIMATE &"Times New Roman,Bold"CONTROLLED UNCLASSIFIED INFORMATION (CUI) &"Times New Roman,Regular"Page &P of &N
File details come from the government source that posted it. Updated .