E. Laughlin AFB Short-Term Contractor Hazmat Usage Log.pdf
PDF 73 KB Posted
- Attached to
- RENOVATE RUNWAY CONTROL STRUCTURE B1776
- Solicitation number
- FA309926Q0021
About this file
This is an appendix template for tracking hazardous materials (HAZMAT) usage by contractors at Laughlin Air Force Base during construction projects. The Laughlin AFB Short-Term Contractor HAZMAT Usage Log serves as a documentation and compliance tool requiring contractors to record detailed information about all hazardous materials brought onto the installation, including product name, manufacturer, product code/part number, container size and type, maximum containers stored on site, number of containers used, and application method.
Contractors must complete and submit the log to the Contracting Officer according to specific timelines: at the start and end of work for contracts spanning less than six months, or monthly and at completion for contracts lasting six months or more. A critical restriction limits spray-painting applications to no more than 100 gallons of paint on external surfaces. The form emphasizes that all hazardous materials must be authorized before being brought onto Laughlin AFB, and an Excel version of the template is available upon request. This appendix is part of the Environmental Quality Construction Specifications dated June 2022 for Laughlin AFB.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exterior Image 2.jpg | JPG image | |
| Exterior Image 4.jpg | JPG image | |
| Exterior Image 7.jpg | JPG image | |
| RCS B1776 Site Visit Attendees List.pdf | ||
| Exterior Image 1.jpg | JPG image | |
| Site Visit Questions and Answers.docx | DOCX document | |
| Exterior Image 3.jpg | JPG image | |
| Exterior Image 5.jpg | JPG image | |
| Exterior Image 6.jpg | JPG image | |
| Exterior Image 8.jpg | JPG image | |
| Solicitation Amendment FA309926Q00210001 .pdf | ||
| SOW- Renovate RSU 1776 _revised 9.15.pdf | ||
| SOW- Renovate RSU 1776 .pdf | ||
| 2026-CEMIRT Report of Visit.pdf | ||
| B. Division 01 Specification Guidelines.docx | DOCX document | |
| D. Laughlin AFB Installation Facilities Standards.pdf | ||
| Progress Schedule and Progress Report.xlsx | XLSX spreadsheet | |
| Wage Determination TX20260186.pdf | ||
| Solicitation - FA309926Q0021.pdf | ||
| SOW- Renovate RCS 1776 .docx | DOCX document | |
| F. B1700 Hazardous Material Test Report.pdf | ||
| C. EQ Contractor Tech Specs FY26.pdf | ||
| H. LeadReport Bldg 1700_1995.pdf | ||
| Schedule of Submittals.xlsx | XLSX spreadsheet |
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Environmental Quality Construction Specifications June 2022 Laughlin AFB
APPENDIX C. LAUGHLIN AFB SHORT-TERM CONTRACTOR HAZMAT USAGE LOG
Contract number:
Contractor: Month/Year:
Product Name Product
Code / Part Number
Manufacturer Container Size and
Type
Max # Containers Stored On
Site
Containers
Used
Application Method (Brush, Roller, Spray*, Rag, Other)
*Cannot use more than 100 gallons of paint if spray-painting an external surface.
Complete log and submit to the Contracting Officer at the start and end of work for contracts spanning less than six months. If the contract spans six months or more, submit log monthly and at completion of work.
An Excel version is available on request. All HM must be authorized before they are brought onto LAFB.
File details come from the government source that posted it. Updated .