E.8_Annual_Fire_Pump_Inspection_-_December_2023.pdf

PDF 306 KB Posted

Attached to
Request for Proposal ("RFP") Property Management Services at Francis L. Cardozo Education Campus
Solicitation number
DCAM-25-NC-RFP-0006
Issued by
District of Columbia

About this file

The document is an Annual Fire Pump Flow Test report prepared by National Fire Protection, LLC for the fire pump system located in the basement of Cardozo High School in Washington, DC, conducted on December 14, 2023. The inspection was performed in accordance with NFPA 25 Standard for Inspection, Test, and Maintenance of Water-Based Fire Protection Systems (2014 edition). The test comprehensively evaluated the fire pump's performance, including electrical systems, pressure readings, flow rates, and supervisory device functionality.

The test results indicate that the fire pump system is functioning within acceptable parameters, with all critical components passing inspection. Key measurements include a rated pump capacity of 1000 GPM at 80 PSI, with test points showing measured flows of 1028 GPM and 1516 GPM at various pressure levels. The inspection verified that the pump's voltage, amperage, speed, and pressure readings were within the manufacturer's specified ranges, and all supervisory devices like phase reversal, power monitoring, and running status checks were successfully tested and passed.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

785923 Cardozo

Powered by ASURiO Inspection Systems, Copyright 2017. All Rights Reserved ASURiO

Annual Fire Pump Flow Test

National Fire Protection, LLC 207A Perry Pkwy

Gaithersburg, MD 20877

Tel: 301-340-6500 Fax: 301-309-1284 www.natlfire.com

Customer Inspection Location

RWD Consulting Cardoza High School 7 8 5 9 2 3

1300 Clifton Ave NW 1300 Clifton Ave NW

Washington, DC Washington, DC

Phone: Fax: Phone: Fax:

Inspection Date:

Flow Test Results

Basement Fire Pump Room The results of the fire pump test indicate pump is within 5% of the rated PSI/GPM readings from the original pump curve or fire pump nameplate.

Inspection performed in accordance with NFPA 25 Standard for Inspection, Test, and Maintenance of Water-Based Fire Protection Systems 2014 ed.

12/14/2023 http://www.natlfire.com/

Fire Pump System

Fire Pump House/Room

Basement Fire Pump Room

Ventilating louvers free to operate, no excessive water collecting on floor. (8.2.2) Pass

Coupling guard in place. (8.2.2) Pass

Supervisory Devices

Fire Pump Phase Reversal

Basement Fire Pump Room

Visual inspection verifying unit was free of physical damage. (13.2.8.1) Pass

Pump Phase Reversal annunciated properly when tested. (13.2.8.2) Pass

Fire Pump Power

Basement Fire Pump Room

Visual inspection verifying unit was free of physical damage. (13.2.8.1) Pass

Fire Pump Power supervision annunciated properly when tested. (13.2.8.2) Pass

Fire Pump Running

Basement Fire Pump Room

Visual inspection verifying unit was free of physical damage. (13.2.8.1) Pass

Fire Pump Running supervision annunciated properly when tested. (13.2.8.2) Pass

Fire Pump Supervision

Basement Fire Pump Room

Visual inspection verifying unit was free of physical damage. (13.2.8.1) Pass

Fire Pump supervision annunciated properly when tested. (13.2.8.2) Pass

Electric Pump Inspection

Pump suction, discharge and by-pass control valves fully open,and piping free of leaks. (8.2.2(2)) Pass

Suction line pressure gauge reading is within acceptable range. (8.2.2(2c)) Pass

System line pressure gauge reading is within acceptable range. (8.2.2(2d)) Pass

Suction reservoir has required water level & wet pit suction screen in place and unobstructed. (8.2.2(2)) N/A

Waterflow valve in closed position, hose connection valve closed, test valve line free of water. (8.2.2(2)) Pass

Controller pilot light (power on) illuminated (8.2.2(3)) Pass

Oil level in vertical motor sight glass, if available, within acceptable range. (8.2.2(3)) N/A

Power to Jockey pump is provided, if applicable. (8.2.2(3)) Pass

Record pump starting pressure. (8.3.2.9(1a) 130

Record the system suction pressure gauge readings with pump running. (8.3.2.9(1b)) Pass

Time (sec) controller is on first step. (8.3.2.9(2)) 2

Time (sec.) for driver to accelerate to full speed. (8.3.2.9(2)) 3

Record time pump runs after starting (for auto stop controller). (8.3.2.9(2)) 10

Record the discharge pressure gauge readings with pump running. (8.3.2.9(1b)) 155

With pump running, check for slight discharge from packing glands; Pump free from any unusual noise or vibration. (8.3.2.9 (1))

Pass

Packing boxes, bearing, or pump casing maintain an acceptable temperature during the test. (8.3.2.9(1)) Pass

Pump run minimum 10 minutes. (8.3.2.3) Pass

Fire pump alarm conditions and supervisory sensors operate when tested through simulation. (8.3.3.10) Pass

Parallel and angular alignment of pump and driver without any misalignments. (8.3.6.4) Pass

Suction screens inspected and cleaned after water flow. (8.3.3.12) N/A

Pressure gauge and sensors, when compared to a calibrated gauge, is less than 5% calibration or have been recalibrated or replaced. (8.1.1.2.21)

Yes

Nameplate Information

Rated GPM 1000 Rated PSI 80 Rated RPM 1770

Max PSI 90.9 150% PSI 67.9 150% GPM 1500

Churn

Suction Discharge Net PSI Speed

65 55 -10 1798

L1: L2: L3:

Volts 468 468 471

Amps 41 41 42

Test Point 1

Flow Test Point %:

102.8 Measured Flow: 1028 Adj. Flow 1014 Measured Press: 80 Adj. Press.: 78

Press. Test Point %:

98%

Outlet Size 1.75 1.75 1.75 1.75

Coefficient 1.15 1.15 1.15

Pitot 6 6 6 6

Flow 257 257 257 257

Suction Discharge Net PSI Speed

50 130 80 1794

L1: L2: L3:

Volts 467 467 470

Amps 45 46 47

Test Point 2

Flow Test Point %:

151.6 Measured Flow: 1516 Adj. Flow 1502 Measured Press: 70 Adj. Press.: 69

Press. Test Point %:

102%

Outlet Size 1.75 1.75 1.75 1.75

Coefficient 1.15 1.15 1.15 1.15

Pitot 13 13 13 13

Flow 379 379 379 379

Suction Discharge Net PSI Speed

15 85 70 1787

L1: L2: L3:

Volts 465 465 466

Amps 53 54 54