This document is an Annual Water-Based Fire Protection Systems Inspection report for Cardozo High School in Washington, DC, conducted by National Fire Protection, LLC on 12/14/2023. The inspection was performed in accordance with NFPA 25 Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems (2017 edition). The report details a comprehensive examination of the facility's fire pump system, including an electric motor-driven fire pump located in the basement fire pump room, with a focus on verifying the operational status and performance of critical fire protection infrastructure.
The inspection report comprehensively documents multiple system checks, including valve positions, pressure gauge readings, pump performance metrics, and operational tests. Key findings include passing assessments for pump suction and discharge pressures, controller functionality, alarm conditions, and overall system integrity. Specific technical details include a pump starting pressure of 130 PSI, system suction pressure of 65 PSI while running, and a pump speed of 1,798 RPM. The report also includes a liability release statement acknowledging the limited scope of the visual inspection and routine testing, with the inspection performed for RWD Consulting at the Cardozo High School location.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
785923 Cardozo
Powered by ASURiO Inspection Systems, Copyright 2017. All Rights Reserved ASURiO
Annual
Water-Based Fire Protection Systems Inspection
National Fire Protection, LLC 207A Perry Pkwy
Gaithersburg, MD 20877
Tel: 301-340-6500 Fax: 301-309-1284 www.natlfire.com
Inspector: Paul Olson Inspection date: 12/14/2023
Inspection Location
Cardoza High School 785923
1300 Clifton Ave NW
Washington, DC
Phone:
Customer
RWD Consulting 785923
1300 Clifton Ave NW
Washington, DC
Phone:
Inspection performed in accordance with NFPA 25 Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems, 2017 edition.
http://www.natlfire.com/
785923 Cardozo
Powered by ASURiO Inspection Systems, Copyright 2017. All Rights Reserved ASURiO
Liability Release Statement:
The owner and/or designated representative acknowledges the responsibility of the operating condition of the component parts at the time of this inspection. It is agreed that the inspection service provided by the contractor as prescribed herein is limited to performing a visual inspection and/or routine testing, and any investigation or unscheduled testing, modification, maintenance, repair, etc., of the component parts is not included as part of the inspection work performed. It is further understood that all information contained herein is provided to the best of the knowledge of the party providing such information.
System Summary Number of Systems at Site
Items Total Systems
Fire Pump System 1
Fire Pump System
Fire Pump - Electric Motor
Basement Fire Pump Room Aurora
Pump suction, discharge and by-pass control valves fully open,and piping free of leaks. (8.2.2(2)) Pass
Suction line pressure gauge reading is within acceptable range. (8.2.2(2c)) Pass
System line pressure gauge reading is within acceptable range. (8.2.2(2d)) Pass
Waterflow valve in closed position, hose connection valve closed, test valve line free of water. (8.2.2(2)) Pass
Controller pilot light (power on) illuminated (8.2.2(3)) Pass
Power to Jockey pump is provided, if applicable. (8.2.2(3)) Pass
Record pump starting pressure. (8.3.2.9(1a) 130
Record the system suction pressure gauge readings with pump running. (8.3.2.9(1b)) 65
Time (sec) controller is on first step. (8.3.2.9(2)) 2
Time (sec.) for driver to accelerate to full speed. (8.3.2.9(2)) 3
Record time pump runs after starting (for auto stop controller). (8.3.2.9(2)) 10
Record the discharge pressure gauge readings with pump running. (8.3.2.9(1b)) 155
With pump running, check for slight discharge from packing glands; Pump free from any unusual noise or vibration.
(8.3.2.9(1))
Pass
Packing boxes, bearing, or pump casing maintain an acceptable temperature during the test. (8.3.2.9(1)) Pass
Pump run minimum 10 minutes. (8.3.2.3) Pass
Record pump speed (rpm). (8.3.3.7(2)) 1798
Fire pump alarm conditions and supervisory sensors operate when tested through simulation. (8.3.3.10) Pass
Fire pump test results considered acceptable. (8.3.7.2.3) Pass
Pressure gauge and sensors, when compared to a calibrated gauge, is less than 5% calibration or have been recalibrated or replaced. (8.1.1.2.21)
Yes
Jockey Pump and Controller
Basement Fire Pump Room
Jockey pump sensing line gauge start pressure 135
Jockey pump sensing line gauge stop pressure. 165
Jockey pump and its controller maintained. (8.5.1) Pass
Gauges on valve, when compared to calibrated gauge, is less than 5% out of calibration or gauge has been recalibrated or replaced. (8.1.1.2.21)
Yes
12/14/23 12/14/23
Customer: Jeramiah Cook Tech: Paul Olson