DTRT5716R200005_Amendment_000003.pdf

PDF 89 KB Posted

Attached to
Air Traffic Engineering and Program Support (ATEPS) Small Business Set-Aside (SBSA)
Solicitation number
DTRT5715R20015
Issued by

About this file

ATEPS SBSA Amendment 000003

View the file

Other files

File Type Posted
J.8_Master_Cost_and_Business_Proposal_Schedules_Amendment_2.xlsx XLSX spreadsheet
DTRT5716R20005_SF33_Amendment_000002.pdf PDF
DTRT5716R20005_Amendment_000002.pdf PDF
J.11_Organizational_Chart_for_Transition_Amendment_2.xlsx XLSX spreadsheet
Amendment_000001.pdf PDF
J.13_Technical_Reference_Library_TMIS_SOW_and_Task_Order_SOWs.pdf PDF
Executive_Summary_DTRT5716R20005.pdf PDF
J.15_TO_0001_Cost_and_Business_Proposal_Schedules.xlsx XLSX spreadsheet
J.4_DOT_Order_1630_2B.pdf PDF
J.3_DD_Form_254.pdf PDF
ATEPS-SBSA_DTRT5716R20005_FINAL_RFP.pdf PDF
J.8_Master_Cost_and_Business_Proposal_Schedules.xlsx XLSX spreadsheet
J.11_Organizational_Chart_for_Transition.xlsx XLSX spreadsheet
20151218__ATEPS_SBSA_SECOND_Draft_RFP_Q A.pdf PDF
20151204_ATEPS-SBSA_15R20015_Second_Draft_RFP.pdf PDF
ATEPS_SBSA_DRAFT_RFP_Q A_through_16_October_2015_.pdf PDF
ATEPS_SBSA_CLIN_0200_Section_J_Attachment_J.11_-_Task_Order_0001_Cost_and_Business_Proposal_Schedules_DRAFT.xlsx XLSX spreadsheet
ATEPS_SBSA_CLIN_0100_Section_J_Attachment_J.5_-_Master_Contract_Cost_and_Business_Proposal_Schedules_DRAFT.xlsx XLSX spreadsheet
ATEPS_SBSA_CLIN_0100_Section_J_Attachment_J.11_-_Task_Order_0001_Cost_and_Business_Proposal_Schedules_DRAFT.xlsx XLSX spreadsheet
ATEPS_SBSA_CLIN_0200_Section_J_Attachment_J.5_-_Master_Contract_Cost_and_Business_Proposal_Schedules_DRAFT.xlsx XLSX spreadsheet
ATEPS_Preliminary_Webinar_Attendance_Report_2015-09-30.xlsx XLSX spreadsheet
ATEPS_Pre-Solicitation_Slides_Final.pdf PDF
Attachment_J.9_-_TMIS_Prime_and_Subcontractor__List.xls XLS spreadsheet
Attachment_J.6_-_CLIN_0100_-_Sample_Deliverables.pdf PDF
Attachment_J.7_-_CLIN_0200_RIO_Process_Executive_Summary.pdf PDF
ATEPS-SBSA_15R20015_Draft_RFP.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

DTRT5716R20005

x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

V221

Cambridge MA 02142-1001 55 Broadway, V221 Off Site Eng & R&D Contracts USDOT/Volpe Center

V221

Cambridge MA 02142-1001 55 Broadway V221 Off Site Engin & R&D Contracts USDOT/Volpe Center

05/06/2016000003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

03/10/2016

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

See attached pages for solicitation changes.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Robert P. Robinson

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

DTRT5716R200005

Amendment 000003

1. Page 30, Section G, Part I

DELETE:

G.6 TECHNICAL GUIDANCE (JAN 2016)

Performance of the work hereunder may be performed based on technical direction of the COR and TOCOR on a specific task order. As used herein, "technical direction" is limited to directions to the Contractor that fill in details or otherwise complete the specific description of work set forth in the task order. This direction may not include new assignments of work, or may not be of such a nature as to cause an increase or decrease in the estimated cost of the contract or task order, or otherwise affect any other provision of this contract. The Contractor may not begin work without obligated funding.

INSERT:

G.6 TECHNICAL DIRECTION (APR 2016)

Performance of the work hereunder shall be under the technical direction of the COR and TOCOR through the CO and TOCO, in writing, pertinent to a specific task order. As used herein, "technical direction" is limited to directions to the Contractor that provide additional detail regarding the previously defined scope within a particular task order. This direction may not include new assignments of work, or may not be of such a nature as to cause an increase or decrease in the estimated cost of the contract or task order, or otherwise affect any other provision of this contract. At no time may the Contractor begin work without an awarded task order or perform work outside of the scope of an awarded task order.

2. All other terms and conditions of this solicitation remain unchanged.

File details come from the government source that posted it. Updated .