ATEPS-SBSA_DTRT5716R20005_FINAL_RFP.pdf

PDF 1 MB Posted

Attached to
Air Traffic Engineering and Program Support (ATEPS) Small Business Set-Aside (SBSA)
Solicitation number
DTRT5715R20015
Issued by

About this file

ATEPS SBSA DTRT5716R20005 Please note that this is the solicitation for notice DTRT5715R20015. The solicitation number has been changed to DTRT5716R20005.

View the file

Other files

File Type Posted
DTRT5716R200005_Amendment_000003.pdf PDF
J.8_Master_Cost_and_Business_Proposal_Schedules_Amendment_2.xlsx XLSX spreadsheet
DTRT5716R20005_SF33_Amendment_000002.pdf PDF
DTRT5716R20005_Amendment_000002.pdf PDF
J.11_Organizational_Chart_for_Transition_Amendment_2.xlsx XLSX spreadsheet
Amendment_000001.pdf PDF
J.13_Technical_Reference_Library_TMIS_SOW_and_Task_Order_SOWs.pdf PDF
Executive_Summary_DTRT5716R20005.pdf PDF
J.15_TO_0001_Cost_and_Business_Proposal_Schedules.xlsx XLSX spreadsheet
J.4_DOT_Order_1630_2B.pdf PDF
J.3_DD_Form_254.pdf PDF
J.8_Master_Cost_and_Business_Proposal_Schedules.xlsx XLSX spreadsheet
J.11_Organizational_Chart_for_Transition.xlsx XLSX spreadsheet
20151218__ATEPS_SBSA_SECOND_Draft_RFP_Q A.pdf PDF
20151204_ATEPS-SBSA_15R20015_Second_Draft_RFP.pdf PDF
ATEPS_SBSA_DRAFT_RFP_Q A_through_16_October_2015_.pdf PDF
ATEPS_SBSA_CLIN_0200_Section_J_Attachment_J.11_-_Task_Order_0001_Cost_and_Business_Proposal_Schedules_DRAFT.xlsx XLSX spreadsheet
ATEPS_SBSA_CLIN_0100_Section_J_Attachment_J.5_-_Master_Contract_Cost_and_Business_Proposal_Schedules_DRAFT.xlsx XLSX spreadsheet
ATEPS_SBSA_CLIN_0100_Section_J_Attachment_J.11_-_Task_Order_0001_Cost_and_Business_Proposal_Schedules_DRAFT.xlsx XLSX spreadsheet
ATEPS_SBSA_CLIN_0200_Section_J_Attachment_J.5_-_Master_Contract_Cost_and_Business_Proposal_Schedules_DRAFT.xlsx XLSX spreadsheet
ATEPS_Preliminary_Webinar_Attendance_Report_2015-09-30.xlsx XLSX spreadsheet
ATEPS_Pre-Solicitation_Slides_Final.pdf PDF
Attachment_J.9_-_TMIS_Prime_and_Subcontractor__List.xls XLS spreadsheet
Attachment_J.6_-_CLIN_0100_-_Sample_Deliverables.pdf PDF
Attachment_J.7_-_CLIN_0200_RIO_Process_Executive_Summary.pdf PDF
ATEPS-SBSA_15R20015_Draft_RFP.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTRT5716R20005

SOLICITATION, OFFER AND AWARD

4. TYPE OF SOLICITATION2. CONTRACT NUMBER 3. SOLICITATION NUMBER

7. ISSUED BY CODE 8. ADDRESS OFFER TO (If other than Item 7)

ORDER UNDER DPAS (15 CFR 700)

6. REQUISITION/PURCHASE NUMBER

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

NEGOTIATED (RFP)

SEALED BID (IFB)

5. DATE ISSUED

1. THIS CONTRACT IS A RATED RATING PAGE OF PAGES

1 140

C. E-MAIL ADDRESS

EXT.NUMBERAREA CODE

B. TELEPHONE (NO COLLECT CALLS)A. NAME

10. FOR

INFORMATION

CALL:

CAUTION: LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

(Date)(Hour) local timeuntildepository located in copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if hand carried, in the

SOLICITATION

9. Sealed offers in original and

PART IV - REPRESENTATIONS AND INSTRUCTIONS

OTHER STATEMENTS OF OFFERORS

EVALUATION FACTORS FOR AWARD

INSTRS., CONDS., AND NOTICES TO OFFERORS

REPRESENTATIONS, CERTIFICATIONS AND

LIST OF ATTACHMENTS

CONTRACT CLAUSES

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACH.

I

J

K

L

M SPECIAL CONTRACT REQUIREMENTS

CONTRACT ADMINISTRATION DATA

DELIVERIES OR PERFORMANCE

INSPECTION AND ACCEPTANCE

PACKAGING AND MARKING

DESCRIPTION/SPECS./WORK STATEMENT

SUPPLIES OR SERVICES AND PRICES/COSTS

SOLICITATION/CONTRACT FORM

PART II - CONTRACT CLAUSESPART I - THE SCHEDULE

H

G

F

E

D

C

B

A

SEC. DESCRIPTION PAGE(S) (X) DESCRIPTION SEC. (X)

11. TABLE OF CONTENTS

18. OFFER DATE17. SIGNATURE

SUCH ADDRESS IN SCHEDULE.

IS DIFFERENT FROM ABOVE - ENTER

15C. CHECK IF REMITTANCE ADDRESS

EXT.NUMBERAREA CODE

15B. TELEPHONE NUMBER

(Type or print)AND

ADDRESS

OF

OFFEROR

CODE FACILITY

16. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER15A. NAME

DATEAMENDMENT NO.DATEAMENDMENT NO.

and related documents numbered and dated):

amendments to the SOLICITATION for offerors

(The offeror acknowledges receipt of

14. ACKNOWLEDGEMENT OF AMENDMENTS

CALENDAR DAYS (%)30 CALENDAR DAYS (%)20 CALENDAR DAYS (%)10 CALENDAR DAYS (%)

(See Section I, Clause No. 52.232.8)

13. DISCOUNT FOR PROMPT PAYMENT

designated point(s), within the time specified in the schedule.

by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the

12. In compliance with the above, the undersigned agrees, if this offer is accepted within ______________ calendar days (60 calendar days unless a different period is inserted

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

OFFER (Must be fully completed by offeror)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

28. AWARD DATE

(Signature of Contracting Officer)

27. UNITED STATES OF AMERICA

25. PAYMENT WILL BE MADE BY

26. NAME OF CONTRACTING OFFICER (Type or print)

CODE 24. ADMINISTERED BY (If other than Item 7)

ITEM

(4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN

41 U.S.C. 253 (c) ( 10 U.S.C. 2304 (c) (

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

21. ACCOUNTING AND APPROPRIATION20. AMOUNT19. ACCEPTED AS TO ITEMS NUMBERED

AWARD (To be completed by government)

CODE

V340A1017 X

V221

USDOT/Volpe Center Off Site Engin & R&D Contracts 55 Broadway V221 Cambridge MA 02142-1001

SEE BLOCK #7 1500 ET

Camille Hogan 617 camille.hogan@dot.gov

494-3208

X

X

X

X

X

X

X

X

X

X

X

X

X

PAGE(S)

Robert P. Robinson

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is unusable

STANDARD FORM 33 (Rev. 9-97)

Prescribed by GSA - FAR (48 CFR) 53.214(c)

6-10

11-19 22-27 28-39 40-53

54-66

68-73

74-102

103-112

TABLE OF CONTENTS

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

PART I – CONTRACT REQUIREMENTS

B.1 CONTRACT TYPE (OCT 2015)

B.1.I CONTRACT TYPE - Strategic Planning/Management Development and Integration

(CLIN 0100)

B.1.II CONTRACT TYPE - Risk, Issue and Opportunity Management (CLIN 0200)

B.2 CONTRACT LIMITATIONS (DEC 2014)

B.2.I CONTRACT LIMITATIONS - Strategic Planning/Management Development and Integration (CLIN 0100) B.2.II CONTRACT LIMITATIONS - Risk, Issue and Opportunity Management (CLIN 0200) .. 7

B.3 CONTRACT LINE ITEMS (DEC 2014)

B.3.I CONTRACT LINE ITEMS - Strategic Planning/Management Development and Integration (CLIN 0100) B.3.II CONTRACT LINE ITEMS - Risk, Issue and Opportunity Management (CLIN 0200)

B.4 MASTER CONTRACT LEVEL OF EFFORT

B.4.I MASTER CONTRACT LEVEL OF EFFORT - Strategic Planning/Management Development and Integration (CLIN 0100) B.4.II MASTER CONTRACT LEVEL OF EFFORT - Risk, Issue and Opportunity Management

(CLIN 0200)

PART II – TASK ORDER REQUIREMENTS

B.1 TASK ORDER TYPE/ PRICING METHOD

B.1.I TASK ORDER 0001- Strategic Planning/Management Development and Integration

(CLIN 0100)

B.1.II TASK ORDER 0001- Risk, Issue and Opportunity Management (CLIN 0200)

SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK (SOW)

PART I - CONTRACT STATEMENT OF WORK

C.1 BACKGROUND

C.2 SCOPE

C.2.I CLIN 0100 - Strategic Planning/Management Development and Integration

C.2.II CLIN 0200 - RISK, ISSUE AND OPPORTUNITY MANAGEMENT

C.3 SUSTAINABLE ACQUISITION REQUIREMENTS

PART II - TASK ORDER STATEMENT OF WORK

C.1.I SOW FOR THE INITIAL TASK ORDER FOR CLIN 0100 - Strategic Planning/Management Development and Integration

C.1.II SOW FOR THE INITIAL TASK ORDER FOR CLIN 0200 – RISK, ISSUE AND

OPPORTUNITY MANAGEMENT

SECTION D – PACKAGING AND MARKING

PART I - MASTER CONTRACT PACKAGING AND MARKING

D.1 PACKAGING (MAY 1999)

D.2 MARKING (MAY 1999)

PART II – INITIAL TASK ORDER PACKAGING AND MARKING

D.1 INITIAL TASK ORDER PACKAGING AND MARKING FOR CLIN 0100 – STRATEGIC

PLANNING AND MANAGEMENT DEVELOPMENT

D.2 INITIAL TASK ORDER PACKAGING AND MARKING FOR CLIN 0200 – RISK, ISSUE

AND OPPORTUNITY MANAGEMENT

SECTION E - INSPECTION AND ACCEPTANCE

PART I – MASTER CONTRACT INSPECTION AND ACCEPTANCE

E.1 FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

E.2 GOVERNMENT REVIEW AND ACCEPTANCE (JAN 2015)

PART II – INITIAL TASK ORDER INSPECTION AND ACCEPTANCE

E.1 INITIAL TASK ORDER INSPECTION AND ACCEPTANCE FOR CLIN 0100 –

STRATEGIC PLANNING AND MANAGEMENT DEVELOPMENT

E.2 INITIAL TASK ORDER INSPECTION AND ACCEPTANCE FOR CLIN 0200 – RISK,

ISSUE AND OPPORTUNITY MANAGEMENT

SECTION F - DELIVERIES OR PERFORMANCE

PART I - MASTER CONTRACT DELIVERIES OR PERFORMANCE

F.1 FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

CLAUSES INCORPORATED BY REFERENCE

F.2 MASTER CONTRACT PERIOD OF PERFORMANCE (FEB 2011)

F.3 DELIVERIES (JUL 2015)

F.4 DELIVERABLE AND REPORTING REQUIREMENTS FOR TASK ORDERS

(MAR 2008)

F.5 MONTHLY CONTRACT PROGRESS REPORTS (MARCH 2016)

F.6 MONTHLY TASK ORDER PROGRESS REPORTS (MARCH 2016)

F.7 MONTHLY TASK ORDER COST REPORTS (MARCH 2016)

F.8 TECHNICAL REPORTS – TASK ORDER CONTRACTS (MAY 2013)

F.9 REPORTS OF WORK - REPORT DISTRIBUTION (MARCH 2016)

F.10 DOCUMENTATION OF COMPUTER PROGRAMS (MAY 1999)

F.11 RIGHTS IN DATA (DEC 2007)

F.12 WARRANTIES (MAY 1999)

F.13 LICENSES (MAY 1999)

F.14 PLACE OF CONTRACT PERFORMANCE (MAY 2013)

F.15 DELIVERABLE FORMAT (MARCH 2016)

PART II – INITIAL TASK ORDER DELIVERIES OR PERFORMANCE

F.1 INITIAL TASK ORDER DELIVERABLES AND PERFORMANCE FOR CLIN 0100 –

STRATEGIC PLANNING AND MANAGEMENT DEVELOPMENT

F.1.I TRANSITION PLAN

F.1.II REPORTING REQUIREMENTS

F.1.III SUBMISSION OF DELIVERABLES

F.1.IV PERIOD OF PERFORMANCE

F.2 INITIAL TASK ORDER DELIVERABLES AND PERFORMANCE FOR CLIN 0200 – RISK,

ISSUE AND OPPORTUNITY MANAGEMENT

F.2.I TRANSITION PLAN

F.2.II REPORTING REQUIREMENTS

F.2.III SUBMISSION OF DELIVERABLES

F.2.IV PERIOD OF PERFORMANCE

SECTION G - CONTRACT ADMINISTRATION DATA

PART I - MASTER CONTRACT ADMINISTRATION DATA

G.1 RESPONSIBILITY FOR CONTRACT ADMINISTRATION (MAY 2013)

G.2 TAR 1252.242-73 CONTRACTING OFFICER’S TECHNICAL REPRESENTATIVE (OCT

1994) 28

G.3 ORDERING (JAN 2016)

G.4 TASK ORDER LIMITATIONS (DEC 1998)

G.5 TASK ORDER OMBUDSMAN (MAY 2013)

G.6 TECHNICAL GUIDANCE (JAN 2016)

G.7 ACCOUNTING AND APPROPRIATION DATA (JAN 2016)

G.8 PAYMENT AND CONSIDERATION (APR 2008)

G.9 PAYMENT REQUEST SUBMISSION REQUIREMENTS (JAN 2016)

G.10 PAYMENT OF FEE – COST PLUS FIXED FEE (MAY 2013)

G.11 PERFORMANCE EVALUATIONS (NOV 2015)

G.12 VOUCHER REVIEW (MAR 2003)

G.13 COST ACCOUNTING SYSTEMS (DEC 2015)

G.14 INCREMENTAL FUNDING OF TASK ORDERS (NOV 2015)

G.15 TRAVEL AND PER DIEM (JAN 2016)

G.16 SUBCONTRACTING REPORT (MAR 2008)

G.17 ALLOTMENT (JAN 2015)

G.18 QUALITY ASSURANCE SURVEILLANCE PLAN (NOV 2015)

PART II – INITIAL TASK ORDER ADMINISTRATION DATA

G.1 INITIAL TASK ORDER CONTRACT ADMINISTRATION DATA FOR CLIN 0100 –

STRATEGIC PLANNING AND MANAGEMENT DEVELOPMENT

G.2 INITIAL TASK ORDER ADMINISTRATION DATA FOR CLIN 0200 – RISK, ISSUE AND

OPPORTUNITY MANAGEMENT

SECTION H - SPECIAL CONTRACT REQUIREMENTS

PART I - MASTER CONTRACT SPECIAL CONTRACT REQUIREMENTS

H.1 NON-PERSONAL SERVICES (DEC 1998)

H.2 CONFLICT OF INTEREST DISCLOSURE (MAR 2008)

H.3 EXCLUSIONS DUE TO ORGANIZATIONAL CONFLICTS OF INTEREST (JUL 2015) ... 41

H.4 U.S. DEPARTMENT OF TRANSPORTATION (DOT) CONTRACTOR PERSONNEL

SECURITY AND AGENCY ACCESS (NOV 2011)

H.5 SECURITY AND POSITION SENSITIVITY DESIGNATIONS (SEP 2015)

H.6 HANDLING OF DATA (AUG 2011)

H.7 PERFORMANCE OF WORK AND SAFETY PROVISIONS ON GOVERNMENT

PREMISES (MAR 2005)

H.8 TECHNOLOGY UPGRADES/REFRESHMENTS (MAR 2008)

H.9 INCIDENTAL HARDWARE/SOFTWARE (SEP 2015)

H.10 REQUESTS TO ACQUIRE EQUIPMENT (JAN 2016)

H.11 SUPERVISION OF CONTRACTOR PERSONNEL WORKING ON-SITE (JAN 2016)

H.12 CONTRACTOR RESPONSIBILITY (DEC 1998)

H.13 LEVEL-OF-EFFORT NOTIFICATION (FEB 2011)

H.14 MAXIMUM FEE AND PROFIT (JAN 2016)

H.15 ACCOUNTING SYSTEM (MAY 2013)

H.16 INSURANCE (FEB 2009)

H.17 SALES TAX EXEMPTION (MAY 2009)

H.18 GPO PRINTING REQUIREMENT (SEP 2009)

H.19 SUBCONTRACT APPROVAL (SEP 2011)

H.20 VISITOR IDENTIFICATION REQUIREMENTS FOR FEDERAL FACILITIES (JAN 2015)

PART II – INITIAL TASK ORDER SPECIAL CONTRACT REQUIREMENTS

H.1 INITIAL TASK ORDER INSPECTION AND ACCEPTANCE FOR CLIN 0100 –

STRATEGIC PLANNING AND MANAGEMENT DEVELOPMENT

H.2 INITIAL TASK ORDER INSPECTION AND ACCEPTANCE FOR CLIN 0200 – RISK,

ISSUE AND OPPORTUNITY MANAGEMENT

SECTION I – CONTRACT CLAUSES

PART 1 - MASTER CONTRACT CLAUSES

I.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

I.2 FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

I.3 FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) - FULL TEXT CLAUSES

I.4 TRANSPORTATION ACQUISITION REGULATION (48 CFR CHAPTER 12) CLAUSES 59

I.5 TRANSPORTATION ACQUISITION REGULATION (48 CFR CHAPTER 12) - FULL

TEXT CLAUSES

PART II – INITIAL TASK ORDER CLAUSES

I.1 INITIAL TASK ORDER CLAUSES FOR CLIN 0100 – STRATEGIC PLANNING AND

MANAGEMENT DEVELOPMENT

I.2 INITIAL TASK ORDER CLAUSES FOR CLIN 0200 – RISK, ISSUE AND OPPORTUNITY

MANAGEMENT

SECTION J – LIST OF ATTACHMENTS

SECTION J - PART I – MASTER CONTRACT ATTACHMENTS

SECTION J - PART II – INITIAL TASK ORDERS ATTACHMENTS AND SCHEDULES

SECTION K – Representations, certifications, and other statements of offerors or respondents

K.1 IMPORTANCE OF ANNUAL REPRESENTATIONS AND CERTIFICATIONS (FEB 2013)

K.2 FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) - FULL TEXT

PROVISIONS

K.3 TRANSPORTATION ACQUISITION REGULATION (48 CFR CHAPTER 12) CLAUSES 73

SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

L.1. FAR 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB

1998) 74

L.2 FAR (48 CFR CHAPTER 1) - SOLICITATION PROVISIONS

L.3 FAR (48 CFR CHAPTER 1) - FULL TEXT PROVISIONS

L.4 GENERAL INFORMATION

L.5 GENERAL INSTRUCTIONS FOR TECHNICAL PROPOSAL AND COST AND BUSINESS

PROPOSAL PREPARATION

L.6 COST AND BUSINESS PROPOSAL – INSTRUCTIONS TO OFFERORS

L.7 TECHNICAL PROPOSAL -- INSTRUCTIONS TO OFFERORS

SECTION M - EVALUATION FACTORS FOR AWARD

M.1 GENERAL

M.2. EVALUATION CRITERIA – CLIN 0100 – STRATEGIC PLANNING AND

MANAGEMENT DEVELOPMENT

M.3. EVALUATION CRITERIA – CLIN 0200 – RISK, ISSUE AND OPPORTUNITY

MANAGEMENT

M.4 ADJECTIVAL RATINGS AND DEFINITIONS FOR USE IN EVALUATION

ATTACHMENT J.1 - MONTHLY TASK ORDER COST REPORT FORMAT

ATTACHMENT J.2 - LABOR CATEGORY QUALIFICATIONS

ATTACHMENT J.3 – DD FORM 254

ATTACHMENT J.4 – DOT ORDER 1630.2B

ATTACHMENT J.5 - QUALITY ASSURANCE SURVEILLANCE PLAN

ATTACHMENT J.6 - MASTER CONTRACT COST PROPOSAL COVER SHEET

ATTACHMENT J. 7 - ATEPS SBSA MASTER CONTRACT COST AND BUSINESS

PROPOSAL CHECKLIST

ATTACHMENT J.8 – MASTER COST AND BUSINESS PROPOSAL SCHEDULES

ATTACHMENT J. 9 - CLIENT AUTHORIZATION LETTER

ATTACHMENT J.10 - PAST PERFORMANCE QUESTIONNAIRE

ATTACHMENT J.11 – ORGANIZATIONAL CHART FOR TRANSITION

ATTACHMENT J.12 – LIST OF TRANSPORTATION MANAGEMENT INFRASTRUCTURE

SYSTEMS (TMIS) PRIME CONTRACTORS AND SUBCONTRACTORS

ATTACHMENT J.13 – TMIS SOW AND TASK ORDER SOWS

ATTACHMENT J.14 – TASK ORDER COST AND BUSINESS PROPOSAL CHECKLIST

ATTACHMENT J.15 – TASK ORDER 0001 COST AND BUSINESS PROPOSAL SCHEDULES

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

NOTE: This section includes a description of supplies/services and prices/costs and applies to the ATEPS master contracts for CLIN 0100 and CLIN 0200 (Part I) and the ATEPS Task Order 0001 for CLIN 0100 and CLIN 0200 (Part II). The numbering sequences in Section B, Parts I and II, are the same in order to facilitate the concurrent issuance of two master contracts and the initial two task orders. No items titled as “NOTE” nor the Part II requirements will appear in the master contract at time of award;

and the Part II requirements will be included in the OF 347 for Task Order 0001 which will be issued concurrently with the award of the master contracts for CLIN 0100 and CLIN 0200 respectively.

PART I – CONTRACT REQUIREMENTS

B.1 CONTRACT TYPE (OCT 2015)

B.1.I CONTRACT TYPE - Strategic Planning/Management Development and Integration (CLIN 0100)

A. This is an Indefinite Delivery/Indefinite Quantity (ID/IQ) task order type contract. Work will be placed under this contract through the issuance of task orders.

B. Task orders may be issued on a Firm-Fixed-Price (FFP) basis in accordance with Federal Acquisition Regulation (FAR) 16.202. Task orders may also be issued on a Cost-Plus-Fixed-Fee (CPFF) completion, or CPFF term basis in accordance with FAR 16.306 (d). Task order type shall be determined and issued at the Contracting Officer's (CO) discretion consistent with the guidelines provided in Part 16 of the FAR. Performance-based task orders will be used to the maximum extent practicable.

C. The Contract Line Item Number (CLIN) structure provided in Subsection B.I.3.A below establishes a CLIN 0100 for Strategic Planning/ Management Development and Integration as outlined in the Statement of Work (SOW) (Section C). Because using a particular contract type/pricing methodology requires terms and conditions specific to that use, this contract includes terms and conditions covering FFP, CPFF completion, and CPFF term tasks. In general, these terms and conditions are clear on their face with regard to applicability.

B.1.II CONTRACT TYPE - Risk, Issue and Opportunity Management (CLIN 0200)

A. This is an Indefinite Delivery/Indefinite Quantity (ID/IQ) task order type contract. Work will be placed under this contract through the issuance of task orders.

B. Task orders may be issued on a Firm-Fixed-Price (FFP) basis in accordance with Federal Acquisition Regulation (FAR) 16.202. Task orders may also be issued on a Cost-Plus-Fixed-Fee (CPFF) completion, or CPFF term basis in accordance with FAR 16.306 (d). Task order type shall be determined and issued at the CO discretion consistent with the guidelines provided in Part 16 of the FAR.

Performance-based task orders will be used to the maximum extent practicable.

C. The Contract Line Item Number (CLIN) structure provided in Subsection B.I.3.B below establishes a CLIN 0200 for Risk, Issue and Opportunity Management as outlined in the Statement of Work (SOW) (Section C). Because using a particular contract type/pricing methodology requires terms and conditions specific to that use, this contract includes terms and conditions covering FFP, CPFF completion, and CPFF term tasks. In general, these terms and conditions are clear on their face with regard to applicability.

B.2 CONTRACT LIMITATIONS (DEC 2014)

B.2.I CONTRACT LIMITATIONS - Strategic Planning/Management Development and Integration (CLIN 0100)

(1) Contract Award under CLIN 0100: (TO BE COMPLETED AT TIME OF AWARD) has been awarded under the U.S. Department of Transportation (USDOT), Volpe National Transportation Systems Center (Volpe Center), Solicitation DTRT5716R20005. The value of all task orders placed under CLIN 0100 shall not exceed $ _______________(TO BE COMPLETED AT TIME

OF AWARD).

(2) Minimum Guarantee: The guaranteed minimum is $2,500.

B.2.II CONTRACT LIMITATIONS - Risk, Issue and Opportunity Management (CLIN 0200)

(1) Contract Award under CLIN 0200: (TO BE COMPLETED AT TIME OF AWARD) has been awarded under the U.S. Department of Transportation (USDOT), Volpe National Transportation Systems Center (Volpe Center), Solicitation DTRT5716R20005. The value of all task orders placed under CLIN 0200 shall not exceed $ ________________ (TO BE COMPLETED AT

TIME OF AWARD).

(2) Minimum Guarantee: The guaranteed minimum is $2,500.

B.3 CONTRACT LINE ITEMS (DEC 2014)

The Contractor shall furnish all supplies and facilities, personnel, and management necessary to provide the required services in accordance with the SOW in Section C titled, “Air Traffic Engineering and Program Support Small Business Set Aside (ATEPS-SBSA)” and other terms and conditions of this contract through individual task orders issued under one of the contract line item types as set forth below:

B.3.I CONTRACT LINE ITEMS - Strategic Planning/Management Development and Integration (CLIN 0100)

CLIN Supplies/Services Qty. Unit Unit Price Amount 00100

ATEPS-SBSA Strategic Planning/Management Development and Integration *

1 JOB Est. Cost

Fixed Fee

Profit

Total

00101 Fixed Price Task Orders Undefined Undefined NSP NSP

00102 Cost Plus Fixed Fee – Term

(LOE) Type Task Orders Undefined Undefined NSP NSP

00103 Cost Plus Fixed Fee – Completion Type Task Orders

Undefined Undefined NSP NSP

*Performance-based task orders will be used to the maximum extent practicable.

B.3.II CONTRACT LINE ITEMS - Risk, Issue and Opportunity Management (CLIN 0200)

00200

ATEPS-SBSA Risk, Issue and Opportunity Management *

1 JOB Est. Cost

Fixed Fee

Profit

Total

00201 Fixed Price Task Orders Undefined Undefined NSP NSP

00202 Cost Plus Fixed Fee – Term (LOE) Type Task Orders

Undefined Undefined NSP NSP

00203 Cost Plus Fixed Fee – Completion Type Task Orders

Undefined Undefined NSP NSP

*Performance-based task orders will be used to the maximum extent practicable.

B.4 MASTER CONTRACT LEVEL OF EFFORT

B.4.I MASTER CONTRACT LEVEL OF EFFORT - Strategic Planning/Management Development and Integration (CLIN 0100)

The total level of effort (LOE) estimated to be ordered during the term of this contract is shown below.

Note: The LOE identified below will be used for the purpose of preparing the Master Contract Cost and Business Proposal. Refer to Section L for proposal preparation instructions.

In Hours Labor Category Contract

Year 1 Contract Year 2

Contract Year 3

Contract Year 4

Contract Year 5

Total

Senior Staff 20,000 20,000 20,000 20,000 20,000 100,000 Middle Staff 18,000 18,000 18,000 18,000 18,000 90,000 Staff 11,000 11,000 11,000 11,000 11,000 55,000 Junior Staff 10,000 10,000 10,000 10,000 10,000 50,000

Total Level of Effort

59,000 59,000 59,000 59,000 59,000 295,000

Administrative Staff*

To Be Estimated by Offeror

To Be Estimated by Offeror

To Be Estimated by Offeror

To Be Estimated by Offeror

To Be Estimated by Offeror

To Be Estimated by Offeror

*Hours for Administrative Support must be consistent with the Offeror’s established accounting practice.

B.4.II MASTER CONTRACT LEVEL OF EFFORT - Risk, Issue and Opportunity Management

(CLIN 0200)

The total level of effort (LOE) estimated to be ordered during the term of this contract is shown below.

Note: The LOE identified below will be used for the purpose of preparing the Master Contract Cost and Business Proposal. Refer to Section L for proposal preparation instructions.

In Hours Labor Category Contract

Year 1 Contract Year 2

Contract Year 3

Contract Year 4

Contract Year 5

Total

Senior Staff 9,400 9,400 9,400 9,400 9,400 47,000 Middle Staff 7,600 7,600 7,600 7,600 7,600 38,000 Staff 6,000 6,000 6,000 6,000 6,000 30,000 Junior Staff 3,600 3,600 3,600 3,600 3,600 18,000

Total Level of Effort

26,600 26,600 26,600 26,600 26,600 133,000

Administrative Staff*

To Be Estimated by Offeror

To Be Estimated by Offeror

To Be Estimated by Offeror

To Be Estimated by Offeror

To Be Estimated by Offeror

To Be Estimated by Offeror

*Hours for Administrative Support must be consistent with the Offeror’s established accounting practice.

PART II – TASK ORDER REQUIREMENTS

B.1 TASK ORDER TYPE/ PRICING METHOD

B.1.I TASK ORDER 0001- Strategic Planning/Management Development and Integration (CLIN 0100)

Task Order 0001 will consist of one line item, CLIN 0100, for Transition. This task order will be issued on an FFP basis.

TRANSITION

JOB

B.1.II TASK ORDER 0001- Risk, Issue and Opportunity Management (CLIN 0200)

Task Order 0001 will consist of one line item, CLIN 0200, for Transition. This task order will be issued on an FFP basis.

TRANSITION

JOB

SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK (SOW)

AIR TRAFFIC ENGINEERING AND PROGRAM SUPPORT-SMALL BUSINESS SET ASIDE

(ATEPS-SBSA)

NOTE: Part I of this SOW is the scope of work for the ATEPS-SBSA master contracts for CLIN 0100 and CLIN 0200, which will be awarded as separate master contracts. Part II is the SOW for the first ATEPS- SBSA Task Orders for each master contact. No items titled as “NOTE” nor the Part II requirements will appear in the master contract at time of award; and the Part II requirements will be included in the OF 347 for Task Order 0001 which will be issued concurrently with the award of the master contract for CLIN 0100 and CLIN 0200 respectively.

PART I - CONTRACT STATEMENT OF WORK

C.1 BACKGROUND

The John A. Volpe National Transportation Systems Center (Volpe Center) is a Federal fee-for-service organization within the Office of Assistant Secretary for Research & Technology (OST-R) of the United States Department of Transportation (USDOT). The Volpe Center’s mission is to improve the nation’s transportation systems. In partnership with sponsoring agencies, the Volpe Center provides technical research and analysis services to the USDOT, other Federal agencies, state agencies, and other organizations and businesses in connection with the transportation-related components of their missions.

The Volpe Center’s focus is research and innovation in all areas of transportation to improve the transportation system for the future. The Volpe Center is an active partner with several agencies in defining and implementing the future transportation system. For example, the Interagency Planning Officer (formerly known as the Joint Planning and Development Office (JPDO)) has developed an interagency framework in which several executive agencies of the U.S. Government, including the USDOT, are participating in developing the future aviation system. Within the USDOT, the Federal Aviation Administration (FAA) is leading the future aviation system activities.

The Volpe Center supports the FAA’s Air Traffic Organization (ATO), Program Management Organization (PMO) in system management, development, engineering and deployment activities using a variety of Federal and Contractor personnel. Currently, the Volpe Center’s Traffic Management Infrastructure Services (TMIS) contracts are providing significant ongoing support to the ATO PMO.

The work under this contract is currently being performed as a portion of the work within the much larger scope of the TMIS contracts.

The organizational design of the PMO, as approved by Congress, aims to facilitate, through a single FAA organization, the effective definition, design, development, and deployment of nearly all of the ATO’s capabilities in the National Airspace System (NAS).

One of the two branches within the PMO is the Air Traffic Systems (ATS) Directorate which is characterized by developing, deploying and operating systems that deliver services to all segments of the

NAS:

• Systems that provide accurate and reliable surveillance and automation for aircraft separation services provided by controllers to pilots

• Systems that support decision-making for traffic flow managers

• Systems that provide services directly to pilots for improved safety and efficiency

While the five groups that make up the ATS Directorate share the same mission and strategic goals, each group has its own unique set of programs and initiatives. The groups that make up the Directorate are as follows:

• AJM-21 – Air Traffic Management Programs, focuses on the air traffic automation systems that controllers use to manage aircraft in National Airspace. Major programs that reside in this group are En Route Automation Modernization (ERAM) and Terminal Automation Modernization and Replacement (TAMR).

• AJM-22 – Decision Support Programs, focuses on the support programs air traffic controllers, pilots, and airlines use to make informed decisions during aircraft operations. These programs also help increase air traffic flexibility and capacity, allowing for more dynamic NAS operations.

• AJM-23 – Surveillance Services Group focuses on the surveillance systems that provide the complete picture for operations taking place in the National Airspace. These systems range from traditional ground based radar to more advanced GPS based positioning systems.

• AJM-24 – Terminal Field Operations Support is responsible for ensuring the successful deployment and sustainment of systems residing in the terminal domain. This group also helps coordinate major software updates and hardware upgrades in the field.

• AJM-25 – En Route and Oceanic Second Level Engineering, is responsible for ensuring the successful deployment and sustainment of systems residing in the En Route and Oceanic domains. This group also helps coordinate major software updates and hardware upgrades in the field.

Each group within the ATS Directorate is responsible for systems that support tactical operations today, as well as for developing new tools that are forming the basis for NextGen. The Directorate plays an integral part in each of the Define, Design, Develop, Deploy, and Sustainment Phases of life-cycle management.

The other branch of the PMO, the Enterprise Services Directorate (ESD), develops, acquires, deploys, maintains, sustains, and improves navigation, communications, weather, and aeronautical information products and services for the NAS. Navigation Services covers projects in the following areas: Global Positioning System (GPS) Satellite-Based Augmentation, GPS Ground-Based Augmentation, Ground Systems, Lighting Systems, and Technical Support. Communications Services provides communications and telecommunications services consistent with International Civil Aviation Organization (ICAO) standards required for air traffic control within the NAS. It provides communications infrastructure and services for the Department of Defense (DOD) to ensure interoperability with the NAS. Weather services provide sensor, processor, and distribution systems required to provide accurate forecasts for timely air traffic decisions. Through unique customer/client relationships and customer-derived requirements, execution of full life-cycle service has the capability to define, design, build, deploy, commission, operate, support, and decommission communications, navigation, and weather services.

C.2 SCOPE

The Contractor shall provide technical, management, and analysis support to the Volpe Center in the definition, evaluation, management, and development of programs and initiatives within and related to the

PMO.

Representative programs for the majority of the work within the PMO include: Automatic Dependent Surveillance-Broadcast (ADS-B), Airborne Collision Avoidance System X (ACAS-X), Aerospace Medicine Safety Information System (AMSIS), Airport Surface Detection System — Model X (ASDE-X), Airport Surveillance Radar-9 & 11 (ASR-9 & 11), Airport Surface Surveillance Capability (ASSC), Advanced Technologies and Oceanic Procedures (ATOP), Data Communications, En Route Automation Modernization (ERAM), Integrated Display System Replacement (IDSR), Logistics Center Support System (LCSS), Runway Status Lights (RWSL), System

Approach to Safety Oversight (SASO), Terminal Automation Modernization Replacement (TAMR), and Terminal Flight Data Management (TFDM). However, the entire project scope could entail any program within the FAA PMO.

Contractor support is required in the following areas:

• CLIN 0100

1. Strategic Planning

2. Management Development and Integration

• CLIN 0200

1. Risk, Issue and Opportunity Management

C.2.I CLIN 0100 - Strategic Planning/Management Development and Integration

C.2.I.1 Task Area 1 - Strategic Planning

The Contractor shall assist in the development of program charters for governing bodies (steering committees, management work groups, requirements analysis teams, software issues resolution teams) to ensure clarity of purpose, deliverables, and alignment with end-to-end process goals. The Contractor may utilize business process re-engineering techniques to assist with the refinement of processes within PMO programs. Activities in these task areas include, but are not be limited:

• Facilitation and integration of key program governance teams (i.e. planning and managing agendas, facilitating sessions, documenting and tracking action items, and liaising with senior leaders to ensure critical issues are identified, escalated, and managed appropriately).

• Facilitation of working sessions and strategic, tactical, and other management meetings inclusive only of government personnel and/or inclusive of both government personnel as well as union representation. For example, planning and managing agenda, facilitating sessions, documenting and tracking action items, and liaising with senior leaders to ensure critical issues are identified, escalated, and managed appropriately.

• Assistance in the development of program charters for governing bodies (steering committees, management work groups, requirements analysis teams, software issues resolution teams).

• Support for planning activities.

• Development of As-Is Analysis, To-Be Analysis and Alternatives Analysis to make recommendations as to how business processes can be improved for various organizations within the ATO.

• Development of strategies options for ensuring synchronized joint delivery of program commitments by the Government and industry, within and across PMO lines of business.

• Development of frameworks and/or strategic plans options for dealing with the non-technical factors influencing the implementation of system capabilities.

• Analysis of technical and integration issues of proposed architectures and operations.

• Support formulation of strategic plans for introduction of new capabilities and the development of concept of operations.

• Development of comprehensive analyses to support identification of the most beneficial operational capabilities for near-to-midterm system implementation.

• Conduct of research in support of formulating goals and objectives for new capabilities.

• Development or refinement of enterprise architectures describing national-level systems and support in the decomposition of architectures into functional components and program products.

C.2.I.2 Task Area 2 - Management Development and Integration

The Contractor shall provide consultation and support to the Air Traffic Organization (ATO) and the PMO to enhance the Senior Leadership ability to identify critical issues impacting operations, further the achievement of strategic goals, and develop collaborative behaviors and a culture based on the collective integration of cross-organizational efforts. In addition, the Contractor shall provide support to the Leadership Council to conduct governance processes and develop collective skills for effective strategic and operational management. Activities of this task include, but are not limited to:

• Management consulting services for executives and managers such as providing guidance on improving participant skills in strategic thinking; communication and collaborative problem solving; creating leadership development activities; and providing facilitation support to management teams or sub-teams.

• Support to the strategic and business planning and management processes such as management team development, leadership and management training, consultation and coaching. Support will consist of participation in, leading, observation of and/or facilitation of meetings to provide analysis of issues, recommendations for courses of action, and development of strategies to achieve management development, organizational performance and change management.

• Make recommendations for strategies and approaches appropriate for various levels within the organization.

• Support for organizational redesign and change management activities related to realignment of organizational structures. For example, o Assessment of current state operating model.

o Identification of weaknesses and opportunities.

o Definition of target state and development of a transition plan to realize target state.

o Management of the change from current to future vision, and implementation of performance monitoring points to ensure realization of targeted benefits/changes.

• Identification of issues and recommended strategies for operational management team development.

• Evaluation of management and/or business practices, processes, programs and program elements and provide recommendations for improvements to current processes or policies.

• Development of processes, templates, and visual or text-based materials in electronic and printed media.

• Consultation and/or data collection, and analysis to make recommendations for management decisions and follow-through.

• Support for the planning for the diffusion of new processes and products to the operational management workforce.

• Support for the identification of team performance impediments and recommendation for improvement strategies.

• Assessment of collaborative leadership behavior, and development of skill-enhancement strategies.

• Analyze the potential effectiveness of possible cost savings initiatives in the areas of Facilities and Equipment (F&E) and Operations (Ops).

• Assistance to the Leadership in designing and implementing products and processes to clarify expectations and improve accountability throughout the ATO management chain.

• Support for the design, implementation, and staffing of a Quality Assurance function to manage all program process improvement functions.

• Services to support facilitation, presentations and notes on meetings with recommendations for follow-up strategies and actions for:

o Strategic planning; balanced scorecard, and Core Clarity assessments and workshops designed to improve operational leadership team effectiveness o Operational management development skills and requirements o Change management, o Communications, o Cost and performance management, and o Performance measurement.

• Assistance in the preparation and update of briefing and communication materials; including briefings, talking points, white papers, and web site design and content; related to management development and integration.

• Development and implementation of communication strategies, and devising communication products, templates, activities and venue recommendations.

• Documentation of processes, and development of templates and visual and text-based materials.

• Recommendations and assistance in the design and completion of analyses, evaluations, and survey instruments, including development of databases and analytic programs as requested.

C.2.II CLIN 0200 - RISK, ISSUE AND OPPORTUNITY MANAGEMENT

C.2.II.1 Task Area 1 – Risk, Issue and Opportunity Management

Risk, Issue, and Opportunity (RIO) Management is a systems engineering and program management process focused on identifying, analyzing, assessing, monitoring and tracking events throughout the life of a program or project that may have a negative impact on program success considering technical, cost, and schedule facets. The power in the RIO management process is in the development, tracking and implementation of step-by-step plans to lessen (or increase, in the case of opportunities) the likelihood and/or consequences of the event (i.e., negative impact on program success) occurring. The implementation of each step in the plan ranges from simple coordination efforts to large scale engineering analyses. RIO Management is a key ongoing activity throughout the FAA’s Acquisition Management System (AMS) lifecycle and is performed from the mission analysis phase through the service life extension phase.

The PMO’s RIO management process was tailored and developed as a tiered and integrated process.

RIO’s are identified and managed at the program level (Tier 3); the directorate level (Tier 2); and at the AJM-2 and AJM-3 level (Tier 1). The key functionality of this process is that RIOs satisfying the set criteria for elevation to a higher level tier (including if the RIOs are shared across multiple programs) are appropriately identified and subsequently up-leveled for visibility and/or management. RIO Management activities include, but are not limited to:

• Facilitate the Government’s development or enhancement of a tailored RIO process for each organization, make suggestions regarding successful Government monitoring of organizational compliance with the process guidance, and capture lessons learned which will then be provided as feedback to the Government for use in its continuous process improvement.

• Coordinating with Subject Matter Experts (SMEs), stakeholders, management, and project team members to:

o Identify RIO;

o Develop RIO statements appropriately capturing the root cause or essence of the RIO;

o Analyze and assess each RIO; and o Develop thorough step-by-step plans to address the RIO’s likelihood and/or consequence and continually track their progress.

• Facilitate RIO Management board meetings.

• Implementing or assisting in the implementation of the step-by-step plans, as appropriate.

• Administration and maintenance of the ATS RIO Management database.

• Development of custom reports for the ATS RIO Management database.

• Providing technical input, coordination and oversight for development of associated

Knowledge Sharing Network RIO Management sites.

• Coordinating with RIO Managers at other levels of the tiered ATS RIO Management process, as necessary.

• Development of risk reports summarizing planned and potential risk mitigations, the probability of each risk being realized, the effectiveness of mitigation activities, and the level of effort spent for risk management activities.

• Coordination with responsible parties and subject matter experts to develop and update risk mitigation plans.

• Generation of white papers and briefings applicable to the RIO process.

C.3 SUSTAINABLE ACQUISITION REQUIREMENTS

To the maximum extent possible and consistent with FAR Part 23, during the performance of the work under this SOW, the Government requires the Contractor to provide or use products that are energy efficient (ENERGY STAR® or FEMA- designated); water-efficient; bio based; environmentally preferable (e.g., EPEAT-registered or non-toxic or less toxic alternatives); non-ozone depleting; or made with recovered materials. Unless otherwise identified in this SOW or in an individual task order, each recovered materials or bio based product provided and delivered must meet, but may exceed, the minimum recovered materials or bio based content of an EPA- or DOA-designated product. The sustainable acquisition requirements specified herein apply only to products that are required to be (1) delivered to the Government during contract performance; (2) acquired by the Contractor for use in performing services (including construction) at a Federally controlled facility; (3) furnished by the Contractor for use by the Government; or (4) specified in the design of a building or work or incorporated during its construction, renovation, or maintenance.

PART II - TASK ORDER STATEMENT OF WORK

(ATEPS - Initial Task Orders)

NOTE: This section contains the scope of work for initial ATEPS-SBSA Task Orders for both CLINs.

Initial Task Orders will be awarded concurrently with the award of each Master Contract.

C.1.I SOW FOR THE INITIAL TASK ORDER FOR CLIN 0100 - Strategic Planning/Management Development and Integration

In this task order, the Contractor shall provide support services for CLIN 0100. The scope of work also includes requirements for Transition of the work from the TMIS Contracts and Task Order SOWs provided in Attachment J.13- Technical Reference Library TMIS SOW and Task Order SOWs (Task Orders 0019, 0021, 0022, 0023, and 0025). The Contractor shall provide the Level of Effort (LOE) for this task order for the following Periods of Performance (POP):

CLIN Description POP 0101 Transition Ninety (90) Days

The Contractor shall finalize the Draft Transition Plan submitted with initial offer and begin transitioning the work being performed under existing TMIS task orders to personnel that will perform the same work on under this effort with minimal disruption. (See Attachment J.11 - Organizational Chart for Transition which contains information on approximate Full Time Employees (FTEs), total personnel and categorization of personnel currently working under contract in the Task Areas applicable to this solicitation. This attachment also identifies the timeframes for individual program transition).

The Contractor shall perform the necessary tasks during the transition period on a FFP basis to ensure that the Contractor can achieve a satisfactory performance level at the end of the transition period. Successful transition will be based on the submission and Task Order Contracting Officer’s Representative’s (TOCOR) acceptance of an acceptable Transition Plan and associated deliverables. The Contractor shall be staffed and prepared to perform at 100% by the end of the transition period. The transition period shall not exceed ninety (90) calendar days.

Note that during the 90 calendar day transition period, the Government intends to issue a Task Order Request for Proposal (TORFP) for Task Order No. 0002 for the commencement of tasking for the programs identified in the Master SOW.

Weekly Updates: The Contractor shall provide weekly updates on the progress of transition via e-mail to the Task Order Contracting Officer (TOCO) and the TOCOR.

Transition Manager: The Contractor shall appoint and identify to the Contracting Officer a Transition Manager with the authority to act upon the contract’s requirements, and accomplish all work necessary to successfully facilitate Contract transition.

The Contractor shall develop a Transition Plan to document how it will transition related work under existing TMIS Task Orders to this effort.

Upon approval of this deliverable (Transition Plan) by the TOCOR, the Contractor’s Transition Plan shall serve as the basis upon which performance will be tracked, reported, and measured for acceptance.

Transition Plan

Within 30 calendar days after task order issuance, the Contractor shall provide to the TOCOR, the CO and the TOCO a Revised Draft Transition Plan based upon the Draft Transition Plan provided in the Contractor's task order proposal. The Transition Plan shall include the following:

1. Key transition personnel;

2. Management organization, authorities, and lines of reporting during the transition from the incumbent Contractor to the successor;

3. Understanding of current workload, status of ongoing projects, and milestones;

4. Plan to initiate coordination with the Volpe Center and its sponsor, the FAA;

5. Communication strategy with key stakeholders (e.g., incumbent contractor management and staff, TOCOR, and the TOCO);

6. Transition Schedule that identifies tasks to be performed; and

7. Risk mitigation during the execution of subtasks, including minimizing disruption to ongoing tasks, the plan for mitigating any potential project disruptions, and a staffing plan, if necessary, including retention of percentage of incumbent staff for continuity.

The TOCOR and TOCO will review the Revised Draft Transition Plan and return comments to the Plan to the Contractor for further refinements and editing within 14 calendar days. The Contractor shall submit the Final Transition Plan within 21 calendar days after receipt of the TOCOR and TOCO’s review comments of the Revised Draft Transition Plan.

C.1.II SOW FOR THE INITIAL TASK ORDER FOR CLIN 0200 – RISK, ISSUE AND

OPPORTUNITY MANAGEMENT

In this task order, the Contractor shall provide support services for CLIN 0200. The scope of work includes requirements for Transition of the work from the TMIS Contracts and Task Order SOWs provided in Attachment J.13- Technical Reference Library (Task Orders 0019, 0021, 0022, 0023, and 0025). The Contractor shall provide the Level of Effort (LOE) for this task order for the following POP:

CLIN Description POP 0201 Transition Ninety (90) Days

The Contractor shall finalize the Draft Transition Plan submitted with initial offer and begin transitioning the work being performed under existing TMIS task orders to personnel that will perform the same work on under this effort with minimal disruption. (See Attachment J.11 - Organizational Chart for Transition which contains information on approximate Full Time Employees (FTEs), total personnel and categorization of personnel currently working under contract in the Task Areas applicable to this solicitation. This attachment also identifies the timeframes for individual program transition).

The Contractor shall perform the necessary tasks during the transition period on a FFP basis to ensure that the Contractor can achieve a satisfactory performance level at the end of the transition period. Successful transition will be based on the submission and TOCOR acceptance of an acceptable Transition Plan and associated deliverables. The Contractor shall be staffed and prepared to perform at 100% by the end of the transition period. The transition period shall not exceed ninety (90) calendar days.

Note that during the 90 calendar day transition period, the Government intends to issue a Task Order Request for Proposal (TORFP) for Task Order No. 0002 for the commencement of tasking for the programs identified in the Master SOW.

Weekly Updates: The Contractor shall provide weekly updates on the progress of transition via e-mail to the TOCO and the TOCOR.

Transition Manager: The Contractor shall appoint and identify to the Contracting Officer a Transition Manager with the authority to act upon the contract’s requirements, and accomplish all work necessary to successfully facilitate Contract transition.

The Contractor shall develop a Transition Plan to document how it will transition related work under existing TMIS Task Orders to this effort.

Upon approval of this deliverable (Transition Plan) by the TOCOR, the Contractor’s Transition Plan shall serve as the basis upon which performance will be tracked, reported, and measured for acceptance.

Transition Plan

Within 30 calendar days after task order issuance, the Contractor shall provide to the TOCOR, the CO and the TOCO a Revised Draft Transition Plan based upon the Draft Transition Plan provided in the Contractor's task order proposal. The Transition Plan shall include the following:

1. Key transition personnel;

2. Management organization, authorities, and lines of reporting during the transition from the incumbent Contractor to the successor;

3. Understanding of current workload, status of ongoing projects, and milestones;

4. Plan to initiate coordination with the Volpe Center and its sponsor, the FAA;

5. Communication strategy with key stakeholders (e.g., incumbent Contractor management and staff, TOCOR, and the TOCO);

6. Transition Schedule that identifies tasks to be performed; and

7. Risk mitigation during the execution of subtasks, including minimizing disruption to ongoing tasks, the plan for mitigating any potential project disruptions, and a staffing plan, if necessary, including retention of percentage of incumbent staff for continuity.

The TOCOR and TOCO will review the Revised Draft Transition Plan and return comments to the Plan to the Contractor for further refinements and editing within 14 calendar days. The Contractor shall submit the Final Transition Plan within 21 calendar days after receipt of the TOCOR and TOCO’s review comments of the Revised Draft Transition Plan.

SECTION D – PACKAGING AND MARKING

NOTE: This section includes terms and Conditions for Section D that apply to the ATEPS-SBSA master contracts (Part I) and the ATEPS-SBSA Initial Task Orders (Part II) for CLIN 0100 and 0200. All Master Contract information is applicable at the Task Order level. Task Order level information provides specific information and/or instruction applicable to the Task Order.

PART I - MASTER CONTRACT PACKAGING AND MARKING

D.1 PACKAGING (MAY 1999)

The Contractor shall ensure that all items are preserved, packaged, packed, and marked in accordance with best commercial practices to meet the packing requirements of the carrier and ensure safe delivery at destination.

D.2 MARKING (MAY 1999)

All items submitted to the Government shall be clearly marked as follows:

1. Name of Contractor;

2. Contract number;

3. Task order number (if applicable);

4. Description of items contained therein;

5. Consignee's name and address; and

6. If applicable, packages containing software or other magnetic media shall be marked on external containers with a notice reading substantially as follows: "CAUTION: SOFTWARE/MAGNETIC

MEDIA ENCLOSED. DO NOT EXPOSE TO HEAT OR MAGNETIC FIELDS."

PART II – INITIAL TASK ORDER PACKAGING AND MARKING

D.1 INITIAL TASK ORDER PACKAGING AND MARKING FOR CLIN 0100 – STRATEGIC

PLANNING AND MANAGEMENT DEVELOPMENT

The Contractor shall comply with all Section D terms and conditions stated in the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .