Amendment_000001.pdf
PDF 877 KB Posted
- Solicitation number
- DTRT5715R20015
About this file
Amendment 000001
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
DTRT5716R20005
x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
V221
Cambridge MA 02142-1001 55 Broadway, V221 Off Site Eng & R&D Contracts USDOT/Volpe Center
V221
Cambridge MA 02142-1001 55 Broadway V221 Off Site Engin & R&D Contracts USDOT/Volpe Center
03/29/2016000001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
03/10/2016
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
See attached pages for solicitation changes.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Robert P. Robinson
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Solicitation No. DTRT5716R20005 Amendment 000001
The purpose of this amendment is to make the following changes to Solicitation
DTRT5716R20005:
1. The slides from the March 24, 2016 Pre-Proposal Webinar are attached to this amendment.
2. The list of attendees from the March 24, 2016 Pre-Proposal Webinar are attached to this amendment.
3. Remove the following by reference clause from I.2 and move to section L, Subsection L.2 FAR - Solicitation Provisions:
4. In paragraph L.4.IV replace:
“Any questions, clarification requests, or other inquiries pertaining to the solicitation must be submitted no later than TBD.”
With:
“Any questions, clarification requests, or other inquiries pertaining to the solicitation must be submitted no later than 11:59 PM, March 31, 2016.”
5. Replace Attachment J.7 ATEPS SBSA Master Contract Cost and Business Proposal Checklist with the following revised Attachment J.7:
ATTACHMENT J. 7 - ATEPS SBSA MASTER CONTRACT COST AND BUSINESS
PROPOSAL CHECKLIST
FOR CLIN ____*
Prime Offeror /Subcontractor Name:_______________________________________________
Item Solicitation
Reference
Prime
Offeror Subcontractor(s) Proposal
Page Reference
Signed SF 33 SF 33 pg. 1, L.5.II.1, L.6.II.1
X
Acknowledgement of Amendments to the solicitation, if applicable
SF 30 pg. 1, L.5.II.1, L.6.II.1 X
Offeror Representations and Certifications
Section K (entire), L.5.II.1, L 6 II 1
X
Signed Proposal Cover Sheet L.5.II.1, L.6.II.2 X X
Approved Accounting System Documentation
L.6.II.2(m)
X X
(cost-type only)
Solicitation No. DTRT5716R20005 Amendment 000001
Item Solicitation
Reference
Prime
Offeror Subcontractor(s) Proposal
Page Reference
Subcontract Consent Packages L.4.VIII, L.5.II.1, L.6.II.3.b
X
Self -Performance by the Offeror J.15, L.IX X
Cost Control Plan L.5.II.1, L.6.II.3.a X
Master Contract Cost and Business Proposal Checklist (this document) L.5.II.1, L.6.II.2 X X
Conflict of Interest Disclosure Statement (with Mitigation Plan, if applicable)
H.2, L.5.II.1,
L.6.II.3.c
X X
Master Contract Cost and Business Proposal Schedules:
Schedule 1: Summary of Estimated/Proposed Costs and Fixed Fee/Profit
J.8, L.5.II.1,
L.6.II.2 X X
Schedule 2: Summary of Estimated Costs and Fixed Fee by Cost Element
J.8, L.5.II.1,
L.6.II.2 X
X
(cost-type only)
Schedule 3: Summary of Proposed Costs and Profit by Cost Element
J.8, L.5.II.1,
L.6.II.2
X
(fixed price type only)
Schedule 4: Calculation of Direct Labor Cost
J.8, L.5.II.1,
L.6.II.2
X X
Schedule 5: Proposed Indirect Rates and Allocation Bases
J.8, L.5.II.1,
L.6.II.2
X X
Schedule 6: Proposed Fixed Fee and Profit Calculation and Master Contract Maximum Fee/Profit Rates
J.8, L.5.II.1,
L.6.II.2 X
Schedule 7: Table of Subcontractors J.8, L.5.II.1, L.6.II.2 X
Schedule 8: Breakdown of Labor Hours Between Offeror and Subcontractors
J.8, L.5.II.1,
L.6.II.2 X
Schedule 9: Schedule of Offeror Proposed Other Direct Costs (ODCs)
J.8, L.5.II.1,
L.6.II.2 X X
Schedule 10: Resume Checklist and Labor Cost Realism
J.8, L.5.II.1,
L.6.II.2 X
Client Authorization Letter J.8, L.7.II.A.1, L.7.III.A.1, J.9
Pre-Proposal Conference Air Traffic Engineering and Program Support (ATEPS)
Solicitation DTRT5716R20005 (Small Business Set Aside)
The National Transportation Systems Center
Advancing transportation innovation for the public good
U.S. Department of Transportation Office of Research and Technology John A. Volpe National Transportation Systems Center
March 24, 2016
Today’s Agenda
Introduction
Ground Rules and Logistics
Volpe Center Overview
ATEPS Overview & Procurement Objectives
RFP Highlights
Technical Proposal
Cost/Business Proposal
Proposal Submission Reminders
Ground Rules and Logistics
Any statements, remarks or explanations made during this pre-proposal conference shall not qualify the terms of the RFP, unless an amendment is issued.
A copy of today’s presentation and list of attendees will be provided as an amendment to the solicitation.
No questions will be entertained during this webinar.
Ground Rules and Logistics – cont’d
Any questions, clarification requests, or other inquires pertaining to the solicitation must be submitted, via e-mail, no later than 11:59 p.m. ET on Thursday, March 31, 2016
Written questions received after March 31, 2016 will be answered by amendment only if determined by the CO to be in the best interest of the Government.
An amendment will be issued answering written questions received by the CO
Today’s Presenters
Camille Hogan, Office of Acquisitions, Contract Specialist, V-221
Dr. Michael Geyer, Office of Air Traffic Systems and Operations, V-
Brandon Lint, Management and Program Analyst, V-341
Volpe Center Overview
Background Volpe established in 1970 Part of U.S. Department of
Transportation (DOT) Office of Research and Technology
Named after former DOT Secretary and MA Governor John A. Volpe
Volpe supports DOT goals Safety State of good repair Economic competitiveness Livable communities Environmental sustainability
About Volpe
Operations Offices
Volpe Center organization
Technical Centers
Safety Management and Human Factors Stephen Popkin
Policy, Planning, and Environment
Gregg Fleming
Air Traffic Systems and Operations
Anne Aylward, acting
Infrastructure Systems and Technology
Luisa Paiewonsky
Chief Financial Officer William Henrikson
Chief Counsel Monica Conyngham
EEO Officer Karen Kowalewski
Acting Director David Ishihara
Human Resources
Susan Connors
Acquisitions Mary Doherty
Information Technology
Eric Frykenberg
Facilities Management David Duncan
Communication and Knowledge Management
Cassandra Allwell
Director Emeritus Richard John
Strategic Management Rachel Winkeller
Deputy Director for Research and Technology
Anne Aylward
Deputy Director for Operations David Ishihara
Organizational Culture and Work Life Helen Blackman
Strategic Initiatives Ellen Bell
Multimodal Programs and Partnerships
Mike Dinning Research Infrastructure and Operations Bob Dorer
Technical organizations
Safety Management and Human
Factors
Policy, Planning, and Environment
Safety Information
Systems
Safety Measurement and Analysis
Aviation Safety
Management Systems
Surface Transportation Human Factors
Aviation Human Factors
Economic Analysis
Transportation Planning
Organizational Performance
Environmental Measurement and Modeling
Environmental Science and Engineering
Energy Analysis
CAFE
Program
Office
Infrastructure Systems and
Technology
Air Traffic Systems and Operations
Aviation Systems
Engineering
Situational Awareness and
Logistics
Systems Safety and
Engineering
Structures and Dynamics
Advanced Vehicle
Technology
Infrastructure Engineering and Deployment
Technology Innovation and Policy
Air Navigation and
Surveillance
Air Wakes and
Weather
Air Traffic Management
Systems
Aviation Facilities and Business Services
NextGen Program
Office
Air Traffic Systems and Operations Focus Development of aviation systems that alleviate air traffic congestion, improve safety, and mitigate environmental impacts
Planning, testing, research, and evaluation in support of the Next Generation Air Transportation System (NextGen)
Real-time operational communication, navigation, surveillance, and decision support systems
Example projects Aircraft wake turbulence and aircraft separation – FAA Remotely piloted aircraft technology assessments – FAA NextGen surveillance systems(ADS-B) – FAA NextGen modeling and simulation – FAA Air traffic facilities support – FAA
ATEPS Small Business Set-Aside Overview & Procurement
Objectives
ATEPS SBSA- Procurement Objective
Acquire the services of two contractors with expertise and capabilities in Strategic Planning/Management Development & Integration and Risk, Issue, and Opportunity Management activities in support of the Volpe Center’s efforts to support the FAA’s Air Traffic Organization (ATO), Program Management Organization’s (PMO) deployment of the Next Generation Air Transportation System (NextGen)
Recap - FBO Special Notice
TMIS Follow-On Acquisition Strategy Announced on 9/17/2015 https://www.fbo.gov/notices/9a2666bdd7d88cc9714e03c739aef75b
Work has “evolved” to require separate procurements Three Solicitations to be issued
Two for ATEPS (one Full and Open and one SBSA) One for TMSEDS (Full & Open) https://www.fbo.gov/notices/9a2666bdd7d88cc9714e03c739aef75b
ATEPS – Background – Current Contract
Traffic Management Infrastructure Systems (TMIS) multiple award ID/IQ contracts Six master contracts (Boeing Company, Computer Sciences Corporation, Engility
Corporation, Lockheed Martin IS&GS, Raytheon Company, and Science Application International Corporation) awarded December 8, 2011
Ordering Period Expires December 7, 2016. Performance period expires December 7, 2017
Maximum Value: $450 million over 5 Years
To date, 21 task orders have been issued under the TMIS multiple award contracts – 11 of those to support the FAA’s ATO PMO deployment of NextGen
ATEPS – Acquisition Strategy (cont’d)
SBSA – Single Award ID/IQ for each CLIN - CLIN 0100 Strategic Planning/ Management Development and Integration CLIN 0200 Risk, Issue, and Opportunity Management
F&O – Single Award ID/IQ
First Task Order (Transition) awarded concurrently with Master Contract
Cost-Plus-Fixed-Fee(CPFF) and Firm-Fixed Price (FFP) Task Orders
ATEPS - Procurement Overview
Statement of Work based on ongoing TMIS task orders issued in support of the FAA ATO PMO’s deployment of NextGen.
Funded by Intra-Agency Agreements
Advisory and Assistance Services
Federal Acquisition Certification-certified personnel will ensure appropriate management controls and perform contracting functions under the contracts and all task orders
ATEPS - SBSA SOW – CLIN 0100 –
Task Areas
The Contractor will support the following task areas:
1. Strategic Planning
2. Management Development and Integration
Task Area 1- Strategic Planning
The Contractor shall assist in:
Program charters for governing bodies Business process re-engineering Refinement of processes within PMO programs
Task Area 1- Strategic Planning
Examples of activities in Task Area 1 include:
Facilitation and integration of key program governance teams Facilitation of working sessions such as strategic, tactical, and other management meetings Development of strategies options for ensuring synchronized joint delivery of program commitments by the Government and industry, within and across PMO lines of business
Analysis of technical and integration issues for proposed architectures and concept of operations
Development or refinement of enterprise architectures describing national-level systems and support in the decomposition of architectures into functional components and program products.
Task Area 2- Management Development and Integration The Contractor shall provide consultation and support to
ATO PMO to assist in:
Enhancement of Senior Leadership’s ability to identify critical issues impacting operations Achievement of strategic goals Development of collaborative behaviors and a culture based on the collective integration of cross-organizational efforts Support to the Leadership Council for governance processes Development of collective skills for effective strategic and operational management
Task Area 2- Management Development and Integration Examples of activities in Task Area 2 include:
Management consulting for executives and managers Support redesign and change management activities related to realignment of organizational structures Identification of issues and recommended strategies for management team development Assistance to Leadership in designing and implementing products and processes to clarify expectations and improve accountability throughout the ATO management chain
ATEPS - SBSA SOW – CLIN 0200 –
Task Areas
The Contractor will support the following task area:
1. Risk, Issue, and Opportunity (RIO) Management
ATEPS - SBSA SOW – CLIN 0200 -
Task Area 1- RIO Management
Provide support to the various PMO programs to identify technical, cost and schedule risks and identify necessary actions to mitigate impacts on the program. The Contractor’s support includes:
Development of Risk Management Plans Creation and maintenance of a risk database Analysis, assessment, monitoring, and tracking of identified risks Facilitation of risk management board meetings Coordination with responsible parties and subject matter experts to develop and update risk mitigation plans Generation of white papers and briefings
Task Order 0001 – SOW – CLIN 0100 and CLIN 0200
Transition Period of Performance 90 Days
The Contractor will finalize the Draft Transition Plan submitted with initial offer and begin transitioning the work being performed under existing TMIS task orders to personnel that will perform the same work on under this effort with minimal disruption For work being performed under existing TMIS task orders see attachment J.13
Technical Reference Library
Task Order 0002 RFP to be issued during the transition period
Transition Plan Deliverables (see Section F – Part II)
RFP Highlights
Sections B through I Contains Parts I and II Part I – Refers to the Master RFP Part II – Refers to Task Order 0001 The items listed as Part II will be included in the OF 347 for Task Order 0001
Master Contract and Task Order 0001 will be awarded concurrently
Note the Cybersecurity Compliance Requirements (TAR 1252.239-70) in I.5
Note the Security and Position Sensitivity (DOT Order 1630.2B) Compliance Requirements in H.5
RFP – Section L
L.3 – Requirements for Certified Cost or Pricing Data
L.4.I – Exclusion from Making an Offer
L.4.III – Award Without Discussions
RFP Questions – NLT 11:59PM on March 31, 2016 (e-mail only)
Proposal Validity – Minimum of 180 Calendar Days
RFP – Section L – cont’d
Offerors must clearly identify if its proposal is a proposal for CLIN 0100 or a proposal for CLIN 0200 ON EVERY VOLUME.
Offerors desiring to pursue awards for both CLINs must submit separate proposals for each CLIN. Separate proposals may not be contained within the same binders/volumes nor may one proposal refer to the other proposal.
This requirement also applies to Subcontractor proposals
RFP – Section L – cont’d
L.5.II – Proposal Organization Volume I – Cost/Business Proposal (three labeled sections) o Three (3) copies of Cost/Business (original and two copies) and one (1) copy on virus-free CD (including subcontractors) o CD Must include the completed cost proposal schedules in Microsoft Excel 2013. Excel file must include shall be used to verify calculations (no encrypted or protected cells) o Narrative (such as the subcontracting plan and other business proposal documents) must be provided in Microsoft Word 2010 or compatible format.
o NOTE CDs MUST CLEARY BE LABELED WITH COMPANY NAME, IDENTIFICATION
AS AN OFFEROR OR SUBCONTRATCOR, AND RFP NUMBER.
Volume II – Technical Proposal (three labeled sections) o Six (6) copies of Technical Proposal (original and five copies) and one (1) copy on virus-free CD o The Technical Proposal CD must be in Adobe Acrobat or compatible format.
RFP – Section L –Technical Proposal Written Technical Proposal Submission Consisting of Three (3)
Sections Staffing Transition Contract Past Performance
Oral Presentations Consisting of Two (2) Sections:
Technical Understanding Management Approach
L.5.V – Proposal Format
NO COST INFORMATION SHALL BE INCLUDED IN THE TECHNICAL
PROPOSAL
RFP – Section L –Technical Proposal – Oral Presentations
ORAL PRESENTATION SCHEDULE
Evaluation Factor Topic Time Limit Presenters N/A Introduction 5 minutes Program Manager and/or any of the Task Area Managers Only
Technical Understanding Presentation of Technical Understanding
20 minutes Program Manager and/or any of the Task Area Managers only
Technical Understanding Structured Questions and Answers on Technical Understanding
10 minutes Program Manager and/or any of the Task Area Managers Only
Break Management Approach Presentation of Management
Approach 10 minutes Program Manager and/or any of the Task Area Managers Only
Management Approach Structured Questions and Answers on Management Approach
10 minutes Program Manager and/or any of the Task Area Managers Only
N/A Conclusion 5 minutes Program Manager and/or any of the Task Area Managers Only
ATEPS – SBSA – Section L – Cost/Business Proposal
Follow the guidance as provided in Section L.6 Identification of uncompensated overtime (FAR Provision 52.237-10) Include information required under FAR Provision 52.222-46
(Evaluation of Compensation of Professional Employees) Proposals must contain sufficient information for the Government to complete its evaluation (completely filled out Cost Proposal Schedules )
Supporting documentation must be clear, complete, and convincing Proposals need to be stand-alone proposals and not reference previously submitted proposals or other provided documentation
Cost/Business Proposal cont’d
Prime Offerors must complete all ten (10) Attachment J.8 Cost Proposal Schedules
Cost Type Subcontractors must Complete Attachment J.8 Schedules 1 through 5, Schedule 9, and other items as identified on the Attachment J.7 Checklist NOTE: Cost type subcontractors must provide evidence that their accounting system has been approved by a Federal Government Audit Agency or describe how their accounting system could be reviewed and approved.
NOTE: There was an error in the Attachment J.7 Checklist. Subcontractors should not complete Schedules 6 and 7. This will be issued via Amendment 0001.
Cost Type Subcontractors – when completing Schedules 2 and 3, enter $0 for subcontracts and $0 for RFP-stipulated ODC.
Those are reserved for the prime offeror.
Note that second-tier subcontracting is not permissible unless the Offeror can provide a strong technical rationale for inclusion of a second-tier subcontract and demonstrate what steps have been taken to prevent layering of costs and profit.
Cost Type Subcontractors shall also enter 90% of their direct labor to Schedule 2 and the remaining 10% to Schedule 3.
Time and Material (T&M) Subcontractors must provide items as identified on the Attachment J.7 Checklist Consent for T&M type subcontractors will be based on cost build up or commerciality of billing rates (fully loaded).
If consent is based on commerciality, the offeror must provide information and statistical information demonstrating the use of billing rates in substantial quantities to the non-Government public
Burden of proof rests with the offeror and subcontractor If based on commerciality, Include a signed statement that the offered rate is
“most favored customer rate”.
Schedule 1 CPFF Columns: Enter Estimated Cost and Fixed Fee for each Contract Period
(from the totals in Schedule 2) o Note to include the RFP stipulated ODC as shown on Schedule 2 o Offeror estimated ODC may be proposed provided that a detailed breakdown is provided. The Master Contract will include a list of offeror proposed ODCs
FFP Columns: Enter Estimated Cost and Profit for each Contract Period (from the totals in Schedule 3) o Note that there is no RFP stipulated ODCs for FFP.
o Offeror estimated ODC may be proposed provided that a detailed breakdown is provided. The Master Contract will include a list of offeror proposed ODCs
The Master Contract Value will be based on the Total provided in this Schedule
Schedule 2 Complete the elements of cost for each cost element by Contract Period.
Totals will be entered in the CPFF Table on Schedule 1 Direct Labor comes from the CPFF labor calculations of Schedule 4 (90% of
Direct Labor Costs) Fixed fee comes the calculations provided in Schedule 6
Schedule 3 Complete the elements of cost for each cost element by Contract Period.
Totals will be entered in the FFP Table on Schedule 1 Direct Labor comes from the Schedule 4 Profit comes the calculations provided in Schedule 6
Schedule 4 Prime Offeror Labor is entered on this schedule o Prime labor hours (excluding subcontractor assigned LOE) is provided in Section A of this schedule o For Administrative Labor, the offeror shall specify the labor category, the number of hours proposed (Section A) and the unburdened hourly rate in Section B o Unburdened labor rates for each category must be entered in Section B (Labor Rate Calculations - see page 94 – Direct Labor) o Extended Labor costs (hours time hourly rates) must be shown in Section C o 90% of the annual direct labor total costs is entered in Schedule 2 (by contract period) o 10% of the annual direct labor total costs is entered in Schedule 3 (by contract period)
Schedule 5 Prime Offerors shall indicate their indirect rates by their Fiscal Year and calculate a weighted average based on the anticipated performance period (beginning November 1st in each year of contract performance)
Indicate and provide evidence whether the offeror has an approved Forward Price Rate Agreement with the Government. Include a copy of the FPRA.
Offerors shall provide a copy from their cognizant audit agency, such as DCAA, that their Accounting System has received Government approval.
Offerors shall provide the allocation base for each indirect rate
Schedule 6 Prime Offerors shall complete the schedule for the purpose of indicating the maximum factors for fixed fee and profit The total for estimated cost for fixed fee and profit shall be based on the entire five year performance period The fixed fee amounts shall come from Schedule 2 and the profit estimate costs shall come from Schedule 3 The total fixed fee and profit percentages shall be entered in Clause H.14 of the contract Note that the Government reserves the right to negotiate lower percentages (if the Government decides to negotiate instead of awarding without discussions).
The Government shall analyze proposed fixed fee and profit based on DOT
Weighted Guidelines. NOTE: A proposal that proposes fixed fee in excess of statutory limitations shall be eliminated from consideration.
Schedule 7 Complete the amount proposed for each subcontract (for the entire 5 year effort). In addition to the amount indicate the type of subcontract and the total number of technical hours proposed.
90% of the total for subcontractors is entered in Schedule 2 while the remaining 10% is entered in Schedule 3. The 90/10 ratio applies to each year of performance
Schedule 8 Offerors shall provide the allocation of direct labor hours for the prime and each proposed subcontractor for the entire 5 year effort.
Additionally, provide the value and type of subcontract for each year of performance.
Schedule 9 Offerors shall provide an estimate for each of its Offeror-estimated ODCs that it anticipates invoicing directly during performance of the initial Task Orders.
The Offeror must clearly identify the different types of costs that may be direct costs in accordance with its established accounting practice, the amount for each cost, and the basis of the cost estimate.
Schedule 10 Offerors shall provide the allocation of direct labor hours for the prime and each proposed subcontractor for the entire 5 year effort.
Additionally, provide the value and type of subcontract for each year of performance.
Complete the Labor Cost Realism Schedule by providing the Labor Category for the
Resumed Person, the Resumed Person’s Name, their Company Affiliation, their current unburdened labor rate and the Contract Period 1 unburdened labor rate for that labor category (from Schedule 4). If the resume person rate is greater or lower than 5% of the Schedule 4 rate, the offeror must provide an explanation on why the rate is higher or lower.
Task Order 0001 Cost Proposal Complete Attachment J.15 Firm-Fixed Price Consisting of Three (3) Schedules No stipulated ODCs for this Task Order Any proposed Subcontractors must provide the same level of detail as Schedules 1 through 3.
Business Proposal
Cost Control Plan Subcontract Consent
Offeror compliance with FAR Part 44
Subcontracting Plan No subcontracting plan is required, however, Prime must perform 51% of the services
Conflict of Interest Disclosure Required for offeror and each proposed subcontractor
Limitations on Pass-Through Charges Compliance with FAR 52.215-22 Provide the required information Description of value added may be required
ATEPS – SBSA – Section M – Evaluation Factors for Award
Basis for Award Award to be made to the responsive and responsible offeror whose proposal provides the best value to the Government Award may be made based on initial offers However, the Government may determine during proposal evaluation that discussions may be necessary The Government intends to award Task Order 0001 concurrently with the award of the Master Contract, provided the proposed price for the Task Order is fair and reasonable.
The Government may determine that it is necessary to negotiate Task Order 0001.
If Task Order 0001 is negotiated, then the Task Order may be awarded after the award of the Master Contract.
ATEPS – SBSA – Section M – Evaluation Factors for Award – cont’d
Order of Importance Technical Proposal significantly more important than the Cost Business Proposal Offerors are cautioned not to minimize the importance of the Cost Business proposal.
Technical Proposal Factors for Evaluation Technical Understanding Staffing Management Approach Transition Contract Past Performance
ATEPS – SBSA – Section M – Evaluation Factors for Award – cont’d
Cost Proposal Evaluation Criteria Cost Proposal for Master Contract to be evaluated for Realism, Reasonableness and Completeness Analysis will include a probable cost determination Best Value Determination will be based on Cost Realism Cost Analysis to be performed on Task Order 0001 Price Proposal to establish fairness and reasonableness of the FFP proposal Cost/Business Proposal Evaluation by the Government will also include:
Evaluation for Consistency Evaluation of Proposed Fee Assignment of Risk Evaluation of Uncompensated Overtime, Compensation for Professional
Employees Evaluate the Acceptability of the Cost Control Plan
Amendment 0001
To Be Issued NLT March 29th Provide Webinar PowerPoint Slides Correct Attachment J.7 Checklist Add FAR 52.204-16 to Section L Correct L.4.IV inquiries submitted no later than March 31, 2016
Important Dates and Reminders
Offerors are encouraged to ask questions.
RFP Questions due NLT 11:59 PM, March 31, 2016 via e-mail to
Camille.hogan@dot.gov
Terms and Conditions of the Solicitation remain unchanged unless the CO issues an Amendment
Proposals must remain valid for a minimum of 180 calendar days effective from the proposal due date (May 10, 2016)
Proposals Due at 2:00 PM ET, on May 10, 2016.
THANK YOU FOR YOUR ATTENDANCE
mailto:Camille.hogan@dot.gov
FirstName LastName Email Title Company John Fries john.fries@noblis.org Capture Manager Noblis, Inc.
Bob Etris betris@evansincorporated.com Partner and Director Evans Incorporated Randall Hoover rhoover@linkvisum.com Capture Manager LinkVisum Consulting Group, Inc.
Arianne Tidwell arianne.tidwell@ruota.consulting Consultant Ruota Consulting Arianne Tidwell arianne.tidwell@ruota.consulting Consultant Ruota Consulting John Andreadakis johnandreadakis@orbisinc.net ORBIS Betsy Robbins betsy.robbins@ruota.consulting Principal Ruota Consulting Douglas Robert drobert@evansincorporated.com Contracts Managwr Evans Incorporated Valerie Nottage valerie.nottage@6ksystems.com Director 6K Systems Mike Wodell mike.wodell@hitecsystems.com Sr. Director Hi Tec Systems David Scali dscali85@comcast.net Director DS Consulting Richard Abbott richard.abbott@hitecsystems.com Program Director, Transportation Systems Hi-Tec Systems, Inc.
Josue Sanchez josue.g.sanchez@us.pwc.com Business Architect PwC shueyb ali sali@world-servicesllc.com President World Services LLC Jared Hegberg jared.hegberg@dot.gov Contract Specialist Volpe Center Sasha Kruse sasha.kruse@ruota.consulting Ruota Consulting Aaron Mallin aaron.mallin@6ksystems.com 6K Systems, Inc.
Ashley Tolub atolub@evansincorporated.com Evans Incorporated Lance Johnson lance.johnson@6ksystems.com 6K Systems, Inc.
brandon lint brandon.lint@dot.gov DOT Volpe Roberta Massiah rmassiah@aurorasciences.com Aurora Sciences Steve Scheimreif edinunzio@crownci.com Crown Consulting, Inc.
Eric Anderson eric@rigil.com Rigil Ross Pringle ross.pringle@ruota.consulting Ruota Consulting Jim Wright jwright@evansincorporated.com Director Evans Incorporated Michael Kalnasy mkalnasy@wsl-llc.com WSL Consulting
| Amendment 000001 Continuation Sheets.pdf |
| ATTACHMENT J. 7 - ATEPS SBSA MASTER CONTRACT COST AND BUSINESS PROPOSAL CHECKLIST |
| ATEPS SBSA Pre-Proposal Slides FINAL.pdf |
| Slide Number 1 |
| Today’s Agenda |
| Ground Rules and Logistics |
| Ground Rules and Logistics – cont’d |
| Today’s Presenters |
| Slide Number 6 |
| Slide Number 7 |
| Volpe Center organization |
| Technical organizations |
| Air Traffic Systems and Operations |
| ATEPS Small Business Set-Aside Overview & Procurement Objectives� |
| ATEPS SBSA- Procurement Objective |
| Recap - FBO Special Notice |
| ATEPS – Background – Current Contract |
| ATEPS – Acquisition Strategy (cont’d) |
| ATEPS - Procurement Overview |
| ATEPS - SBSA SOW – CLIN 0100 – �Task Areas |
| ATEPS - SBSA SOW – CLIN 0100 – �Task Area 1- Strategic Planning |
| ATEPS - SBSA SOW – CLIN 0100 – �Task Area 1- Strategic Planning |
| ATEPS - SBSA SOW – CLIN 0100 – �Task Area 2- Management Development and Integration |
| ATEPS - SBSA SOW – CLIN 0100 – �Task Area 2- Management Development and Integration |
| ATEPS - SBSA SOW – CLIN 0200 – �Task Areas |
| ATEPS - SBSA SOW – CLIN 0200 - �Task Area 1- RIO Management |
| Task Order 0001 – SOW – �CLIN 0100 and CLIN 0200 |
| RFP Highlights |
| RFP – Section L |
| RFP – Section L – cont’d |
| RFP – Section L – cont’d |
| RFP – Section L – Technical Proposal |
| RFP – Section L – Technical Proposal – Oral Presentations |
| ATEPS – SBSA – Section L – Cost/Business Proposal |
| ATEPS – SBSA – Section L – Cost/Business Proposal cont’d |
| ATEPS – SBSA – Section L – Cost/Business Proposal cont’d |
| ATEPS – SBSA – Section L – Cost/Business Proposal cont’d |
| ATEPS – SBSA – Section L – Cost/Business Proposal cont’d |
| ATEPS – SBSA – Section L – Cost/Business Proposal cont’d |
| ATEPS – SBSA – Section L – Cost/Business Proposal cont’d |
| ATEPS – SBSA – Section L – Cost/Business Proposal cont’d |
| ATEPS – SBSA – Section L – Cost/Business Proposal cont’d |
| ATEPS – SBSA – Section L – Cost/Business Proposal cont’d |
| ATEPS – SBSA – Section L – Cost/Business Proposal cont’d |
| ATEPS – SBSA – Section L – Cost/Business Proposal cont’d |
| ATEPS – SBSA – Section L –�Business Proposal |
| ATEPS – SBSA – Section M – Evaluation Factors for Award |
| ATEPS – SBSA – Section M – �Evaluation Factors for Award – cont’d |
| ATEPS – SBSA – Section M – �Evaluation Factors for Award – cont’d |
| Amendment 0001 |
| Important Dates and Reminders |
| Attendance List.pdf |
| Attendance List |
File details come from the government source that posted it. Updated .