Technical Exhibit TE-31 FSS Class Vessel Automation Upgrades Status

View the file

Other files

File Type Posted
J-2_Cost_Reimbursable_Items_Amend_30.pdf PDF
J-14_Required_Crewing_Amend_30.xlsx XLSX spreadsheet
DTMA91R140002-0030.pdf PDF
J-14_Required_Crewing_Amend_29.xlsx XLSX spreadsheet
DTMA91R140002-0029.pdf PDF
J-2_Cost_Reimbursable_Items_Amend_28.pdf PDF
TE-4_Ship_Characteristics_Amend_28.pdf PDF
J-14_Required_Crewing_Amend_28.xlsx XLSX spreadsheet
DTMA91R140002-0028.pdf PDF
J-4_Deliverables_Amend_28.pdf PDF
DTMA91R140002-0027.pdf PDF
J-14_Required_Crewing_Amend_26.xlsx XLSX spreadsheet
DTMA91R140002-0026.pdf PDF
DTMA91R140002-0025_.pdf PDF
J-17_ROS_Crew_Security_Watch_Worksheet_Amend_25.xlsx XLSX spreadsheet
J-5b_EIS_Supporting_Spreadsheet_-_FF_Amd_25.xlsx XLSX spreadsheet
J-14_Required_Crewing_Amend_24.xlsx XLSX spreadsheet
J-17_ROS_Crew_Security_Watch_Worksheet.xlsx XLSX spreadsheet
DTMA91R140002-0024.pdf PDF
J-2_Cost_Reimbursable_Items_Amend_24.pdf PDF
J-14_Required_Crewing_Amend_23.xlsx XLSX spreadsheet
DTMA91R140002-0023.pdf PDF
J-2_Cost_Reimbursable_Items_Amend_23.pdf PDF
J-14_Required_Crewing_Amend_22.xlsx XLSX spreadsheet
DTMA91R140002-0022.pdf PDF
DTMA91R140002-0021_Amendment_21.pdf PDF
J-8a_Pricing_Data_Amend_21_(unprotected).xlsx XLSX spreadsheet
J-2_Cost_Reimbursable_Items_Amend_21.pdf PDF
J-5b_EIS_Supporting_Spreadsheet_-_Fixed_Fees_Amend_21.xlsx XLSX spreadsheet
J-14_Required_Crewing.xlsx XLSX spreadsheet
J-8_Pricing_Data_Amend_21.xlsx XLSX spreadsheet
J-2_Cost_Reimbursable_Items_Amend_20.xlsx XLSX spreadsheet
DTMA91R140002-0020.pdf PDF
J-8a_Pricing_Data_Amend_20.xlsx XLSX spreadsheet
DTMA91R140002-019.pdf PDF
J-2_Cost_Reimbursable_Items_Amend_19.pdf PDF
DTMA91R140002-018.pdf PDF
J-2_Cost_Reimbursable_Items_Amend_18.pdf PDF
DTMA91R140002-017.pdf PDF
J-8_Pricing_Data_Amend_16.xlsx XLSX spreadsheet
DTMA91R140002-016.pdf PDF
J-8a_Pricing_Data_(unprotected)_Amend_16.xlsx XLSX spreadsheet
J-8a_Pricing_Data_(unprotected)_Amend_15.xlsx XLSX spreadsheet
J-8a_Pricing_Data_Amend_15.xlsx XLSX spreadsheet
DTMA91R140002-015.pdf PDF
DTMA91R140002-014.pdf PDF
J-8a_Pricing_Data_(unprotected)_Amend_14.xlsx XLSX spreadsheet
J-8_Pricing_Data_Amend_14.xlsx XLSX spreadsheet
DTMA91R140002-013.pdf PDF
SMC_Amd_012.pdf PDF
Show 40 more

Latest 50 of 118 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical Exhibit 31 (TE‐31)

FSS Class Vessel Automation Upgrades and Ongoing Projects

ITEM DESCRIPTION

ALTAIR 88% BELLATRIX 86% POLLUX 63% ANTARES 63% REGULUS 60% DENEBOLA 55% ALGOL 51% CAPELLA 51%

1 ICI Combustion Control Upgrade ‐ (T‐ALT 89‐080 / 06‐145) ICI replaced the existing Bailey mini‐line series pneumatic controls with the Yokogawa YS‐170 dual loop controllers, I/P transduces, Yokogawa pressure and differential transmitters.

2 TMS Alarm and Monitoring System ‐ This proposed system will replace the following systems, Main Console alarms.

TMS Bearing Temperature Monitoring System ‐ Rewire the existing RTD's (3‐way vs. 2‐wire) to a new junction panel at each reduction gear on the outboard side. The panels will have a stand alone scanner system which displays the temperatures and when a temperature is in alarm the a signal is sent to the main console where a light and sonar alarm signal will sound. The panels will have the available space for PLC modules in the future to incorporate the bearing temperatures into the Alarm and Monitoring System.

ICI Engineers Alarm Panel (Port, Starboard and Center) ‐ The existing Hose McCann system is no longer parts supportable. This interim upgrade would replace these three (3) panels with a fully redundant PLC and two 12" touch screen panels to display and acknowledge the required alarms. The new system would need to be designed to talk to the Alarm and Monitoring System in the future.

Burner Management System ‐ (T‐ALT 94‐106) The existing system is a Flame Safe Guard System and does not meet the new ABS/USCG requirements. A new system which is fully redundant would need to be supplied and designed to the present ABS/USCG designs. This new system would be fully independent of the proposed A&M system, but all data can be included in the A&M HMI system.

Boiler Feedwater Control Valve Replacement ‐ The existing Bailey Feedwater valves are no longer available.

The old valve was a not an ANSI standard valve size. A new Fisher 6x4 feedwater valve with electronic positioners has been supplied with an spacer flange to replace the failed valves.

Leslie Pilot Control Station Upgrades ‐ The existing Leslie pilots (pressure, temperature, level) with be replaced with new pressure transmitters, temperature transmitters and level transmitters. These inputs would be sent to a P&ID loop controller which will be installed in a new panel mounted on the existing console. This upgrade allows true control over all of the auxiliary steam equipment from the main console.

This upgrade does away with the very maintenance intense Leslie pilots.

Superheater Temperature Flow Control valves (main and by‐pass) positioner upgrade ‐ Upgrade the existing pneumatic positioners to the new Fisher electronic positioner. The new positioners response time greatly improves the overall temperature control of the super heater steam outlet temperature to the HP turbine.

Fuel Oil Flow Control Valve positioner Upgrade ‐ Upgrade the existing pneumatic positioners to the new Fisher electronic positioner. The new positioners response time greatly improves the overall fuel oil flow control with in the combustion control system.

Variable Frequency Drive (VFD) for FD Fans ‐ This upgrade would reduce overall energy cost, improve the combustion control efficiency, and simplify boiler operations.

Yarway Drum Level Indicator and High/Low alarm replacement ‐ The existing Yarways need replacement and new Yarways are very expensive. The old system has been replaced with a TMS level indicator and a new drum level transmitter w/ 3‐way valve.

FD Fan actuator rebuild ‐ The Bailey actuator are in serious disrepair and are no longer controlling in a repeatable fashion. The existing cylinders and bearings need replacement.

Tank Level Indication Upgrade ‐ Existing pneumatic mercury gauges are in serious disrepair. TMS LEVELCOM electronic/pneumatic gauges are a direct replacement for FO systems.

FD Fan/Windbox/Furnace/Uptake Draft Guage replacement ‐ The existing Baily gauges to not work(failed movements and bellows) and require replacement.

Drum Level/DC heater/Hot Well/ADT Level Control indicators ‐ Existing Bailey indicators have failed pneumatic receivers and damaged movements. These units should be replaced with electronic 4‐20mA bar graphs with digital displays.

Atomizing steam valve trim replacement ‐ The existing atomizing steam valve trim is to large for the new TODD TCD atomizers. The Leslie 1/4" trim would allow better pressure control.

Fuel Oil Flow Totalizer ‐ Install two (2) 1/8 din digital meter to display instantaneous feul oil flow and totalized fuel oil flow for each boiler, the fuel oil flow signal is taken from the Yokogawa control signal.

ITEM DESCRIPTION

ALTAIR 88% BELLATRIX 86% POLLUX 63% ANTARES 63% REGULUS 60% DENEBOLA 55% ALGOL 51% CAPELLA 51%

Boiler Casing Light/View Ports ‐ DAO initiative, drawing available if needed. Adjust Steam Smothering if needed.

19 Covered Lifeboats ‐ Procure new SOLAS lifeboats. HQ action 20 Rudder Locks ‐ One set can be shared between groups. DGO FSSs could share one.

21 850#‐140# Reducing Stations ‐ Replace with properly sized valve and set point controller 22 Upgrade Technical Library ‐ Install new cabinets for 04 and 05 level technical library 23 DC Heater ‐ Install remote digital temperature monitors

Two 25 man Life Rafts & Modify Rails ‐ Add in two new stations & upgrade all stations to "drop‐in" rails (gates). New life rafts won't fit in old cradles up forward. Also all stations require upgrade to allow servicability and access from back side.

Sewage System Modification ‐ To provide labor and materials to modify the ship's sewage and grey water system, MSD piping and overboard connection to dockside sewage disposal facilty or designated holding tank.

MSD Holding Tank ‐ Increase the Marine Sanitation Device holding capacity to comply with NPDES and Federal and State requirements for "GREY" and "BLACK" water holding capabilty. Combine with above.

27 Vidmar Cabinet Install PHASE I ‐ Install new Vidmar parts cabinets in various location as designated in specifications.

28 Vidmar Cabinet Install PHASE II ‐ Install new Vidmar parts cabinets in various location as designated in specifications.

29 Tank Level Indicator Upgrade ‐ Current Gauge type indicators contain inherently dangerous mercury, are inoperable, obsolete and not supportable. (Mercury Filled) See No. 13 above.

30 FWD & AFT Cranes Controllers, Upgrade ‐ Upgrade the Cranes set starter panels with MacGregor Y/D starter replacement contactors.

31 Vacuum Drag System ‐ Install a level monitoring system to operate the vacuum control valve to open and close.

32 Gyro Compass Upgrade/Backup ‐ Install backup Gyro Compass and associated automated switch gear.

Refurbish and upgrade existing Gyro. DGO has lead.

33 In Port Electric Feed Pump ‐ Install electric feed pump with 2 valve protection 34 Bridge Air Conditioning ‐ Install air conditioning system in navigation bridge 35 Boiler DH unit, Upgrade ‐ Install two (2) 600 CFM dehumidification unit for the firesides of each Port and Stbd

Boilers. This work is to include fabrication of two (2) foundations to hold and properly secure DH units, fabrication and installation of four (4) transition pieces at the FD fan discharge access and economizer access doors, and all electrical hookups.

36 Evaporator Upgrade ‐ Replace Existing Evaporators with 100 ton/day capacity Alpha Laval Nirex Evaporators

37 Standby Diesel Pre‐Lube ‐ Reconfigure source power from Main Board to Emergency Board 38 Mooring Equipment Alteration ‐ Install Capstans/Winches, chocks and bits as necessary for mooring requirements.

39 O2 Sensors ‐ Install an O2 monitoring system and alarms for the Main CO2 storage room, Emergency Diesel

Room, and Paint Locker 40 Steering Stand, Upgrade ‐ Upgrade to Raytheon Compilot 20 Steering Stand and Steering Control System to the vessels existing Main Steering gear, and Main pumps and steering feedback units.

41 LRIT ‐ Install Long Range Identification Tracking (LRIT) System installed in the FWD Pilot House that meets all

USCG and FCC Requirements.

42 Potable Water System, Upgrade ‐ Remove brominator system and install UV disenfection system 43 Shore Power Monitoring System ‐ Install a Shore Power Monitoring system that can display real‐time power consumption and can keep a running log at set intervals. (ALRIS) 44 Air Compressor Upgrade ‐ Replace CONTROL / SHIP SERVICE Air Compressors (3 total) with more efficient units, preferably Quincy units, as needed.

45 Ship Service Air Dryer Upgrade ‐ Upgrade Ships Service Air Dryers. Current units are beyond service life and no longer parts supportable 46 SCBA Cascade System ‐ Install and properly Cascade air storage cylinder assembly to support refilling of SCBA bottles 47 Chloropac system ‐ Install/Upgrade Chloropac System

ITEM DESCRIPTION

ALTAIR 88% BELLATRIX 86% POLLUX 63% ANTARES 63% REGULUS 60% DENEBOLA 55% ALGOL 51% CAPELLA 51%

48 Simplified Voyage Data Recorder ‐ Install S‐VDR system to meet the SOLAS and IMO requirements. All S‐VDR IMO Carriage Requirements for equipment interfaces shall be met.

49 ICI Bridge Alarm Navigation System Upgrade ‐ Upgrade Bridge alarm panel as per SOLAS requirement V/19

50 Rudder Angle Indictors, Upgrade ‐ Upgrade Rudder Angle Indicators and all repeaters 51 Motor Winding Heaters ‐ Install external Electric Band Heaters on various motors in the Engine Room

52 Fire Detection System (Engineering) ‐ Upgrade Fire Detection System in Engineering Spaces and or Cargo Holds

53 Fire Detection System (Non‐Engineering) ‐ Upgrade Fire Detection System 54 Lube Oil Electric Heaters ‐ Upgrade the existing 72 kW Hynes and Indeeco electric lube oil heaters for the two

(2) lube oil centrifuges with OFM Alfa Laval 72kW EHS‐61 HeatPac heaters. The EHS‐61 system is comprised of one (1) each EHM heater, control unit, auxiliary contactor box and associated ancillary sensors, etc.

55 Feed Pumps ‐ Upgrade overspeed trips and oil relays (Lee Engineering) 56 Standby Generator ‐ Install Exhaust Temp Indicator 57 Stack Temperature Indicator ‐ Upgrade Stack Temp Indicator 58 Echo Sounder ‐ Replace the existing Raytheon RD‐500 Echo Sounder with a Raytheon 'Navigation Sounder LAZ

5100'.

59 Main Engine Throttle Controls ‐ The electrical part of the throttle controls was upgraded in 2004 by General

Electric. The hydraulic part is considered the second phase of the upgrade. Currently, the electrical system doesn't interface correctly with the hydraulic system.

60 SSTG Gland Seal Controller Upgrade ‐ Replace the existing Bailey pneumatic controllers for the Port and Stbd Gland Seal steam system with a P& ID loop controller (Yokogawa UT320 loop controller).

61 HP/LP Turbine Vibration Monitor ‐ Replace the Bently Nevada vibration monitoring system for the main engines with a state‐of‐the‐art system, with repair part and technical support availability.

62 Replace existing/undersized auxiliary desuperheaters‐‐Foster Wheeler noted on DAO FSSs that they were undersized causing high saturated steam temps. All ships should be checked.

Reinstall High Fire limit protections in boiler control panel‐‐previously disabled, prevents too much fuel flow to boilers.

DFM purifier‐‐needed to protect EDG and SSDG from burning dirty oil which can damage engines. DGO/ODI has lead and MDO has done a shipcheck on ALGOL & CAPELLA.

Segregate Bilge & Ballast Systems‐‐DPO/ODI has lead. Piping mods and blanks need ABS approval, eliminates chains & locks.

66 Cargo Hold Fan start/stop controls‐‐Safety issue. Consider Variable Freequency Drive.

67 Inspect/upgrade remote FO shutoff system‐‐safety issue.

Upgrade Galley Fryer‐‐retrofit on all ships due to CAPELLA fire. DGO/ODI has lead on parts supportable fryer and CO2 bottle‐‐Safety issue.

In‐Stream Discharge certs for M1A1 tank in SS3‐‐DAO has lead on getting ABS approved test procedure and test to 99 LT.

MSD repair kit‐‐DPO/ODI to forward to ALCON Schedulke replacement during Out Year DD Availability.

71 Flight Deck ramp electro‐hydraulic control upgrade with interlock system‐‐DGO has lead, specs developed

72 Side port door electro‐hydraulic control upgrade with interlock system 73 TMS P/S Shaft strut LO temp and level monitoring with Steering Gear‐‐DGO/ODI has the lead 74 Bilge Alarms‐‐DGO/ODI has the lead

COMPLETED

OUTSTANDING

NOT NEEDED