PROJECT_DESCRIPTION_AZ_PP.pdf

PDF 12 KB Posted

Attached to
AZ NPS PP 2016(7), Pavement Preservation Arizona
Solicitation number
DTFH7017R00003
Issued by

View the file

Other files

File Type Posted
Q&A_(3-3-2017).pdf PDF
Q&A.pdf PDF
A002.pdf PDF
A001.pdf PDF
GLCA_C5_RipReport.pdf PDF
TUMA_C5_RipReport.pdf PDF
IFB_PP_Arizona.pdf PDF
SUCR_C5_RipReport.pdf PDF
HUTR_C5_RipReport.pdf PDF
WACA_C5_RipReport.pdf PDF
CACH_C5_RipReport.pdf PDF
TUZI_C5_RipReport.pdf PDF
NAVA_C5_RipReport.pdf PDF
PISP_C5_RipReport.pdf PDF
WUPA_C5_RipReport.pdf PDF
MOCA_C5_RipReport.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AZ NPS PP 2016(7), Pavement Preservation Arizona, Mohave, Coconino, Navajo, Apache, & Yavapai Counties, Arizona

The work consists of resurfacing and other small items of work.

Project length: 82.12 miles

Tentative Fixed Completion Date: Fall 2017 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: $7 million and $10 million

Location: Project is located at various park sites throughout Northern Arizona

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

One Schedule Name

A

DIVISION 150 – Project Requirements 152 Construction Survey & Staking No 153 Contractor Quality Control and Assurance

Yes 154 Contractor Sampling & Testing Yes 155 Schedules for Construction Contracts (construction schedules) Yes

DIVISION 400 – Asphalt Pavements & Surface Treatments 406 Fog Seal 850 TON 407 Chip Seal 1,257,000 SQYD 407 Emulsified Asphalt 2,300 TON 407 Blotter 40 Ton 409 Micro Surfacing 315,000 SQYD 414 Asphalt Pavement Crack Filling 1,200 LNFT 414 Asphalt Pavement Crack Sealing 45.0 MILE 418 Asphalt Concrete Pavement Patching 2,300 SQYD

DIVISION 600 – Incidental Construction 622 Rental Equipment Yes 623 General Labor Yes 634 Permanent Pavement Markings (traffic pavement markings) 3,650,000 LNFT 635 Temporary Traffic Control – Flagger 2,300 FXHR 635 Temporary Traffic Control – Pilot Car 400 HR 635 Temporary Traffic Control – Cone 220 EACH 635 Temporary Traffic Control – Pavement Marking 435,000 LNFT 635 Temporary Traffic Control – Construction Sign 400 SQFT 635 Temporary Traffic Control – Supervisor Yes