HUTR_C5_RipReport.pdf
PDF 2 MB Posted
- Attached to
- AZ NPS PP 2016(7), Pavement Preservation Arizona
- Solicitation number
- DTFH7017R00003
About this file
HUTR_C5_RipReport
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q&A_(3-3-2017).pdf | ||
| Q&A.pdf | ||
| A002.pdf | ||
| A001.pdf | ||
| GLCA_C5_RipReport.pdf | ||
| TUMA_C5_RipReport.pdf | ||
| IFB_PP_Arizona.pdf | ||
| SUCR_C5_RipReport.pdf | ||
| WACA_C5_RipReport.pdf | ||
| CACH_C5_RipReport.pdf | ||
| TUZI_C5_RipReport.pdf | ||
| NAVA_C5_RipReport.pdf | ||
| PISP_C5_RipReport.pdf | ||
| WUPA_C5_RipReport.pdf | ||
| MOCA_C5_RipReport.pdf | ||
| PROJECT_DESCRIPTION_AZ_PP.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Road Inventory and Condition Assessment
Hubbell Trading Post National Historic Site
HUTR
Cycle 5 Report
Prepared By: Federal Highway Administration Road Inventory Program (RIP) Data Collected: 08/2012 Report Date: 03/2013
Mesa
Tucson
Phoenix
Las Vegas
Hubbell Trading Post National Historic Site in
Arizona
Hubbell Trading Post National Historic Site
DCV = Data Collection Vehicle
TABLE OF CONTENTS
SECTION PAGE
1. INTRODUCTION 1 - 1
2. PARK ROUTE INVENTORY
Route IDs, Subcomponents & Changes Report (As Applicable) 2 – 1
3. PARK SUMMARY INFORMATION
Paved Route Miles and Percentages by Functional Class and PCR 3 – 1 DCV Road Condition Summary 3 – 3
Parkwide DCV Condition Summary 3 – 4
4. PARK ROUTE LOCATION MAPS
Route Location Key Map 4 – 1 Route Location Area Map 4 – 2 Route Condition Key Map – PCR Mile by Mile 4 – 3 Route Condition Area Map – PCR Mile by Mile 4 – 4
5. PAVED ROUTE CONDITION RATING SHEETS
CRS Pages 5 – 1
6. MANUALLY RATED PAVED ROUTE CONDITION RATING SHEETS
MRR Pages 6 – 1
7. PARKING AREA CONDITION RATING SHEETS
Paved Parking Area Pages 7 – 1
8. PARKWIDE / ROUTE MAINTENANCE FEATURES SUMMARIES
Parkwide Maintenance Features Summary 8 – 1 DCV Route Maintenance Features Summary 8 – 2 Structure List 8 – 3
9. ROUTE MAINTENANCE FEATURES ROAD LOGS
Route Maintenance Features Road Logs 9 – 1
10. APPENDIX
Explanation of Changes to the RIP Index Equations and Determination of PCR 10 – 1 Explanation of the Excellent, Good, Fair and Poor Condition Descriptions 10 – 2 Description of Rating System 10 – 3 Surface Distresses 10 – 5 Index Formulas 10 – 12 Data Collection Vehicle Subsystems 10 – 16 Geodatabase – Background and Metadata 10 – 19 Glossary of Terms and Abbreviations 10 – 20
Section 1 Introduction
1-1
INTRODUCTION
The Federal Highway Administration, (FHWA), in the mid 1970s, was charged with the task of identifying surface condition deficiencies and corrective priorities on National Park Service (NPS) roads and parkways. Additionally, FHWA was tasked with establishing an integrated maintenance features inventory, locating features such as culverts, guardrails, and signs, among others, along NPS roads and parkways. As a result, in 1976 the NPS and FHWA entered into an MOA (Memorandum Of Agreement) which established the RIP (Road Inventory Program). This MOA was terminated and revised in 1980 to establish a new MOA aiming to update RIP data and develop a long-range program to improve and maintain NPS roads to designated condition standards and establish a maintenance management program.
The FHWA completed this initial phase of the RIP in the early 1980s. As a result of this effort, each NPS site included in the study received a RIP Report known as the “Brown Book” which included the information collected during this first RIP phase.
In the 1990s, the effort was again renewed to update and maintain the RIP data. By this time the computer age was upon us and a process was employed that relied heavily on electronic data collection and computer technology. A cyclical program was developed and the RIP completed two cycles of data collection from 1994 to 2001. Cycle 1, starting in 1994, was conducted in 44 “large parks” (parks containing 10 or more paved route miles). Cycle 2 began in 1997 and comprised 79 large parks and 5 small parks totaling 4,874 paved route miles. Each of these parks received a RIP Report known as the “Blue Book”. Cycle 3, from 2001 to 2004, was conducted in all parks, large and small, that contained any paved routes, including parking areas and, again, each park received a RIP Report and associated electronic files.
Cycle 4 was initiated in the spring of 2006 covering 86 large parks and several associated small parks consisting of 5,553 paved route miles and 6,232 paved parking areas. Data collection has been completed for Cycle 4 and all data has been delivered to the NPS.
In 2005, the FHWA began implementing the use of a Pavement Management System (PMS) to assist the NPS in prioritizing Pavement Maintenance and Rehabilitation activities. The PMS used by FHWA is the Highway Pavement Management Application (HPMA) and this software has the ability to store inventory and condition data from RIP and forecast future performance using prediction models. Outputs include performance and condition reports at the National, Regional, Park, or Route level. A regional prioritized list and optimization have been produced for most regions and the Federal Highway Deferred Maintenance is calculated via the HPMA.
In an effort to improve the accuracy of treatment recommendations and pavement condition descriptions, an extensive study was completed throughout 2010 that has resulted in changes to the RIP condition reporting method, specifically the distresses and indexes that comprise the Pavement Condition Rating (PCR). It was determined that a better representation of PCR could
1-2 be achieved by modifying the relative impact certain distresses would have on the overall rating.
The changes that were implemented were endorsed by management at both the FHWA and NPS in October 2010. These changes will allow greater use of RIP and HPMA data for not simply condition data reporting, but also as a reliable tool for project identification and selection.
Because of these changes, the PCR Condition ratings reported in Cycle 5 do not directly relate to the condition ratings reported in previous cycle RIP Reports. For more detailed information about the changes, see Section 3 and Section 10 in this RIP Report.
Cycle 5 has launched in the summer of 2010 and will again comprise all parks, large and small, that are served by paved roads and/or parking areas. For Cycle 5, the decision was made to collect condition data in large parks on Functional Class 1, 2, and 7 paved routes only, as well as any new routes that were previously not collected. In small parks, all paved routes and parking areas will be collected. As a result, this will include 81 large parks with 4,459 paved route miles and 231 small parks with 529 paved route miles and associated paved parking areas.
Since 1984, the Road Inventory Program has been funded through the Federal Lands Highway Park Roads and Parkways (PRP) Program. Currently, coordination of the RIP with FLH is under the NPS Washington Headquarters Park Facility Management Division. The FLH Washington office coordinates policy and prepares national reports and needs assessment studies for Congress.
In 1998, the Transportation Equity Act for the 21st Century (TEA-21) amended Title 23 U.S.C., and inserted Section 204(a)(6) requiring the FHWA and NPS, to develop by rule, a Pavement Management System (PMS) applied to park roads and parkways serving the National Park System.
FLH is responsible for the accuracy of all data presented in this report. Any questions or comments concerning the contents of this report should be directed to the national RIP Coordinator located in Sterling, Virginia.
Respectfully, FHWA RIP Team
FHWA/Eastern Federal Lands FHWA/Central Federal Lands 21400 Ridgetop Circle 12300 West Dakota Ave Sterling, VA 20166 Lakewood, CO 80228
(703) 404-6371 (720) 963-3556
Section 2 Park Route Inventory
Cycle 5 NPS/RIP Route ID Report Road Inventory Program 02/04/2013 (Numerical By Route #) Page 1 of 3
Shading Color Key: Green = All Unpaved Parking AreasYellow = Unpaved Routes, DCV not DrivenWhite = Paved Routes, DCV Driven
Grey = Paved Routes, DCV not Driven
Blue = All Paved Parking Areas Red text denotes approx. mileage Black = State, Local or Private non-NPS Routes = Concession Route Flag ON
*Unpaved route data was obtained from NPS and was not inventoried by the Road Inventory Program (RIP).
** DCV - Data Collection Vehicle NC - Not Collected
HUTR HUBBELL TRADING POST NATIONAL HISTORIC SITE
Func.
Class
Route Description Rte.
No. Route Name
Paved Miles
Surf.
Type
Un- Paved MilesFrom To
Total Route Length
FMSS
No.
Manual Rated
SQ/FT
Area Maps
C o n ce ss R o u te Maint.
District
C y cl e C o ll e ct e d
FROM PARK BOUNDARY
/ ENTRANCE ROAD
(NON NPS SECTION)
10010 ENTRANCE ROAD 0.14 0.10 ASTO ROUTE 0901
(TRADING POST
PARKING) AT MP 0.24
68446 1N/A 0.245
FROM ROUTE 0010
(ENTRANCE ROAD)
50400 RESIDENCE ROAD 0.11 0.00 ASTO ROUTE 0401
(RESIDENCE ROAD
LOOP)
74183 1N/A 0.115
FROM END OF ROUTE
0400 (RESIDENCE
ROAD)
50401 RESIDENCE ROAD
LOOP
0.07 0.00 ASTO END OF LOOP102663 1N/A 0.075
FROM ROUTE 0901
(TRADING POST PARKING)
60402 HD UNPAVED
BOUNDARY ROADS
0.00 0.87 NVTO ROUTE 0901 (TRADING
POST PARKING)
74192 N/A 0.87NC
FROM ROUTE 0010
(ENTRANCE ROAD)
0900 MAINTENANCE AREA 0.00 0.00 ASTO PARKING74186 16,076 1N/A 0.005
FROM END OF ROUTE 0010
(ENTRANCE ROAD)
0901 TRADING POST
PARKING
0.00 0.00 GRTO PARKING74165 123,176N/A 0.00NC
FROM ROUTE 0400
(RESIDENCE ROAD)
0902 RESIDENTIAL STAFF
PARKING
0.00 0.00 GRTO PARKING237479 6,500N/A 0.00NC
ADJACENT TO ROUTE 0010
(ENTRANCE ROAD)
0903 COMFORT STATION
PARKING
0.00 0.00 GR237478 3,000N/A 0.00NC
Road Inventory Program 02/04/2013 (Numerical By Route #) Page 2 of 3
Shading Color Key: Green = All Unpaved Parking AreasYellow = Unpaved Routes, DCV not DrivenWhite = Paved Routes, DCV Driven
Grey = Paved Routes, DCV not Driven
Blue = All Paved Parking Areas Red text denotes approx. mileage Black = State, Local or Private non-NPS Routes = Concession Route Flag ON
*Unpaved route data was obtained from NPS and was not inventoried by the Road Inventory Program (RIP).
** DCV - Data Collection Vehicle NC - Not Collected
CYCLE 5 SUMMARY TOTALS FOR HUBBELL TRADING POST NATIONAL HISTORIC SITE
Manually Rated Route Miles
TOTAL PARK ROUTE MILES COLLECTED IN CYCLE 5
DCV Driven Route Miles Concession Paved Route Miles
Paved Parking (SQFT)
Manually Rated Routes (SQFT)
0.00
16,076
CYCLE 5 ROUTE TOTALS
Concession Paved Parking Area SQFT
Concession Manually Rated Rotes SQFT
CYCLE 5 CONCESSION TOTALS
* CYCLE 5 PARKING AREA TOTALS CYCLE 5 WEIGHTED AVERAGE PARK VALUES
0.31
* - The Parking Area Totals SQFT value represents all parking areas collected in Cycle 5, both park and concessionaire.
DCV Driven PCR
**Manually Rated Routes PCR
**Parking PCR
N/A
*** - Equivalent Lane Miles are calculated by route using the following equations : DCV and Manually Rated Lines Routes=(PAVE_WIDTHxPAVED_MI)/11 foot lane. Parking Areas=SQ_FEET/5280/11. Manually Rated Polygons=SQ_FEET/5280/11.
***Total Equivalent Lane Miles 0.89
** - Parking and Manually Rated Routes are assigned the following PCR values based on their observed condition: Construction=-1, Excellent=97, Good=90, Fair=73, and Poor=45.
0.00
Unpaved Parking (SQFT) 132,676
TOTAL PARKING (SQFT) 148,752
Concession Unpaved Route Miles 0.00
TOTAL CONCESSION ROUTE MILES 0.00
Concession Unpaved Parking Area SQFT 0
TOTAL CONCESSION PARKING AREA SQFT 0
0.97TOTAL UNPAVED PARK ROUTE MILES
0.31
Road Inventory Program 02/04/2013 (Numerical By Route #) Page 3 of 3
Shading Color Key: Green = All Unpaved Parking AreasYellow = Unpaved Routes, DCV not DrivenWhite = Paved Routes, DCV Driven
Grey = Paved Routes, DCV not Driven
Blue = All Paved Parking Areas Red text denotes approx. mileage Black = State, Local or Private non-NPS Routes = Concession Route Flag ON
*Unpaved route data was obtained from NPS and was not inventoried by the Road Inventory Program (RIP).
** DCV - Data Collection Vehicle NC - Not Collected
Surface Type Abbreviations:
AS - Asphaltic Concrete Pavement
CO - Portland Cement Concrete Pavement
CB - Cobble Stone Road Bed
BR - Brick or Pavers Road Bed
GR - Gravel Road Bed
SA - Sand Road Bed
NV - Native or Dirt Material Road Bed
OT - Other Materials Road Bed
General Park Road Functional Classification Table
Class 1 Principal Park Road/Rural Parkway (Public Roads) Roads which constitute the main access route, circulatory tour, or thoroughfare for park visitors.
Route Numbers 1 - 99. Note: Rural parkways (e.g. Natchez Trace) are numbered 1 - 9. State Routes Inventoried for Park. Route Numbers 5000-5999
Class 2 Connector Park Road (Public Roads) - Roads which provide access within a park to areas of scenic, scientific, recreational or cultural interest, such as overlooks, campgrounds, etc. Route Numbers 100-199.
Class 3 Special Purpose Park Road (Public Roads) - Roads which provide circulation within public areas, such as campgrounds, picnic areas, visitor center complexes, concessionaire facilities, etc. These roads generally serve low-speed traffic and are often designed for one-way circulation. Route Numbers 200-299.
Class 4 Primitive Park Roads (Public Roads) - Roads which provide circulation through remote areas and/or access to primitive campgrounds and undeveloped areas. These roads frequently have no minimum design standards and their use may be limited to specially equipped vehicles. Route Numbers 200-299.
Note: Functional Classes 3 and 4 have the same route numbers because, historically, they were numbered similarly.
Class 5 Administrative Access Road (Administrative Roads) - All public roads intended for access to administrative developments or structures such as park offices, employee quarters, or utility areas. Route Numbers 400-499.
Class 6 Restricted Road (Administrative Roads) - All roads normally closed to the public, including patrol roads, truck trails, and other similar roads. Route Numbers 400-499.
Note: Functional Classes 5 and 6 have the same route numbers because historically they were numbered similarly and often there is little distinction between these routes. For example, because utility areas and employee housing are often closed to the public, this restriction would result in classification of FC 6 rather than FC 5.
Class 7 Urban Parkway (Urban Parkways and City Streets) - These facilities serve high volumes of park and non-park related traffic and are restricted, limited-access facilities in an urban area. This category of roads primarily encompasses the major parkways which serve as gateways to our nation's capital. Other major park roads or portions thereof, however, may be included in this category. Route Numbers 1-9.
Class 8 City Streets (Urban Parkways and City Streets) - City streets are usually extensions of the adjoining street system that are owned and maintained by the National Park Service. The construction and/or reconstruction should conform with accepted local engineering practice and local conditions. Route Numbers 600-699.
A park road system contains those roads within or giving access to a park or other unit of the NPS which are administered by the NPS, or by the Service in cooperation with other agencies. The assignment of a functional classification (FC) to a park road is not based on traffic volumes or design speed, but on the intended use or function of that road or route.
The historic route numbering system also included a 300 number series for interpretive roads, and a 500 series for one-way roads. There are approximately 250 roads nationwide which are designated by the 300 and 500 series. The numbers for these roads will be maintained for reporting consistency. However, since these interpretive and one-way routes are not as clearly tied to a specific functional class, the 300 and 500 series will be discontinued for future use.
5000 route numbers are assigned to Non-NPS Routes that are State, County or City owned which border, traverse, or provide access to Park Facilities or Locations. 5000 Routes are driven for GPS and Video Log only.
ROUTE IDENTIFICATION CHANGES TO PAVED ROUTES FROM PREVIOUS CYCLE - HUTR
ROUTES MODIFIED FROM PREVIOUS INVENTORY:
Route # Type of ModificationRoute Name Comments
0010 LENGTH CHANGE
MINOR ALIGNMENT AND LENGTH
CHANGES. ROUTE STARTS AT PARK
BOUNDARY AT THE PAVEMENT CHANGE.
ENTRANCE ROAD
Section 3 Park Summary Information
HUTR: PAVED ROUTE MILES AND PERCENTAGES
BY FUNCTIONAL CLASS AND PCR
Pavement Condition Rating (PCR) Poor (0-60) Fair (61-84) Good (85-94) Excellent (95-100) TOTAL
F.C. MILES % MILES % MILES % MILES % MILES
1 0.08 25.81% 0.04 12.90% 0.02 6.45% 0.14 5 0.07 22.58% 0.08 25.81% 0.02 6.45% 0.17
Totals 0.08 25.81% 0.07 22.58% 0.12 38.71% 0.04 12.90% 0.31
Note:
Explanation of the Excellent, Good, Fair and Poor Condition Descriptions
In addition to the RIP Index changes that have been implemented in Cycle 5, we will also aim to provide greater assistance in translating excellent/good/fair/poor categories into pavement needs categories. The PCR can be used to indicate the place in the Pavement Life Cycle and the types of treatments that should be considered now and into the future.
Excellent/New: PCR of 95-100. Pavements in this range will require only spot repairs
The information in this table is derived from the PMS_20 table in the Park database, which only contains processed data from routes collected with the Data Collection Vehicle (DCV). Information for Manually Rated Routes (MRR) and Parking Areas is not reported in this table. Only Functional Class 1, 2, & 7 routes, and any new routes not previously collected by RIP, are collected in Large Parks.
Good: PCR of 85-94. Pavements in this range will likely be candidates for Preventive Maintenance. Examples include Chip and Slurry Seals, Micro Surfacing and Thin Overlays.
Fair: PCR of 61-84. Pavements in this range will likely be candidates of Light Rehabilitation (L3R). Examples include single-lift overlays up to 2.5 inches in total thickness, milling and overlays.
Poor: PCR of 0-60. Pavements in this range will likely be candidates of Heavy Rehabilitation or Reconstruction (H3R or 4R). Examples include Pulverization, Multiple Lift Overlays, and Reconstruction.
3-1
At this time, specific Maintenance and Rehabilitation activities should be evaluated and recommended at the project level. Site-specific conditions that influence treatment type should be determined based on performing a subsurface investigation and/or pavement condition survey, and not be based solely on RIP data. Additionally, RIP produces a snapshot of conditions the year in which the data was collected. For further information or to obtain additional Pavement Management System’s data from our Highway Pavement Management Application (HPMA) please contact the Eastern Federal Lands pavement team.
3-2
HUTR: DCV ROAD CONDITION SUMMARY
DCV - Data Collection Vehicle
ROUTE
NUMBER ROUTE NAME
FUNCT
CLASS
PAVED
LENGTH
SURFACE
TYPE
AVERAGE
SURFACE
CONDITION
RATING (SCR)
AVERAGE
PAVEMENT
CONDITION
RATING (PCR)
0010 ENTRANCE ROAD 1 0.14 ASPHALT 76 76
0400 RESIDENCE ROAD 5 0.11 ASPHALT 89 89
0401 RESIDENCE ROAD LOOP 5 0.07 ASPHALT 87 87
Data Collected 08/2012
DCV ROAD CONDITION SUMMARY
89 87
89 87
0010 0400 0401
ROUTE NUMBER
SC
R
/P C
R
AVERAGE SURFACE
CONDITION RATING (SCR)
AVERAGE PAVEMENT
CONDITION RATING (PCR)
3-3
HUTR: PARKWIDE DCV CONDITION SUMMARY
AVERAGE
PAVEMENT
CONDITION
RATING (PCR)
AVERAGE
ROUGHNESS
CONDITION
INDEX (RCI)
AVERAGE
SURFACE
CONDITION
RATING (SCR)
AVERAGE
RUT INDEX
AVERAGE
ALLIGATOR
CRACKING
INDEX
AVERAGE
LONGITUDINAL
CRACKING
INDEX
AVERAGE
TRANSVERSE
CRACKING
INDEX
AVERAGE
PATCHING
INDEX
83 NA 83 95 91 95 90 100
All Index values are based on Data Collection Vehicle (DCV) driven roads that were collected in Cycle-5.
Roughness data is only collected on routes with lengths greater than 0.5 miles and a posted speed limit of 25 MPH or greater.
Data Collected 08/2012
CYCLE 5 PARKWIDE CONDITION SUMMARY
83 83
NA
AVERAGE PAVEMENT
CONDITION RATING
(PCR)
AVERAGE ROUGHNESS
CONDITION INDEX (RCI)
AVERAGE SURFACE
CONDITION RATING
(SCR)
AVERAGE RUT INDEX AVERAGE ALLIGATOR
CRACKING INDEX
AVERAGE
LONGITUDINAL
CRACKING INDEX
AVERAGE
TRANSVERSE
CRACKING INDEX
AVERAGE PATCHING
INDEX
R A
TI
N
G
3-4
Section 4 Park Route Location Maps
4-1º
Hubbell Trading Post National Historic Site Route Location Map
Key Map
0.1 0 0.10.05 Miles
Cycle 5 Collected Routes
Rte 0010
Rt e
Rte 0401
Rte 0900
4-2º0.1 0 0.10.05 Miles
Hubbell Trading Post National Historic Site Route Location Map
Area 1
Unique colors used to differentiate routes
4-3º0.1 0 0.10.05 Miles
Hubbell Trading Post National Historic Site Route Condition Map
PCR - Mile by Mile Key Map
Note: Only routes collected by the DCV in Cycle-5 are displayed.
* If the PCR rating is not available for a section, the SCR rating will be displayed. See appendix for definitions and formulas.
PCR
(61 - 84)
Fair (85 - 94)
Good (95 - 100)
Excellent No Data (0 - 60)
Poor
Rte 0010
Rt e
R te 0401
4-4º0.1 0 0.10.05 Miles
Hubbell Trading Post National Historic Site Route Condition Map
PCR - Mile by Mile Area 1
* If the PCR rating is not available for a section, the SCR rating will be displayed. See appendix for definitions and formulas.
PCR
(61 - 84)
Fair (85 - 94)
Good (95 - 100)
Excellent No Data (0 - 60)
Poor
Section 5 Paved Route
Condition Rating Sheets
º
* If the PCR rating is not available for a section, the SCR rating will be displayed. See appendix for definitions and formulas.
PCR
(61 - 84)
Fair (85 - 94)
Good (95 - 100)
Excellent No Data (0 - 60)
Poor
Rte 0010
ROUTE: 0010 ENTRANCE ROAD
HUTR : HUBBELL TRADING POST NATIONAL HISTORIC SITE
COLLECTED: 8/10/2012
INTERMOUNTAIN REGION TOTAL LENGTH: 0.14 Miles Section Number 0 Section Length (mi) 0.14 Cross Section Information
Number of Lanes 2 Paved Width (ft) 21 Lane Width (ft) 11
Roadway Condition Information SCR (Surface Condition Rating) 76 PCR (Pavement Condition Rating) 76
Distress Index Values Structural Crack Index 76 Transverse Cracking Index 92 Patching Index 100 Rutting Index 93 Roughness Condition Index (RCI) NC
NOTES:
Structural Crack Index is a combination of the Longitudinal Cracking Index and Alligator Cracking Index.
See Section 10 for explanation of SCR, PCR, & all Distress Index Values.
NC - Not Collected N/A - Not Applicable 5-1
R O
U T
E : 0
E N
T R
A N
C E
R O
A D
º
* If the PCR rating is not available for a section, the SCR rating will be displayed. See appendix for definitions and formulas.
PCR
(61 - 84)
Fair (85 - 94)
Good (95 - 100)
Excellent No Data (0 - 60)
Poor
Rt e
ROUTE: 0400 RESIDENCE ROAD
HUTR : HUBBELL TRADING POST NATIONAL HISTORIC SITE
COLLECTED: 8/10/2012
INTERMOUNTAIN REGION TOTAL LENGTH: 0.11 Miles Section Number 0 Section Length (mi) 0.11 Cross Section Information
Number of Lanes 2 Paved Width (ft) 26 Lane Width (ft) 13
Roadway Condition Information SCR (Surface Condition Rating) 89 PCR (Pavement Condition Rating) 89
Distress Index Values Structural Crack Index 94 Transverse Cracking Index 89 Patching Index 100 Rutting Index 98 Roughness Condition Index (RCI) NC
NOTES:
Structural Crack Index is a combination of the Longitudinal Cracking Index and Alligator Cracking Index.
See Section 10 for explanation of SCR, PCR, & all Distress Index Values.
NC - Not Collected N/A - Not Applicable 5-2
R O
U T
E : 0
R E
SI
D
E N
C E
R O
A D
º
* If the PCR rating is not available for a section, the SCR rating will be displayed. See appendix for definitions and formulas.
PCR
(61 - 84)
Fair (85 - 94)
Good (95 - 100)
Excellent No Data (0 - 60)
Poor
Rt e
ROUTE: 0401 RESIDENCE ROAD LOOP
HUTR : HUBBELL TRADING POST NATIONAL HISTORIC SITE
COLLECTED: 8/10/2012
INTERMOUNTAIN REGION TOTAL LENGTH: 0.07 Miles Section Number 0 Section Length (mi) 0.07 Cross Section Information
Number of Lanes 1 Paved Width (ft) 16 Lane Width (ft) 15
Roadway Condition Information SCR (Surface Condition Rating) 87 PCR (Pavement Condition Rating) 87
Distress Index Values Structural Crack Index 96 Transverse Cracking Index 87 Patching Index 100 Rutting Index 96 Roughness Condition Index (RCI) NC
NOTES:
Structural Crack Index is a combination of the Longitudinal Cracking Index and Alligator Cracking Index.
See Section 10 for explanation of SCR, PCR, & all Distress Index Values.
NC - Not Collected N/A - Not Applicable 5-3
R O
U T
E : 0
R E
SI
D
E N
C E
R O
A D
L O
O P
Section 6 Manually Rated Paved Route
6-1
MANUALLY RATED ROUTE CONDITION RATING SHEETS
No data available for this section.
Section 7 Parking Area
HUBBELL TRADING POST NATIONAL HISTORIC SITE
Route 0900
MAINTENANCE AREA
FROM ROUTE 0010 (ENTRANCE ROAD)
TO PARKING
Route Number
Public / NonPublic Lane Miles *
0900 NONPUBLIC 0.28
Culverts Drop Inlets Curb
0 1 NO CURB
* Lane miles are based on 11' lane widths
7-1
Surface Type
AS
PCR
POOR/45
Curb & Gutter
CONCRETE CURB
AND GUTTER
Date Visited 9/1/2011
Area (sq ft) 16,076
Gates
º600 0 600300 Feet
Rte 0010
R te
R te 0401
Rte 0900
Section 8 Parkwide/Route
Maintenance Features Summaries
HUTR: PARKWIDE MAINTENANCE FEATURES SUMMARY
Includes DCV, MRL, MRP & PKG routes collected in Cycle-5
FEATURE LINEAR FEET COUNT
BRIDGE -- 1
CATTLE GUARD -- 2
CULVERT -- 2
CURB 0 --
DROP INLET -- 1
GATE -- 3
GUARD/GUIDE RAIL 254 --
CABLE 0 --
NON-CABLE 254 --
GUARD/GUIDE WALL 0 --
BOLLARD 0 --
TEMPORARY BARRIER 0 --
NON TEMP/BOLLARD 0 --
INTERSECTION -- 13
LOW WATER CROSSING 0 0
MILE MARKER -- 0
OVERPASS -- 0
PARK BOUNDARY -- 1
PAVED DITCH 0 --
PULLOUT 0 0
RAILROAD CROSSING -- 0
RETAINING WALL 0 0
SIGN -- 18
STATE BOUNDARY -- 0
TRAFFIC LIGHT -- 0
TUNNEL 0 0
Data Collected 08/2012
Notice: Culverts and drop inlets were marked by NPS and inventoried by RIP in Cycle 5 on all DCV driven routes. Culverts, drop inlets, and gates were also collected on all Manually Rated Routes and Paved Parking areas. Those totals are reflected below.
8-1
HUTR: DCV ROUTE MAINTENANCE FEATURES SUMMARY
FEATURE R
O
U T
E
E N
T R
A N
C E
R O
A D
R O
U T
E
R E
SI
D
E N
C E
R O
A D
R O
U T
E
R E
SI
D
E N
C E
R O
A D
L O
O P
UNIT
BRIDGE EACH
CATTLE GUARD EACH
CULVERT EACH
CURB LINEAR FEET
DROP INLET EACH
GATE EACH
GUARD/GUIDE RAIL LINEAR FEET
CABLE LINEAR FEET
NON-CABLE LINEAR FEET
GUARD/GUIDE WALL LINEAR FEET
BOLLARD LINEAR FEET
TEMPORARY BARRIER LINEAR FEET
NON TEMP/BOLLARD LINEAR FEET
INTERSECTION EACH
LOW WATER CROSSING EACH
LOW WATER CROSSING LINEAR FEET
MILE MARKER EACH
OVERPASS EACH
PARK BOUNDARY EACH
PAVED DITCH LINEAR FEET
PULLOUT EACH
PULLOUT LINEAR FEET
RAILROAD CROSSING EACH
RETAINING WALL EACH
RETAINING WALL LINEAR FEET
SIGN EACH
STATE BOUNDARY EACH
TRAFFIC LIGHT EACH
TUNNEL EACH
TUNNEL LINEAR FEET
Data Collected 08/2012
0 0
0 0
Notice: Culverts and drop inlets were marked by NPS and inventoried by RIP in Cycle 5.
0 0 0
0 0 0
0 0 0
8-2
HUTR: STRUCTURE LIST
ROUTE
NUMBER
FUNCTIONAL
CLASS
MILEPOST
START
MILEPOST
END FEATURE
STRUCTURE
NUMBER
0010 1 0.115 0.135 BRIDGE 7420-001
Data Collected 08/2012 8-3
Section 9 Route Maintenance Features
Road Logs
FROM
MILEPOST
TO
MILEPOST FEATURE SIDE COMMENT
ROUTE 0010: ENTRANCE ROAD
HUTR: ROUTE MAINTENANCE FEATURES ROAD LOG
Culverts and drop inlets were marked by NPS and inventoried by RIP in Cycle 5 on all paved routes.
Notice:
0.000 ROUTE BEGIN N/A FROM PARK BOUNDARY / ENTRANCE ROAD (NON NPS
SECTION)
0.000
0.000 PARK BOUNDARY N/A N/A0.000
0.000 SIGN N/A REGULATORY, ONLY0.000
0.000 SIGN N/A REGULATORY, UNABLE TO READ FROM VIDEO0.000
0.000 INTERSECTION N/A PAVED ROUTE (ENTRANCE ROAD / NON NPS)0.000
0.026 INTERSECTION LEFT ROUTE 0900 (MAINTENANCE AREA)0.026
0.026 INTERSECTION RIGHT ROUTE 0903 (COMFORT STATION PARKING)0.026
0.038 CATTLE GUARD N/A N/A0.038
0.038 SIGN RIGHT GUIDE, HUBBELL TRADING POST NATIONAL HISTORIC SITE0.038
0.038 SIGN RIGHT GUIDE, NATIONAL PARK SERVICE0.038
0.039 CULVERT N/A N/A0.039
0.063 SIGN RIGHT REGULATORY, SPEED LIMIT 100.063
0.078 INTERSECTION LEFT ROUTE 0400 (RESIDENCE ROAD)0.078
0.081 SIGN RIGHT GUIDE, PARK HOURS 8:00 AM-6:00 PM0.081
0.081 SIGN RIGHT WARNING, ONE LANE BRIDGE0.081
0.086 GATE N/A N/A0.086
0.086 SIGN LEFT REGULATORY, GRAPHIC SIGN NO TEXT0.086
0.086 SIGN RIGHT GUIDE, WHAT TIME? MOUNTAIN DAYLIGHT SAVING TIME
ONE HOUR AHEAD OF ARIZONA ON THE NAVAJO NATION
0.086
0.087 SIGN RIGHT REGULATORY, GRAPHIC SIGN NO TEXT0.087
0.088 SIGN RIGHT GUIDE, UNABLE TO READ FROM VIDEO0.088
0.089 SIGN RIGHT REGULATORY, STOP0.089
0.138 GUARD/GUIDE RAIL RIGHT N/A0.114
0.138 GUARD/GUIDE RAIL LEFT N/A0.114
0.135 BRIDGE N/A 7420-001 (ENTRANCE ROAD BRIDGE)0.115
0.138 INTERSECTION N/A ROUTE 0010 (ENTRANCE ROAD) UNPAVED SECTION0.138
0.138 ROUTE END N/A TO ROUTE 0901 (TRADING POST PARKING) AT MP 0.240.138
9-1Data Collected 08/2012
TO
MILEPOST FEATURE SIDE COMMENT
ROUTE 0400: RESIDENCE ROAD
HUTR: ROUTE MAINTENANCE FEATURES ROAD LOG
Culverts and drop inlets were marked by NPS and inventoried by RIP in Cycle 5 on all paved routes.
Notice:
0.000 ROUTE BEGIN N/A FROM ROUTE 0010 (ENTRANCE ROAD)0.000
0.000 INTERSECTION LEFT ROUTE 0010 (ENTRANCE ROAD)0.000
0.000 INTERSECTION RIGHT ROUTE 0010 (ENTRANCE ROAD)0.000
0.003 SIGN LEFT REGULATORY, STOP0.003
0.007 CATTLE GUARD N/A N/A0.007
0.007 CULVERT N/A N/A0.007
0.012 SIGN RIGHT GUIDE, EMPLOYEES HOUSING AREA RESIDENTS ONLY0.012
0.022 SIGN RIGHT WARNING, SLOW CHILDREN AT PLAY0.022
0.022 SIGN RIGHT WARNING, 10 M.P.H.0.022
0.049 SIGN RIGHT REGULATORY, SPEED LIMIT 100.049
0.089 INTERSECTION RIGHT ROUTE 0902 (RESIDENTIAL STAFF PARKING)0.089
0.105 INTERSECTION LEFT ROUTE 0401 (RESIDENCE ROAD LOOP)0.105
0.105 INTERSECTION N/A ROUTE 0401 (RESIDENCE ROAD LOOP)0.105
0.105 SIGN N/A REGULATORY, ONE WAY0.105
0.105 ROUTE END N/A TO ROUTE 0401 (RESIDENCE ROAD LOOP)0.105
9-2Data Collected 08/2012
TO
MILEPOST FEATURE SIDE COMMENT
ROUTE 0401: RESIDENCE ROAD LOOP
HUTR: ROUTE MAINTENANCE FEATURES ROAD LOG
Culverts and drop inlets were marked by NPS and inventoried by RIP in Cycle 5 on all paved routes.
Notice:
0.000 ROUTE BEGIN N/A FROM END OF ROUTE 0400 (RESIDENCE ROAD)0.000
0.000 INTERSECTION N/A ROUTE 0400 (RESIDENCE ROAD)0.000
0.071 ONE-WAY N/A N/A0.000
0.071 INTERSECTION LEFT ROUTE 0401 (RESIDENCE ROAD LOOP)0.071
0.071 INTERSECTION N/A ROUTE 0400 (RESIDENCE ROAD)0.071
0.071 ROUTE END N/A TO END OF LOOP0.071
9-3Data Collected 08/2012
Section 10 Appendix
10-1
Explanation of Changes to the RIP Index Equations and Determination of PCR
In 2005, the FHWA began implementing the use of a Pavement Management System to assist the National Park Service in prioritizing Pavement Maintenance and Rehabilitation activities.
The PMS used by FHWA is the Highway Pavement Management Application (HPMA) and this software has the ability to store inventory and condition data from RIP and forecast future performance using prediction models. Outputs include performance and condition reports at the National, Region, Park, or Route level. A regional prioritized list and optimization have been produced for most regions and the Federal Highway Deferred Maintenance is calculated via the HPMA as well.
In an effort to improve the accuracy of treatment recommendations and pavement condition descriptions vis a vis the distresses and indexes that comprise the Pavement Condition Rating (PCR), an extensive study was completed throughout 2010 that has resulted in changes to the Road Inventory Program condition reporting method and specifically, the calculation of PCR. It was determined that a better representation of PCR could be achieved by modifying the relative impact certain distresses would have on the overall rating.
Through the use of HPMA data, it was noted that false failure indicators existed with the existing PCR model, and that it would be necessary to reduce their impact. The distresses affected in this way were Rutting and Roughness. Conversely, experience showed that roadways with extensive cracking present were often shown to have a high PCR. Therefore, the crack index models were adjusted to be more sensitive to changes in crack severity or quantity. It was also determined that these issues were not due to a problem with data acquisition (i.e. the RIP “van”), but with the way the collected data was processed. The final change was to provide guidance on when to use the Roughness Condition Index (RCI) in the PCR calculation. Roughness data is of little value to determining overall condition on routes that, due to their length or geometrics, have lower vehicle operating speeds. Therefore, in Cycle 5, only routes that have lengths of one half mile or greater and posted speed limits of 25 mph or greater will have RCI reported and included in the PCR calculations.
The changes that were implemented were endorsed by management at both the FHWA and NPS.
In order to show the effectiveness of these changes, several sites were ground truth tested to ensure that an improvement was achieved between the relationship of PCR and the actual Maintenance and Rehabilitation needs that were represented. The changes will allow greater use of RIP and HPMA data for not simply condition data reporting, but also as a reliable tool for project identification and selection.
10-2
Explanation of the Excellent, Good, Fair and Poor Condition Descriptions
In addition to the RIP Index changes that will be implemented in Cycle 5, we will also aim to provide greater assistance in translating good/fair/poor categories into pavement needs categories. The PCR can be used to indicate the place in the Pavement Life Cycle and the types of treatments that should be considered now and into the future.
Excellent/New: PCR of 95-100. Pavements in this range will require only spot repairs
Good: PCR of 85-94. Pavements in this range will likely be candidates for Preventive Maintenance. Examples include Chip and Slurry Seals, Micro Surfacing and Thin Overlays.
Fair: PCR of 61-84. Pavements in this range will likely be candidates of Light Rehabilitation (L3R).
Examples include single-lift overlays up to 2.5 inches in total thickness, milling and overlays.
Poor: PCR of 60 or below. Pavements in this range will likely be candidates of Heavy Rehabilitation or Reconstruction (H3R or 4R). Examples include Pulverization, Multiple Lift Overlays, and Reconstruction.
At this time, specific Maintenance and Rehabilitation activities should be evaluated and recommended at the project level. Site-specific conditions that influence treatment type should be determined based on performing a subsurface investigation and/or pavement condition survey, and not be based solely on RIP data. Additionally, RIP produces a snapshot of conditions the year in which the data was collected. For further information or to obtain additional Pavement Management System’s data from our Highway Pavement Management Application (HPMA) please contact the Eastern Federal Lands pavement team.
Pa ve m en t C on di ti on R at in g
Pavement Age
Condition Categories and Treatments
Reconstruction
POOR/Heavy Rehabilitation
GOOD/Preventive Maintenance EXCELLENT/Localized Repairs Only
FAIR/Light Rehabilitation
10-3
DESCRIPTION OF RATING SYSTEM
The Federal Highway Administration (FHWA), Road Inventory Program (RIP) for the National Park Service (NPS), collects roadway condition data on paved surfaces (asphalt, concrete, brick, and cobblestone) on roads, parkways, and parking areas in national parks nationwide. The road surface condition data is collected using an automated Data Collection Vehicle (DCV). Roads having brick or cobblestone surfacing are not normally surveyed with the DCV, but are manually rated for condition rating.
The FHWA RIP is implemented based on the premise that an accurate pavement surface condition assessment can be accomplished using automated crack detection technology as applied to digital images. Various methods of pavement condition assessment have been developed over the years with varying degrees of accuracy and acceptance. The use of digital photography to record pavement images and subsequent crack detection and classification has undergone continuous improvements over the past decade. Digital cameras with increasingly superior resolution and high definition have become more affordable, and the proprietary programming code and algorithms have been improved in crack detection software.
With the use of quality digital photography and automated crack detection software, FHWA RIP is tasked with executing a pavement condition assessment on about 5000 miles of National Park Service roads and parkways. Foremost in setting up the basis of pavement distress identification is employing the distress identification protocols used by FHWA. There is no single distress identification system that is universal among entities conducting a program of distress identification. For the purpose of the NPS RIP, FHWA employs distress identification protocols that are specific to this program.
FHWA has referenced the “Distress Identification Manual for the Long-Term Pavement Performance Program”, Publication No. FHWA-RD 03-031, June 2003, as the point-of-reference for distress types on NPS pavement. In truth, the FHWA RIP distress types are similar to those described in the LTPP manual with some modifications. This document, “Distress Identification Manual for the NPS Road Inventory Program, Cycle 5, 2010-2013” was developed using the “Distress Identification Manual for the Long-Term Pavement Performance Program” as a guideline. Definitions of severity levels based on crack width contained in this document adhere to the LTPP Distress ID Manual. Modifications have been made to the definition of Alligator and Longitudinal Cracking and determination of Alligator Cracking severity. This manual also addresses Rutting and Roughness and its application to RIP.
In 2010, FHWA RIP began the fifth cycle of data collection in national parks. For Cycle 5, data will be collected in approximately 81 large parks (10 or more paved route miles) on Functional Class 1, 2, and 7 routes plus any new routes or parking areas previously not collected, totaling an estimated 4,459 paved route miles. Additionally, 168 small parks will be collected comprising approximately 529 paved route miles and associated paved parking areas. The data is used to support the National Park Service road maintenance program and Pavement Management System (PMS) developed and maintained by FHWA.
10-4
This “Distress Identification Manual for the NPS Road Inventory Program, Cycle 5, 2010- 2013” will be used as a reference resource in crack detection and classification, determination of distress severity and extent, and in the calculation of distress index values for the FHWA RIP Cycle 5.
10-5
SURFACE DISTRESSES
Surface Condition Rating - SCR
Surface distresses are measured in the primary lane only. In the classification and measurement of all paved surface condition data, results will be reported in the database in record intervals of
0.02 miles (105.6 feet) (smallest granularity) along the route.
Surface distresses determined from digital images Transverse Cracks Longitudinal Cracks Alligator Cracks Patching/Potholes
Surface distress measured by DCV (Data Collection Vehicle) LRMS (Laser Rut Measuring System)
Rutting
Each of the five surface distresses is assigned a computed surface distress index
Transverse Crack Index Longitudinal Crack Index Alligator Crack Index Patching/Pothole Index Rutting Index
Surface distress data are classified as listed above, measured for severity, and quantified for extent. Classification, severity, and extent of these five surface distresses comprise the three main elements for calculation of SCR (Surface Condition Rating).
In addition to the five surface distresses, a Structural Crack Index is computed, which is a combination of the Longitudinal Crack Index and the Alligator Crack Index. The Structural Crack Index is then used in lieu of the LC and AC indices to compute SCR.
Roughness Condition Index - RCI
Additional condition data measured by DCV (lasers and accelerometers) Roughness (IRI)
Roughness is measured by FHWA’s DCV and reported as International Roughness Index (IRI) in inches/mile. Using IRI, the Roughness Condition Index (RCI) is computed.
10-6
Pavement Condition Rating - PCR
Using the SCR (computed from the five surface distresses) and the RCI, an overall Pavement Condition Rating (PCR) is computed. The formula for PCR is:
Asphalt PCR = (0.60 * SCR) + (0.40 * RCI) Concrete PCR = RCI
A detailed description of each distress index formula, roughness index formula, SCR and PCR is provided in this document beginning on page 23.
Each classified surface distress will fall into one or more severity…LOW, MEDIUM, or HIGH based on criteria listed. For each severity, an extent is established based on the measured quantity of the distress within that severity. Within each severity individual distresses are assigned a Maximum Allowable Extent (MAE). For example, LOW severity transverse cracking may be allowed up to 21.1 cracks within a 0.02 interval before it reaches MAE and fails.
The index formulas are based on a scale of 0-100. A PCR index value of 100 would indicate a “new” road with no measurable distresses or rough ride. A PCR value of 60 is determined to be terminable serviceability and the road is considered failed. The range of index values with condition descriptors is:
POOR (<=60), FAIR (61 - 84), GOOD (85 - 94), EXCELLENT (95 - 100)
Index values are generally computed based on cumulative deducts of the measured severities.
As shown in the index formulas below, as any single severity reaches or exceeds MAE, the index computes to a value of 60 or less, and the road fails for that 0.02 interval.
Note: As a result of a unique combination of measured surface distresses and IRI, index values occasionally compute to less than 0 or greater than 100. In this instance, an index value < 0 defaults to 0. Index values > 100 default to 100. For all indices, a higher value indicates a better road condition, and a lower value indicates a poorer road condition.
On the following page, Table 1 summarizes the different types of distresses measured.
10-7
TABLE 1: Distress Summary
*Note: Rou ghness is measured on concrete roadways, but surface distresses and rutting are not measured. For concrete, PCR = RCI
ASPHALT-SURFACED PAVEMENT DISTRESS TYPES with RUTTING and ROUGHNESS
DISTRESS TYPE UNIT OF
MEASURE…
…CONVERTED TO DEFINED
SEVERITY
LEVELS?
MEASURED BY
Alligator Cracking Square Feet Percent of Lane Per 0.02 Mile Yes
Digital Image Crack Detection Software
Transverse Cracking Linear Feet Number of Cracks Per
0.02 Mile Yes
Digital Image Crack Detection Software
Longitudinal Cracking Linear feet Percent of Lane Length
Per 0.02 Mile Yes Digital Image Crack Detection Software
Patching/Potholes Square Feet Percent of Lane Per 0.02 Mile No
Digital Image Crack Detection Software
Rutting Inches Rut Depth Per 0.02 Mile Yes DCV – Laser Rut Measuring System (LRMS)
Roughness IRI *RCI Per 0.02 Mile No DCV – Lasers /Accelerometers
10-8
ALLIGATOR CRACKING
Description
Alligator cracking is considered a combination of fatigue and block cracking. It is a series of interconnected cracks in various stages of development. Alligator cracking develops into a many-sided pattern that resembles chicken wire or alligator skin. It can occur anywhere in the road lane. Alligator cracking must have a quantifiable area.
Severity Levels
LOW
An area of cracks with no or very few interconnecting cracks and the cracks are not spalled. Cracks are <= 0.25 in (6mm) in mean width. Cracks in the pattern are no further apart than 1 foot (0.328 m). May be sealed cracks with sealant in good condition and a crack width that cannot be determined.
MEDIUM
An area of interconnected cracks that form a complete pattern. Cracks may be slightly spalled. Cracks are >0.25 in. (6 mm) and <= 0.75 in. (19 mm) or any crack with a mean width <= 19 mm and adjacent low severity cracking. Cracks in the pattern are no further apart than 6 in. (150 mm).
HIGH
An area of interconnected cracks forming a complete pattern. Cracks are moderately or severely spalled. Cracks are >0.75 in (19mm) or any crack with a mean width <= 0.75 in (19mm) and adjacent medium to high severity random cracking.
A combination of observed crack width and crack pattern is used to determine overall severity of alligator cracking. Based on above description of each severity, the highest level of crack width and crack pattern determines overall severity. Table 2 illustrates this.
TABLE 2: Alligator Crack Severity Levels
ALLIGATOR CRACKING SEVERITY
LEVELS
Crack Pattern
LOW MED HIGH
Cr ac k
W id th
LOW
L M H
MED M M H
HI H H H
10-9
LONGITUDINAL CRACKING
Description
Longitudinal cracking occurs predominantly parallel to the pavement centerline. It can occur anywhere within the lane. Longitudinal cracks occurring in the wheelpath may be noteworthy.
Severity Levels
LOW
Cracks with a mean width of < 0.25 in. (6 mm). Sealed cracks with sealant in good condition and a width that cannot be determined.
MED
Cracks with a mean width > 0.25 in. (6 mm) and <= 0.75 in. (19 mm). Also, any crack with a mean width < 0.75 in. (19 mm) and adjacent random low severity cracking.
HIGH
Cracks with a mean width > 0.75 in. (19 mm). Also, any crack with a mean width < 0.75
in. (19 mm) and adjacent random medium to high severity cracking.
TRANSVERSE CRACKING
Description
Transverse cracking occurs predominantly perpendicular to the pavement centerline. It can occur anywhere within the lane.
Severity Levels
LOW
Cracks with a mean width of < 0.25 in. (6 mm). Sealed cracks with sealant in good condition and a width that cannot be determined.
MED
Cracks with a mean width > 0.25 in. (6 mm) and <= 0.75 in. (19 mm). Also, any crack with a mean width < 0.75 in. (19 mm) and adjacent random low severity cracking.
HIGH
Cracks with a mean width > 0.75 in. (19 mm). Also, any crack with a mean width < 0.75
in. (19 mm) and adjacent random medium to high severity cracking.
10-10
PATCHING AND POTHOLES
Description
Patching is an area of pavement surface that has been removed and replaced with patching material or an area of pavement surface that has had additional patching material applied. Patching may encompass partial lane or full lane width On full lane width patching;
the total, contiguous length of patch may not exceed 0.30 mi. (0.48 km). (Any full-lane patch exceeding 0.30 mi. in length is considered a pavement change). Patching must have a quantifiable area.
Potholes are bowl-shaped holes of various sizes occurring in the pavement surface.
Severity Levels
There are no stratified severities for Patching/Potholes. They either are present or they are not.
RUTTING
Description
Rutting is a longitudinal surface depression in the wheelpath.
Severity Levels
LOW
Ruts with a measured depth
MED
Ruts with a measured depth
HIGH
Ruts with a measured depth
Ruts < 0.20” are not included in the distress calculations.
10-11
ROUGHNESS
Description
Roughness is the measurement of the unevenness of the pavement in the direction of travel. It is measured in units of IRI (International Roughness Index), inches per mile, and is indicative of ride comfort.
Severity Levels
There are no stratified severity levels for roughness. The roughness (or smoothness) of a road surface can be defined by IRI in the following table.
TABLE 3: IRI
IRI Descriptions
Type of Road Typical IRI ( in/mile )
New Road, no noticeable roughness <90
Small level of roughness 90 – 126
Road of average roughness 126 – 190
Road with above average roughness 190 – 253
Road with severe roughness 253 – 380
Nearly impassable >380
10-12
INDEX FORMULAS
Note: All index formulas listed below contain MAE applicable to 0.02 mile (105.6 feet) interval.
Alligator Crack Index
AC_INDEX = 100 – 40 * [(%LOW / 35) + (%MED / 15) + (%HI / 5)]
Where:
The values %LOW, %MED and %HI report the percentage of the observed pavement (0.02 mile, primary lane) that contains alligator cracking within the respective severities.
These values range from 0 to 100.
%LOW = Percent of total area (primary lane, 0.02 in length), low severity %MED = Percent of total area (primary lane, 0.02 in length), medium severity %HI = Percent of total area (primary lane, 0.02 in length), high severity
Percent of total area is computed as:
square foot area of alligator crack severity
0.02 mile * lane width
In AC_INDEX, the denominators 35, 15, and 5 are the Maximum Allowable Extents (MAE) for each severity. In other words, we will allow up to 35% of low severity alligator cracking for a 0.02 interval before failure, 15% for medium severity, and so on.
As you can see, if any single severity reaches MAE the resulting index value is 60, or failure.
Longitudinal Crack Index
LC_INDEX = 100 – 40 * [(%LOW / 175) + (%MED / 75) + (%HI / 25)]
Where:
The values %LOW, %MED, and %HI report the length of longitudinal cracking within each severity as a percent of the section length (0.02 mile, primary lane).
These values are
%LOW = Percent of interval length (primary lane, 0.02 in length), low severity %MED = Percent of interval length (primary lane, 0.02 in length), medium severity %HI = Percent of interval length (primary lane, 0.02 in length), high severity
Percent of interval length is computed as:
length of respective longitudinal cracking
0.02 mile (105.6 feet)
10-13
In LC_INDEX, the denominators 175, 75, and 25 are the Maximum Allowable Extents (MAE) for each severity. In other words, we will allow up to 175% of low severity alligator cracking for a 0.02 interval before failure, 75% for medium severity, and so on.
As you can see, if any single severity reaches MAE the resulting index value is 60, or failure.
Structural Crack Index
SC_INDEX = [100 - ((100 - AC_INDEX) + (100 - LC_INDEX))]
Structural Crack Index is a combination of Alligator Cracking and Longitudinal Cracking, and is used in the SCR formula in lieu of AC and LC separately.
Transverse Crack Index
TC_INDEX = 100 – 40 * [(LOW / 21.1) + (MED / 4.4) + (HI / 2.6)]
Where:
The values LOW, MED and HI report a count of the total number of transverse cracks (reported to three decimals) within each severity level, where one transverse crack is equal to the lane width. These values are
LOW = Number of cracks in interval (primary lane, 0.02 in length), low severity MED = Number of cracks in interval (primary lane, 0.02 in length), medium severity HI = Number of cracks in interval (primary lane, 0.02 in length), high severity
Number of cracks is computed as:
Total length of transverse cracks
Lane width
In TC_INDEX, the denominators 21.1, 4.4, and 2.6 are the Maximum Allowable Extents (MAE) for each severity. In other words, we will allow up to 21.1 low severity transverse cracks for a 0.02 interval before failure, 4.4 cracks for medium severity, and so
on. As you can see, if any single severity reaches MAE the resulting index value is 60, or failure.
10-14
Patching Index
PATCH_INDEX = 100 – 40 * (%PATCHING / 80)
Where:
The value %PATCHING reports the percentage of the observed pavement (0.02 mile, primary lane) that contains patching/potholes. This value ranges from 0 to 100.
%PATCHING = Percent of total area (primary lane, 0.02 in length)
Percent of total area is computed as:
square foot area of patching/potholes
0.02 mile * lane width
There are no severity levels for patching. It either exists or does not.
In PATCH_INDEX, the denominator 80 is the Maximum Allowable Extent (MAE) for each severity. In other words, we will allow up to 80% patching for a 0.02 interval before failure. As you can see, if patching/potholes reaches MAE the resulting index value is 60, or failure.
Rutting Index
RUT_INDEX = 100 – 40 * [(%LOW / 535) + (%MED / 205) + (%HI / 40)]
Where:
20 rut depth measurements are taken per…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .