MT DOR 86(1)
Bozeman to Bridger Mountains Trail
# General Technical Question Answer Date
1 X Are any of the Pipe Culverts in Line items A0660, A0680, A0700, A0720, A0740 RCP ( Reinforced
Concrete Pipe )?
Yes. See Plan Sheet H.1. 12/12/18
2 X Where do I find the info for the type of Pipe culvert needed?
See Plan Sheet H.1 12/12/18
3 X Is the Bond form in the Solicitation required with the bid, or will the bond form from the
Surety Co be acceptable?
It is recommended Standard Form 24 be used for bid bonds. See FAR Clause 52.228-
1 for the requirement to furnish a Bid
Guarantee.
12/12/18
4 X What is the Maintenance period and Warranty
Period for this project?
There are none. See Subsections 106.07 and 109.09.
12/12/18
X
What pages from the Solicitation are required to be included in the sealed bid envelope?
Submit all items listed on the bid submittal checklist.
12/12/18
6 X The cross section for Sta. 1612+91.94 shows an existing UG phone utility on the right. This line will be in conflict with the excavation for the box culvert. Can FHWA confirm if this line will be relocated to allow for the box culvert installation?
See Subsection 107.02 12/13/2018
7 X Would it be allowable to detour both lanes of
MT 86 through the Bozeman Fish Technology
Center parking lot, as opposed to only one lane at a time?
Please bid the project as specified. The contractor may propose changes after award of the contract.
12/17/18
8 X Can you please provide the geopak files for the above referenced project?
Sorry, no. Please bid the project based on the solicitation.
12/20/2018