Q&A_12-13-18.pdf
PDF 75 KB Posted
- Attached to
- MT DOT 86(1), Bozeman to Bridger Mountains Trail
- Solicitation number
- DTFH7017B00036
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MT DOR 86(1)
Bozeman to Bridger Mountains Trail
# General Technical Question Answer Date 1 X Are any of the Pipe Culverts in Line items A0660, A0680, A0700, A0720, A0740 RCP ( Reinforced Concrete Pipe )?
Yes. See Plan Sheet H.1. 12/12/18
2 X Where do I find the info for the type of Pipe culvert needed?
See Plan Sheet H.1 12/12/18
3 X Is the Bond form in the Solicitation required with the bid, or will the bond form from the Surety Co be acceptable?
It is recommended Standard Form 24 be used for bid bonds. See FAR Clause 52.228‐ 1 for the requirement to furnish a Bid Guarantee.
12/12/18
4 X What is the Maintenance period and Warranty Period for this project?
There are none. See Subsections 106.07 and 109.09.
12/12/18
X
What pages from the Solicitation are required to be included in the sealed bid envelope?
Submit all items listed on the bid submittal checklist.
12/12/18
6 X The cross section for Sta. 1612+91.94 shows an existing UG phone utility on the right. This line will be in conflict with the excavation for the box culvert. Can FHWA confirm if this line will be relocated to allow for the box culvert installation?
See Subsection 107.02 12/13/2018
Check General or Technical
File details come from the government source that posted it.