PROJECT_DESCRIPTION.pdf

PDF 39 KB Posted

Attached to
MT DOT 86(1), Bozeman to Bridger Mountains Trail
Solicitation number
DTFH7017B00036
Issued by

About this file

Project Description

View the file

Other files

File Type Posted
Bid_Opening_Summary_Bozeman.pdf PDF
Amendment_A001.pdf PDF
Q&A1-3-19.pdf PDF
Q&A_12-20-18.pdf PDF
Q&A_12-13-18.pdf PDF
GR_9-16_mt08601,_Geotechnical_Report.pdf PDF
SWPPP_MT_DOT_86(1).pdf PDF
mt08601_Plans_Stamped_101818.pdf PDF
mt08601_HydraulicsDesignMemo_Final.pdf PDF
Plan_Request_form.pdf PDF
GR_3-18,_mt08601_Geotechnical_Report_Addendum_1.pdf PDF
IFB_Bozeman_to_Bridger_Mountains_Trail.pdf PDF
mt08601_XS_Signoff.pdf PDF
Preliminary-Letter.pdf PDF
mt08601_Plans_PreAd.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MT DOT 86(1), Bozeman to Bridger Mountains Trail, Gallatin County, Montana

The work consists of Constructing a bike trail including walls, pedestrian Underpass, 1 bridge and paving and other small items of work.

Project length: 2.2 Miles

Tentative Fixed Completion Date: Fall 2018 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: $3 million to $5 million

Location: 1 Mile East of Bozeman, MT

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

On e S ch ed ul e

Sc h

Na m e

DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance

(yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes 157 Soil Erosion & Sediment Control (fiber roll) 1000 lf 158 Watering for Dust Control 750 mgal

DIVISION 200 – Earthwork 201 Clearing & Grubbing 8.8 ac 202 Additional Clearing & Grubbing (clearing & grubbing) 203 Removal of concrete sidewalk 42 sy 204 Excavation & Embankment Roadway Excavation Subexcavation

29,572 CY

650 CY

207 Earthwork Geosynthetics Stabilization geotextile 5200 SY 208 Structure Excavation Foundation Fill Shoring and Bracing

170 CY

14 CY

All LPSM ch ed ul e

Sc h

Na m e

DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap Riprap Ditch

365 CY

1350 LF

252 Rockery Mechanically Stabilized Earth Wall, WWF

1125 SF

7424 SF

DIVISION 300 – Aggregate and Base Courses 302 Roadway Aggregate, Method 2 9650 T

DIVISION 400 – Asphalt Pavements & Surface Treatments 403 Asphalt Concrete 1850 T 412 Asphalt Tack Coat (asphalt surface treatment) 1 T 414 Asphalt Pavement Crack Sealing & Filling 100 LF

DIVISION 550 – Bridge Construction 552 Structural Concrete , Class A (AE) 58 CY 553 Prestressed Concrete Decked Bulb Tee Girder 189 LF 554 Reinforcing Steel, Epoxy Coated 6950 LB 556 Bridge Railing, steel 226 LF 559 Waterproofing (concrete – major structures) 436 SY 564 Bearing Devices, elasometric 4 EA

DIVISION 600 – Incidental Construction 602 Culverts 12x10 precase reinforced box culvert

1100 LF

108 LF

604 Inlet, FLH Type 7B 3 EA 605 Underdrains) 108LF 615 Detectible warning Panels 4 SY 619 Fence (pedestrian Rail) 2000 LF 621 Monuments & Markers (construction survey & staking) (yes/no) Yes 622 Rental Equipment (yes/no) Yes 623 General Labor (yes/no) Yes ch ed ul e

Sc h

Na m e

624 Topsoil 4.6 AC 625 Turf Establishment 31 SLRY 633 Sign System 151 SF 634 Permanent Pavement Markings ( 890 LF 635 Temporary Traffic Control – Flagger 3000 FXHR 635 Temporary Traffic Control Barricade Cone Drum Concrete Barrier Construction sign

6 EA

50 EA

50 EA

200 LF

296 SF

636 Traffic Signal System (Pedestrian) Lighting (Cross walk) Lighting (underpass)

LPSM

LPSM

LPSM

DIVISION 200 – Earthwork
DIVISION 250 – Slope Reinforcement and Retaining Walls
DIVISION 300 – Aggregate and Base Courses
DIVISION 400 – Asphalt Pavements & Surface Treatments
DIVISION 550 – Bridge Construction

File details come from the government source that posted it. Updated .