Amendment_A001.pdf

PDF 326 KB Posted

Attached to
MT DOT 86(1), Bozeman to Bridger Mountains Trail
Solicitation number
DTFH7017B00036
Issued by

About this file

Amendment A001

View the file

Other files

File Type Posted
Bid_Opening_Summary_Bozeman.pdf PDF
Q&A1-3-19.pdf PDF
Q&A_12-20-18.pdf PDF
Q&A_12-13-18.pdf PDF
GR_9-16_mt08601,_Geotechnical_Report.pdf PDF
SWPPP_MT_DOT_86(1).pdf PDF
mt08601_Plans_Stamped_101818.pdf PDF
mt08601_HydraulicsDesignMemo_Final.pdf PDF
Plan_Request_form.pdf PDF
GR_3-18,_mt08601_Geotechnical_Report_Addendum_1.pdf PDF
IFB_Bozeman_to_Bridger_Mountains_Trail.pdf PDF
mt08601_XS_Signoff.pdf PDF
PROJECT_DESCRIPTION.pdf PDF
Preliminary-Letter.pdf PDF
mt08601_Plans_PreAd.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A001 01/04/2019 N/A See block 10

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X

DTFH7017B00036

9B. DATED (SEE ITEM 11)

11/20/2018

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers (__ ) is extended, ( x ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

N/A

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

N/A

D OTHER (Specify type of modification and authority) N/A

E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

MT DOT 86(1), Bozeman to Bridger Mountains Trail

See page 2

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Amendment No. A001, dated 01/04/2018 MT DOT 86(1) Solicitation No. DTFH7017B00036 Bozeman to Bridger Mountains Trail

REVISIONS ARE AS FOLLOWS:

SPECIAL CONTRACT REQUIREMENTS

Page F-28, Subsection 625.03 subsection title General. Revises seeding dates.

ENCLOSURES

Pages:

F-28

F-28 DIVISION 600

Special Contract Requirements Project: MT DOT 86(1), Bozeman to Bridger Mountains Trail

Section 625. — TURF ESTABLISHMENT

01/01/14–FP14

Description

625.01 Delete the first sentence and substitute the following:

Turf establishment consists of applying seed mixture, fertilizer, and mulch.

Construction Requirements

625.03 General. Delete the text of this Subsection and substitute the following:

Apply turf establishment to finished slopes and ditches between October 15 and April 15after September 1. Do not apply turf establishment during windy weather or when the ground is excessively wet, frozen, snow covered, extremely dry, cloddy, hard pan, or not friable.

625.05 Watering. Delete this Subsection.

625.06 Fertilizing. Delete this Subsection.

625.07 Seeding. Delete this Subsection.

625.08 Mulching. Delete this Subsection.

625.08A Turf Establishment, Hydraulic Method. (Added Subsection).

(a) Type 1 Turf Establishment Mixture. The permanent turf establishment mixture is composed of the following components. Apply in two applications placing no more than 50% of the mixture at any one application. The application rate must avoid sloughing or washing away the mixture on steep slopes. Adjust application rate to avoid sloughing or washing away the mixture on steep slopes as approved by the CO.

Component Application Rate

Seed conforming to Subsection 713.04 5.5 lbs/slurry unit Fertilizer conforming to Subsection 713.03 10 lbs/slurry unit Bonded fiber matrix hydromulch conforming to Subsection 713.05(g)

500 lbs/slurry unit

(b) Type 2 Turf Establishment Mixture. The permanent turf establishment mixture is composed of the following components. Apply in two applications placing no more than 50% of the mixture at any one application. The application rate must avoid sloughing or washing away the mixture on steep slopes. Adjust application rate to avoid sloughing or washing away the mixture on steep slopes as approved by the CO.

Revised by Amendment A001

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
A001

File details come from the government source that posted it.