MONTANA KEY MAP
COLUMBIA
BRITISH
ALBERTA
SASKATCHEWAN
N O
R T
H D
A K
O T
A
S O
U T
H D
A K
O T
A
WYOMING
ID
A
H O
UNITED STATES
CANADA
GLACIER
NATIONAL
PARK
YELLOWSTONE
NATIONAL
PARK
CHARLES M. RUSSELL
NATIONAL
WILDLIFE RANGE
Lake
Flathead
Elwell
Lake
M
Lake
Fort Peck
I SOS U IR
KALISPELL
MISSOULA
Anaconda
HELENA
BUTTE
BOZEMAN
Livingston
BILLINGS
City
Miles
Glendive
Point
Wolf Glasglow
HAVRE
Shelby
FALLS
GREAT
Lewistown
Dillon
E N
O T
S
WOLLEY
R E
VIR
90 15
2 2
MONTANA
REVIR
FEDERAL HIGHWAY ADMINISTRATION
U. S. DEPARTMENT OF TRANSPORTATION
18 MPH
Project Location
Projects, FP-14 US Customary Units of Roads and Bridges on Federal Highway
Standard Specifications for Construction
APPROVED:
DATE
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
TYPE OF CONSTRUCTION:
DESIGN DESIGNATION:
SPECIFICATION:
Western Federal Lands Highway Division
Director, Project Delivery, INDEX TO SHEETS
PROJECT MANAGER
VANCOUVER, WASHINGTON
WESTERN FEDERAL LANDS HIGHWAY DIVISION
PLANS PREPARED FOR
MONTANA
GALLATIN COUNTY
PLANS FOR PROPOSED PROJECT
MT DOT 86(1)
BOZEMAN TO BRIDGER MOUNTAINS TRAIL
R
E N
O R
A I
N
N
ST F
R
I
D
D E P A
T
NTOFT A SP
T T
O
U
TE
ATESO
AM
E R
IC
A
M m t0 a a .d g n
I n t_ ft
D
A.1
STATE PROJECT
NUMBER
SHEET
MT
DOT 86(1)
M a y
P
M
N
B e ll
B
T h o m p s o n
C h e c k e d b y
D e s ig n e d b y
N
SCALE IN MILES
0 2
PLANS PREPARED BY
R E
R E
G a lla tin R iv e r
Bridger Creek
T. 2 S
T. 1 S
MONTANA
BOZEMAN
MONTANA
N. F.
GALLATIN
K. LOFTSGAARDEN
V bridge, and underpass.
aggregate base, asphalt concrete pavement, Pedestrian/bicycle path grading, drainage, K. PERMANENT TRAFFIC CONTROL PLAN
J. TEMPORARY TRAFFIC CONTROL PLAN
I. MISCELLANEOUS
H. DRAINAGE
G. BRIDGE
F. EROSION CONTROL
E. APPROACH ROADS AND PARKING AREAS
D. PLAN-PROFILE
C. TYPICAL SECTIONS
B. SUMMARIES
A. GENERAL INFORMATION
LENGTH 2.163 MILES
1506+31.66
BEGIN PROJECT
FI
N
AL
(9
5%
REVI
EW
1620+50
END PROJECT
K.7
K.6
K.5
K.2-4
K.1
J.4-8
J.3
J.2
J.1
I.8
I.7
I.5-6
I.3-4
I.2
I.1
H.8-11
H.7
H.6
H.5
H.3-4
H.1-2
G.1-15
F.5
F.2-4
F.1
E.4
E.3
E.2
E.1
D.3-7
D.2
D.1
C.4
C.2-3
C.1
B.1-2
A.3
A.2
A.1
0.51 1
PAVEMENT MARKING DETAILS
(PEDESTRIAN) DETAILS
SYSTEM INSTALLATION, TRAFFIC SIGNAL
MT 86 CROSSWALK DETAILS
PERMANENT TRAFFIC CONTROL PLANS
QUANTITIES
TABULATION OF PERMANENT TRAFFIC CONTROL
STANDARD DRAWINGS
DETAIL
TEMPORARY TRAFFIC CONTROL ROAD CLOSURE
DETAIL
PEDESTRAIN UNDERPASS ROAD CLOSURE
QUANTITIES
TABULATION OF TEMPORARY TRAFFIC CONTROL
DETECTABLE WARNING PANEL DETAILS
PEDESTRIAN UNDERPASS FENCING DETAILS
PLAN AND DETAILS
SYSTEM INSTALLATION, LIGHTING (UNDERPASS)
PLAN AND DETAILS
SYSTEM INSTALLATION, LIGHTING (CROSSWALK)
FENCE, PEDESTRIAN RAIL DETAILS
TABULATION OF MISCELLANEOUS QUANTITIES
STANDARD DRAWINGS
DETAIL
1562+91 PEDESTRIAN BRIDGE RIPRAP LAYOUT
ENERGY DISSIPATOR AND RIPRAP DITCH DETAILS
INLET, FLH TYPE 7B DETAILS
1613+00 PEDESTRIAN UNDERPASS DETAILS
TABULATION OF DRAINAGE QUANTITIES
BRIDGE CONSTRUCTION DETAILS
EROSION CONTROL DETAIL
EROSION CONTROL PLAN
TABULATION OF EROSION CONTROL QUANTITIES
APPROACH ROAD DETAILS
PEDESTRIAN UNDERPASS RAMP DETAIL
DRINKING HORSE MTN PARKING LOT PLAN
AREA QUANTITIES
TABULATION OF APPROACH ROAD AND PARKING
PLAN AND PROFILE
SURVEY CONTROL
TABULATION OF PLAN AND PROFILE QUANTITIES
TYPICAL DETAILS
TYPICAL SECTIONS
TABULATION OF TYPICAL SECTION QUANTITIES
SUMMARY OF QUANTITIES
VICINITY MAP
PLAN SYMBOLS AND ABBREVIATIONS
TITLE SHEET
P re lim in ar y
- N ot
F or
C on st ru ct io n
- F in al
(9 5%
) D es ig
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009 10/2014
W101-1
AND ABBREVIATIONS
PLAN SYMBOLS
W west drwg(s).
dist.
diaph.
diag.
dia.
DHV
D exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish jt.
ID
joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material
J a n u a r y
U
S C
F h ig h w a y s F
H W
A
B o z e m a n
T r a il D e s ig n G e n e r a l I n fo r m a ti o n m t0 a b .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
A.2 DOT 86(1) MT
BH
CP GPS
JH
TP
DI
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
E
RIP
G G
W W
DI
T T
NOTE:
NO SCALE
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend 1.
Property Line w/Found Property Corner
Section Corner (Found, Projected)16
Section Line16
Section Corner (Found, Projected)4
Section Line4
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub
Ø spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
bearing bridge balance point bench mark back brg.
br.
BP
BM
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line
M.P.
M.L.
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use,
- no symbol -
EXISTING PROPOSED
Transition
Toe of Fill
Top of Cut wall face
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
N
Fiber Roll or Wattle
P re lim in ar y
- N ot
F or
C on st ru ct io n
- F in al
(9 5%
) D es m t0 a c .d g n
I n t_ ft
D
A.3
STATE PROJECT
M a y
B
T h o m p s
C h e c k e d b y
D e s ig n e d b y
VICINITY MAP
N
SCALE IN MILES
0 10.50.5
L y m a n C re e k
Bridger Creek
M a y fi e ld G u lc h
C h u rn C re e k
P la c e C re e k
NATIONAL FOREST
GALLATIN
MONTANA
MONTANA
Gallatin River
G a lla tin R iv e r
BOZEMAN
S to r y M il l
R d
R o u s e A v e
N th A v e
N th A v e
Main St
Oak St
Griffin Dr
Frontage Rd
Baxter Ln
W College St
S W il ls o n A v e
H ig h la n d B lv d
S p r in g h il l
R d
Valley Center Dr
M a n le y R d
M c Ilh a tta n R d
F is h H a tc h e ry R d
Bridger Creek Bridge
T. 1 S
T. 2 S
R E
R E
"M" Trailhead Parking Area
Bridger Canyon Rd
Pedestrian Underpass
Center Fish Tech
MOUNTAINS TRAIL
BOZEMAN TO BRIDGER
MT DOT 86(1)
1506+31.66
BEGIN PROJECT
MOUNTAINS TRAIL
BOZEMAN TO BRIDGER
MT DOT 86(1)
1620+50
END PROJECT
P re lim in ar y
- N ot
F or
C on st ru ct io n
- F in al
(9 5%
) D es
Sheet and Description
Section C Section D Section E Section F Section G Section H Section I Section J Section K
Typical Section
Plan & Profile
Approach Roads
Erosion Control Bridge Drainage Miscellaneous
Temporary Traffic Control
Permanent Traffic Control ALLOWANCE Bid
Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
A0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 1,000 1,000
A0140 15801-0000 WATERING FOR DUST CONTROL MGAL 750
A0160 20101-0000 CLEARING AND GRUBBING ACRE 8.8 8.8 Contract Quantity
A0180 20303-3200 REMOVAL OF SIDEWALK, CONCRETE SQYD 42 42
A0200 20401-0000 ROADWAY EXCAVATION CUYD 29,572 29,572 Contract Quantity
A0220 20402-0000 SUBEXCAVATION CUYD 604 46 650
A0240 20701-0100 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE
A (NONWOVEN) SQYD 5,103 97 5,200
A0260 20801-0000 STRUCTURE EXCAVATION CUYD 170 170 Contract Quantity
A0280 20802-0000 FOUNDATION FILL CUYD 12 2 14
A0300 20810-0000 SHORING AND BRACING LPSM ALL ALL Contract Quantity
A0320 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2 (ENERGY DISSIPATOR) CUYD 13 2 15
A0340 25101-0400 PLACED RIPRAP, METHOD A, CLASS 4 CUYD 345 5 350
A0360 25120-0200 RIPRAP DITCH, METHOD A, CLASS 2 LNFT 1,302 48 1,350
A0380 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 9,233 149 268 9,650
A0400 40301-0200 ASPHALT CONCRETE PAVEMENT, TYPE 2 TON 1,673 123 54 1,850
A0420 41201-0000 TACK COAT TON 1 1
A0440 41401-2000 CRACKS, CLEANING AND SEALING LNFT 100 100
A0460 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE) CUYD 58 58 Contract Quantity
A0480 55302-3700 PRECAST, PRESTRESSED CONCRETE DECKED BULB TEE GIRDER LNFT 189 189 Contract Quantity
A0500 55401-2000 REINFORCING STEEL, EPOXY COATED LB 6,950 6,950 Contract Quantity
A0520 55601-0900 BRIDGE RAILING, STEEL LNFT 226 226 Contract Quantity
A0540 55901-0000 MEMBRANE WATERPROOFING SQYD 436 436 Contract Quantity
A0560 56401-1000 BEARING DEVICE, ELASTOMERIC EACH 4 4 Contract Quantity
A0580 60201-0600 18-INCH PIPE CULVERT LNFT 620 20 640
A0600 60201-0800 24-INCH PIPE CULVERT LNFT 118 2 120
A0620 60201-0900 30-INCH PIPE CULVERT LNFT 270 10 280
A0640 60201-1000 36-INCH PIPE CULVERT LNFT 58 2 60
A0660 60220-4150 12 FEET SPAN, 10 FEET RISE PRECAST REINFORCED
CONCRETE BOX CULVERT LNFT 108 108
A0680 60403-2300 INLET, FLH TYPE 7B EACH 3 3
A0700 60501-0000 STANDARD UNDERDRAIN SYSTEM LNFT 108 108
A0720 61509-0000 DETECTABLE WARNING PANELS SQYD 4 4
A0740 61901-0000 FENCE (PEDESTRIAN RAIL) LNFT 500 500
A0760 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY HOUR 40
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-M ay -2
9:
A M
F:
\h ig hw ay s\
FH
W
A\
_B oz em an _T ra il\
Es tim at e\
[m t0
_E st im at e-
_N ew
.x ls x] S he et
STATE PROJECT
B.1DOT 86(1)MT
SHEET
NUMBER
P re lim in ar y
- N ot
F or
C on st ru ct io n
- F in al
(9 5%
) D es
Sheet and Description
Section C Section D Section E Section F Section G Section H Section I Section J Section K
Typical Section
Plan & Profile
Approach Roads
Erosion Control Bridge Drainage Miscellaneous
Temporary Traffic Control
Permanent Traffic Control ALLOWANCE Bid
Schedule
A0780 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY
BUCKET, 24-INCH WIDTH HOUR 40
A0800 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE HOUR 40
A0820 62301-0000 GENERAL LABOR HOUR 40
A0840 62406-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH ACRE 4.6 4.6
A0860 62503-0000 TURF ESTABLISHMENT (TYPE 1, HYDRAULIC METHOD) SLRY 5 5
A0880 62503-0000 TURF ESTABLISHMENT (TYPE 2, HYDRAULIC METHOD) SLRY 25 1 26
A0900 63302-0000 SIGN SYSTEM SQFT 151 151
A0920 63403-0400 PAVEMENT MARKINGS, TYPE D (WHITE) SQFT 184 6 190
A0940 63403-0800 PAVEMENT MARKINGS, TYPE H (WHITE) SQFT 688 12 700
A0960 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 6 6
A0980 63502-1000 TEMPORARY TRAFFIC CONTROL, CONE, TYPE 36-INCH EACH 50 50
A1000 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM EACH 50 50
A1020 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER LNFT 200 200
A1040 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 296 296
A1060 63509-1000 TEMPORARY TRAFFIC CONTROL, FLAGGER FXHR 3,000 3,000
A1080 63601-1000 SYSTEM INSTALLATION, TRAFFIC SIGNAL (PEDESTRIAN) LPSM ALL ALL
A1100 63601-2000 SYSTEM INSTALLATION, LIGHTING (CROSSWALK) LPSM ALL ALL
A1120 63601-2000 SYSTEM INSTALLATION, LIGHTING (UNDERPASS) LPSM ALL ALL
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-M ay -2
9:
A M
F:
\h ig hw ay s\
FH
W
A\
_B oz em an _T ra il\
Es tim at e\
[m t0
_E st im at e-
_N ew
.x ls x] S he et
2)
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.2DOT 86(1)MT
SHEET
NUMBER
P re lim in ar y
- N ot
F or
C on st ru ct io n
- F in al
(9 5%
) D es
6,359 6,359 TON
1,533 140 1,673 TON
1 1 TON
100 100 LNFT
Locations will be determined by CO.
See sheet C.4 for details.
Based on 1.97 TON/CUYD.
1,022 1519+50 to 1528+60 226 1,375 2,247
Station to Station Item 20402-0000
Subexcavation
(CUYD)
Item 30202-2000 Roadway aggregate, method 2
(TON)
Item 20701-0100 Separation-stabilization geotextile, class 1, type A (nonwoven) (SQYD)
1509+50 to 1511+00 58 264 367 1512+50 to 1513+71 68 199 282
FOOTNOTE:
Total 604 2,874 5,103
1513+98 to 1516+50 107 396 1,185
1528+85 to 1533+00 145 640
Remarks
TYPICAL SECTION QUANTITIES
Unit
Roadway aggregate, method 2 Asphalt concrete pavement, type 2
Description Typical No. 1 TotalItem Number Typical
No. 2
SUBEXCAVATION QUANTITIES
30202-2000 40301-0200 41201-0000 Tack coat 41401-2000 Cracks, cleaning and sealing
Based on 1.97 TON/CUYD Based on 1.94 TON/CUYD Based on 0.10 GAL/SQYD and 240 GAL/TON
STATE PROJECT
DOT 86(1) C.1MT
F:
\h ig hw ay s\
FH
W A\
_B oz em an
_T ra il\ D es ig n\ Ty pi ca l
-M ay
-2
3:
P
M B
TH
O
M
PS
O N
4/
N
B
EL
L 1/
D es ig ne d by
C he ck ed b y:
SHEET
NUMBER
TABULATION OF TYPICAL
SECTION QUANTITIES
P re lim in ar y
- N ot
F or
C on st ru ct io n
- F in al
(9 5%
) D es
C.2
STATE PROJECT
M a y
P
M m t0 c a .d g n
U
S S u r ft
D
B h e c k e d b y
T h o m p s s ig n e d b y
NO SCALE
TYPICAL SECTIONS
FOOTNOTE:
NOTE:
1. See sheet C.1 for quantities.
LC
Original ground
1:3 1:3
5' 5' pathway Multi-use pathway Multi-use
Slope
Original ground
Existing asphalt surfacing
3 3
Asphalt concrete pavement, type 2, 2-inch compacted depth
Tack coat
LC
Original ground
Original ground
1:3
1:3
Va ria ble
Va ria bl e
5'
C le a r in g li m it s
5' 2' shldr.2' shldr.
5' 5'
Slope stake
Slope stake
Placin g con serve d top soil, 4-inc h dep th
Turf e stabl ishment
4-i nc h d ep th
Pla cin g c on ser ve d t op so il, Tu rf est ab lish men t
Profile grade pathway Multi-use pathway Multi-use
Asphalt concrete pavement, type 2, 2-inch compacted depth
Roadway aggregate, method 2, 6-inch compacted depth
1:3 0.5' typ.
C le a r in g li m it s
Cracks, cleaning and sealing
Construct slopes as shown in the Staking Report.
Match existing cross slope or superelevation.
Adjust to match existing pavement width as approved.
Construct ditches as shown in the Staking Report.
Five feet or to right-of-way line, whichever is less.
1.5% slope
TYPICAL SECTION NO. 2
BOZEMAN TO BRIDGER
MOUNTAINS TRAIL
1545+39.27 to 1556+50
TYPICAL SECTION NO. 1
BOZEMAN TO BRIDGER MOUNTAINS TRAIL
1506+31.66 to 1513+71
1513+98.50 to 1528+60.25
1528+85.50 to 1544+57.83
1545+00 to 1545+39.27
1556+50 to 1562+37.61
1563+44.61 to 1564+90.76
1565+06.33 to 1600+59.45
1601+64.91 to 1620+50
P re lim in ar y
- N ot
F or
C on st ru ct io n
- F in al
(9 5%
) D es
C.3
STATE PROJECT
M a y
P
M m t0 c a .d g n
U
S S u r ft
B e c k e d b
T h o m p s s ig n e d b y
NO SCALE
TYPICAL SECTIONS
LC
14' max.
Existing centerline
Original ground
Cross slope Cross slope
Original ground
2 2
Asphalt concrete pavement, type 2, 5-inch compacted depth
Roadway aggregate, method 2, 8-inch compacted depth
Va ria ble
Variable
14' max. Existing guardrail
FOOTNOTE:
4 5 section
See typical surfacing asphalt
Existing o r a p p r o a c h
E d g e o f p a v e d s tr e e t
PAVED STREET OR APPROACH
CONNECTION DETAIL
section
See typical surfacing approach
Existing
AGGREGATE APPROACH
CONNECTION DETAIL
E d g e o f a p p r o a c h
Asphalt concrete pavement, type 2, 4-inch compacted depth
Subbase grading A, 20-inch compacted depth
Adjust to match existing roadway width up to maximum shown as approved.
Reestablish roadway fill slopes, foreslopes, and crown according to Section 152.
Remove and reset existing guardrail.
All work and materials to reconstruct MT 86 as shown are incidental to item 60220-4150.
Construct typical section in all areas where the existing asphalt surfacing on MT 86 is removed for pedestrian underpass construction.
See sheet E.1 for locations and quantities.
TYPICAL SECTION NO. 3
MT 86 AT PEDESTRIAN UNDERPASS
Traveled lane Traveled lane vertical joint
Sawcut and tack
P re lim in ar y
- N ot
F or
C on st ru ct io n
- F in al
(9 5%
) D es
LC
Original ground
Original ground
Surfacing structure
Profile grade
Proposed ditch invert class 1, type A (nonwoven) Separation-stabilization geotextile, SUBEXCAVATION DETAIL
C.4
STATE PROJECT
M a y
P
M m t0 c a .d g n
U
S S u r ft
B e c k e d b
T h o m p s s ig n e d b y
NO SCALE
TYPICAL DETAILS
LC
LC
R
R underpass
Pedestrian
Edge of shoulder
Edge of shoulder
2'
2' underpass
PedestrianOriginal ground of pathway
Normal edge surfacing section Match mainline
PATHWAY AT PEDESTRIAN UNDERPASS DETAIL
ELEVATION
PLAN
FOOTNOTE:
1 See sheet C.1 for locations and quantities.
of pavement
Normal edge
Roadway aggregate, method 2, 12-inch compacted depth
P re lim in ar y
- N ot
F or
C on st ru ct io n
- F in al
(9 5%
) D es
LT 21
LT 19
LT 25
LT 76
LT 26
LT 54
LT 52
LT 49
LT 27
LT 101
LT 76
LT 58
LT 168
LT 100
RT 50
LT 250
RT 150
1,302
Unadjusted quantity. Includes conserved topsoil.
Based on conserved topsoil depth of 8 inches from 1506+31.66 to 1533+75, and 4 inches from 1533+75 to 1620+50.
See sheet H.6 for details.
1611+50 to 1612+50 1612+00 to 1612+50 1613+75 to 1616+25 1613+75 to 1615+25
Item 62503-0000 Turf establishment (type 2, hydraulic method)
(SLRY)
0.6 431 1,423 348 0.2
0.4 3
1575+00 to 1605+00 1605+00 to 1620+50
764 4,179 549 15,319 9,988 1,766 2.1
0.6
503 816 0.9
FOOTNOTE:
8.8 29,572 19,698 5,235 4.6 5
Side Quantity
(LNFT)
ITEM 25120-0200
RIPRAP DITCH, METHOD A,
CLASS 2
1560+50 to 1560+75 1562+25 to 1562+44 1565+50 to 1565+75
1589+50 to 1589+97 1592+25 to 1592+50
1570+75 to 1571+50 1576+25 to 1576+50 1579+75 to 1580+25 1588+25 to 1588+75
1592+75 to 1593+75 1599+00 to 1599+75
Total
1601+71 to 1602+25 1603+16 to 1604+75
Item 62503-0000 Turf establishment (type 1, hydraulic method)
(SLRY)
ROADWAY QUANTITIES
Station to Station
1556+50 to 1562+43.61 0.5 321 1533+75 to 1545+39.27
Total
1.5 10,855 3.4
1563+38.61 to 1575+00 1.1 1,636 245 0.2
1506+31.66 to 1515+00 501 0.2 29180.6 698 1515+00 to 1533+75 1.1 1,184 1,051 1,010
Item 20401-0000 Roadway excavation
(CUYD)
Embankment
(CUYD)
FOR INFORMATION
ONLY
Conserved topsoil
(CUYD)
FOR INFORMATION
ONLY
Item 62406-0300 Placing conserved topsoil, 4-inch depth (ACRE)
Station to Station
Item 20101-0000 Clearing and grubbing
(ACRE)
STATE PROJECT
DOT 86(1) D.1MT
F:
\h ig hw ay s\
FH
W A\
_B oz em an
_T ra il\ D es ig n\ Pl an a nd
-M ay -2
7:
TH
O
M
PS
O N
4/
N
B
EL
L 1/
D es ig ne d by
C he ck ed b y:
SHEET
NUMBER
TABULATION OF PLAN AND
PROFILE QUANTITIES
P re lim in ar y
- N ot
F or
C on st ru ct io n
- F in al
(9 5%
) D es
VERTICAL DATUM : NAVD 88
POINT
NUMBER NORTH EAST ELEVATION DESCRIPTION
4805m 533423.775 1580050.167 4733.760 2" MDT aluminum cap
14101 533494.995 1580739.244 4739.224 5/8" IR W/ALUM CAP
14102 533396.241 1581387.329 4746.512 5/8" IR W/ALUM CAP
14103 533369.703 1582064.633 4756.027 5/8" IR W/ALUM CAP
14104 533348.050 1582691.281 4763.325 5/8" IR W/ALUM CAP
14105 533340.728 1583267.859 4770.357 5/8" IR W/ALUM CAP
14106 533336.868 1583986.271 4779.947 5/8" IR W/ALUM CAP
14107 534560.459 1585683.202 4801.808 5/8" IR W/ALUM CAP
14108 534883.029 1586208.555 4808.981 5/8" IR W/ALUM CAP
14109 535206.063 1586762.991 4831.591 5/8" IR W/ALUM CAP
14110 535253.729 1588298.977 4891.606 5/8" IR W/ALUM CAP
14111 535141.619 1589543.348 4916.931 5/8" IR W/ALUM CAP
14112 535587.377 1591012.703 4945.156 5/8" IR W/ALUM CAP
A6077 535434.282 1590596.868 4942.498 2" MDT aluminum cap
B6077 535099.061 1589966.112 4938.869 2" MDT aluminum cap
C6077 535098.850 1589191.759 4924.077 2" MDT aluminum cap
D6077 535115.626 1588710.479 4902.641 2" MDT aluminum cap
E6077 535174.524 1587834.352 4868.006 2" MDT aluminum cap
F6077 535175.635 1587134.292 4841.102 2" MDT aluminum cap
G6077 535240.695 1589159.392 4930.590 2" MDT aluminum cap
CP2A 533556.899 1584545.021 4783.738 2" MDT aluminum cap
CP3A 534190.324 1585332.084 4798.057 2" MDT aluminum cap
CP3X 534264.971 1585257.461 4795.041 2" MDT aluminum cap
CP3Z 535297.276 1587087.475 4853.070 2" MDT aluminum cap
PROJECT : Bozeman to Bridger Mountains Trail DATE OF FIELD WORK : October 2014 PROJECT UNITS : INTERNATIONAL FOOT
COORDINATE SYSTEM : MONTANA STATE PLANE COORDINATES (2500)
NAD83 (2011)
PROJECT COORDINATES
STATE PROJECT
DOT 86(1) D.2MT
F:
\h ig hw ay s\
FH
W A\
_B oz em an
_T ra il\ D es ig n\ Pl an a nd
6-ay -2
2:
P M
R
PA
/2
R
PA
/2
D es ig ne d by
C he ck ed b y:
NUMBER
SURVEY CONTROL
SHEET
P re lim in ar y
- N ot
F or
C on st ru ct io n
- F in al
(9 5%
) D es
R= 100.00'
T= 6.45'
L= 12.87'
D
R= 300.00'
T= 16.71'
L= 33.38'
D
R= 300.00'
T= 7.70'
L= 15.39'
D
R= 300.00'
T= 18.05'
L= 36.05'
D
R= 275.00'
T= 72.99'
L= 142.69'
D
R= 60.00'
T= 28.15'
L= 52.63'
D
R= 100.00'
T= 18.74'
L= 37.06'
P C
.8
P T
.7
P C
.9
P T
.2
P C
.8
P
T
.2
P C
.2
P T
.3
P C
.9
P T
.6
P C
.0
P T
.7
P C
.2
P T
.3
Existing ground
Profile grade
Headlands Subdivision
Line to be constructed
CP
M4805
CP
14102
CP
14101
N
1:
:2
PLAN AND PROFILE LEGEND:1
Typical inlet/outlet ditch
Culvert with inlet/outlet ditch
Line to be constructed
D
P ip e C u lv e r t
P ip e C u lv e r t
5NOTE:
See sheet D.1 for complete excavation and embankment totals.
Excavation volumes shown do not include conserved topsoil quantities.
El.= 4740.67
E= 1580621.603
N= 533434.855
NOTE:
boundary locations and descriptions.
Right-of-Way Plans for right-of-way and permanent easement
Refer to MT DOT 86(1) Bozeman to Bridger Mountains Trail
See sheet C.41
Subexcavation
See sheet C.4
1506+31.66
MOUNTAINS TRAIL
BOZEMAN TO BRIDGER
MT DOT 86(1)
BEGIN PROJECT
See sheet C.4
Subexcavation 1
Subexcavation
2 19 91 85
915 3
CUYD
EXC.
CUYD
EMB.
1515+001510+001505+001500+00
4700 4700
4710 4710
4720 4720
4730 4730
4740 4740
4750 4750
4760 4760
4770 4770
4780 4780
D.3
STATE PROJECT
A
M a y
I n t_ ft h ig h w a y s F
H W
A
B o z e m a n
T r a il D e s ig n P la n a n d P r o fi le m t0 fa
.d
B
T h o m p s
C h e c k e d b y
D e s ig n e d b y
,7
.5
+2.10 00%
+0.4883%
50' VC
,7
.8
,7
.2
,7
.6
50' VC
+3.2
,7
.0
VC
50'
,7
.6
,7
.4
+0.4336%
50' VC
P re lim in ar y
- N ot
F or
C on st ru ct io n
- F in al
(9 5%
) D es
R= 1,180.00'
T= 106.33'
L= 212.09'
D
R= 100.00'
T= 19.16'
L= 37.86'
D
R= 100.00'
T= 25.72'
L= 50.35'
D
R= 1,500.00'
T= 117.92'
L= 235.35'
D
R= 40.00'
T= 41.11'
L= 63.93'
P T
.5
P C
.4
P R
C
.5
P T
.3
P C
.5
P C
C
.8
P C
C
.2
PT
+57
.15
D
R= 100.00'
T= 10.42'
L= 20.77'
D
R= 300.00'
T= 44.57'
L= 88.50'
D
R= 100.00'
T= 13.41'
L= 26.66'
D
R= 300.00'
T= 40.30'
L= 80.12'
D
R= 100.00'
T= 9.04'
L= 18.03'
D
R= 500.00'
T= 14.88'
L= 29.74'
D
R= 100.00'
T= 7.77'
L= 15.50'
D
R= 100.00'
T= 7.79'
L= 15.56' D
R= 100.00'
T= 12.90'
L= 25.65'
D
R= 60.00'
T= 7.97'
L= 15.85'
P T
.3
P C
.1
P T
.9
P C
.3
P T
.8
P C
.5
P T
.1
P C
.4
P T
.5
P C
.7
P T
.7
P C
.0
P T
.7
P C
.5
P T
.0
P C
.3
P T
.8
P C
.6
P T
.3
P C
.6
Existing ground
Profile grade
N
CP
14103
CP
14104
CP
14106
14105
CP
be constructed
Line to
P ip e C u lv e r t
D o N o t
D is tu r b
P ip e A r c h C u lv e r t
L T
E x x
.5
A p p r o a c
P ip e C u lv e r t
E x te n s io n
9 1
PT
+57
.15
Subexcavation
See sheet C.4
See sheet C.4 1
P T
.3
P ip e C u lv e r t
Subexcavation
Subexcavation
See sheet C.4 1
28 22 9 2 27 30 56 10 21 36 6
555 323 1,596
CUYD
EXC.
CUYD
EMB.
1545+001540+001535+001530+001525+001520+001515+00
4720 4720
4730 4730
4740 4740
4750 4750
4760 4760
4770 4770
4780 4780
4790 4790
4800 4800
D.4
STATE PROJECT
M a y
I n t_ ft h ig h w a y s F
H W
A
B o z e m a n
T r a il D e s ig n P la n a n d P r o fi le m t0 fb
.d
B
T h o m p s
C h e c k e d b y
D e s ig n e d b y
-2.0000%
,7
.0
+3.2
+1.2500
50' VC
,7
.5
50' VC
,7
.5
+3.1
50' VC
,7
.0
-0.3030%
50' VC
,7
.0
+1.714 3%
+0.8654%
50' VC
,7
.2
,7
.6
+1.2525
,7
.8
,7
.0
,7
.8
-0.2500%
,7
.8
+1.637 4%
,7
.2
,7
.8
+1.692 3%
,7
.0
,7
.2
+2.00 00%
,7
.9
-1.4222%
50' VC
,7
.7
+4.
200' VC
,7
.0
P re lim in ar y
- N ot
F or
C on st ru ct io n
- F in al
(9 5%
) D es
.7
P T
.1
P C
.1
P T
.4
P C
.4
P C
C
.0
D
R= 300.00'
T= 24.74'
L= 49.37'
D
R= 300.00'
T= 18.13'
L= 36.22'
D
R= 1,200.00'
T= 92.46'
L= 184.55'
D
R= 1,175.00'
T= 324.11'
L= 632.49'
L= 63.93'
D
R= 60.00'
T= 15.64'
L= 30.60'
D
R= 60.00'
T= 18.46'
L= 35.82'
D
R= 100.00'
T= 27.94'
L= 54.48'
D
R= 100.00'
T= 24.18'
L= 47.45'
D
R= 100.00'
T= 8.75'
L= 17.45'P C
C
.2
PT 1544+57.16
P C
.2
P T
.8
P C
.2
P T
.1
P C
.8
P R
C
.2
P T
.7
P C
.1
P T
.6
Existing ground
Profile grade
N
CP
CP
14107
CP
14109
CP
14108
CP
2A
3X
3A
CP
.6
.6
See sheets G.1 -G.15 Construct new pedestrian bridge Bridger Creek Bridge
Bridger Creek
P ip e C u lv e r t
P ip e C u lv e r t
D o N o t
D is tu r b
P ip e C u lv e r t
R T
E x A p p r o a
D o N o t
D is tu r b
E x P ip e C u lv e r t
R T
P ip e C u lv e r t
D o N o t
D is tu r b
P ip e C u lv e r t
E x A p p r o a
D o N o t
D is tu r b
P ip e C u lv e r t
R T
E x A p p r o a
8 19
1,636 4,179
76 2 11 183
Line to be constructed
CUYD
EXC.
CUYD
EMB.
1575+001570+001565+001560+001555+001550+001545+00
4770 4770
4780 4780
4790 4790
4800 4800
4810 4810
4820 4820
4830 4830
4840 4840
4850 4850
D.5
STATE PROJECT
e p te m b e r
I n t_ ft h ig h w a y s F
H W
A
B o z e m a n
T r a il D e s ig n P la n a n d P r o fi le m t0 fc
.d
B
T h o m p s
C h e c k e d b y
D e s ig n e d b y
+2.00 00%
,7
.0
-2.0000%
,7
.0
,7
.5
+1.1719
,7
.2
50' VC
,8
.2
+2.42 86%
,8
.2
-3.5556%
,8
.0
80' VC
,8
.2
,8
.9
+4.0
5%
50' VC
+2.00 00%
+0.0000%
40' VC 40' VC
,8
.5
7.
40' VC
,8
.2
+4.3
6%
50' VC
,8
.9
-1.7872%
150' VC
,8
.7
100' VC
,8
.7
7.
50' VC
6.
P R
C
.4
P R
C
.3
P T
.5
5 P
C
.5
P T
.9
P C
.7
R= ,1 .0 0'
T= .1 1'
L= .4 9'
D
R= 800.00'
T= 81.71'
L= 162.85'
D
R= 800.00'
T= 45.66'
L= 91.21'
D
R= 300.00'
T= 16.72'
L= 33.40'
D
R= 1,500.00'
T= 154.07'
L= 307.06'
D
R= 200.00'
T= 8.72'
L= 17.42'
D
R= 200.00'
T= 10.81'
L= 21.60'
D
R= 200.00'
T= 10.81'
L= 21.60'
D
R= 200.00'
T= 12.25'
L= 24.46'
D
R= 200.00'
T= 33.20'
L= 65.81'
D
R= 200.00'
T= 20.75'
L= 41.34'
P R
C
.1
P T
.5
P C
.7
P T
.3
P C
.5
P T
.1
5 P
C
.7
P T
.2
P C
.6
P T
.4
P C
.4
P T
.8
Existing ground
Profile grade
Line to be constructed
P ip e C u lv e r t
P ip e C u lv e r t
P ip e C u lv e r t
E x te n s io n
P ip e C u lv e r t
P ip e C u lv e r t
E x te n s io n
N
14109
CP
F6077
CP
CP
E6077
CP
14110
CP
D6077
CP
C6077
CP 14111
CP
G6077
CP
3Z
D o N o t
D is tu r b
C u lv e r t
L T
E x ip
D o N o t
D is tu r b
C u lv e r t
L T
E x
A p p r o a c h R d
L T
P ip e C u lv e r t
P ip e C u lv e r t
E x te n s io n
P ip e C u lv e r t
A p p r o a c h R d
L T
P ip e C u lv e r t
P ip e C u lv e r t
D o N o t
D is tu r b
E x e C u lv e r t
R T
197 7,715 246
303 5,092
2,228 767 1,160 1,397 4,436
CUYD
EXC.
CUYD
EMB.
1605+001600+001595+001590+001585+001580+001575+00
4860 4860
4870 4870
4880 4880
4890 4890
4900 4900
4910 4910
4920 4920
4930 4930
4940 4940
D.6
STATE PROJECT
e p te m b e r
I n t_ ft h ig h w a y s F
H W
A
B o z e m a n
T r a il D e s ig n P la n a n d P r o fi le m t0 fd
.d
B
T h o m p s
C h e c k e d b y
D e s ig n e d b y
Cut retaining wall, LT 1
Cut retaining wall, LT1
Cut retaining wall, LT
Cut retaining wall, LT
Cut retaining wall, LT1
Fill retaining wall, RT1
Fill retaining wall, RT 1
,8
.4
6.
,8
.9
,8
.8
+4.1
6%
100' VC
,8
.4
+2.5
,8
.9
+3.2
,8
.7
7.
100' VC
1598+25
4,928.90
-1 .0
175' VC
,9
.4
100' VC
,9
.7
+0.5797%
,9
.5
,9
.8
50' VC
,9
.0
-5.2826% 5.
150' VC
,8
.3
50' VC1576+25
4,848.20
+1.1377%
50' VC
,8
.0
+4.
-0.1400%
50' VC
,8
.6
100' VC
,8
.6
.0
+0.6750%
100' VC
,8
.0
150' VC
,8
.5
.0
+3.9
6%
100' VC
,8
.0
-1 .0
150' VC
,8
.0
50' VC
,8
.6
0+2.08 00%
6.
100' VC
R= 1,076.00'
T= 207.43'
L= 409.84'
D
R= 200.00'
T= 7.99'
L= 15.97'
D
R= 200.00'
T= 7.54'
L= 15.07'
D
R= 1,000.00'
T= 85.39'
L= 170.36'
D
R= 100.00'
T= 37.42'
L= 71.61'1
P C
.7
P R
C
.5
P T
.5
P C
.9
P T
.9
P C
.2
P R
C
.6
P T
.2
P O
T
.4
Existing ground
Profile grade
"M" Parking Lot
Line to be constructed
P e d e s tr ia n u n d e r p a s s s p a n x r is e R
C B
N
B6077
CP
A6077
CP
14112
CP
1620+50
MOUNTAINS TRAIL
BOZEMAN TO BRIDGER
END MT DOT 86(1)
A p p r o a c h R d
L T
P ip e C u lv e r t
P ip e C u lv e r t
D o N o t
D is tu r b
P ip e C u lv e r t
R T
E x A p p r o a
3,659 6,380
El.= 4941.40
E= 1591115.161
N= 535672.825
I n le t, F
L H t y p e
B R
T
P ip e C u lv e r t
4 421 7 71
I n le ts
F L
H t y p e
B R
T
P ip e C u lv e r t
Parking Lot
Drinking Horse Mtn
CUYD
EXC.
CUYD
EMB.
1625+001620+001615+001610+001605+00
4880 4880
4890 4890
4900 4900
4910 4910
4920 4920
4930 4930
4940 4940
4950 4950
4960 4960
D.7
STATE PROJECT
M a y
I n t_ ft h ig h w a y s F
H W
A
B o z e m a n
T r a il D e s ig n P la n a n d P r o fi le m t0 fe
.d
B
T h o m p s
C h e c k e d b y
D e s ig n e d b y
,9
.0
5.
-2.9091%
150' VC
,9
.0
50' VC
,9
.3
+1.0000%
,9
.8
,9
.8
-0.2000%
-9 .8
%50' VC
,9
.0
150' VC
,9
.0
8.
150' VC
,9
.5
+1.2500 % -0.5500%
200' VC
,9
.4
P re lim in ar y
- N ot
F or
C on st ru ct io n
- F in al
(9 5%
) D es
1. See sheet E.4 for approach road details.
Based on 1.97 TON/CUYD.
Based on 1.94 TON/CUYD.
See sheet E.2.
APPROACH ROAD AND PARKING AREA QUANTITIES
1612+50 RT 344 149
NOTE:
Embankment
(CUYD)
FOR INFORMATION
ONLY
Item 30202-2000 Roadway aggregate, method 2
(TON)
FOOTNOTE:
1539+75 RT
Mainline Station
Item 40301-0200 Asphalt concrete pavement, type 2
(TON)
1534+69 RT 10
1590+20 LT 15
1592+01 LT 17
1610+98 LT 56
Total
1533+88 RT
STATE PROJECT
DOT 86(1) E.1MT
F:
\h ig hw ay s\
FH
W A\
_B oz em an
_T ra il\ D es ig n\ A pp ro ac h 6-
M ay
-2
2:
P
M B
TH
O
M
PS
O N
4/
N
B
EL
L 1/
D es ig ne d by
C he ck ed b y:
SHEET
NUMBER
TABULATION OF APPROACH
ROAD AND PARKING AREA
QUANTITIES
P re lim in ar y
- N ot
F or
C on st ru ct io n
- F in al
(9 5%
) D es
NO SCALE
4902.851590494.016535199.170A1 top center of drop inlet grate
Coordinates and elevation are at
A1
Edge of new gravel parking surface
Toe of slope
N
Pedestrian underpass
El. 4908.00
Edge of existing parking area El. 4908.00
4%
Edge of new gravel parking surface
Toe of slope
El. 4908.46
A3
A2
B3
B2
B4
B5
B1
A3
A2
B5
B4
B3
B2
B1
Begin drainage swale
Drainage swale
Edge of new gravel surface
Edge of new gravel surface
Edge of new gravel surface
Edge of new gravel surface
Center of 10' radius arc
4908.00
4904.59
4904.78
4902.91
4903.55
4906.81
4907.63
10' R
Centerline of drainage swale
Centerline of drainage swale
4" compacted depth
Roadway aggregate, method 2, GRAVEL SURFACING SECTION
535184.991
535188.071
535212.759
535247.322
535225.511
1590475.246
1590492.814
1590497.476
1590470.974
1590379.490
535226.049
535218.172
1590369.504
1590455.062
Centerline of existing road
El. 4908.00
Pedestrian underpass ramp
Variable Variable
Existing contour
Proposed contour
DRINKING HORSE MTN
PARKING LOT PLAN
NOTE:
underpass excavation
Embankment from pedestrian
2. Elevations are to finished grade unless otherwise stated.
1. See sheet E.1 for quantities
E.2
STATE PROJECT
M a y
I n t_ ft h ig h w a y s F
H W
A
B o z e m a n
T r a il D e s ig n A p p r o a c h R o a d s m t0 g c .d
B
T h o m p s
C h e c k e d b y
D e s ig n e d b y
NAME NORTHING EASTING ELEVATION DESCRIPTION
CONTROL POINTS
P re lim in ar y
- N ot
F or
C on st ru ct io n
- F in al
(9 5%
) D es
NO SCALE
E.3
STATE PROJECT
M a y
A
M m t0 g b .d g n
U
S I n t2
B e c k e d b y
T h o m p s s ig n e d b y
1:4 1:4
Roadway aggregate, method 2, 6" compacted depth
6" compacted depth
Roadway aggregate, method 2, A1
A2
A3
A4
A5
A6
A6
A5
A4
A3
A2
A1
Asphalt concrete pavement, type 2, 2" compacted depth
Asphalt concrete pavement, type 2, 2" compacted depth
Existing ground Existing ground
Toe of fill slope
B
A
A
SECTION A-A
UNDERPASS RAMP PLAN
B
SECTION B-B
1590507.586
1590502.321
1590487.823
1590484.441
1590476.530
1590473.148
Bottom of ramp, tie to existing ground
Bottom of ramp, tie to existing ground
Corner of landing pad, top of ramp
Corner of landing pad, top of ramp
Corner of landing pad
Corner of landing pad
Pedestrian underpass
Pedestrian underpass
Pedestrian underpass
RAMP DETAIL
PEDESTRIAN UNDERPASS
1.50% 8.33%
0.00%
535271.796
535280.531
535264.694
535274.104
535260.635
535270.046
4907.89
4908.18
4909.62
4909.77
4909.62
4909.77
Edge of existing parking area
N
NOTE:
1. All work and materials to construct ramp as shown are incidental to item 60220-4150.
1:4
6" compacted depth
Roadway aggregate, method 2, Asphalt concrete pavement, type 2, 2" compacted depth
Existing ground
SECTION C-C
1.50%
1:4
C
C
NAME NORTHING EASTING ELEVATION DESCRIPTION
CONTROL POINTS
P re lim in ar y
- N ot
F or
C on st ru ct io n
- F in al
(9 5%
) D es
Stationing Mainline x x x x x
L x x
Length Approach Road
L
APPROACH ROAD DETAILS
C of approach x x
FOOTNOTE:
STATION
MAINLINE
R1 R2 LW
APPROACH ROAD TABLE
c o n s tr u c ti o n
E n d o f a p p r o a c hvariable
C of approachL
C of highwayL
1:3 1:3
W
R
APPROACH PLAN DETAIL
APPROACH PROFILE DETAIL
APPROACH SECTION DETAIL
NO SCALE
E.4
STATE PROJECT
M a y
A
M m t0 g a .d g n
U
S I n t2
B e c k e d b y
T h o m p s s ig n e d b y highway
Edge of path
Edge of
W5'
Match existing approach grade type 2, 4" compacted depth
Asphalt concrete pavement, 5'Variable 10' Path
Approach area to be paved (typ.)
4" compacted depth (typ.)
Asphalt concrete pavement, type 2, Approach length L
Width Approach
C of path
APPROACH ROAD LOCATION SYMBOL
Crown Crown
2 2
1610+98 LT
1592+01 LT
1590+20 LT
1539+75 RT
1534+69 RT
1533+88 RT
asphalt at edge of highway Sawcut and tack coat
Adjust to match field conditions as approved.
Match existing crown as approved.
to existing alignment of approach is at an angle.
Continue approach radius as required if connection
P re lim in ar y
- N ot
F or
C on st ru ct io n
- F in al
(9 5%
) D es
,8
.2
+0.0000%
40' VC
,8
.0
-3.5556%
80' VC
,7
.2
50' VC
,8
.2
+2.42 86%
40' VC
91'-0"
2'-0" concrete abutment wall (typ.)
9'-0"
T r a il
El. 4804.20
STA. 1562+43.61
BEGIN BRIDGE
95'-0" BRIDGE LENGTH
2% crown Trail & BridgeLC
Original ground
Abutment 1
Centerline bearing (typ.)
+ 0.00% GRADE
Flowline El. 4791.23
Abutment 2
El. 4,790.50
LC
Low Structure El. 4,800.40
El. 4804.20
STA. 1562+43.61
BEGIN BRIDGE
N
El. 4,790.50
PLAN
ELEVATION
Q V WS El.
HYDRAULIC DATA
100Q
Q
4.75
3.07
1,100
4796.65
4794.21
+ 0.00% GRADE
back wall (typ.)
Concrete
PROFILE GRADE DIAGRAM
NTS
Bridge elevations are at profile grade at layout line bearing (typ.)
Centerline wall (typ.)
abutment Concrete bulb-tee deck beams (typ.)
3'-8" x 7'-6" pre-stressed
RG3036-A
NO. DATE BY REVISIONS DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADER
J. Schlegelmilch 1" = 6'-0" N. Bell S. Markwardt J. Schegelmilch
NO. DATE BY REVISIONS
BRIDGE SHEET
1 of 15 MAY 2016
DATE SHEET NO.
PLAN & ELEVATION
BRIDGER CREEK BRIDGE
GALLATIN COUNTY, MT
WESTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
m t0
G A .d g n
I n t_ ft
D
G.1
STATE PROJECT
M a y
A
M
4'
2'-0" (typ.)
1'-2" (typ.)
2'-0" (typ.)
footing (typ.)
Concrete spread wing wall (typ.)
Turn back wing wall (typ.)
Turn back
4,810
4,805
4,790
4,795
4,800
Profile grade grade at
Existing
DESCRIPTION
BRIDGE SHEET INDEX
NO.
SHEET
4,785
4'-0" Bridge railing (typ.)
2'-0" (typ.)"2 18'-6
112'-1"
(typ.)
El. 4,804.05
El. 4,804.05 El. 4,804.05
El. 4,804.05
(typ.)
6'-0"
(typ.)
6'-0"
91'-0"
= El. 4796.65100Q Wildlife path at Q2 WS Elev.
Wildlife path
(typ.)
8'-0" ty p
REBAR LIST 2 OF 2
REBAR LIST 1 OF 2
BRIDGE RAILING DETAILS
BRIDGE RAILING
APPROACH SLAB
GIRDER DETAILS
P/S GIRDER SECTIONS
P/S GIRDERS A & B
DECK PLAN DETAILS
ABUTMENT WING WALLS
ABUTMENT END WALL DETAILS
ABUTMENT WALL
SUBSURFACE INFORMATION
GENERAL NOTES & FOUNDATION PLAN
PLAN & ELEVATION
RG3036-O
RG3036-N
RG3036-M
RG3036-L
RG3036-K
RG3036-J
RG3036-I
RG3036-H
RG3036-G
RG3036-F
RG3036-E
RG3036-D
RG3036-C
RG3036-B
RG3036-A
between rub rails 13'-9" clear
9'-0"
Scour El. 4,788.23100Q footing (typ.)
Concrete spread El. 4,787.73 El. 4,787.73
.8
.8
.2 according to Section 208.
and bracing as required
Provide temporary shoring
El. 4,801.83
El. 4,802.34
El. 4,802.78 of existing bridge
Upstream profile
END BRIDGE
Face of bridge barrier are at upstream face of bridge.
Note: Velocity and water surface elevations
END BRIDGE
t y p
95'-0" BRIDGE LENGTH
P re lim in ar y
- N ot
F or
C on st ru ct io n
- F in al
(9 5%
) D es
S T
S T
GENERAL NOTES:N
Abutment 1 Abutment 2
FOUNDATION PLAN AND BORING LOCATIONS
ESTIMATE
ITEM NO. DESCRIPTION UNITQUANTITY NOTES
FOOTNOTE:
1 Contract quantity.
END BRIDGE
BEGIN BRIDGE
LC
LCLC Bearing Bearing
RG3036-B
2 of 15 MAY 2016
DATE
J. Schlegelmilch 1"= 10'-0" N. Bell S. Markwardt J. Schlegelmilch
BRIDGE SHEET SHEET NO.
PLAN
GENERAL NOTES & FOUNDATION
BRIDGER CREEK BRIDGE
GALLATIN COUNTY, MT
WESTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
G.2
STATE PROJECT
M a y
A
M m t0
G B .D
G N
I n t_ ft
D
2'-0"2'-0"
Path and Bridge
Concrete abutment wall bridge
Existing highway
El. 4,790.50
Footing bearing
8'-0"
91'-0"
95'-0" BRIDGE LENGTH
2'-0"
2'-0"
Design net allowable bearing pressure = 2,000 lbs/sqft.1.
FOUNDATION NOTE:
56401-1000
55601-0900
55401-2000
55302-3700
55201-0200
20810-0000
20801-0000
Bearing device, elastomeric
Bridge railing, steel
Reinforcing steel, epoxy coated
Precast, prestressed concrete decked bulb-tee girder
Structural concrete, class A(AE)
Shoring and bracing
Structure excavation
EACH
LNFT
LB
LNFT
CUYD
LPSM
CUYD
See summary of subsurface information on sheet RG3036-C.
See Geotechnical Report No. 14-3246G, prepared by SK Geotechnical.
GEOTECHNICAL REPORT:
galvanized diaphragm anchor bolts in accordance with AASHTO M111 or M232.
flange-tie connections which are to be black iron finish. Provide ASTM A307 structural steel shapes. Galvanize all metal after fabrication except girder welded
Provide ASTM A36 for all structural metal for field welded connections and
MISCELLANEOUS STRUCTURAL METAL:
Chamfer exposed edges of all concrete 3/4", unless shown otherwise.
a grooved finish across deck perpendicular to beam centerline.
Minimum f’ci = 5,000 psi. Finish top surface of the girders with
Fabricate with Class P (AE) concrete. Minimum f’c = 6,000 psi.
PRESTRESSED CONCRETE DECK BULB-TEE UNITS:
prestress force per strand is 34,870 lbs based on estimated losses of 41.84 ksi.
load of 44,000 lbs at which load fpi = 0.75 fpu = 202.5 ksi. The final estimate effective strand conforming to AASHTO M203 (ASTM A416). Pre-tension each strand to a total
Provide Grade 270, 0.6-inch diameter, seven-wire, bright low-relaxation prestressing
PRESTRESSING STEEL:
noted otherwise.
reinforcing steel. Provide a minimum concrete cover of 2 inches on formed face, unless
Conform to AASHTO M31, Grade 60 deformed (ASTM A615, Grade 60). Epoxy coat all
REINFORCING STEEL:
Preformed expansion joint filler: AASHTO M213.
Preformed flexible cellular joint filler: ASTM D1056, Type 2, Grade 3.
unless shown otherwise on plans.
Use Type II, low alkali cement. Chamfer exposed edges of all concrete 3/4", Class A (AE) with minimum 28-day design compressive strength f’c = 4500 psi.
CAST-IN-PLACE:
= 0.331 g. Site Class = C. Seismic Zone = 3.D1S
= 2.196) to give the long period spectrum acceleration, Vmodified by the Site Coefficient (F
= 0.151 g) 1 = 0.696 g. Long period acceleration at 1.0 seconds (SDSacceleration, S
= 1.40) to give the short period spectrum a = 0.496 g) modified by the Site Coefficient (FS(S
= 0.286 g. Short period acceleration at 0.2 secondsSto give a spectrum acceleration, A
= 1.388)PGAPeak Ground Acceleration (PGA = 0.206 g), modified by the Site Coefficient (F
SEISMIC:
Vehicle load: H10 (20,000 lb), dynamic load allowance (impact), IM = 0%
Snow load and H5 vehicle load applied simultaneously.
Snow load: 45 lb per square foot
Pedestrian live load: 90 lb per square foot
LIVE LOAD:
Coefficient of friction: 0.5
Passive pressure: Equivalent fluid unit weight of soil, 500 lb per cubic foot
At rest lateral earth pressure: Equivalent fluid unit weight of soil, 50 lb per cubic foot
Active lateral earth pressure: Equivalent fluid unit weight of soil, 32 lb per cubic foot
Future wearing surface allowance: 24 lb per square foot
Concrete in Prestressed Concrete Units: 155 lb per cubic foot
Cast-in-place concrete: 150 lb per cubic foot
DEAD LOAD:
Construction of Roads and Bridges on Federal Highway Projects, FP-14.
CONSTRUCTION: Federal Highway Administration Standard Specifications for
2014, with 2015 Interim revisions.
December 2009 with 2015 interims. AASHTO LRFD Bridge Design Specifications 7th Edition, DESIGN: AASHTO LRFD Guide Specifications for the Design of Pedestrian Bridges, SPECIFICATIONS:
P re lim in ar y
- N ot
F or
C on st ru ct io n
- F in al
(9 5%
) D es
LEGEND:
WATER LEVELS
After drilling
At completion
While drilling
NOTE:
3.
2.
1.
See Sheet RG3036-B for soil boring locations. The boring logs on this sheet represent the subsurface conditions encountered at the boring locations shown.
Subsurface conditions may vary between these locations.
The series of numbers on the log shows the number of blows from a 140 lb hammer with a 30-inch drop required to drive a split barrel sampler 18-inches.
The test is measured in three 6-inch intervals. If the split barrel did not penetrate 18-inches after
50 blows, the log shows the measured penetration within that particular interval. The symbol next to the blow count indicates the size of split barrel sampler that was used for each test depth.
For boring logs and other geotechnical information see Geotechnical Report No. 14-3246G, prepared by SK Geotechnical.
0.0000%
Profile grade
RG3036-C
DATE
J. Schlegelmilch Not to Scale N. Bell S. Markwardt J. Schlegelmilch
BRIDGE SHEET SHEET NO.
MAY 2016
SUBSURFACE INFORMATION
BRIDGER CREEK BRIDGE
GALLATIN COUNTY, MT
WESTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
G.3
STATE PROJECT
M a y
A
M m t0
G C .d g n
I n t_ ft
D
Hollow Stem Auger
2" OD Split Spoon (SPT)
4769.5
2-2-4
3-4-5
2-5-5
WH-WH-2
4-12-15
6-6-15
14-23-35
10-17-14
20-34-40
OL
CL
SM
GM
GM
OL
SC
SM
GM
4772.1
3-6-5
5-5-5
2-5-7
14-13-18
5-15-19
11-20-22
3-4-7
11-16-22
22-50/0.4ft
Blow counts
Blow counts
ST-13
EL: 4795.0'
ST-14
STA 1563+37, 11' Rt
EL: 4797.0'
STA 1562+54, 6' Rt
P re lim in ar y
- N ot
F or
C on st ru ct io n
- F in al
(9 5%
) D es
10.4 x 16 25101 -0200
60201 -0600
60201 -0800
60201 -0900
60201 -1000
60220 -4150
60403 -2300
Station
ES
TI
M
A
TE
D M
A X
IM
U M
C O
V
ER
S
TR
U C
TU
R A L
EX
C A V A
TI
O N
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
EN
ER
G
Y D
IS
S
IP
A
TO
R
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
F
EE
T
S
PA
N
F
EE
T
R
IS
E
PR
EC
A S T
R
EI
N
FO
R
ED
O
N C R
ET
E B O
X C
U
LV
ER
T
IN
LE
T, F
LH
T
YP
E
7B
S K
EW
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el ow
B
EV
EL
S
1V :n
H
B
EV
EL
S
1V :n
H
REMARKS
See below for numbered notes
FEET CUYD CUYD LNFT LNFT LNFT LNFT LNFT EACH Lt Rt 1509+25 0.5 1 28 X/P 1512+25 0.5 3 28 X/P 1517+00 0.5 3 28 X/P 1528+74 LT, Do not disturb 1541+50 0.7 1 28 X/P
1541+96 0.9 4 20 2° RT GS 2,7
1545+16 Do not disturb 1556+18 RT, Do not disturb 1558+25 0.9 2 30 X/P 1564+83 RT, Do not disturb 1565+25 0.6 1 28 X/P 1566+78 RT, Do not disturb 1570+50 3.4 1 48 X/P
1576+21 3.1 1 4 40 13° RT X/P 6
1579+74 Do not disturb
1579+88 8.1 4 3 72 24° RT X/P 6
1588+62 9.8 5 16 2° LT GS 2
1588+68 LT, Do not disturb 1588+74 LT, Do not disturb 1590+20 1.0 14 44 X/P 1
1590+62 0.4 5 32 35° LT X/P
1592+50 1.8 3 32 X/P 6
1592+70 14.8 5 26 2° RT GS 2
1601+16 2.8 79 102 X/P 1
1603+14 15.8 16 42 4° RT GS 2
1603+25 5.6 1 3 46 X/P 6 1611+04 1.8 23 38 X/P 1
1612+77 24.0 2044 270 2 3° LT C 3,5
1613+00 7.7 1655 108 C 2 2 4 1613+15 2.4 34 1 C 3,8 1619+55 RT, Do not disturb
1620+46 0.7 11 34 34° RT X/P 5
PROJECT TOTAL 3879 13 620 118 270 58 108 3
Allowable Pipe Material
NOTE: FOOTNOTES: A Aluminum
1. Steel pipe, aluminum pipe and aluminized steel pipe culvert minimum wall thickness 1. Approach road culvert 6. Energy dissipator at outlet. AS Aluminized steel is the thickness required by the Std. 602-1 fill height table. 2. Pipe culvert extension. 7. Reuse existing end section. C Concrete
2. See Std. 602-7 for acceptable concrete cell class. 3. Construct inlets, FLH type 7B. See sheets H.3, H.5, 8. Structural excavation included in GS Galvanized steel
3. Maintain cover per manufacturers recommendations on all culverts under and E.2. station 1613+00 box culvert. P Plastic live loading during consturction. 4. Pedestrian underpass. See sheets H.3-H.4. (blank) Any appropriate material
5. Inlet / Outlet ditch included in structural excavation. x/__ Any appropriate material except __
PAY ITEM NUMBER
TABULATION OF DRAINAGE QUANTITIES
F:
\h ig hw ay s\
FH
W A\
_B oz em an
_T ra il\ D es ig n\ D ra in ag e\
[m t0
_S ec tio n
H Q ua nt it ie s.
xl sx ]S he et
-M ay -2
2:
K N
U
TH
/2
N
B
EL
L 1/
D es ig ne d by
C he ck ed b y:
STATE PROJECT
H.1
SHEET
NUMBER
DOT 86(1)MT
Note: The quantities shown hereon are approximate and are subject to field adjustments.
P re lim in ar y
- N ot
F or
C on st ru ct io n
- F in al
(9 5%
) D es
RT
LT & RT
LT & RT
RT
See sheet H.4.
See sheet H.7.
RT
1563+06 to 1564+02 12 Total 12
Total 42
ITEM 20802-0000
FOUNDATION FILL
Station to Station Side Quantity
(CUYD)
ITEM 20303-3200
REMOVAL OF SIDEWALK, CONCRETE
Station to Station Side Quantity
(SQYD)
1563+42 to 1564+02 42
FOOTNOTE:
Station Side Quantity
(SQYD)
1613+00 108 Total 108
Station Side Quantity
(LNFT)
ITEM 60501-0000
STANDARD UNDERDRAIN SYSTEM
ITEM 55901-0000
MEMBRANE WATERPROOFING
1613+00 436 Total 436
Total 345
ITEM 25101-0400
PLACED RIPRAP, METHOD A, CLASS 4
Station Side Quantity
(CUYD)
1562+91 345
STATE PROJECT
DOT 86(1) H.2MT
F:
\h ig hw ay s\
FH
W A\
_B oz em an
_T ra il\ D es ig n\ D ra in ag e\
[m t0
_S ec tio
H ay -2
2:
P M
B
TH
O
M
PS
O N
/2
N
B
EL
L
/2
D es ig ne d by
C he ck ed b y:
NUMBER
TABULATION OF DRAINAGE
QUANTITIES
SHEET
P re lim in ar y
- N ot
F or
C on st ru ct io n
- F in al
(9 5%
) D es
SCALE IN FEET
5 0 5 10 15
75453015015 105 120 135
LC
B o z e m a n t o B r id g e r M o u n ta in s T r a il centerline
New culvert
1:2
1:
section (typ.)
Sloped end
OUTLET
Crown N/E/EL: 535272.1/1590478.8/4909.77
INLETPIPE
LENGTH: 108 ft
SPAN: 12 ft RISE: 10 ft
WALL THICKNESS: 8 in
TOP/BOTTOM THICKNESS: 9 in
Crown N/E/EL: 535373.6/1590442.3/4915.16
12.48 RT
1613+00.00, 120.35' RT
1613+00.00, 4915.16
Invert in elev.
4909.77
Invert out elev.
14' of roadway
Existing edge of roadway
Existing edge guardrail
Existing grade Existing road
N
TYPE: Reinforced Concrete Box grade
Proposed profile
END SECTION: 1:2 END SECTION: 1:2
30" pipe culvert
30" pipe culvert concrete box culvert precast reinforced
12' span x 10' rise
18" pipe culvert parking lot
Existing edge of
Inlet, FLH type 7B
Inlet, FLH type 7B
DETAIL
PEDESTRIAN UNDERPASS
1613+00 pipe culvert
18" culvert
Existing 24" pipe
M T system
Standard underdrain
1. See sheet H.4 for details.
NOTE:
Underdrain system measurement limits
Slope 5%
PIPE SLOPE: 0.05 ft/ft
H.3
STATE PROJECT
M a y
I n t_ ft h ig h w a y s F
H W
A
B o z e m a n
T r a il D e s ig n D r a in a g e m t0 h c .d
B E
L
K N
U
C h e c k e d b y
D e s ig n e d b y
FOOTNOTE:
See sheet I.7.1
P re lim in ar y
- N ot
F or
C on st ru ct io n
- F in al
(9 5%
) D es
Fl ow
Fl ow
(typ.)
6"x6"x6" Tee
LC
U nd er pa ss
17'-4" min.
Granular backfill
Separation-stabilization geotextile, class 1, type A (nonwoven) (typ.)
Pedestrian underpass
Description Unit Total
NOTE:
quantities.
1. See sheet H.2 for underdrain system and waterproofing
FOOTNOTE:
' m ax
UnderpassLC
ISOMETRIC LAYOUT DETAIL
STANDARD UNDERDRAIN SYSTEM
ELEVATION
CUYD
SQYD
SQYD
LNFT
waterproofing Install membrane waterproofing Install membrane waterproofing Install membrane
INFORMATIONAL QUANTITIES
UNDERDRAIN SYSTEM
H.4
STATE PROJECT
M a y
A
M m t0 h c .d g n
U
S C u s to m a r y
B E e c k e d b y
K N
U s ig n e d b y
6"x6" Elbow
Provide 12" overlap on seams.
2 Do not install membrane on exposed surfaces.
(typ.)
2' min.
system Standard underdrain
4" (typ.)
4" (typ.)
:1 m ax
:1 m a x
Geogrid, biaxial
LNFT 64
Select borrow
DETAIL
PEDESTRIAN UNDERPASS
1613+00
24" tubing polyethylene drainage
6" non-perforated drainage tubing
6" perforated polyethylene
Geogrid, biaxial type A (nonwoven) geotextile, class 1, Separation-stabilization
Granular backfill drainage tubing (typ.)
6" perforated polyethylene tubing polyethylene drainage 6" nonperforated
Outlet underdrain system in new inlet located at Station 1612+90.
Subgrade
6" perforated polyethylene drainage tubing (typ.)
drainage tubing (typ.)
6" perforated polyethylene drainage tubing 6" perforated polyethylene
P re lim in ar y
- N ot
F or
C on st ru ct io n
- F in al
(9 5%
) D es
A A
B
NOTE:Weld
V a r ia b le to be sealed by welding
Open areas at end of pipes shear connector
" x 4" stud2 each end of each pipe
" at8 3in L 2" x 2" x
" holes to be drilled8
INFORMATIONAL QUANTITIES
may be substituted.
2" dia. solid steel bar at 10.68 lbs/ft at 6.41 lbs/ft (ASTM A 53)
" OD double-extra strong steel pipe 2
H.5
STATE PROJECT
M a y
P
M m t0 h d .d g n
U
S C u s to m a r y
B E e c k e d b y
K N
U s ig n e d b y
1.
2.
3.
4.
PLAN SECTION B-B
SECTION A-A DETAIL A
DETAILS
INLET, FLH TYPE 7B
3"
3"
3"
H v a r ie s
8" 8"
INLET, FLH TYPE 7B
Trail fill slope Ro ad way fi ll slo pe See Detail A
Concrete
Ditch slope Ditc h slo pe "2
12"2 ty p ty p
W varies
W varies
W v a r ie s
(2 at W required)
"8 3L 2" x 2" x
(2 at W required)
"8 3" x 2
1" x 22 1L 2
Inlet Concrete, CUYD
Grate Dimensions
Depth (H)
Width (W)
Pipe size
Offset
Station
18"
"4 33'-4" x 2'-11
30"
4'-0"4'-0"3'-0"
"4 34'-4" x 3'-11 "4
34'-4" x 3'-11
30"
1613+15.00
12.17' RT
1612+78.33
12.88' RT
1612+89.67
194.10' RT
"2 13'-8
2.412
"4 14'-6
2.786
2"-5"
1.339 if approved.
Alternate methods of anchoring angle iron will be acceptable
AASHTO M 111.
Galvanize grate after fabrication in accordance with and vertical bars on 12 inch centers.
each way. In walls, place horizontal bars on 6 inch centers from face of concrete. In floors, place bars on 6 inch centers inch clear 2 1All reinforcing bars are #5 placed a minimum 1
See informational quantities for outside dimensions of grate.
P re lim in ar y
- N ot
F or
C on st ru ct io n
- F in al
(9 5%
) D es re lim in ar y
- N ot
F or
C on st ru ct io n
- F in al
(9 5%
) D es
H.7
STATE PROJECT
M a y
P
M m t0 h k .d g n
I n t_ ft
D
W A
C K
E e c k e d b y
K N
U s ig n e d b y
A A
SECTION A-A
NOTE:
B rid g e r C re e k
N
Varie s
Existing wildlife path
New wildlife path
New pedestrian bridge
SCALE IN FEET
15 0 15 30
Path centerline
RIPRAP LAYOUT DETAIL
PEDESTRIAN BRIDGE
1562+91
4'
A1 A2 B4 B3
A3 A4
A6
A5
B9
B2 B1
B7
B6
B5
B10
B11 B12
B13
Existing highway bridge method A, class 4
Placed riprap, B8
Existing highway bridge
1:10 1:2.4
1:2 .4
1:2 .4
1:10
T y p
Placed riprap, method A, class 4 class 4 (Typ.)
method A, Placed riprap, New pedestrian bridge
Low beam
T y p
Q100
OHW
7.5
1:
2.
:2 .4
1:
2.
1:
2.
1:
2.
B13
B12
B11
B10
B9
B8
B7
B6
B5
B4
B3
B2
B1
A6
A5
A4
A3
A2
A1
Toe of slope, tie into existing riprap tie into existing riprap
Top of slope, edge of wildlife path, tie into existing riprap
Toe of slope, edge of wildlife path, Top of slope, tie into existing riprap
Top of slope
Toe of slope
Top of slope, edge of wildlife path
To…