PROJECT_DESCRIPTION_Dene_Tene.pdf

PDF 16 KB Posted

Attached to
AK TTP CHIC 2013(1), Dene Tene Pedestrian Path Federal contract opportunity
Solicitation number
DTFH70-16-B-00028
Issued by
Department of Transportation Federal Highway Administration

About this file

Project Description

View the file

Other files for this federal contract opportunity

Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AK TTP CHIC 2013(1), Dene’ Tene’ Pedestrian Path, Matanuska–Susitna Borough, Alaska

The work consists of grading, paving, drainage, and steel truss bridge installation on GRS abutments and other small items of work.

The project includes construction of a 16-foot span, 125-foot long steel truss bridge with cast-in-place concrete deck. Abutments are founded on Geosynthetic Reinforced Soil (GRS).

Project length: 1 Mile

Tentative Fixed Completion Date: Summer 2017 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: $1 million to $2 million

Location: 14 Miles NE of Palmer, AK

DESCRIPTION OF WORK in US

CUSTOMARY UNITS FP-03

O ne

S ch ed ul e Sc h N am e

A

A dd iti on al S ch

Sc h

N am e

B

DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes Yes 153 Contractor Quality Control and Assurance

(yes/no) Yes Yes 154 Contractor Sampling & Testing (yes/no) Yes Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes Yes 157 Soil Erosion Control Devices (erosion control devices) Silt Fence Sediment Wattle

390 LNFT

430 LNFT

840 LNFT

890 LNFT

158 Watering for Dust Control 55 MGAL 80 MGAL

DIVISION 200 – Earthwork 201 Clearing & Grubbing 0.5 Acre 0.9 Acre 202 Additional Clearing & Grubbing (clearing & grubbing) 203 Removal of Structures & Obstructions (structures, demolition) Pipe

Guardrail Pipe

Guardrail 204 Excavation & Embankment Roadway Excavation Select Borrow

45 CUYD

1,560 Ton

375 CUYD

1,560 Ton

205 Rock Blasting: Controlled Blast Hole (rock blasting) 205 Blasting Consultant (Consultant/Engineering Services) (yes/no) Select Select 207 Earthwork Geotextiles (geotextiles) 250 SQYD 250 SQYD

DESCRIPTION OF WORK in US

CUSTOMARY UNITS FP-03

O ne

S ch ed ul e Sc h N am e

A

A dd iti on al S ch

Sc h

N am e

B

DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap 400 CUYDS 400 CUYDS

DIVISION 300 – Aggregate Courses 308 Minor Crushed Aggregate (crushed aggregate) 110 Ton 270 Ton

DIVISION 400 – Asphalt Pavements & Surface Treatments 404 Minor Hot Asphalt Concrete (asphalt concrete pavement) 39 Ton 105 Ton

DIVISION 550 – Bridge Construction 555 Steel Structures (structures, steel) Pre-fabricated steel bridge (installation only) (125’ x 16’) LPSM (125’ x 16’) LPSM

DIVISION 600 – Incidental Construction 602 Culverts & Drains (indicate one or both) 72 LNFT 160 LNFT 622 Rental Equipment (yes/no) Yes Yes 625 Turf Establishment (indicate seeding or mulching separately) .4 Acre .6 Acre 633 Permanent Traffic Control Devices (traffic control devices) 5 each 5 each 634 Permanent Pavement Markings (traffic pavement markings) 150 LNFT 180 LNFT 635 Temporary Traffic Control – Flagger 120 Hours 120 Hours