Dene_Tene_Earthwork_Schedule_B.pdf

PDF 98 KB Posted

Attached to
AK TTP CHIC 2013(1), Dene Tene Pedestrian Path Federal contract opportunity
Solicitation number
DTFH70-16-B-00028
Issued by
Department of Transportation Federal Highway Administration

About this file

Dene Tene_Earthwork_Schedule B

View the file

Other files for this federal contract opportunity

Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FEDERAL HIGHWAY ADMINISTRATION

PROJECT

AK TTP CHIC 2013(1)

DENE’ TENE’ PEDESTRIAN PATH

SCHEDULE B

EARTHWORK

21+00.00 TO 30+92.00

ALASKA DEPARTMENT OF TRANSPORTATION

AND PUBLIC FACILITIES

MATANUSKA-SUSITNA BOROUGH, ALASKA

File: c:\myfiles\pw_production\d0188416\Dene_Tene_EW_Schedule B.log 6/28/2016, 1:50:47 PM

Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol

(sq. ft.) (cu. yd.) (cu. yd.)

(cu. yd.)

21+00.00 RDWYEXC

Excavation 19.23 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.18 0 0 1.00 0

EXISTPAVEMENT

Excavation 2.17 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 0 Mass ordinate for EXISTPAVEMENT = 0

TOPSOIL

Excavation 2.88 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.66 0 0 0.00 0

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.34 0 0 0.00 0

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 19.99 0 0 0.00 0

21+10.00 RDWYEXC

Page: 15

Excavation 0.79 4 4 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 33.91 6 6 1.00 -2

EXISTPAVEMENT

Excavation 0.00 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 -2 Mass ordinate for EXISTPAVEMENT = 0

TOPSOIL

Excavation 1.48 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -2 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -2

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -2

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -2

21+15.00 RDWYEXC

Excavation 0.00 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 48.47 8 8 1.00 -10

TOPSOIL

Excavation 0.25 0 0 0.00 Subsoil Exc 0.00 0 0 0.00

Page: 16

Fill 0.00 0 0 0.00 -10 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 0 0 0.00 -10

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -10

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 4 0 0.00 -10

21+20.00 RDWYEXC

Excavation 0.42 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 54.55 10 10 1.00 -20

TOPSOIL

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -20 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 0 0 0.00 -20

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -20

Page: 17

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 4 0 0.00 -20

21+27.00 RDWYEXC

Excavation 1.58 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 61.82 15 15 1.00 -35

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 0 0 0.00 -35

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -35

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 5 0 0.00 -35

21+30.00 RDWYEXC

Excavation 0.75 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 64.86 7 7 1.00 -42

TOPSOIL

Excavation 1.86 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -42 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00

Page: 18

Subsoil Exc 0.00 0 0 0.00 Fill 1.67 0 0 0.00 -42

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 0 0 0.00 -42

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 2 0 0.00 -42

21+40.00 RDWYEXC

Excavation 2.16 1 1 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 77.32 26 26 1.00 -67

TOPSOIL

Excavation 2.69 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -67 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -67

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -67

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -67

Page: 19

21+50.00 RDWYEXC

Excavation 2.95 1 1 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 91.31 31 31 1.00 -97

TOPSOIL

Excavation 3.24 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -97 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -97

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -97

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -97

21+60.00 RDWYEXC

Excavation 3.94 1 1 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 106.38 37 37 1.00 -133

TOPSOIL

Excavation 3.69 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -133 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00

Page: 20

Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -133

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -133

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -133

21+70.00 RDWYEXC

Excavation 4.92 2 2 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 119.97 42 42 1.00 -173

TOPSOIL

Excavation 4.11 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -173 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -173

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -173

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -173

Page: 21

21+75.00 RDWYEXC

Excavation 5.67 1 1 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 121.13 22 22 1.00 -194

TOPSOIL

Excavation 4.36 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -194 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 0 0 0.00 -194

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -194

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 4 0 0.00 -194

21+80.00 RDWYEXC

Excavation 6.78 1 1 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 122.24 23 23 1.00 -216

TOPSOIL

Excavation 4.68 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -216 Mass ordinate for TOPSOIL = 0

LAYER1

Page: 22

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.74 0 0 0.00 -216

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.46 1 0 0.00 -216

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.80 4 0 0.00 -216

21+90.00 RDWYEXC

Excavation 5.99 2 2 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 141.77 49 49 1.00 -263

TOPSOIL

Excavation 4.22 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -263 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.87 1 0 0.00 -263

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.73 1 0 0.00 -263

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00

Page: 23

Fill 22.42 8 0 0.00 -263

22+00.00 RDWYEXC

Excavation 5.43 2 2 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 155.73 55 55 1.00 -316

TOPSOIL

Excavation 4.25 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -316 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.00 1 0 0.00 -316

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 4.00 1 0 0.00 -316

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.01 9 0 0.00 -316

22+10.00 RDWYEXC

Excavation 1.89 1 1 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 239.62 73 73 1.00 -388

TOPSOIL

Excavation 2.75 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -388 Mass ordinate for TOPSOIL = 0

Page: 24

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.14 1 0 0.00 -388

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 4.26 2 0 0.00 -388

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 25.60 9 0 0.00 -388

22+13.00 RDWYEXC

Excavation 0.00 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 271.96 28 28 1.00 -416

TOPSOIL

Excavation 0.24 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -416 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.18 0 0 0.00 -416

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 4.34 0 0 0.00 -416

LAYER3

Excavation 0.00 0 0 0.00

Page: 25

Fill 26.09 3 0 0.00 -416

SKIP STATION RANGE = 22+15.00 to 23+80.00

22+20.00 RDWYEXC

Excavation 0.00 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 340.76 23 23 1.00 -439

TOPSOIL

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -439 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.27 0 0 0.00 -439

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 4.53 0 0 0.00 -439

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 27.22 2 0 0.00 -439

22+24.00 RDWYEXC

Excavation 0.00 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 348.25 0 0 1.00 -439

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.33 0 0 0.00 -439

Page: 26

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 4.64 0 0 0.00 -439

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 27.87 0 0 0.00 -439

23+70.00 RDWYEXC

Excavation 0.00 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 111.46 0 0 1.00 -439

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.21 0 0 0.00 -439

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 4.40 0 0 0.00 -439

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 26.42 0 0 0.00 -439

23+80.00 RDWYEXC

Excavation 0.00 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 99.78 0 0 1.00 -439

LAYER1

Excavation 0.00 0 0 0.00

Page: 27

Subsoil Exc 0.00 0 0 0.00 Fill 2.07 0 0 0.00 -439

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 4.13 0 0 0.00 -439

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.80 0 0 0.00 -439

23+90.00 RDWYEXC

Excavation 0.00 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 88.06 35 35 1.00 -474

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.94 1 0 0.00 -474

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.87 1 0 0.00 -474

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 23.27 9 0 0.00 -474

24+00.00 RDWYEXC

Excavation 0.00 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 70.80 29 29 1.00 -503

Page: 28

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.80 1 0 0.00 -503

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.60 1 0 0.00 -503

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 21.59 8 0 0.00 -503

24+10.00 RDWYEXC

Excavation 0.00 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 52.32 23 23 1.00 -526

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -526

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -526

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 8 0 0.00 -526

24+20.00 RDWYEXC

Excavation 0.00 0 0 1.00 Subsoil Exc 0.00 0 0 1.00

Page: 29

Fill 35.19 16 16 1.00 -542

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -542

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -542

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -542

24+30.00 RDWYEXC

Excavation 0.00 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 26.66 11 11 1.00 -553

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -553

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -553

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -553

24+40.00 RDWYEXC

Page: 30

Excavation 0.00 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 20.69 9 9 1.00 -562

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -562

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -562

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -562

24+50.00 RDWYEXC

Excavation 0.00 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 18.60 7 7 1.00 -569

TOPSOIL

Excavation 0.82 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -569 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -569

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00

Page: 31

Fill 3.33 1 0 0.00 -569

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -569

24+60.00 RDWYEXC

Excavation 0.13 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 14.45 6 6 1.00 -575

TOPSOIL

Excavation 4.50 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -575 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -575

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -575

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -575

24+70.00 RDWYEXC

Excavation 7.13 1 1 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 6.38 4 4 1.00 -578

TOPSOIL

Page: 32

Excavation 5.00 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -578 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -578

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -578

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -578

24+80.00 RDWYEXC

Excavation 22.18 5 5 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.46 1 1 1.00 -574

TOPSOIL

Excavation 0.00 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -574 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -574

LAYER2

Excavation 0.00 0 0 0.00

Page: 33

Fill 3.33 1 0 0.00 -574

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -574

SKIP STATION RANGE = 24+84.20 to 25+20.23

25+20.00 RDWYEXC

Excavation 19.96 3 3 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.03 0 0 1.00 -571

EXISTPAVEMENT

Excavation 3.08 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 -571 Mass ordinate for EXISTPAVEMENT = 0

TOPSOIL

Excavation 1.94 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -571 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.66 0 0 0.00 -571

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.34 1 0 0.00 -571

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 19.99 3 0 0.00 -571

Page: 34

25+30.00 RDWYEXC

Excavation 12.98 6 6 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 1.11 0 0 1.00 -565

EXISTPAVEMENT

Excavation 0.00 1 1 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 -565 Mass ordinate for EXISTPAVEMENT = 1

TOPSOIL

Excavation 5.00 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -565 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -565

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -565

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -565

25+40.00 RDWYEXC

Excavation 9.75 4 4 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 9.56 2 2 1.00 -563

TOPSOIL

Page: 35

Excavation 0.00 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -563 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -563

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -563

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -563

25+50.00 RDWYEXC

Excavation 9.06 3 3 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 9.98 4 4 1.00 -564

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -564

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -564

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00

Page: 36

Fill 20.00 7 0 0.00 -564

25+60.00 RDWYEXC

Excavation 3.56 2 2 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 11.30 4 4 1.00 -566

TOPSOIL

Excavation 5.00 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -566 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -566

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -566

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -566

25+70.00 RDWYEXC

Excavation 2.76 1 1 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 12.15 4 4 1.00 -569

TOPSOIL

Excavation 5.00 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -569

Page: 37

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -569

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -569

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -569

25+80.00 RDWYEXC

Excavation 2.35 1 1 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 12.51 5 5 1.00 -573

TOPSOIL

Excavation 5.00 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -573 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -573

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -573

LAYER3

Excavation 0.00 0 0 0.00

Page: 38

Fill 20.00 7 0 0.00 -573

25+90.00 RDWYEXC

Excavation 2.04 1 1 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 12.07 5 5 1.00 -577

TOPSOIL

Excavation 5.00 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -577 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -577

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -577

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -577

26+00.00 RDWYEXC

Excavation 2.49 1 1 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 11.26 4 4 1.00 -580

TOPSOIL

Excavation 5.00 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -580

Page: 39

Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -580

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -580

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -580

26+10.00 RDWYEXC

Excavation 3.92 1 1 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 10.53 4 4 1.00 -583

TOPSOIL

Excavation 3.74 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -583 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -583

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -583

LAYER3

Excavation 0.00 0 0 0.00

Page: 40

Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -583

26+20.00 RDWYEXC

Excavation 5.81 2 2 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 10.32 4 4 1.00 -585

TOPSOIL

Excavation 1.57 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -585 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -585

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -585

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -585

26+30.00 RDWYEXC

Excavation 6.76 2 2 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 10.37 4 4 1.00 -587

TOPSOIL

Excavation 0.87 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -587

Page: 41

Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -587

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -587

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -587

26+40.00 RDWYEXC

Excavation 7.70 3 3 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 10.65 4 4 1.00 -588

TOPSOIL

Excavation 0.28 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -588 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -588

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -588

LAYER3

Page: 42

Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -588

26+50.00 RDWYEXC

Excavation 8.34 3 3 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 11.01 4 4 1.00 -589

TOPSOIL

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -589 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -589

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -589

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -589

26+60.00 RDWYEXC

Excavation 9.26 3 3 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 10.36 4 4 1.00 -590

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00

Page: 43

Fill 1.67 1 0 0.00 -590

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -590

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -590

26+70.00 RDWYEXC

Excavation 10.66 4 4 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 9.16 4 4 1.00 -590

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -590

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -590

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -590

26+80.00 RDWYEXC

Excavation 12.02 4 4 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 7.90 3 3 1.00 -589

LAYER1

Page: 44

Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -589

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -589

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -589

26+90.00 RDWYEXC

Excavation 13.38 5 5 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 6.61 3 3 1.00 -587

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -587

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -587

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -587

27+00.00 RDWYEXC

Excavation 14.74 5 5 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 5.44 2 2 1.00 -584

Page: 45

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -584

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -584

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -584

27+10.00 RDWYEXC

Excavation 16.54 6 6 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 4.14 2 2 1.00 -580

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -580

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -580

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -580

27+20.00 RDWYEXC

Excavation 18.33 6 6 1.00

Page: 46

Subsoil Exc 0.00 0 0 1.00 Fill 2.83 1 1 1.00 -575

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -575

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -575

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -575

27+30.00 RDWYEXC

Excavation 20.35 7 7 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 1.80 1 1 1.00 -569

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -569

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.25 1 0 0.00 -569

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.08 7 0 0.00 -569

Page: 47

27+40.00 RDWYEXC

Excavation 22.40 8 8 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 1.20 1 1 1.00 -562

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -562

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -562

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -562

27+50.00 RDWYEXC

Excavation 24.38 8 8 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.02 0 0 1.00 -554

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -554

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -554

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00

Page: 48

Fill 20.00 7 0 0.00 -554

27+60.00 RDWYEXC

Excavation 24.97 9 9 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.02 0 0 1.00 -545

TOPSOIL

Excavation 0.02 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -545 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.64 1 0 0.00 -545

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -545

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -545

27+70.00 RDWYEXC

Excavation 24.92 9 9 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.02 0 0 1.00 -536

TOPSOIL

Excavation 0.12 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -536

Page: 49

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.66 1 0 0.00 -536

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -536

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -536

27+80.00 RDWYEXC

Excavation 23.75 9 9 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.08 0 0 1.00 -527

TOPSOIL

Excavation 0.14 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -527 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -527

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -527

LAYER3

Excavation 0.00 0 0 0.00

Page: 50

Fill 20.00 7 0 0.00 -527

27+90.00 RDWYEXC

Excavation 21.76 8 8 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.37 0 0 1.00 -519

TOPSOIL

Excavation 0.10 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -519 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -519

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -519

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -519

28+00.00 RDWYEXC

Excavation 19.35 8 8 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 1.09 0 0 1.00 -511

TOPSOIL

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -511

Page: 51

Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -511

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -511

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -511

28+10.00 RDWYEXC

Excavation 17.74 7 7 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 1.42 0 0 1.00 -504

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -504

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -504

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -504

28+20.00 RDWYEXC

Excavation 20.12 7 7 1.00

Page: 52

Subsoil Exc 0.00 0 0 1.00 Fill 0.83 0 0 1.00 -497

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -497

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -497

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -497

28+30.00 RDWYEXC

Excavation 20.90 8 8 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.54 0 0 1.00 -489

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -489

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -489

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -489

Page: 53

28+40.00 RDWYEXC

Excavation 21.34 8 8 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.44 0 0 1.00 -481

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -481

LAYER2

Excavation 0.00 0 0 0.00