Dene_Tene_Earthwork_Schedule_B.pdf
PDF 98 KB Posted
- Attached to
- AK TTP CHIC 2013(1), Dene Tene Pedestrian Path Federal contract opportunity
- Solicitation number
- DTFH70-16-B-00028
About this file
Dene Tene_Earthwork_Schedule B
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BidSum_Dene'_Tene'.pdf | ||
| Q&A_April_14.pdf | ||
| A003.pdf | ||
| A002_AK_TTP_CHIC_2013(1).pdf | ||
| Q&A_4-11.pdf | ||
| A001_AK_TTP_CHIC_2013(1).pdf | ||
| Q&A.pdf | ||
| GR01-15_Dene_Tene_Pedrestrain_Bridge_Foundation_Report__31March2015_.pdf | ||
| GM05-14_Dene_Tene_Path-Eska_Creek_Bridge_Preliminary_Foundation_Recommendations_05Feb2014.pdf | ||
| CHIC_2013(1)_101__Truss_Installation_Guide_By_Others.pdf | ||
| Plan_Request_for_Dene_Tene.pdf | ||
| IFB_Dene'_Tene'.pdf | ||
| Dene_Tene_XS_Final.pdf | ||
| Eska_Cr_Bridge_Geotechnical_Report_1997.pdf | ||
| Dene_Tene_Plans.pdf | ||
| GM15-14_Dene_Tene_Path-Eska_Creek_Liquefaction_Analysis_Memo_29July2014.pdf | ||
| CHIC_2013(1)_101__Truss_Plan_Set_By_Others.pdf | ||
| Dene_Tene_Earthwork_Schedule_A.pdf | ||
| PROJECT_DESCRIPTION_Dene_Tene.pdf | ||
| Pre-ad_Letter.pdf | ||
| Dene_Tene_Plans_Prelim.pdf |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FEDERAL HIGHWAY ADMINISTRATION
PROJECT
AK TTP CHIC 2013(1)
DENE’ TENE’ PEDESTRIAN PATH
SCHEDULE B
EARTHWORK
21+00.00 TO 30+92.00
ALASKA DEPARTMENT OF TRANSPORTATION
AND PUBLIC FACILITIES
MATANUSKA-SUSITNA BOROUGH, ALASKA
File: c:\myfiles\pw_production\d0188416\Dene_Tene_EW_Schedule B.log 6/28/2016, 1:50:47 PM
Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol
(sq. ft.) (cu. yd.) (cu. yd.)
(cu. yd.)
21+00.00 RDWYEXC
Excavation 19.23 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.18 0 0 1.00 0
EXISTPAVEMENT
Excavation 2.17 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 0 Mass ordinate for EXISTPAVEMENT = 0
TOPSOIL
Excavation 2.88 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.66 0 0 0.00 0
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.34 0 0 0.00 0
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 19.99 0 0 0.00 0
21+10.00 RDWYEXC
Page: 15
Excavation 0.79 4 4 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 33.91 6 6 1.00 -2
EXISTPAVEMENT
Excavation 0.00 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 -2 Mass ordinate for EXISTPAVEMENT = 0
TOPSOIL
Excavation 1.48 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -2 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -2
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -2
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -2
21+15.00 RDWYEXC
Excavation 0.00 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 48.47 8 8 1.00 -10
TOPSOIL
Excavation 0.25 0 0 0.00 Subsoil Exc 0.00 0 0 0.00
Page: 16
Fill 0.00 0 0 0.00 -10 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 0 0 0.00 -10
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -10
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 4 0 0.00 -10
21+20.00 RDWYEXC
Excavation 0.42 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 54.55 10 10 1.00 -20
TOPSOIL
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -20 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 0 0 0.00 -20
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -20
Page: 17
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 4 0 0.00 -20
21+27.00 RDWYEXC
Excavation 1.58 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 61.82 15 15 1.00 -35
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 0 0 0.00 -35
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -35
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 5 0 0.00 -35
21+30.00 RDWYEXC
Excavation 0.75 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 64.86 7 7 1.00 -42
TOPSOIL
Excavation 1.86 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -42 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00
Page: 18
Subsoil Exc 0.00 0 0 0.00 Fill 1.67 0 0 0.00 -42
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 0 0 0.00 -42
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 2 0 0.00 -42
21+40.00 RDWYEXC
Excavation 2.16 1 1 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 77.32 26 26 1.00 -67
TOPSOIL
Excavation 2.69 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -67 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -67
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -67
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -67
Page: 19
21+50.00 RDWYEXC
Excavation 2.95 1 1 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 91.31 31 31 1.00 -97
TOPSOIL
Excavation 3.24 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -97 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -97
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -97
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -97
21+60.00 RDWYEXC
Excavation 3.94 1 1 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 106.38 37 37 1.00 -133
TOPSOIL
Excavation 3.69 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -133 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00
Page: 20
Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -133
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -133
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -133
21+70.00 RDWYEXC
Excavation 4.92 2 2 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 119.97 42 42 1.00 -173
TOPSOIL
Excavation 4.11 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -173 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -173
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -173
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -173
Page: 21
21+75.00 RDWYEXC
Excavation 5.67 1 1 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 121.13 22 22 1.00 -194
TOPSOIL
Excavation 4.36 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -194 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 0 0 0.00 -194
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -194
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 4 0 0.00 -194
21+80.00 RDWYEXC
Excavation 6.78 1 1 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 122.24 23 23 1.00 -216
TOPSOIL
Excavation 4.68 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -216 Mass ordinate for TOPSOIL = 0
LAYER1
Page: 22
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.74 0 0 0.00 -216
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.46 1 0 0.00 -216
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.80 4 0 0.00 -216
21+90.00 RDWYEXC
Excavation 5.99 2 2 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 141.77 49 49 1.00 -263
TOPSOIL
Excavation 4.22 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -263 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.87 1 0 0.00 -263
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.73 1 0 0.00 -263
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00
Page: 23
Fill 22.42 8 0 0.00 -263
22+00.00 RDWYEXC
Excavation 5.43 2 2 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 155.73 55 55 1.00 -316
TOPSOIL
Excavation 4.25 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -316 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.00 1 0 0.00 -316
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 4.00 1 0 0.00 -316
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.01 9 0 0.00 -316
22+10.00 RDWYEXC
Excavation 1.89 1 1 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 239.62 73 73 1.00 -388
TOPSOIL
Excavation 2.75 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -388 Mass ordinate for TOPSOIL = 0
Page: 24
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.14 1 0 0.00 -388
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 4.26 2 0 0.00 -388
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 25.60 9 0 0.00 -388
22+13.00 RDWYEXC
Excavation 0.00 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 271.96 28 28 1.00 -416
TOPSOIL
Excavation 0.24 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -416 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.18 0 0 0.00 -416
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 4.34 0 0 0.00 -416
LAYER3
Excavation 0.00 0 0 0.00
Page: 25
Fill 26.09 3 0 0.00 -416
SKIP STATION RANGE = 22+15.00 to 23+80.00
22+20.00 RDWYEXC
Excavation 0.00 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 340.76 23 23 1.00 -439
TOPSOIL
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -439 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.27 0 0 0.00 -439
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 4.53 0 0 0.00 -439
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 27.22 2 0 0.00 -439
22+24.00 RDWYEXC
Excavation 0.00 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 348.25 0 0 1.00 -439
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.33 0 0 0.00 -439
Page: 26
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 4.64 0 0 0.00 -439
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 27.87 0 0 0.00 -439
23+70.00 RDWYEXC
Excavation 0.00 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 111.46 0 0 1.00 -439
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.21 0 0 0.00 -439
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 4.40 0 0 0.00 -439
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 26.42 0 0 0.00 -439
23+80.00 RDWYEXC
Excavation 0.00 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 99.78 0 0 1.00 -439
LAYER1
Excavation 0.00 0 0 0.00
Page: 27
Subsoil Exc 0.00 0 0 0.00 Fill 2.07 0 0 0.00 -439
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 4.13 0 0 0.00 -439
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.80 0 0 0.00 -439
23+90.00 RDWYEXC
Excavation 0.00 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 88.06 35 35 1.00 -474
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.94 1 0 0.00 -474
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.87 1 0 0.00 -474
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 23.27 9 0 0.00 -474
24+00.00 RDWYEXC
Excavation 0.00 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 70.80 29 29 1.00 -503
Page: 28
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.80 1 0 0.00 -503
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.60 1 0 0.00 -503
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 21.59 8 0 0.00 -503
24+10.00 RDWYEXC
Excavation 0.00 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 52.32 23 23 1.00 -526
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -526
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -526
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 8 0 0.00 -526
24+20.00 RDWYEXC
Excavation 0.00 0 0 1.00 Subsoil Exc 0.00 0 0 1.00
Page: 29
Fill 35.19 16 16 1.00 -542
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -542
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -542
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -542
24+30.00 RDWYEXC
Excavation 0.00 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 26.66 11 11 1.00 -553
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -553
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -553
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -553
24+40.00 RDWYEXC
Page: 30
Excavation 0.00 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 20.69 9 9 1.00 -562
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -562
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -562
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -562
24+50.00 RDWYEXC
Excavation 0.00 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 18.60 7 7 1.00 -569
TOPSOIL
Excavation 0.82 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -569 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -569
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00
Page: 31
Fill 3.33 1 0 0.00 -569
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -569
24+60.00 RDWYEXC
Excavation 0.13 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 14.45 6 6 1.00 -575
TOPSOIL
Excavation 4.50 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -575 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -575
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -575
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -575
24+70.00 RDWYEXC
Excavation 7.13 1 1 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 6.38 4 4 1.00 -578
TOPSOIL
Page: 32
Excavation 5.00 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -578 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -578
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -578
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -578
24+80.00 RDWYEXC
Excavation 22.18 5 5 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.46 1 1 1.00 -574
TOPSOIL
Excavation 0.00 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -574 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -574
LAYER2
Excavation 0.00 0 0 0.00
Page: 33
Fill 3.33 1 0 0.00 -574
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -574
SKIP STATION RANGE = 24+84.20 to 25+20.23
25+20.00 RDWYEXC
Excavation 19.96 3 3 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.03 0 0 1.00 -571
EXISTPAVEMENT
Excavation 3.08 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 -571 Mass ordinate for EXISTPAVEMENT = 0
TOPSOIL
Excavation 1.94 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -571 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.66 0 0 0.00 -571
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.34 1 0 0.00 -571
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 19.99 3 0 0.00 -571
Page: 34
25+30.00 RDWYEXC
Excavation 12.98 6 6 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 1.11 0 0 1.00 -565
EXISTPAVEMENT
Excavation 0.00 1 1 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 -565 Mass ordinate for EXISTPAVEMENT = 1
TOPSOIL
Excavation 5.00 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -565 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -565
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -565
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -565
25+40.00 RDWYEXC
Excavation 9.75 4 4 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 9.56 2 2 1.00 -563
TOPSOIL
Page: 35
Excavation 0.00 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -563 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -563
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -563
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -563
25+50.00 RDWYEXC
Excavation 9.06 3 3 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 9.98 4 4 1.00 -564
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -564
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -564
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00
Page: 36
Fill 20.00 7 0 0.00 -564
25+60.00 RDWYEXC
Excavation 3.56 2 2 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 11.30 4 4 1.00 -566
TOPSOIL
Excavation 5.00 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -566 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -566
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -566
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -566
25+70.00 RDWYEXC
Excavation 2.76 1 1 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 12.15 4 4 1.00 -569
TOPSOIL
Excavation 5.00 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -569
Page: 37
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -569
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -569
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -569
25+80.00 RDWYEXC
Excavation 2.35 1 1 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 12.51 5 5 1.00 -573
TOPSOIL
Excavation 5.00 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -573 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -573
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -573
LAYER3
Excavation 0.00 0 0 0.00
Page: 38
Fill 20.00 7 0 0.00 -573
25+90.00 RDWYEXC
Excavation 2.04 1 1 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 12.07 5 5 1.00 -577
TOPSOIL
Excavation 5.00 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -577 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -577
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -577
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -577
26+00.00 RDWYEXC
Excavation 2.49 1 1 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 11.26 4 4 1.00 -580
TOPSOIL
Excavation 5.00 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -580
Page: 39
Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -580
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -580
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -580
26+10.00 RDWYEXC
Excavation 3.92 1 1 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 10.53 4 4 1.00 -583
TOPSOIL
Excavation 3.74 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -583 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -583
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -583
LAYER3
Excavation 0.00 0 0 0.00
Page: 40
Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -583
26+20.00 RDWYEXC
Excavation 5.81 2 2 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 10.32 4 4 1.00 -585
TOPSOIL
Excavation 1.57 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -585 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -585
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -585
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -585
26+30.00 RDWYEXC
Excavation 6.76 2 2 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 10.37 4 4 1.00 -587
TOPSOIL
Excavation 0.87 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -587
Page: 41
Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -587
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -587
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -587
26+40.00 RDWYEXC
Excavation 7.70 3 3 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 10.65 4 4 1.00 -588
TOPSOIL
Excavation 0.28 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -588 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -588
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -588
LAYER3
Page: 42
Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -588
26+50.00 RDWYEXC
Excavation 8.34 3 3 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 11.01 4 4 1.00 -589
TOPSOIL
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -589 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -589
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -589
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -589
26+60.00 RDWYEXC
Excavation 9.26 3 3 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 10.36 4 4 1.00 -590
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00
Page: 43
Fill 1.67 1 0 0.00 -590
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -590
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -590
26+70.00 RDWYEXC
Excavation 10.66 4 4 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 9.16 4 4 1.00 -590
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -590
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -590
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -590
26+80.00 RDWYEXC
Excavation 12.02 4 4 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 7.90 3 3 1.00 -589
LAYER1
Page: 44
Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -589
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -589
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -589
26+90.00 RDWYEXC
Excavation 13.38 5 5 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 6.61 3 3 1.00 -587
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -587
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -587
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -587
27+00.00 RDWYEXC
Excavation 14.74 5 5 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 5.44 2 2 1.00 -584
Page: 45
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -584
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -584
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -584
27+10.00 RDWYEXC
Excavation 16.54 6 6 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 4.14 2 2 1.00 -580
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -580
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -580
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -580
27+20.00 RDWYEXC
Excavation 18.33 6 6 1.00
Page: 46
Subsoil Exc 0.00 0 0 1.00 Fill 2.83 1 1 1.00 -575
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -575
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -575
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -575
27+30.00 RDWYEXC
Excavation 20.35 7 7 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 1.80 1 1 1.00 -569
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -569
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.25 1 0 0.00 -569
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.08 7 0 0.00 -569
Page: 47
27+40.00 RDWYEXC
Excavation 22.40 8 8 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 1.20 1 1 1.00 -562
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -562
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -562
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -562
27+50.00 RDWYEXC
Excavation 24.38 8 8 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.02 0 0 1.00 -554
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -554
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -554
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00
Page: 48
Fill 20.00 7 0 0.00 -554
27+60.00 RDWYEXC
Excavation 24.97 9 9 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.02 0 0 1.00 -545
TOPSOIL
Excavation 0.02 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -545 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.64 1 0 0.00 -545
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -545
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -545
27+70.00 RDWYEXC
Excavation 24.92 9 9 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.02 0 0 1.00 -536
TOPSOIL
Excavation 0.12 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -536
Page: 49
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.66 1 0 0.00 -536
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -536
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -536
27+80.00 RDWYEXC
Excavation 23.75 9 9 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.08 0 0 1.00 -527
TOPSOIL
Excavation 0.14 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -527 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -527
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -527
LAYER3
Excavation 0.00 0 0 0.00
Page: 50
Fill 20.00 7 0 0.00 -527
27+90.00 RDWYEXC
Excavation 21.76 8 8 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.37 0 0 1.00 -519
TOPSOIL
Excavation 0.10 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -519 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -519
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -519
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -519
28+00.00 RDWYEXC
Excavation 19.35 8 8 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 1.09 0 0 1.00 -511
TOPSOIL
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -511
Page: 51
Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -511
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -511
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -511
28+10.00 RDWYEXC
Excavation 17.74 7 7 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 1.42 0 0 1.00 -504
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -504
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -504
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -504
28+20.00 RDWYEXC
Excavation 20.12 7 7 1.00
Page: 52
Subsoil Exc 0.00 0 0 1.00 Fill 0.83 0 0 1.00 -497
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -497
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -497
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -497
28+30.00 RDWYEXC
Excavation 20.90 8 8 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.54 0 0 1.00 -489
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -489
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.33 1 0 0.00 -489
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.00 7 0 0.00 -489
Page: 53
28+40.00 RDWYEXC
Excavation 21.34 8 8 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.44 0 0 1.00 -481
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.67 1 0 0.00 -481
LAYER2
Excavation 0.00 0 0 0.00