Amendment A003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BidSum_Dene'_Tene'.pdf | ||
| Q&A_April_14.pdf | ||
| A002_AK_TTP_CHIC_2013(1).pdf | ||
| Q&A_4-11.pdf | ||
| A001_AK_TTP_CHIC_2013(1).pdf | ||
| Q&A.pdf | ||
| Eska_Cr_Bridge_Geotechnical_Report_1997.pdf | ||
| GR01-15_Dene_Tene_Pedrestrain_Bridge_Foundation_Report__31March2015_.pdf | ||
| GM05-14_Dene_Tene_Path-Eska_Creek_Bridge_Preliminary_Foundation_Recommendations_05Feb2014.pdf | ||
| CHIC_2013(1)_101__Truss_Installation_Guide_By_Others.pdf | ||
| Dene_Tene_Plans.pdf | ||
| GM15-14_Dene_Tene_Path-Eska_Creek_Liquefaction_Analysis_Memo_29July2014.pdf | ||
| CHIC_2013(1)_101__Truss_Plan_Set_By_Others.pdf | ||
| Dene_Tene_Earthwork_Schedule_A.pdf | ||
| Dene_Tene_Earthwork_Schedule_B.pdf | ||
| Plan_Request_for_Dene_Tene.pdf | ||
| IFB_Dene'_Tene'.pdf | ||
| Dene_Tene_XS_Final.pdf | ||
| PROJECT_DESCRIPTION_Dene_Tene.pdf | ||
| Pre-ad_Letter.pdf | ||
| Dene_Tene_Plans_Prelim.pdf |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A003 04/14/2017 N/A AK TTP CHIC 2013(1), Dene’ Tene’ Pedestrian Path
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X
DTFH70-16-B-00028
9B. DATED (SEE ITEM 11)
03/09/2017
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A
N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
(__ ) is extended, ( x ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D OTHER (Specify type of modification and authority)
N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
AK TTP CHIC 2013(1), Dene’ Tene’ Pedestrian Path
Amendment A003 is issued to revise FAR Clause 52.236-4 Physical Data (Apr 1984). This amendment adds an additional Physical Data attachment.
ENCLOSURES: Pages C-75 Shipping Bill of Lading
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
C-75
Contract Clauses Project: AK TTP CHIC 2013(1), Dene’ Tene’ Pedestrian Path
52.236-4 Physical Data (Apr 1984)
Data and information furnished or referred to below is for the Contractor’s information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by: N/A..
(b) Weather conditions: N/A.
(c) Transportation facilities: N/A.
(d) Geotechnical data, design data, and environmental information consisting of the following, will be posted with the solicitation.
(1) CHIC 2013(1) 101% Truss Installation Guide By Others
(2) CHIC 2013(1) 101% Truss Plan Set By Others
(3) Eska Cr Bridge_Geotechnical_Report_1997
(4) GM05-14 Dene Tene Path-Eska Creek Bridge Preliminary Foundatio Recommendations 05Feb2014
(5) GM15-14 Dene Tene Path-Eska Creek Liquefaction Analysis Memo 29July2014
(6) GR01-15 Dene Tene Pedrestrain Bridge Foundation Report 31March2015
(7) Earthwork data listing end areas, adjusted volumes, and mass ordinates.
(8) Plotted cross-sections of earthwork.
(9) Shipping Bill of Lading
52.236-5 Material and Workmanship (Apr 1984)
(a) All equipment, material, and articles incorporated into the work covered by this contract shall be new and of the most suitable grade for the purpose intended, unless otherwise specifically provided in this contract. References in the specifications to equipment, material, articles, or patented processes by trade name, make, or catalog number, shall be regarded as establishing a standard of quality and shall not be construed as limiting competition. The Contractor may, at its option, use any equipment, material, article, or process that, in the judgment of the Contracting Officer, is equal to that named in the specifications, unless otherwise specifically provided in this contract.
(b) The Contractor shall obtain the Contracting Officer’s approval of the machinery and mechanical and other equipment to be incorporated into the work. When requesting approval, the Contractor shall furnish to the Contracting Officer the name of the manufacturer, the model number, and other information concerning the performance, capacity, nature, and rating of the machinery and mechanical and other equipment. When required by this contract or by the Contracting Officer, the Contractor shall also obtain the Contracting Officer’s approval of the material or articles which the Contractor contemplates incorporating into the work. When requesting approval, the Contractor shall provide full information concerning the material or articles. When directed to do so, the Contractor shall submit samples for approval at the Contractor’s expense, with all shipping charges prepaid. Machinery, equipment, material, and articles that do not have the required approval shall be installed or used at the risk of subsequent rejection.
(c) All work under this contract shall be performed in a skillful and workmanlike manner. The Contracting Officer may require, in writing, that the Contractor remove from the work any employee the Contracting Officer deems incompetent, careless, or otherwise objectionable.
52.236-6 Superintendence by the Contractor (Apr 1984)
At all times during performance of this contract and until the work is completed and accepted, the Contractor shall directly superintend the work or assign and have on the worksite a competent superintendent who is satisfactory to the Contracting Officer and has authority to act for the Contractor.
Revised by Amendment A003