PROJECT_DESCRIPTION.pdf
PDF 18 KB Posted
- Solicitation number
- DTFH70-15-B-00024
About this file
Project Description
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AK NPS KLGO 10(1) Repair Dyea Flats Road and Slide Cemetery Road, Klondike Gold Rush National Historical Park, Skagway Hoonah Angoon Borough, Alaska
The work consists of Base, Sub-excavation, Drainage, and other small items of work.
Project length: 2.238 Miles
Tentative Fixed Completion Date: Summer 2016 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: Between $500,000 and $1,000,000
Location: 9 miles NW of Skagway, Alaska
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
O ne
S ch ed ul e Sc h N am e
_A
DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance
(yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes 157 Soil Erosion & Sediment Control (Silt Fence) 1200 LNFT 157 Soil Erosion & Sediment Control (Fiber Roll) 1000 LNFT 157 Soil Erosion & Sediment Control (Sediment Control Trap) 3 EACH 157 Soil Erosion & Sediment Control (Temporary Diversion Channel) LPSM 158 Watering for Dust Control 80 MGAL
DIVISION 200 – Earthwork 201 Clearing & Grubbing 2.5 ACRE
203 Removal of Pipe Culvert 3 EACH 204 Excavation 1160 CUYD 204 Subexcavation 1000 CUYD 204 Select Borrow 3500 CUYD 211 Roadway Obliteration 100 SQYD
DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap, Class 1 900 CUYD
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
O ne
S ch ed ul e Sc h N am e
_A
252 Riprap Class 3 100 CUYD
DIVISION 300 – Aggregate and Base Courses 302 Roadway Aggregate 7700 TONS
DIVISION 600 – Incidental Construction 602 Culvert, 18-Inch 80 LNFT 602 Culvert, 24-Inch 136 LNFT 602 Culvert, 36-Inch 48 LNFT 604 Trench Drain (For information Only -Geotextile fabric 1000 SQYD, Granular rock backdrain 150 CUYD) 4300 SQFT 622 Rental Equipment (yes/no) Yes 623 General Labor (yes/no) Yes 624 Topsoil 4-Inch Depth 1 ACRE 633 Temporary Traffic Control – Remove and Reset Sign 16 EACH 635 Temporary Traffic Control Barricade Type 3 2 EACH 635Temporary Traffic Control – Tubular Marker 48 EACH 635 Temporary Traffic Control – Construction Sign 113 SQFT 635 Temporary Traffic Control – Warning Light 4 EACH 635 Temporary Traffic Control – Flagger 1200 FXHR 635 Temporary Traffic Control – Temporary Traffic Control Supervisor LPSM
File details come from the government source that posted it. Updated .