80__Dyea_Rd_Plan_Set.pdf
PDF 12 MB Posted
- Solicitation number
- DTFH70-15-B-00024
About this file
Preliminary Plans
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
% D es ign
P lan s
Not for
C on str uc tio n
Juneau
State Park
Point Bridge
Preserve and
National Park
Glacier Bay
Island
Chichagof
Island
Admiralty
Bemers Bay
Gold Rush
Klondike
PROJECT LOCATION
Marine Park
Bay State
St. James
ALASKA
Forest Resource
Haines State
State Forest
Haines
CANADA
UN
IT
ED
STATES
CAN
AD
A
UN
ITED
STATES
C A
N A
D A
C h ilk o o t In le t
C h ilk a t In le t
Alaska of
Gulf
Skagway
Atlin Lake
S T
A T E S
UNITED
Dyea Rd
N
SCALE IN MILES
25 0 25 50
Tatshenshini - Alsek Park
State Marine Park
Funter Bay
Project Location
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
TYPE OF CONSTRUCTION:
DESIGN DESIGNATION:
SPECIFICATION:
INDEX TO SHEETS
PROJECT MANAGER
PLANS FOR PROPOSED PROJECT
VANCOUVER, WASHINGTON
WESTERN FEDERAL LANDS HIGHWAY DIVISION
PLANS PREPARED BY
NATIONAL
PARK
SERVICE
Department of the Interior
CEAN
OCITCRA
i r e B n g ea S
PACIFIC OCEAN
Gulf of A la k a s
Dillingham
Bethel ANCHORAGE
Homer
King Salmon
Kodiak
Valdez
Tok YUKON
WHITEHORSE
JUNEAU
Unalaska
Kotzebue
Nome
FAIRBANKS
Barrow
S
IB
E R
IA
C A
N A
D A
U N I T
E D S
T A
T E S
BC
PARK
NATIONAL
DENALI
NAT'L PARK
ST. ELIAS
WRANGELL-
NAT'L PARK
LAKE CLARK
N.P.
FJORDS
KENAI
NAT'L PARK
THE ARCTIC
GATES OF
N.P.
VALLEY
KOBUK
PRESERVE
KATMAI N.P.
NAT'L PARK
GLACIER BAY
ALASKA KEY MAP
k u
Y o n
R
UNI
TE
D
STATE
S
RUSS
IA
AK NPS KLGO 10(1)
e (max)
V
ADT (2036)
ADT (2016)
N/A
15 MPH
B. CHON
NATIONAL HISTORICAL PARK
KLONDIKE GOLD RUSH
NATIONAL PARK SERVICE
U. S. DEPARTMENT OF THE INTERIOR
NPS PMIS No. 169515A NPS Drwg. No. XXX/XXXXX
COMMITMENT TO EXCELLENCE
FEDERAL LANDS HIGHWAY
LENGTH 2.238 MILES
SLIDE CEMETERY ROAD
AND
REPAIR DYEA FLATS ROAD
A.1
STATE PROJECT
NUMBER
SHEET
A
M
J u n e
U
S S u r ft
D c m y fi le s p w p r o d u c ti o n d k lg o a a .d g n
AK NPS KLGO 10(1)
S L
A N I N
R
M E
A D
O W
S
C h e c k e d b y
D e s ig n e d b y
RUSH NATIONAL PARK
KLONDIKE GOLD
H. PERMANENT TRAFFIC CONTROL PLAN
G. TEMPORARY TRAFFIC CONTROL PLAN
F. DRAINAGE
E. EROSION CONTROL
D. PLAN-PROFILE
C. TYPICAL SECTION(S)
B. SUMMARIES
A. GENERAL INFORMATION
Base, subexcavation, and drainage
ALASKA
SKAGWAY HOONAH ANGOON BOROUGH
DATE
DATE
DATE
Western Federal Lands Highway Division
Director, Project Delivery, DATE
DATE
Western Federal Lands Highway Division
Director, Project Delivery, National Park Service
Regional Director, Alaska Region, Klondike Gold Rush National Historical Park
Superintendent, Projects, FP-14 of Roads and Bridges on Federal Highway
Standard Specifications for Construction
STANDARD DRAWING
QUANTITIES
TABULATION OF PERMANENT TRAFFIC CONTROL
STANDARD DRAWINGS
TABULATION OF TEMPORARY TRAFFIC CONTROL
RIRPRAP HEADWALL AND TRENCH DRAIN
TABULATION OF DRAINAGE QUANTITIES
CONTROL TREATMENT
CULVERT AND TRENCH DRAIN EROSION
CONTROL QUANTITIES
TABULATION OF SOIL EROSION SEDIMENT
PLAN AND PROFILE
TABULATION OF PLAN QUANTITIES
TYPICAL SECTIONS
SUMMARY OF QUANTITIES
VICINITY MAP
PLAN SYMBOLS AND ABBREVIATIONS
TITLE SHEET
H.2
H.1
G.2-5
G.1
F.6
F.2-5
F.1
E.3-6
E.2
E.1
D.2-23
D.1
C.1-3
B.1-2
A.3
A.2
A.1
APPROVED:
es ign
P lan s
Not for
C on str uc tio n
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009 10/2014
W101-1
AND ABBREVIATIONS
PLAN SYMBOLS
W west drwg(s).
dist.
diaph.
diag.
dia.
DHV
D exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish jt.
ID
joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material
A p r il
U
C m y fi le s p w p r o d u c ti o n d k lg o a c .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
A.2 NPS KLGO 10(1) AK
NPS PMIS No. 169515A NPS Drwg. No. XXX/XXXXX
BH
CP GPS
JH
TP
DI
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
E
RIP
G G
W W
DI
T T
NOTE:
NO SCALE
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend 1.
Property Line w/Found Property Corner
Section Corner (Found, Projected)16
Section Line16
Section Corner (Found, Projected)4
Section Line4
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub θs Ø
∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
bearing bridge balance point bench mark back brg.
br.
BP
BM
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line
M.P.
M.L.
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use,
- no symbol -
EXISTING PROPOSED
Transition
Toe of Fill
Top of Cut wall face
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
Fiber Roll or Wattle es ign
P lan s
Not for
C on str uc tio n
DYEA
Dyea Road
Dyea Road
Dyea Roa d
VICINITY MAP
NATIONAL HISTORICAL PARK
KLONDIKE GOLD RUSH
N
Tai ya
Riv er
N e ls o n
C re e k
BEGIN PROJECT
END PROJECT
BEGIN ROAD
END ROAD
SCALE IN MILES
0 0.50 1.0
NPS PMIS No. 169515A NPS Drwg. No. XXX/XXXXX
3+40.00
DYEA FLATS ROAD
200+09.00
SLIDE CEMETERY ROAD
72+45.00
DYEA FLATS ROAD
208+60.00
END SLIDE CEMETERY ROAD
A.3
STATE PROJECT
NUMBER
SHEET
P
J u n e
U
S S u r ft m y fi le s p w p r o d u c ti o n d k lg o a d .d g
C h e c k e d b y
D e s ig n e d b y
Staging area
Staging area
208+60.00
BEGIN LOST LAKE ROAD
249+40.00
ROAD
LOST LAKE
9 miles
To Skagway, AK
T a iy a R iv e r es ign
P lan s
Not for
C on str uc tio n
Sheet and Description
SECTION D SECTION E SECTION F SECTION F SECTION G -
PLAN &
PROFILE
EROSION
CONTROL DRAINAGE
TEMP
TRAFF
CONTROL
PERM
TRAFF
CONTROL
ALLOWANCE Bid
Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
A0060 15301-0010 CONTRACTOR QUALITY CONTROL
AND ASSURANCE LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15702-1000 SOIL EROSION CONTROL,
TEMPORARY DIVERSION CHANNEL LPSM All ALL
A0140 15705-0100 SOIL EROSION CONTROL, SILT
FENCE LNFT 1,031 169 1,200
A0160 15705-1400 SOIL EROSION CONTROL, FIBER
ROLL LNFT 812 188 1,000
A0180 15706-0400 SOIL EROSION CONTROL,
SEDIMENT TRAP EACH 3 3
A0200 15801-0000 WATERING FOR DUST CONTROL MGAL 69 11 80
A0220 20101-0000 CLEARING AND GRUBBING ACRE 2.5 0.1 2.6
A0240 20301-1900 REMOVAL OF PIPE CULVERT EACH 3 3
A0260 20401-0000 ROADWAY EXCAVATION CUYD 1,027 133 1,160
A0280 20402-0000 SUBEXCAVATION CUYD 862 138 1,000
A0300 20410-0000 SELECT BORROW CUYD 3,257 243 3,500
A0320 25101-0100 PLACED RIPRAP, METHOD A,
CLASS 1 CUYD 800 100 900
A0340 25101-0300 PLACED RIPRAP, METHOD A,
CLASS 3 CUYD 95 15 110
A0360 25125-0000 BOULDER (6 FEET X 6 FEET X 6
FEET) EACH 1 1
A0380 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 7,337 363 7,700
A0400 60201-0600 18-INCH PIPE CULVERT LNFT 71 9 80
A0420 60201-0800 24-INCH PIPE CULVERT LNFT 120 16 136
A0440 60201-1000 36-INCH PIPE CULVERT LNFT 38 10 48
A0460 60414-0000 TRENCH DRAIN SQFT 4,025 275 4,300
A0480 62201-0250 DUMP TRUCK, 10 CUBIC YARD
MINIMUM CAPACITY HOUR 16 16
A0500 62201-0350 BACKHOE HOUR 16 16
A0520 62201-0750 WHEEL LOADER, 0.4 CUBIC YARD
MINIMUM RATED CAPACITY HOUR 24 24
A0540 62201-2350 POWER BROOM HOUR 24 24
A0560 62201-3850 WATER TRUCK HOUR 24 24
A0580 62301-0000 GENERAL LABOR HOUR 16 16
MileStone: 95% Date Completed: In Progress Report Date: 08/26/15
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES - Schedule A
-A ug
-2
1:
P
M
Remarks and/or Determination of Estimated
Quantity Pay Item Description Unit
Estimated Quantities c:
\m yf ile s\ pw
_p ro du ct io n\ d0 su m m ar y.
xl sm
]S he et
STATE PROJECT
B.1NPS KLGO 10(1)AK
SHEET
NUMBER
es ign
P lan s
Not for
C on str uc tio n
Sheet and Description
SECTION D SECTION E SECTION F SECTION F SECTION G -
PLAN &
PROFILE
EROSION
CONTROL DRAINAGE
TEMP
TRAFF
CONTROL
PERM
TRAFF
CONTROL
ALLOWANCE Bid
Schedule
A0600 62406-0300 PLACING CONSERVED TOPSOIL,
4-INCH DEPTH ACRE 2.5 2.5
A0620 63316-1000 REMOVE AND RESET SIGN EACH 16 16
A0640 63501-1000 TEMPORARY TRAFFIC CONTROL,
TRAFFIC CONTROL SUPERVISOR LPSM All ALL
A0660 63502-0600 TEMPORARY TRAFFIC CONTROL,
BARRICADE TYPE 3 EACH 2 2
A0680 63502-1050 TEMPORARY TRAFFIC CONTROL,
TUBULAR MARKER EACH 48 48
A0700 63502-1500 TEMPORARY TRAFFIC CONTROL,
WARNING LIGHT TYPE A EACH 2 2
A0720 63502-1600 TEMPORARY TRAFFIC CONTROL,
WARNING LIGHT TYPE B EACH 2 2
A0740 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 113 113
A0760 63509-1000 TEMPORARY TRAFFIC CONTROL,
FLAGGER FXHR 960 240 1,200
-A ug -2
1:
P M
MileStone: 95% Date Completed: In Progress Report Date: 08/26/15 c:
\m yf ile s\ pw
_p ro du ct io n\ d0 su m m ar y.
xl sm
]S he et
2) SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
STATE PROJECT
B.2NPS KLGO 10(1)AK
es ign
P lan s
Not for
C on str uc tio n
TYPICAL SECTION
LC
Traveled way Traveled way
Existing ground
3%3%
69+72 to 72+45
FOOTNOTE:
LC
Traveled way Traveled way
3%
1:2
C le a r in g L im it s
C le a r in g L im it s
0.5'
Select borrow
3+40 to 3+60
DYEA FLATS ROAD
TYPICAL SECTION
3' typ. 3' typ.
3' typ.
C le a r in g L im it s
C le a r in g L im it s 3' typ.
LC
Traveled way
Existing ground
3%3%
3+60 to 69+72
DYEA FLATS ROAD
TYPICAL SECTION
DYEA FLATS ROAD
TYPICAL SECTION
3' typ.
C le a r in g L im it s
C le a r in g L im it s
3' typ.
Profile grade point
6' 6'
9'
9'
Traveled way
0.5'
1:2
1:
1:2
NO SCALE
Select borrow
Select borrow
Roadway Aggregate, Method 2
6" compacted depth
Roadway Aggregate, Method 2
6" compacted depth
Roadway Aggregate, Method 2
6" compacted depth
Or as directed by the CO to preserve trees.
Existing ground
1:
1:2
3%
1:2
Match existing ground
Varies 6' - 9' Varies 6' - 9'
C.1
STATE PROJECT
AK
NPS KLGO 10(1)
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d k lg o c a .d g
S la n in a
M e a d o w s
C h e c k e d b y
D e s ig n e d b y es ign
P lan s
Not for
C on str uc tio n
TYPICAL SECTION
LC
Traveled way Traveled way
Existing ground
3%
C le a r in g L im it s
C le a r in g L im it
3%
LC
Traveled way Traveled way
Existing ground
3%
1:
C le a r in g L im it s
C le a r in g L im it
Select borrow
FOOTNOTE:
3%
200+09.00 to 208+60.00
208+60.00 to 249+40.00
Profile grade point
7'7'
Profile grade point
4.5'
NPS PMIS No. 169515A NPS Drwg. No. XXX/XXXXX
SLIDE CEMETERY ROAD
TYPICAL SECTION
NO SCALE
Select borrow
1:2
1:21:
3'3'
3'3'
Roadway Aggregate, Method 2
6" compacted depth
Roadway Aggregate, Method 2
6" compacted depth
Or as directed by CO to preserve trees.
4.5'
C.2
STATE PROJECT
J u n e
U
S S u r ft m y fi le s p w p r o d u c ti o n d k lg o c b .d
S la n
M e a d o
C h e c k e d b y
D e s ig n e d b y
LOST LAKE ROAD
TYPICAL SECTION
es ign
P lan s
Not for
C on str uc tio n
NPS PMIS No. 169515A NPS Drwg. No. XXX/XXXXX
NO SCALENO SCALE
CL
53+00 to 57+00
SUBEXCAVATION TYPICAL DETAILS
C le a r in g L im it s
C le a r in g L im it s
Select borrow
Placed riprap, method A, class 1
C.3
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d k lg o c c .d
S la n
M e a d o
C h e c k e d b y
D e s ig n e d b y
SUBEXCAVATION DETAILS
TABULATION OF
D.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d k lg o d a .d g n
AK NPS KLGO 10(1)
A u g u s t
C h e c k e d b y
D e s ig n e d b
14124
CP
Profile grade
Existing ground
Line to be constructed
BEGIN PROJECT
DYEA OLD TOWNSITE ROAD
3+40.00
N
Proposed shoulder
Proposed shoulder
Existing bridge
50025
SCALE IN FEET
Curve= 31
R= 260.00'
T= 80.02'
L= 155.25'
Existing shoulder construction
Limits of
El=20.38
E=2370863.05
N=2804157.92
Existing shoulder
Existing shoulder
Limits of construction
CUYD
EXC.
CUYD
EMB.
5+00 4+00 3+00 2+00 1+00
12 12
14 14
16 16
18 18
20 20
22 22
24 24
26 26
28 28
D.2
STATE PROJECT
NUMBER
SHEET
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d k lg o d b .d g
S la n
M e a d o
C h e c k e d b y
D e s ig n e d b y
Obliteration area
Clearing Limits
Clearing limits
P O
T
.0
P C
.9
P T
.1
.3
.0
40' VC
K = 73
-0.3474%
14123
Line to be constructed
Profile grade
Existing ground
N
Proposed shoulder
Proposed shoulder
50025
SCALE IN FEET
Remove and reset sign
Remove and reset sign
NPS PMIS No. 169515A NPS Drwg. No. XXX/XXXXX
D
R= 1,000.00'
T= 58.36'
L= 116.59'
Curve= 29
D
R= 600.00'
T= 27.75'
L= 55.47'
Curve= 28
D
R= 250.00'
T= 34.83'
L= 69.22'
Curve= 30 Existing shoulder
Existing shoulder
Limits of construction
Limits of construction
C u lv e r t
Construct culvert
NOTE:
Prune tree roots
CUYD
EXC.
CUYD
EMB.
11+0010+00 9+00 8+00 7+00 6+00 5+00
12 12
14 14
16 16
18 18
20 20
22 22
24 24
26 26
28 28
D.3
STATE PROJECT
NUMBER
SHEET
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d k lg o d c .d g
S la n
M e a d o
C h e c k e d b y
D e s ig n e d b y
Grind or remove stump and roots
Clearing limits
Clearing limits
Obliteration area
P C
.0
P T
.6
P C
.1
P T
.6
P C
.0
P T
.2
+0.2000%
.1
40' VC
K = 175
+0.4286%
14122
CP
14121
Line to be constructed
Profile grade
Existing ground
Proposed shoulder
Proposed shoulder
50025
SCALE IN FEET
Remove and reset sign
Remove and reset sign
Off:8.0' RT
Sta:13+35.90
Off:32.37' RT
Sta:13+38.01
Off:26.23' RT
Sta:14+43.28
Off:27.62' RT
Sta:14+51.10
Off:33.36' RT
Sta:14+59.61
Off:43.77' RT
Sta:14+68.10
Off:77.69' RT
Sta:14+82.94
Off:75.25' RT
Sta:14+95.29
Off:58.23' RT
Sta:14+99.65
Off:19.63' RT
Sta:15+28.71
NPS PMIS No. 169515A NPS Drwg. No. XXX/XXXXX
D
R= 400.00'
T= 28.27'
L= 56.44'
Curve= 26
D
R= 300.00'
T= 135.54'
L= 254.61'
Curve= 27
Limits of construction
Limits of construction
Existing shoulder
Existing shoulder
Remove and reset sign
Off:18.00' RT
Sta:16+45.96
Off:9.00' RT
Sta:16+68.29
NOTE:
Preserve existing island
Prune tree roots
CUYD
EXC.
CUYD
EMB.
17+0016+0015+0014+0013+0012+0011+00
12 12
14 14
16 16
18 18
20 20
22 22
24 24
26 26
28 28
D.4
STATE PROJECT
NUMBER
SHEET
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d k lg o d d .d g
S la n
M e a d o
C h e c k e d b y
D e s ig n e d b y
Grind or remove stump and roots
Placed riprap, method A, class 1
Clearing limits
Clearing limits
P C
.7
P T
.1
P C
.6
P T
.2
.6
+0.4286% -0.7600%
160' VC
K = 135
SSD = 988'
.7
60' VC
K = 59
+0.2504%
14120
CP
14120 CP
14120
CP
14119
Line to be constructed
Profile grade
Existing ground
Proposed shoulder
Proposed shoulder
50025
SCALE IN FEET
NPS PMIS No. 169515A NPS Drwg. No. XXX/XXXXX
D
R= 600.00'
T= 96.11'
L= 190.60'
D
R= 160.00'
T= 28.40'
L= 56.22'
Curve= 25
Curve= 24
Existing shoulder
Existing shoulder
Limits of construction
Limits of construction
Remove and reset sign
NOTE:
CUYD
EXC.
CUYD
EMB.
23+0022+0021+0020+0019+0018+0017+00
12 12
14 14
16 16
18 18
20 20
22 22
24 24
26 26
28 28
D.5
STATE PROJECT
NUMBER
SHEET
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d k lg o d e .d g
S la n
M e a d o
C h e c k e d b y
D e s ig n e d b y
Grind or remove stump and roots
Prune tree roots
Clearing limits
Clearing limits
P C
.9
P T
.5
P C
.7
P T
.9
P C
.3
.2
+0.2504%
30' VC
K = 86
+0.5993%
14118
CP
14117
CP
14116
CP
Line to be constructed
Profile grade
Proposed shoulder
Proposed shoulder
50025
SCALE IN FEET
Off:9.0' LT
Sta:28+46.58
Off:9.0' RT
Sta:28+46.54
Off:16.0' LT
Sta:28+85.72
Off:16.0' RT
Sta:28+85.72
Existing ground
NPS PMIS No. 169515A NPS Drwg. No. XXX/XXXXX
D
R= 230.00'
T= 85.95'
L= 164.51'
Curve= 20
D
R= 350.00'
T= 17.29'
L= 34.55'
Curve= 23
Existing shoulder
Existing shoulder
Limits of construction
Limits of construction
Curve= 33
R= 100.00'
T= 30.93'
L= 59.99'
D
D
T= 17.04'
Curve= 22
L= 67.99'
R= 400.00'NOTE:
Prune tree roots
CUYD
EXC.
CUYD
EMB.
29+0028+0027+0026+0025+0024+0023+00
16 16
18 18
20 20
22 22
24 24
26 26
28 28
30 30
32 32
D.6
STATE PROJECT
NUMBER
SHEET
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d k lg o d f.
d g
S la n
M e a d o
C h e c k e d b y
D e s ig n e d b y
Grind or remove stump and roots
Clearing limits
Clearing limits
P T
.8
P C
.5
P T
.5
P C
.1
P T
.1
P C
.2
P T
.7
.0
+0.5993%
+0.2925%
40' VC
K = 130
SSD = 3537'
14115
CP
14115
CPCP
14114
Line to be constructed
Profile grade
Existing ground
Proposed shoulder
50025
SCALE IN FEET
Proposed shoulder
Off:9.0' RT
Sta:29+53.84
Off:16.0' RT
Sta:29+32.52
Off:9.0' LT
Sta:29+55.01
Off:16.0' LT
Sta:29+32.52
NPS PMIS No. 169515A NPS Drwg. No. XXX/XXXXX
D
R= 260.00'
T= 42.32'
L= 83.91'
Curve= 18
D
R= 220.00'
T= 111.21'
L= 205.94'
Curve= 17
D
T= 74.88'
L= 146.76'
Curve= 19
Existing shoulder
Existing shoulder
Limits of construction
Limits of construction
C u lv e r t
Extend culvert
Construct culvert
Remove and replace culverts
C u lv e r ts
NOTE:
CUYD
EXC.
CUYD
EMB.
35+0034+0033+0032+0031+0030+0029+00
16 16
18 18
20 20
22 22
24 24
26 26
28 28
30 30
32 32
D.7
STATE PROJECT
NUMBER
SHEET
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d k lg o d g .d g
C h e c k e d b y
D e s ig n e d b y
Grind or remove stump and roots
Clearing limits
R= 300.00'
Clearing limits
P C
.3
P T
.2
P C
.3
P T
.2
P C
.7
P T
.5
P C
.9
.1
-0.5680%
170' VC
K = 198
SSD = 1339'
.7
-0.0963%
60' VC
K = 127
14113
CP
14112
CP
14111
Profile grade
Existing ground
Line to be constructed
Proposed shoulder
Proposed shoulder
50025
SCALE IN FEET
90' R
30'R
Riprap headwall
Riprap headwall
NPS PMIS No. 169515A NPS Drwg. No. XXX/XXXXX
D
R= 325.00'
T= 16.80'
L= 33.57'
Curve= 15
D
R= 100.00'
T= 53.20'
L= 97.78'
Curve= 12
D
T= 45.41'
Curve= 16
Existing shoulder shoulder Existing
Limits of construction
Limits of construction replace culvert
Remove and
R= 150.00'
L= 100.82' c u lv e r t
R= 180.00'
T= 59.06'
L= 114.13'
Curve= 34
D
Off: 9.00' RT
Sta:37+10.00
Off:16.18' LT
Sta:37+01.71
Off: 9.00' RT
Sta:36+50.00
See Sheet D.15
Lost Lake Road and Slide Cemetery &
Intersection at Dyea Flats
NOTE:
Prune roots
Remove and reset signs reste sign
Remove and reste sign
Remove and
CUYD
EXC.
CUYD
EMB.
41+0040+0039+0038+0037+0036+0035+00
16 16
18 18
20 20
22 22
24 24
26 26
28 28
30 30
32 32
D.8
STATE PROJECT
NUMBER
SHEET
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d k lg o d h .d g
S la n
M e a d o
C h e c k e d b y
D e s ig n e d b y
Grind or remove stump and roots
Clearing limits
Clearing limits
P T .5
P C .9
P T
.5
P C
.9
P T
.6
P C
.0
P T
.0
P C
.6
P T
.7
P C
.0
P T .8
PC 200+19.30
PT 200+59.94
.1
-0.0963%
100' VC
K = 65
.3
+1.444 4%
+0.3867%
60' VC
K = 57
SSD = 1050'
14110
CP
14110
CP
14109
Profile grade
Existing ground
Line to be constructed Proposed shoulder
50025
SCALE IN FEET
Proposed shoulder
NPS PMIS No. 169515A NPS Drwg. No. XXX/XXXXX
D
R= 300.00'
T= 84.79'
L= 165.27'
D
R= 160.00'
T= 22.20'
L= 44.12'
Curve= 11
Curve= 10
Existing shoulder
Existing shoulder
Limits of construction
Limits of construction
NOTE:
Prune roots
CUYD
EXC.
CUYD
EMB.
47+0046+0045+0044+0043+0042+0041+00
18 18
20 20
22 22
24 24
26 26
28 28
30 30
32 32
34 34
D.9
STATE PROJECT
NUMBER
SHEET
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d k lg o d i.
d g
S la n
M e d o
C h e c k e d b y
D e s ig n e d b y
Grind or remove stump and roots
Clearing limits
Clearing limits
P T
.8
P C
.0
P T
.2
P C
.0
P T
.1
+0.3867%
.8
+0.3867% -0.5778%
40' VC
K = 41
SSD = 1139'
.5
80' VC
K = 85
14108
Line to be constructed
Profile grade
Existing ground
Proposed shoulder
50025
SCALE IN FEET
Proposed shoulder
NPS PMIS No. 169515A NPS Drwg. No. XXX/XXXXX
D
R= 180.00'
T= 36.53'
L= 72.09'
Curve= 8
D
R= 280.00'
T= 102.43'
L= 196.38'
Curve= 7
D
R= 360.00'
T= 51.89'
L= 103.08'
Curve= 9
Limits of construction
Limits of construction
Existing shoulder
Existing shoulder
CUYD
EXC.
CUYD
EMB.
53+0052+0051+0050+0049+0048+0047+00
18 18
20 20
22 22
24 24
26 26
28 28
30 30
32 32
34 34
D.10
STATE PROJECT
NUMBER
SHEET
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d k lg o d j.
d g
S la n
M e a d o
C h e c k e d b y
D e s ig n e d b y
NOTE:
Prune tree roots
Grind or remove stump and roots
Clearing limits
Clearing limits
P C
.4
P T
.5
P C
.0
0 P
T
.4
P C
.5
P T
.6
+0.3600%
.4
80' VC
K = 462
.0
+0.5333%
100' VC
K = 85
SSD = 962'
-0.6500%
14107
Line to be constructed
Profile grade
Proposed shoulder
50025
SCALE IN FEET
Proposed shoulder
NPS PMIS No. 169515A NPS Drwg. No. XXX/XXXXX
Limits of construction
Limits of construction
Existing shoulder
Existing shoulder
CUYD
SUBEX.
CUYD
SUBEX.806
53+00
Begin subexcavation 57+00
End subexcavation
Existing ground
CUYD
EXC.
CUYD
EMB.
59+0058+0057+0056+0055+0054+0053+00
18 18
20 20
22 22
24 24
26 26
28 28
30 30
32 32
34 34
D.11
STATE PROJECT
NUMBER
SHEET
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d k lg o d k .d g
S la n
M e a d o
C h e c k e d b y
D e s ig n e d b y
NOTE:
Grind or remove tree stump and roots
Clearing limits
Clearing limits
-0.6500%
.7
60' VC
K = 55 5
.0
+0.4333%
+0.0333%
40' VC
K = 100
SSD = 2718'
14106
CP
14105
Line to be constructed
Profile grade
Existing ground
Proposed shoulder
50025
SCALE IN FEET
Proposed shoulder
NPS PMIS No. 169515A NPS Drwg. No. XXX/XXXXX
D
R= 160.00'
T= 48.61'
L= 94.39'
D
R= 1,000.00'
T= 67.84'
L= 135.47'
Curve= 6
Curve= 5
Limits of construction
Limits of construction
Existing shoulder
Existing shoulder
CUYD
EXC.
CUYD
EMB.
65+0064+0063+0062+0061+0060+0059+00
22 22
24 24
26 26
28 28
30 30
32 32
34 34
36 36
38 38
D.12
STATE PROJECT
NUMBER
SHEET
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d k lg o d l.
d g
S la n
M e a d o
C h e c k e d b y
D e s ig n e d b y
NOTE:
Grind or remove tree stump and roots
Clearing limits
Clearing limits
P C
.1
P T
.5
P C
.7
P T
.2
P C
.0
.1
40' VC
K = 171 6
.9
+0.2667%
+0.1882%
30' VC
K = 383
SSD = 13772'
+0.0333%
14104
CP
14103
CP
14102
Profile grade
Existing ground
Line to be constructed
Proposed shoulder
Proposed shoulder
50025
SCALE IN FEET
NPS PMIS No. 169515A NPS Drwg. No. XXX/XXXXX
D
R= 360.00'
T= 35.10'
L= 69.98'
Curve= 3
D
R= 700.00'
T= 63.43'
L= 126.52'
Curve= 2
D
T= 87.79'
L= 153.07'
Curve= 4
R= 125.00' Limits of Construction
Existing Shoulder
Existing Shoulder
Limits of Construction6
Remove and reset sign
CUYD
EXC.
CUYD
EMB.
70+0069+0068+0067+0066+0065+00
22 22
24 24
26 26
28 28
30 30
32 32
34 34
36 36
38 38
D.13
STATE PROJECT
NUMBER
SHEET
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d k lg o d m .d g
S la n
M e a d o
C h e c k e d b y
D e s ig n e d b y
: NOTE
Grind or remove tree stump and roots
Clearing limits
Clearing limits
11'
- 4"
P C
.0
5 P
T
.0
P C
.0
P T
.5
P C
.1
PT 69+72.21
+0.1882%
14101
72+45.00
Profile grade
Existing ground
50025
SCALE IN FEET
END PROJECT
NPS PMIS No. 169515A NPS Drwg. No. XXX/XXXXX
D
T= 14.78'
L= 29.53'
Curve= 1
R= 270.00'
Existing shoulder
Existing shoulder
Limits of Construction
Limits of Construction
EL= 30.65
E= 2373240.55
N=2809206.61
DYEA FLATS ROAD
CUYD
EXC.
CUYD
EMB.
See Sheet C.3
Taper to existing road
Remove and reset sign
Proposed shoulder
Remove and reset sign
Proposed shoulder
Line to be constructed
'1
CUYD
EXC.
CUYD
EMB.
74+0073+0072+0071+0070+00
22 22
24 24
26 26
28 28
30 30
32 32
34 34
36 36
38 38
D.14
STATE PROJECT
NUMBER
SHEET
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d k lg o d n .d g
S la n
M e a d o
C h e c k e d b y
D e s ig n e d b y
Clearing limits
Clearing limits
P C
.9
P T
.5
P O
T
.0
.5
40' VC
K = 25
SSD = 701'
-1.3968%
BEGIN
200+09.00
N
CP
14113
CP
14201 CP
14202
Line to be constructed
Profile grade
Existing ground
Proposed shoulder
Proposed shoulder
50025
SCALE IN FEET
CEMETERY ROAD
SLIDE
Riprap headwall
NPS PMIS No. 169515A NPS Drwg. No. XXX/XXXXX
D
T= 21.08'
Curve= 101
D
R= 250.00'
T= 53.60'
L= 105.61'
Curve= 14
L= 40.63'
R= 70.00'
Curve= 15
R= 100.00'
T= 53.20'
L= 97.78'
Curve= 38
R= 70.00'
T= 18.48'
L= 36.13'
R= 100.00'
T= 19.72'
L= 38.94'
Curve= 39 Curve= 40
R= 100.00'
T= 19.42'
L= 38.36'
T r e n c h d r a in
Trench drain
D
D
D D
CUYD
EXC.
CUYD
EMB.
205+00204+00203+00202+00201+00200+00
18 18
20 20
22 22
24 24
26 26
28 28
30 30
32 32
34 34
D.15
STATE PROJECT
NUMBER
SHEET
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d k lg o d o .d g
S la n
M e a d o
C h e c k e d b y
D e s ig n e d b y
NOTE:
Grind or remove stump and roots
Clearing limits
Clearing limits
P C
.9
P C
.3
P T
.9
P C
.5
P T
.1
P C
.4
P T
.5
P C
.1
P T
.1
P C
.0
P T
.4
.5
.4
+1.563 1%
-0.3095%
160' VC
K = 89
SSD = 684'
18" CMP
14203
CP
14204
CP
14205
Profile grade
Exsiting ground
Line to be constructed
Proposed shoulder
Proposed shoulder
50025
SCALE IN FEET
Remove and reset sign
Remove and reset sign
NPS PMIS No. 169515A NPS Drwg. No. XXX/XXXXX
Curve= 107
D
R= 100.00'
T= 16.93'
L= 33.54'
Curve= 108
D
R= 600.00'
T= 23.83'
L= 47.64'
Curve= 109
D
R= 80.00'
T= 12.71'
L= 25.21'
208+60.00
Curve= 41
R= 160.00'
T= 41.91'
L= 81.99'
Curve= 53
R= 180.00'
T= 39.69'
L= 78.12'
Off:7.0' LT
Sta:207+91.29 Off:7.0' LT
Sta:208+40.06
Off:7.0' LT
Sta:208+46.42
Off:15.95' LT
Sta:208+46.78
Off:15.39' LT
Sta:208+39.92 Off:45.82' LT
Sta:208+44.63 Off:46.95' LT
Sta:207+86.85
Off:17.01' LT
Sta:207+91.47
Off:16.96' LT
Sta:207+87.94
D
D
BEGIN LOST LAKE ROAD
(6' L x 6' W x 3' H)
Place boulder
CUYD
EXC.
CUYD
EMB.
211+00210+00209+00208+00207+00206+00205+00
18 18
20 20
22 22
24 24
26 26
28 28
30 30
32 32
34 34
D.16
STATE PROJECT
NUMBER
SHEET
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d k lg o d p .d g
S la n
M e a d o
C h e c k e d b y
D e s ig n e d b y
NOTE:
Prune tree roots
Grind or remove stump and roots
Clearing limits
Clearing limits
R 5'
R 4.2'
P C
.5
P T
.5
P C
.9
P T
.1
P C
.6
P T
.2
P C
.5
P T
.2
0 P
C
.4
P T
.6
.1
100' VC
K = 63
.3
+1.2800
121' VC
K = 110
SSD = 1044'
.8
+0.1833%
40' VC
K = 74
SSD = 2006'
14206 CP
14207
CP
14208
CP
14209 Line to be constructed
Profile grade
Existing ground
Proposed shoulder
Proposed shoulder
50025
SCALE IN FEET
NPS PMIS No. 169515A NPS Drwg. No. XXX/XXXXX
D
R= 150.00'
T= 39.12'
L= 76.53'
Curve= 110
D
R= 190.00'
T= 47.29'
L= 92.70'
Curve= 112
Curve= 113
D
R= 90.00'
T= 28.74'
L= 55.63'
Curve= 111
D
R= 90.00'
T= 19.17'
L= 37.78'
Off:4.5' LT
Sta:211+22.93
Trench drain
T r e n c h d r a in
CUYD
EXC.
CUYD
EMB.
217+00216+00215+00214+00213+00212+00211+00
20 20
22 22
24 24
26 26
28 28
30 30
32 32
34 34
36 36
D.17
STATE PROJECT
NUMBER
SHEET
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d k lg o d q .d g
S la n
M e a d o
C h e c k e d b y
D e s ig n e d b y
NOTE:
Grind or remove stump and roots
Clearing limits
Clearing limits
P C
.5
P T
.0
P C
.7
P T
.5
P C
.3
P T
.1
P C
.6
P T
.2
P C
.2
.1
-0.3600%
100' VC
K = 77
.0
+0.9350% -0.2333%
100' VC
K = 86
SSD = 974'
-0.2333%
14210
CP
14211
CP
14212
CP
14213
Line to be constructed
Profile grade
Existing ground
Proposed shoulder
50025
SCALE IN FEET
Proposed shoulder
NPS PMIS No. 169515A NPS Drwg. No. XXX/XXXXX
D R= 90.00'
Curve= 117
D
T= 7.84'
T= 24.54'
L= 39.95'
R= 200.00'
L= 34.26'
Curve= 43
D
R= 200.00'
T= 69.19'
L= 133.23'
D
R= 180.00'
T= 89.02'
L= 165.34'
Curve= 44
Curve= 116
Trench drain
T r e n c h d r a in
CUYD
EXC.
CUYD
EMB.
223+00222+00221+00220+00219+00218+00217+00
20 20
22 22
24 24
26 26
28 28
30 30
32 32
34 34
36 36
D.18
STATE PROJECT
NUMBER
SHEET
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d k lg o d r .d g
S la n
M e a d o
C h e c k e d b y
D e s ig n e d b y
NOTE:
Grind or remove stump and roots
Clearing limits
Clearing limits
P T
.5
P C
.9
P T
.3
P C
.9
P T
.9
P C
.7
P T
.9
.3
40' VC
K = 88
.9
+0.2222% -0.1739%
27' VC
K = 69
SSD = 2737'
-0.2333%
14214
CP
14215
CP
14216
CP
14217
CP
14218
Line to be constructed
Profile grade
Existing ground
Proposed shoulder
Proposed shoulder
50025
SCALE IN FEET
NPS PMIS No. 169515A NPS Drwg. No. XXX/XXXXX
Curve= 48
D
R= 60.00'
T= 9.73'
L= 19.28'
Curve= 47
D
R= 100.00'
T= 31.41'
L= 60.86' Curve= 49
D
R= 75.00'
T= 76.87'
L= 119.65'
Curve= 54
D
R= 140.00'
T= 35.29'
L= 69.14'
Curve= 55
D
R= 100.00'
T= 11.73'
L= 23.36'
Curve= 56
D
R= 160.00'
T= 7.51'
L= 15.02'
Curve= 125
D
R= 160.00'
T= 19.48'
L= 38.76'
Trench drain
T r e n c h d r a in
CUYD
EXC.
CUYD
EMB.
229+00228+00227+00226+00225+00224+00223+00
24 24
26 26
28 28
30 30
32 32
34 34
36 36
38 38
40 40
D.19
STATE PROJECT
NUMBER
SHEET
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d k lg o d s .d g
S la n
M e a d o
C h e c k e d b y
D e s ig n e d b y
NOTE:
Grind or remove stump and roots
Clearing limits
Clearing limits
P C
.1
P T
.0
P C
.0
P T .3
PC 224+
85.37
P T
.0
P C
.4
P T
.5
P C
.4
P T
.8
P C
.2
P T
.2
P C
.2
P T
.0
.5
60' VC
K = 44
.3
+1.1915
+0.4110%
40' VC
K = 51
SSD = 1402'
14219
CP
14220 Line to be constructed
Profile grade
Existing ground
Proposed shoulder
50025
SCALE IN FEET
Proposed shoulder
NPS PMIS No. 169515A NPS Drwg. No. XXX/XXXXX
Curve= 127
D R= 400.00'
T= 22.03'
L= 44.01'
D R= 260.00'
T= 11.37'
L= 22.73'
Curve= 126
Curve= 128
D R= 200.00'
T= 35.50'
L= 70.27'
Curve= 129
D R= 200.00'
T= 10.62'
L= 21.22'
Curve= 131
D R= 140.00'
T= 12.81'
L= 25.55'
Curve= 130
D R= 1,000.00'
T= 27.67'
L= 55.32'
Curve= 132
D R= 60.00'
T= 17.54'
L= 34.13'
T r e n c h d r a in
T r e n c h d r a in
Trench drain
Trench drain
CUYD
EXC.
CUYD
EMB.
235+00234+00233+00232+00231+00230+00229+00
24 24
26 26
28 28
30 30
32 32
34 34
36 36
38 38
40 40
D.20
STATE PROJECT
NUMBER
SHEET
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d k lg o d t.
d g
S la n
M e a d o
C h e c k e d b y
D e s ig n e d b y
NOTE:
Grind or remove stump and roots
Clearing limits
Clearing limits
P C
.4
P T
.1
P C
.1
0 P
T
.1
P C
.1
P T
.4
P C
.4
P T
.6
P C
.1
P T
.4
P C
.7
P T
.2
P C
.6
P T
.7
P C
.9
.2
+0.4110%
+0.0630%
40' VC
K = 115
SSD = 3121' 2
.4
+0.6250%
40' VC
K = 71
14221
CP
14222
CP
14223
Line to be constructed
Profile grade
Existing ground
Proposed shoulder
50025
SCALE IN FEET
Propsed shoulder
NPS PMIS No. 169515A NPS Drwg. No. XXX/XXXXX
D R= 210.00'
T= 36.90'
L= 73.06'
Curve= 133
Curve= 134
D R= 120.00'
T= 36.20'
L= 70.31'
Curve= 50
D
R= 100.00'
T= 35.23'
L= 67.75'
Curve= 51
D
R= 300.00'
L= 89.73'
T= 45.20'
Trench drain
T r e n c h d r a in
CUYD
EXC.
CUYD
EMB.
241+00240+00239+00238+00237+00236+00235+00
28 28
30 30
32 32
34 34
36 36
38 38
40 40
42 42
44 44
D.21
STATE PROJECT
NUMBER
SHEET
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d k lg o d u .d g
S la n
M e a d o
C h e c k e d b y
D e s ig n e d b y
NOTE:
Grind or remove stump and roots
Clearing limits
Clearing limits
P C
.9
P T
.0
P C
.8
P T
.1
P C
.1
P T
.9
P C
.6
P T
.3
.9
+0.6250%
40' VC
K = 229
SSD = 6186'
.2
+0.4500%
40' VC
K = 152
SSD = 4130'
+0.1875%
Curve= 140
D
R= 90.00'
T= 11.78'
L= 23.44'
Curve= 142
D
R= 250.00'
T= 22.96'
L= 45.79'
Curve= 141
D
R= 700.00'
T= 45.74'
L= 91.35'
14224
CP
14225
CP
14226
CP
Line to be constructed
Profile grade
Existing ground
Proposed shoulder
50025
SCALE IN FEET
Proposed shoulder
NPS PMIS No. 169515A NPS Drwg. No. XXX/XXXXX
Curve= 52
D
R= 100.00'
T= 20.95'
L= 41.30'
T r e n c h d r a in
Trench drain
CUYD
EXC.
CUYD
EMB.
247+00246+00245+00244+00243+00242+00241+00
30 30
32 32
34 34
36 36
38 38
40 40
42 42
44 44
46 46
D.22
STATE PROJECT
NUMBER
SHEET
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d k lg o d v .d g
S la n
M e a d o
C h e c k e d b y
D e s ig n e d b y
NOTE:
Grind or remove stump and roots
Clearing limits
Clearing limits
P C
.1
P T
.4
P C
.7
P T
.1
P C
.8
P T
.2
P C
.4
P T
.2
+0.1875%
.0
+0.5333%
40' VC
K = 116
14227
Profile grade
Existing ground
Line to be constructed
END PROJECT
LOST LAKE ROAD
249+40.00
Proposed shoulder
Proposed shoulder
50025
SCALE IN FEET
EL= 40.24
E=2371591.41
N=2811919.26
NPS PMIS No. 169515A NPS Drwg. No. XXX/XXXXX
D R= 500.00'
T= 71.59'
L= 142.21'
Curve= 144
D R= 500.00'
T= 15.42'
L= 30.84'
Curve= 143
Remove and reset sign
Remove and reset sign
See Sheet C.3
Taper to existing road
10' R
'R
R
Off:4.5' LT
Sta:248+78.88
Off:14.4' LT
Sta:248+88.60
Off:24.5' LT
Sta:248+88.60
Off:24.5' RT
Sta:249+04.99
Off:24.5' RT
Sta:248+94.47
Off:14.71' RT
Sta:248+94.58
'R
Off:4.5' RT
Sta:248+84.28
Off:4.5' LT
Sta:249+26.94
Off:14.40' LT
Sta:249+17.22
Off:24.5' LT
Sta:249+17.22
Off:14.71' RT
Sta:249+04.88
Off:4.5' RT
Sta:249+15.18
NOTE:
CUYD
EXC.
CUYD
EMB.
251+00250+00249+00248+00247+00
30 30
32 32
34 34
36 36
38 38
40 40
42 42
44 44
46 46
D.23
STATE PROJECT
NUMBER
SHEET
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d k lg o d w .d g
C h e c k e d b y
D e s ig n e d b y
Grind or remove stump and roots
Clearing limits
Clearing limits
P C
.1
P T
.3
P C
.5
P T
.4
P O
T
.7
.6
+0.2667%
40' VC
K = 150
SSD = 4067'
.2 es ign
P lan s
Not for
C on str uc tio nNOTE:
QUANTITIES
SEDIMENT CONTROL
SOIL EROSION &
TABULATION OF
NPS PMIS No. 169515A NPS Drwg. No. XXX/XXXXX
E.1
STATE PROJECT
J u n e
I n t_ ft m y fi le s p w p r o d u c ti o n d K
L G
O d a t.
d g n
D
S la n in a R
M e a d o w s
C h e c k e d b y
D e s ig n e d b y accomodate permits and actual operations.
Contractor may modify the erosion control plans as necessary to
SCR Section 157 requirements.
Erosion control devices and plans as shown are approximate. See
2.
1.
es ign
P lan s
Not for
C on str uc tio n
NO SCALE
D it c h
Flowing Drainage
F lo w in g D ra in a g e
FOOTNOTE:
E.2
STATE PROJECT
K L
G O d b
U
S S u r ft
D
D
S la n in a C h e c k e d b y
R
M e a d o w s
D e s ig n e d b y silt fence Install
Install silt fence
Install fiber rolls
NPS PMIS No. 169515A NPS Drwg. No. XXX/XXXXX silt fence Install
Install silt fence
Standing water
Sta ndin g w ate r
EROSION CONTROL TREATMENT
TYPICAL CULVERT
Culvert
Trench drain
EROSION CONTROL TREATMENT
TYPICAL TRENCH DRAIN
CONTROL TREATMENT
DRAIN EROSION
CULVERT AND TRENCH
Remove silt fence after culvert/trench drain installation.
only in the case of flowing water.
Provide sediment traps, and diversion channels es ign
P lan s
Not for
C on str uc tio n
STANDARD NO SCALE
U.S. CUSTOMARY STANDARD
NUMBER
SHEET
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE
E.3
PROJECT
s t1
.d g n
U
S C u s to m a r y
STANDARD APPROVED FOR USE 6/2005
REVISED: 6/2007
m in m in m in
6" min. trench
4" min.
SILT FENCE
157-1
6 ft. (max.) spacing without fence support.
10 ft. (max.) spacing with fence support.
NPS PMIS No. 169515A NPS Drwg. No. XXX/XXXXX
NOTE:
ELEVATION
PLAN
POST AND GEOTEXTILE INSTALLATION DETAIL
SILT FENCE INSTALLATION AT TOE OF FILL
Flow
Fi ll slo pe
Flow
T o e o f s lo p e
Flow
Flow
(undisturbed)
Existing ground
Varies
Varies Limits of clearing
Geotextile, type V-A
Support mesh
Steel or wood post
See Note 4 for spacing
Backfilled and compacted soil around the end of the silt fence prevent water from flowing
Provide sufficient length to fo s p a c in g
S e e n o te
See Note 1
SILT FENCE INSTALLATION IN A DRAINAGE DITCH
around the ends.
of silt fence upgrade to prevent water from running
Install silt fence along ground contours. Curve ends does not slide down, supporting posts.
types must ensure silt fence remains attached to, and recommendations for installation procedures. All dimensions are satisfied. Follow manufacturer's type V-B) will be allowed as long as specified
Alternate preassembled silt fence options (geotextile, only when specified on Erosion Control Plan.
Use drainage ditch installation for low flow conditions
4.
3.
es ign
P lan s
Not for
C on str uc tio n
STANDARD
U.S. CUSTOMARY STANDARD
NUMBER
SHEET
FEDERAL LANDS HIGHWAY
STATE PROJECT
''dry'' storage
12" Freeboard
(min.)
6" Typ.
m in
Typ. 6" (min.)
Min. 24" + diameter
(min.)
6" Typ.
1" diameter hole
Typ. 6" (min.)
min.
12"
SEDIMENT TRAP
12" Freeboard min.
4' m a x
67 cubic yards/acre
67 cubic yards/acre ''wet'' storage min.
4' min.
3' m a x
67 cubic yards/acre ''dry'' storage
67 cubic yards/acre ''wet'' storage min.
4' m a x
6" min.
6" min.
9" min.
6" min.
6" min.
157-4 equipment for compaction of each layer.
Compact embankment in 8-inch layers using construction
Do not use sediment traps for drainage areas over 5 acres.
wrapped with geotextile hardware cloth wire then
"2 1" to 4
1Riser wrapped with
" x 6" slits2
STANDARD NO SCALE
U.S. CUSTOMARY STANDARD
NUMBER
SHEET
FEDERAL LANDS HIGHWAY
E.4
PROJECT
s t1
.d g n
U
S C u s to m a r y
REVISED:
" steel plate (min.)4
NPS PMIS No. 169515A NPS Drwg. No. XXX/XXXXX
CROSS SECTION
SEDIMENT TRAP (TYPE A) RIPRAP OUTLET
CROSS SECTION THROUGH SPILLWAY
Geotextile
ELEVATION
SEDIMENT TRAP (TYPE B) PIPE OUTLET
Geotextile
Sediment cleanout point
Barrel
Embankment
WITH SLIT PERFORATIONS IN RISER
CONCRETE BASE
WITH HOLE PERFORATIONS IN RISER
STEEL PLATE BASE
Barrel or tamped earth Stone, gravel, Barrel waterlight connection Continuous weld
Concrete
NOTE:
stones from embankment fill material.
Remove vegetative matter, other organic material, and large mat before constructing Sediment Trap.
Clear, grub, and remove all vegetative matter including root been stabilized against erosion.
grading and seeding when the upslope drainage area has
Remove the Sediment Trap and stabilize the location by
Make repairs as required.
accumulated sediment and especially after each storm event.
Inspect Sediment Trap regularly for damage and sediment reaches half the design water storage of the trap.
Remove sediment from Sediment Trap when accumulated or permanent vegetation within 7 days of construction.
Seed the soil embankment and all cut slopes with temporary
8.
7.
6.
5.
4.
3.
es ign
P lan s
Not for
C on str uc tio n
STANDARD NO SCALE
U.S. CUSTOMARY STANDARD
NUMBER
SHEET
FEDERAL LANDS HIGHWAY
E.5
PROJECT
s t1
.d g n
U
S C u s to m a r y
REVISED: 6/2007
DIVERSION CHANNELS
TEMPORARY
157-5
2'2'2'2' and secure with riprap or sandbags.
edge of the liner a minimum of 6" deep using a plastic liner. Bury the upstream
Do not construct with longitudinal joints if and secure with sandbags (typ.)
Bury plastic liner 6" deep
NPS PMIS No. 169515A NPS Drwg. No. XXX/XXXXX
A
A
B B
Flow
SECTION A-A SECTION B-B
SECTION A-A
SECTION B-B
W
SS
SS
B
D
Flow
Flow
Flow embankment
Roadway embankment
Roadway
NOTE:
W
SS
SS
B
D
PLASTIC LINED DIVERSION CHANNEL
RIPRAP LINED DIVERSION CHANNEL
W
B
DSS SS
Flow
SSSS D
B
W
T
Riprap lining
Geotextile, type IV-E
Sandbags
SECTION B-B
TEMPORARY CULVERT
PLAN
DIVERSION CHANNEL
when scheduled)
Silt fence (typ.
Plastic linerSandbagsPlastic liner temporary barrier
Use sandbags to construct
Permanent culvert
Roadway centerline when scheduled)
Silt fence (typ.
Permanent natural channel backflow into natural channel
Use sandbags to prevent
Earthwork limits
Subgrade
Temporary culvert backfill
Bedding
Natural ground
Geotextile, type IV-E Riprap lining with plastic liner or riprap
Temporary diversion channel when scheduled)
Silt fence (typ.
T
See Note 5
Ø
0.5 percent.
Construct channel at a minimum grade of diversion channel.
length and width of the temporary
Use plastic liner or riprap along the entire dimensions and quantities.
culvert diameter, riprap class, channel
See Erosion Control Section for temporary
204.11(a).
one of the methods listed in Subsection
Compact temporary culvert backfill using embankment with temporary culvert.
diversion channel through the roadway
When specified replace the portion of the 5.
4.
3.
es ign
P lan s
Not for
C on str uc tio n
Drive stakes at each end and at 4' spacing
(ft)
(ft)
Excavate trench 2"
NPS PMIS NO.: XXXXX DRAWING NO.: XXX-XXXXX
REVISED:
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 10/2014
FIBER ROLL
W157-21
119.5'
3' min.
3' min. or m in
M in t o
1" x 1" Wood stake
3" to 5"
A p r il
U m y fi le s p w p r o d u c ti o n d D e t.
W .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
E.6 NPS KLGO 10(1) AK
NPS PMIS No. 169515A NPS Drwg. No. XXX/XXXXX
Fl ow
T o e o f fi ll s lo p e
ELEVATION
PLAN
ELEVATION
Direction of runoff Fi ll slo pe
Flow
PLAN
Spacing Slope
STAKES REQUIRED
disturbed areas
Runoff from
1:1
1:2
1:3
1:4 or flatter as specified in plans
2.
1.
DRAINAGE DITCH INSTALLATION
INSTALLATION BEYOND TOE OF SLOPE
INSTALLATION ALONG SLOPES
Fiber roll length for each roll
Stakes required
FIBER ROLL SPACINGStep 2: Backfill soil against fiber rolls and install fiber rolls
Step 1: Excavate trench
FIBER ROLL STAKING DETAIL
conditions.
Use drainage ditch installation only in low flow permanent installations.
roll while staking. Live stakes may be used for until fiber roll is secure to slope. Do not crush
PROPERLY STAKED AND ENTRENCHED FIBER ROLL
NOTE:
NO SCALE
Fiber roll larger than fiber roll
Existing ground (typ.)
Stagger joints (typ.)
Existing ground
Fiber roll along contours.
Install fiber rolls
Flow direction to end, without overlapping the ends
Abut adjacent fiber rolls tightly, end
Install fiber rolls snugly into trench.
soil to ground level
Backfilled and compacted
Slope
Stake and entrench fiber roll water from flowing around the fiber roll
Provide sufficient length to prevent sp ac in g ch ar t
S ee f ib er r ol l
Direction of runof f from distur bed area es ign
P lan s
Not for
C on str uc tio n
10.4 x 16 20301 -1900
20425 -1000
25101 -0300
60201 -0600
60201 -0800
60201 -1000
60414 -0000
Station
ES
TI
M
A
TE
D M
A X
IM
U M
C O
V
ER
S
TR
U C
TU
R A L
EX
C A V A
TI
O N
R
EM
O V A L
O F
PI
PE
C U
LV
ER
T
D
IT
C H
EX
C A V A
TI
O N
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
TR
EN
C H
D R A
IN
S K
EW
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el ow
B
EV
EL
S
1V :n
H
B
EV
EL
S
1V :n
H
REMARKS
See below for numbered notes
FEET CUYD EACH LNFT CUYD LNFT LNFT LNFT SQFT Lt Rt
5+50 2 9.8 50 AS, GS 2 2
16+50 8.9 30.0 2' Wide Ditch
30+95 2 11.3 38 30 AS, GS 2 2
31+55 1 27.8 2 120 AS, GS 2 2 2-60' culverts side-by-side 36+95 2 71.8 1 95 38 10 AS, GS 2 2 Riprap Headwall & Banks 203+00 1 17.0 460 213+85 1 25.9 700 221+50 1 13.0 352 227+60 1 15.1 408 230+00 1 40.0 1080 234+15 1 10.2 275 240+35 1 14.4 390 245+86 1 13.3 360
PROJECT TOTAL 278.5 3 30.0 95 88 120 38 4025
NPS PMIS No. 169515A NPS Drwg. No. XXX/XXXXX Allowable Pipe Material
NOTE: A Aluminum AS Aluminized steel
1. See Std. 602-1 for minimum wall thickness for pipe culvert C Concrete
2. Driveway cross culvert. GS Galvanized steel
3. Existing Culvert, Do Not Disturb P Plastic
4. Construct Riprap Headwall at Inlet and Outlet as shown on Sheet G.7 (blank) Any appropriate material x/__ Any appropriate material except __
PAY ITEM NUMBER
TABULATION OF DRAINAGE QUANTITIES
Note: The quantities shown hereon are approximate and are subject to field adjustments.
STATE PROJECT
F.1 c:
\m yf ile s\ pw
_p ro du ct io n\ d0
K
LG
O
1_
D ra in ag e.
xl sx ]S he et
-A ug -2
:3
R
M ea do w s 6/
D
S la ni na
6/
D es ig ne d by
C he ck ed b y:
NUMBER
AK NPS KLGO 10(1)AK
es ign
P lan s
Not for
C on str uc tio
STANDARD APPROVED FOR USE 12/1993
REVISED: 4/1994 6/2005
602-1
METAL PIPE CULVERT
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS 5" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
5" x 1" CORRUGATIONS3" x 1" CORRUGATIONS" CORRUGATIONS2 1" x 3
METAL THICKNESS (INCH/GAGE)
0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8 0.060/160.075/140.105/120.135/10 0.164/8 0.060/160.075/140.105/120.135/10 0.164/8
0.060/160.075/140.105/120.135/100.060/160.075/140.105/120.135/100.064/160.079/140.109/120.138/10 0.168/8 0.079/140.109/120.138/10 0.168/8 0.079/140.109/120.138/10 0.168/8
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET) MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
142 x 91
137 x 87
128 x 83
117 x 79
112 x 75
103 x 71
95 x 67
87 x 63
83 x 57
81 x 59
77 x 52
73 x 55
71 x 47
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
3.5
103 x 71
95 x 67
87 x 63
81 x 59
73 x 55
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
3.5
INCHESINCHES INCHESINCHES
INCHESINCHESINCHESINCHESINCHESINCHESINCHESINCHES
Fill heights exceeding 100 feet require
STATE PROJECT
NUMBER
SHEET
F.2
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY STANDARD
STANDARD
A p r il
U m y fi le s p w p r o d u c ti o n d K
L G
O g b .d g n
NPS KLGO 10(1) AK
NPS PMIS No. 169515A NPS Drwg. No. XXX/XXXXX
4.
3.
2.
1.
METAL ROUND PIPE CULVERT
METAL PIPE ARCH CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
STEEL ALUMINUM
DIAMETER
VALENT
EQUI-
RADIUS
CORNER
MINIMUM
COVER
MINIMUM
SPAN x RISE
SIZE
PIPE ARCH
SIZE
PIPE ARCH
SPAN x RISE DIAMETER
VALENT
EQUI-
RADIUS
CORNER
MINIMUM
COVER
MINIMUM
COVER
MINIMUM
DIAMETER
SIZE
PIPE
SIZE
PIPE
DIAMETER COVER
MINIMUM
ALUMINUMSTEEL
NOTE:
NO SCALE
of camber or increase the pipe culvert gradient.
elevation of the inlet invert, reduce the amount parabolic curve as designed exceeds the curve. If the midpoint elevation on the pipe length. Develop camber on a parabolic inverts an ordinate amount equal to 1% of the from a chord through the inlet and outlet
When directed, camber pipe culverts upward pavement for both flexible and rigid pavement.
from the top of the pipe to the top of the rigid pavements. Measure maximum fill height pavements, and to the top of the pavement for pipe culvert to the subgrade for flexible
Measure minimum cover from the top of the corrugation pipe.
Obtain approval before furnishing annular of helical lockseam and welded seam pipe.
corrugations are more restrictive than those
Fill heights for culvert pipe with annular lockseam and welded seam pipe only.
The fill heights in the table are for helical special analysis by the CO.
es ign
P lan s
Not for
C on str uc tio
602-2
COUPLING BAND
METAL PIPE CULVERT
MINIMUM BAND WIDTH (INCHES)
1 x 2
1 x 3
3 x 1
5 x 1 78 to 144
36 to 72
78 to 144
36 to 72
78 to 84
42 to 72
12 to 36
87 x 64 to 142 x 91
60 x 46 to 81 x 59
87 x 64 to 142 x 91
60 x 46 to 81 x 59
49 x 33 to 83 x 57
17 x 13 to 42 x 29
10.5
10.5
10.5
10.5
10.5
10.5
10.5
INCHESINCHESINCHES
" for 18" round culvert (21" x 15" pipe arch) or less8
" for 21" round culvert (24" x 18" pipe arch) or more2 having rerolled end to form annular corrugations. A 10.5 inch band is acceptable on pipe rerolled with 3" x 1" pipe corrugations.
" corrugations. A 12 inch band is acceptable on pipe ends 2 1" x 3
2ends rerolled with 2
The minimum band widths shown for 3" x 1" and 5" x 1" corrugated sizes apply to
" corrugations on rerolled pipe ends.2 1" x 3 steel, or 0.036 inch for aluminum, or a plastic with an equivalent strength to metal.
less. Use a matching metal having a nominal thickness of not less than 0.040 inch for
Smooth sleeve-type couplers and flat bands may be used for pipe diameters of 12" or
42" diameter to 42" diameter, required above
42" diameter to 42" diameter, required above steel or 0.048 inch for aluminum. Fasten coupling bands with the following diameter of bolt:
thinner than the thickness of the pipe to be connected, and no thinner than 0.052 inch for
STATE PROJECT
NUMBER
SHEET
F.3
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY STANDARD
STANDARD
A p r il
U m y fi le s p w p r o d u c ti o n d K
L G
O g c .d g n
NPS KLGO 10(1) AK
NPS PMIS No. 169515A NPS Drwg. No. XXX/XXXXX
2.
1.
SMOOTH SLEEVE BAND FLAT BAND
SEMI-CORRUGATED BAND
HELICAL BANDANNULAR BANDSTANDARD BAND CONNECTIONS
SLEEVE JOINT
SIDE VIEW SIDE VIEW SIDE VIEW
END VIEW
END VIEWEND VIEW
Oval Lug
Band Angle
Bar & Strap
Integral Flange Wedge and Strap
Stab type joint
Smoother sleeve with center stop.
DIAMETER
ROUND PIPE
SPAN x RISE
PIPE ARCH
BANDS
CORRUGATED
ANNULAR
BANDS
CORRUGATED
HELICALLY
BANDS
CORRUGATED
SEMI-
SIZE
CORRUGATION
underdrain
COUPLING BANDS FOR METAL PIPE CULVERT
NOTE:
NO SCALE
W
W W W
Band Band
Band corrugation in pipe end with second annular around band meshes
Continuous corrugation
Band Bolts Band Bolts
Pipe
Band
Bolts
Angle
Pipe
BandBand
Bolts
Pipe heel and toe of angle of corrugation at fillet weld at crest
Rivet, spot weld, or
Angle
Wedge be used.
Highway Bridges, Division II Section 26 may criteria of AASHTO Standard specifications for devices that comply with the joint performance
Other types of coupling bands or fastening specified in the Special Contract Requirements.
Watertight pipe joints are not required unless
3 4 5 of corrugation at heel and toe of angle
Rivet, spot weld, or fillet weld at crest strap connector
Bolt, bar and
Use annular corrugated bands with pipes having annular corrugations or with helical pipe dimension of the end corrugation in the pipe.
For helically corrugated pipe with rerolled ends, the nominal corrugations size refers to the
Use helical corrugated bands with pipes having helically corrugated ends.
as the connecting pipe. Provide coupling bands not more than 3 nominal sheet thicknesses
Fabricate annular, helical and semi-corrugated type coupling bands from the same metal
Second angle connection optional Second angle connection optional es ign
P lan s
Not for
C on str uc tio n
STANDARD APPROVED FOR USE 12/1993
DRAFT: 10/2014
REVISED: 4/1994 6/2005
602-3
PIPE CULVERT BEDDING
METAL AND PLASTIC
or 36" (max.) for embankment installations not exceeding 6" compacted depth.
exceeding 6" compacted depth. Or lean concrete
> 54"
12" to 54"
6"
4"
48" and UP
UP to 48" 24"
2'-0" ±
1'-0" ±
2H or 12' (max.)2H or 12' (max.)
18" ±
18" ±18"±
18" (min.)
minimum
1'-0"
"2H or 12' (max.)2H or 12' (max.)
2H or 12' (max.)1
2H or 12' (max.)
(min.)
6"
2H or 12' (max.)
(min.)
6"
2H or 12' (max.) 2H or 12' (max.)
6" in uncompacted depth.
12" (min.), 24" (max.)
"/foot of cover,2
* Reduce to 18" for span or 36", STATE PROJECT
NUMBER
SHEET
F.4
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY STANDARD
STANDARD
A p r il
U m y fi le s p w p r o d u c ti o n d K
L G
O g d .d g n
NPS KLGO 10(1 AK
NPS PMIS No. 169515A NPS Drwg. No. XXX/XXXXX
See Section 704 for bedding and backfill requirements.
dimension of all pipe arch culverts.
H equals the diameter of all round pipe culverts or the rise amount of camber or increase the pipe culvert gradient.
designed exceeds the elevation of the inlet invert, reduce the curve. If the midpoint elevation on the parabolic curve as to 1% of the pipe length. Develop camber on a parabolic through the inlet and outlet inverts an ordinate amount equal
When directed, camber pipe culverts upward from a chord
3.
2.
1.
be adjusted to tie into impervious material.
granular material is used for backfill. Width may material at the pipe culvert inlet…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .