File: c:\myfiles\pw_production\d0211179\DYEA_EARTHWORK.log 11/4/2015, 3:14:29 PM
Input File: pw:\Alaska\Skagway\AK_NPS_KLGO_10(1)\Development\CADD\Design\DYEA_EARTHWORK.inp Output File: DYEA_EARTHWORK.LOG 1 1 1 1 2 2 1 3 3 Earthwork 1 4 4 1 5 5 /* For use with the .x30 criteria files and TYPICAL SECTIONS */ 1 6 6 /* BELOW (tolerance setting)... use 0.001 for Metric projects and .03 for English projects */ 1 7 7 1 8 8 1 9 9 tolerance = 0.03 1 10 10 1 11 11 xs dgn = klgo01001xs.dgn 1 12 12 1 13 13 Existing Ground Line 1 14 14 soil type = RdwyExc 1 15 15 roadway exc mult factor = 1.10 1 16 16 subsoil exc mult factor = 1.00 1 17 17 fill mult factor = 1.00 1 18 18 type = line, line_string 1 19 19 lvname = x_e_ground_xs 1 20 20 co = 8 1 21 21 1 22 22 /* For use with subex type 1 */ 1 23 23 Existing Suitable Material 1 24 24 soil type = RdwyExc 1 25 25 roadway exc mult factor = 1.00 1 26 26 subsoil exc mult factor = 1.00 1 27 27 fill mult factor = 1.00 1 28 28 type = line, line_string 1 29 29 lvname = x_p_subex_exc1 1 30 30 co = 30 1 31 31 1 32 32 /* For use with sidewalks */ 1 33 33 Existing Suitable Material 1 34 34 soil type = SidewalkExc 1 35 35 roadway exc mult factor = 1.00 1 36 36 subsoil exc mult factor = 1.00 1 37 37 fill mult factor = 1.00 1 38 38 type = line, line_string 1 39 39 lvname = x_p_sidewalk_exc 1 40 40 co = 31 1 41 41 1 42 42 /* For use with Prop_MSE_Wall1 (mse fill wall) */ 1 43 43 Existing Suitable Material 1 44 44 soil type = MseWallExc 1 45 45 roadway exc mult factor = 1.00 1 46 46 subsoil exc mult factor = 1.00 1 47 47 fill mult factor = 1.00 1 48 48 type = line, line_string 1 49 49 lvname = x_p_mse_wall_exc 1 50 50 co = 32 1 51 51 1 52 52 /* For use with subex types 1 and 2 */ 1 53 53 Existing Unsuitable Material 1 54 54 soil type = Subexcavation 1 55 55 roadway exc mult factor = 1.00 1 56 56 subsoil exc mult factor = 1.00 1 57 57 fill mult factor = 1.00 1 58 58 type = line, line_string 1 59 59 lvname = x_p_subex_exc2 1 60 60 co = 20 1 61 61 1 62 62 /* For use with all Concrete Retaining Walls */ 1 63 63 Existing Unsuitable Material 1 64 64 soil type = ConcWallStrucExc
Page: 1
1 65 65 roadway exc mult factor = 1.00 1 66 66 subsoil exc mult factor = 1.00 1 67 67 fill mult factor = 1.00 1 68 68 type = line, line_string 1 69 69 lvname = x_p_conc_wall_str_exc 1 70 70 co = 21 1 71 71 1 72 72 /* For use with REHAB typicals */ 1 73 73 Existing Unsuitable Material 1 74 74 soil type = ColdRecycle 1 75 75 roadway exc mult factor = 1.00 1 76 76 subsoil exc mult factor = 1.00 1 77 77 fill mult factor = 1.00 1 78 78 type = line, line_string 1 79 79 lvname = x_p_milling_exc 1 80 80 co = 22 1 81 81 1 82 82 /* For use with Existing Features typicals */ 1 83 83 Existing Unsuitable Material 1 84 84 soil type = ExistPavement 1 85 85 roadway exc mult factor = 1.00 1 86 86 subsoil exc mult factor = 1.00 1 87 87 fill mult factor = 1.00 1 88 88 type = line, line_string 1 89 89 lvname = x_e_pave_surface 1 90 90 co = 1 1 91 91 1 92 92 /* For use with Existing Features typicals (.x30 criteria)*/ 1 93 93 Existing Unsuitable Material 1 94 94 soil type = ExistPavementLayer2 1 95 95 roadway exc mult factor = 1.00 1 96 96 subsoil exc mult factor = 1.00 1 97 97 fill mult factor = 1.00 1 98 98 type = line, line_string 1 99 99 lvname = x_e_pave_surface2 1 100 100 co = 2 1 101 101 1 102 102 /* For use with Existing Features typicals (.x30 criteria)*/ 1 103 103 Existing Unsuitable Material 1 104 104 soil type = ExistGravel 1 105 105 roadway exc mult factor = 1.00 1 106 106 subsoil exc mult factor = 1.00 1 107 107 fill mult factor = 1.00 1 108 108 type = line, line_string 1 109 109 lvname = x_e_gravel_surface 1 110 110 co = 3 1 111 111 1 112 112 Existing Unsuitable Material 1 113 113 soil type = Topsoil 1 114 114 roadway exc mult factor = 0.000001 1 115 115 subsoil exc mult factor = 0.000001 1 116 116 fill mult factor = 0.000001 1 117 117 type = line, line_string 1 118 118 lvname = x_e_topsoil_layer 1 119 119 co = 23 1 120 120 1 121 121 /* For use with soil nail wall (.x30 criteria)*/ 1 122 122 Existing Unsuitable Material 1 123 123 soil type = SnWallStrExc 1 124 124 roadway exc mult factor = 1.00 1 125 125 subsoil exc mult factor = 1.00 1 126 126 fill mult factor = 1.00 1 127 127 type = line, line_string 1 128 128 lvname = x_p_sn_wall_str_exc 1 129 129 co = 57 1 130 130
Page: 2
1 131 131 /* For use with rockery wall (.x30 criteria)*/ 1 132 132 Existing Unsuitable Material 1 133 133 soil type = RockeryWallStrExc 1 134 134 roadway exc mult factor = 1.00 1 135 135 subsoil exc mult factor = 1.00 1 136 136 fill mult factor = 1.00 1 137 137 type = line, line_string 1 138 138 lvname = x_p_rk_wall_str_exc 1 139 139 co = 88 1 140 140 1 141 141 /* For use with guardwall (.x30 criteria)*/ 1 142 142 Existing Unsuitable Material 1 143 143 soil type = GuardwallStrucExc 1 144 144 roadway exc mult factor = 1.00 1 145 145 subsoil exc mult factor = 1.00 1 146 146 fill mult factor = 1.00 1 147 147 type = line, line_string 1 148 148 lvname = x_p_gd_wall_str_exc 1 149 149 co = 90 1 150 150 1 151 151 /* For use with Prop GFMSE Walls (.x30 criteria) */ 1 152 152 Existing Suitable Material 1 153 153 soil type = GfmseWallExc 1 154 154 roadway exc mult factor = 1.00 1 155 155 subsoil exc mult factor = 1.00 1 156 156 fill mult factor = 1.00 1 157 157 type = line, line_string 1 158 158 lvname = x_p_gfmse_wall_excav 1 159 159 co = 208 1 160 160 1 161 161 1 162 162 1 163 163 1 164 164 /* color 15 is used for the concrete footing for Prop_Cut_Wall1 and */ 1 165 165 /* color 15,0 are used for the stem for Prop_Cut_Wall1 */ 1 166 166 /* color 0 are used for the "face" of the wall for 3D models */ 1 167 167 /* color 0 is used for the Curb Surface Symbology */ 1 168 168 1 169 169 Proposed Finish Grade 1 170 170 soil type = RdwyExc 1 171 171 roadway exc mult factor = 1.00 1 172 172 subsoil exc mult factor = 1.00 1 173 173 fill mult factor = 1.00 1 174 174 type = line, line_string 1 175 175 lvname = x_p_cutslope 1 176 176 lvname = x_p_ditchslope 1 177 177 lvname = x_p_fillslope 1 178 178 lvname = x_p_foreslope 1 179 179 lvname = x_p_pave_layer_top 1 180 180 lvname = x_p_pave_layer_top_curb3_c 1 181 181 lvname = x_p_pave_layer_top_curb3_e 1 182 182 lvname = x_p_conc_wall_below 1 183 183 lvname = x_p_conc_wall_above 1 184 184 lvname = x_p_conc_wall_gutter 1 185 185 lvname = x_p_conc_wall_front 1 186 186 lvname = x_p_curb_top 1 187 187 lvname = x_p_curb_bottom 1 188 188 lvname = x_p_curb3_top 1 189 189 lvname = x_p_curb3_back_c 1 190 190 lvname = x_p_curb3_back_e 1 191 191 lvname = x_p_curb3_face 1 192 192 lvname = x_p_curb3_under_c 1 193 193 lvname = x_p_curb3_under_e 1 194 194 lvname = x_p_parkway_top 1 195 195 lvname = x_p_sidewalk_layer_top 1 196 196 lvname = x_p_sn_wall_face
Page: 3
1 197 197 lvname = x_p_sn_wall_top 1 198 198 lvname = x_p_rk_wall_face 1 199 199 lvname = x_p_rk_wall_top 1 200 200 lvname = x_p_gd_wall_above 1 201 201 lvname = x_p_gd_wall_below 1 202 202 lvname = x_p_conc_median_top 1 203 203 lvname = x_p_conc_median_bottom 1 204 204 lvname = x_p_mse_wall_front 1 205 205 lvname = x_p_mse_wall_veneer 1 206 206 lvname = x_p_wall_top 1 207 207 lvname = x_p_gfmse_wall_pfg 1 208 208 lvname = x_p_rk_wall_tier 1 209 209 /* lvname = x_p_gfmse_wall_embedment_slope */ 1 210 210 1 211 211 1 212 212 /* co = 0,1,15,29,40,42,43,44,49,51,52,54,82,128,178,229,233,234,235,236,247 */ 1 213 213 1 214 214 Proposed Undercut 1 215 215 soil type = Topsoil 1 216 216 roadway exc mult factor = 0.000001 1 217 217 subsoil exc mult factor = 0.000001 1 218 218 fill mult factor = 0.000001 1 219 219 type = line, line_string 1 220 220 lvname=x_p_topsoil_backfill 1 221 221 co = 20 1 222 222 1 223 223 Proposed Undercut 1 224 224 soil type = Layer1 1 225 225 roadway exc mult factor = 0.000001 1 226 226 subsoil exc mult factor = 0.000001 1 227 227 fill mult factor = 0.000001 1 228 228 type = line, line_string 1 229 229 lvname = x_p_pave_layer_1 1 230 230 co = 22 1 231 231 1 232 232 Proposed Undercut 1 233 233 soil type = Layer2 1 234 234 roadway exc mult factor = 0.000001 1 235 235 subsoil exc mult factor = 0.000001 1 236 236 fill mult factor = 0.000001 1 237 237 type = line, line_string 1 238 238 lvname = x_p_pave_layer_2 1 239 239 co = 23 1 240 240 1 241 241 Proposed Undercut 1 242 242 soil type = Layer3 1 243 243 roadway exc mult factor = 0.000001 1 244 244 subsoil exc mult factor = 0.000001 1 245 245 fill mult factor = 0.000001 1 246 246 type = line, line_string 1 247 247 lvname = x_p_pave_layer_3 1 248 248 co = 24 1 249 249 1 250 250 Proposed Undercut 1 251 251 soil type = Layer4 1 252 252 roadway exc mult factor = 0.000001 1 253 253 subsoil exc mult factor = 0.000001 1 254 254 fill mult factor = 0.000001 1 255 255 type = line, line_string 1 256 256 lvname = x_p_pave_layer_4 1 257 257 co = 25 1 258 258 1 259 259 Proposed Undercut 1 260 260 soil type = Layer5 1 261 261 roadway exc mult factor = 0.000001 1 262 262 subsoil exc mult factor = 0.000001
Page: 4
1 263 263 fill mult factor = 0.000001 1 264 264 type = line, line_string 1 265 265 lvname = x_p_pave_layer_5 1 266 266 co = 26 1 267 267 1 268 268 /* For use with x20 sidewalks */ 1 269 269 Proposed Undercut 1 270 270 soil type = SidewalkLayer1 1 271 271 roadway exc mult factor = 0.000001 1 272 272 subsoil exc mult factor = 0.000001 1 273 273 fill mult factor = 0.000001 1 274 274 type = line, line_string 1 275 275 lvname = x_p_sidewalk_layer_1 1 276 276 co = 35 1 277 277 1 278 278 /* For use with x20 sidewalks */ 1 279 279 Proposed Undercut 1 280 280 soil type = SidewalkLayer2 1 281 281 roadway exc mult factor = 0.000001 1 282 282 subsoil exc mult factor = 0.000001 1 283 283 fill mult factor = 0.000001 1 284 284 type = line, line_string 1 285 285 lvname = x_p_sidewalk_layer_2 1 286 286 co = 36 1 287 287 1 288 288 /* For use with x20 sidewalks */ 1 289 289 Proposed Undercut 1 290 290 soil type = SidewalkLayer3 1 291 291 roadway exc mult factor = 0.000001 1 292 292 subsoil exc mult factor = 0.000001 1 293 293 fill mult factor = 0.000001 1 294 294 type = line, line_string 1 295 295 lvname = x_p_sidewalk_layer_3 1 296 296 co = 37 1 297 297 1 298 298 /* For use with x20 sidewalks */ 1 299 299 Proposed Undercut 1 300 300 soil type = SidewalkLayer4 1 301 301 roadway exc mult factor = 0.000001 1 302 302 subsoil exc mult factor = 0.000001 1 303 303 fill mult factor = 0.000001 1 304 304 type = line, line_string 1 305 305 lvname = x_p_sidewalk_layer_4 1 306 306 co = 38 1 307 307 1 308 308 /* For use with x20 subex criteria */ 1 309 309 Proposed Undercut 1 310 310 soil type = SubExBackfill 1 311 311 roadway exc mult factor = 0.000001 1 312 312 subsoil exc mult factor = 0.000001 1 313 313 fill mult factor = 0.00001 1 314 314 type = line, line_string 1 315 315 lvname = x_p_subex_backfill1 1 316 316 co = 40 1 317 317 1 318 318 /* For use with subex type 2 */ 1 319 319 Proposed Undercut 1 320 320 soil type = RdwyExc 1 321 321 roadway exc mult factor = 0.000001 1 322 322 subsoil exc mult factor = 0.000001 1 323 323 fill mult factor = 0.00001 1 324 324 type = line, line_string 1 325 325 lvname = x_p_subex_backfill2 1 326 326 co = 41 1 327 327 1 328 328 /* For use with Prop_MSE_Wall1 (mse fill wall) */
Page: 5
1 329 329 Proposed Undercut 1 330 330 soil type = SelectWallBackfill 1 331 331 roadway exc mult factor = 0.000001 1 332 332 subsoil exc mult factor = 0.000001 1 333 333 fill mult factor = 0.00001 1 334 334 type = line, line_string 1 335 335 lvname = x_p_mse_wall_backfill1 1 336 336 co = 51 1 337 337 1 338 338 /* For use with Prop_MSE_Wall1 (mse fill wall) */ 1 339 339 Proposed Undercut 1 340 340 soil type = SelectWallBackfill 1 341 341 roadway exc mult factor = 0.000001 1 342 342 subsoil exc mult factor = 0.000001 1 343 343 fill mult factor = 0.00001 1 344 344 type = line, line_string 1 345 345 lvname = x_p_mse_wall_backfill2 1 346 346 co = 52 1 347 347 1 348 348 /* For use with Prop_MSE_Wall1 (mse fill wall) */ 1 349 349 Proposed Undercut 1 350 350 soil type = GranularBackfill 1 351 351 roadway exc mult factor = 0.000001 1 352 352 subsoil exc mult factor = 0.000001 1 353 353 fill mult factor = 0.00001 1 354 354 type = line, line_string 1 355 355 lvname = x_p_mse_wall_backfill3 1 356 356 co = 53 1 357 357 1 358 358 /* For use with Prop_MSE_Wall1 (mse fill wall) */ 1 359 359 Proposed Undercut 1 360 360 soil type = LevelingPad 1 361 361 roadway exc mult factor = 0.000001 1 362 362 subsoil exc mult factor = 0.000001 1 363 363 fill mult factor = 0.00001 1 364 364 type = line, line_string 1 365 365 lvname = x_p_mse_wall_backfill4 1 366 366 co = 56 1 367 367 1 368 368 /* For use with Prop_MSE_Wall1 (mse fill wall) */ 1 369 369 Proposed Undercut 1 370 370 soil type = RdwyExc 1 371 371 roadway exc mult factor = 0.000001 1 372 372 subsoil exc mult factor = 0.000001 1 373 373 fill mult factor = 0.00001 1 374 374 type = line, line_string 1 375 375 lvname = x_p_mse_wall_backfill5 1 376 376 co = 57 1 377 377 1 378 378 /* For use with all Concrete Retaining Walls */ 1 379 379 Proposed Undercut 1 380 380 soil type = Pervious 1 381 381 roadway exc mult factor = 0.000001 1 382 382 subsoil exc mult factor = 0.000001 1 383 383 fill mult factor = 0.00001 1 384 384 type = line, line_string 1 385 385 lvname = x_p_conc_wall_backfill 1 386 386 co = 54 1 387 387 1 388 388 /* For use with all Concrete Retaining Walls */ 1 389 389 Proposed Undercut 1 390 390 soil type = FoundationFill 1 391 391 roadway exc mult factor = 0.000001 1 392 392 subsoil exc mult factor = 0.000001 1 393 393 fill mult factor = 0.00001 1 394 394 type = line, line_string
Page: 6
1 395 395 lvname = x_p_conc_wall_foundation 1 396 396 co = 58 1 397 397 1 398 398 /* For use with CFL Parapet Wall */ 1 399 399 Proposed Undercut 1 400 400 soil type = SelectWallBackfill 1 401 401 roadway exc mult factor = 0.000001 1 402 402 subsoil exc mult factor = 0.000001 1 403 403 fill mult factor = 0.00001 1 404 404 type = line, line_string 1 405 405 lvname = x_p_conc_wall_backfill2 1 406 406 co = 52 1 407 407 1 408 408 /* For use with all Parapet Walls */ 1 409 409 Proposed Undercut 1 410 410 soil type = Pervious /* CFL ‐ Use ‐ WallBackfill */ 1 411 411 roadway exc mult factor = 0.000001 1 412 412 subsoil exc mult factor = 0.000001 1 413 413 fill mult factor = 0.00001 1 414 414 type = line, line_string 1 415 415 lvname = x_p_conc_wall_backfill 1 416 416 co = 56 1 417 417 1 418 418 1 419 419 /* For use with REHAB typicals */ 1 420 420 Proposed Undercut 1 421 421 soil type = ColdRecycle 1 422 422 roadway exc mult factor = 0.00001 1 423 423 subsoil exc mult factor = 0.00001 1 424 424 fill mult factor = 0.00001 1 425 425 type = line, line_string 1 426 426 lvname = x_p_milling_backfill 1 427 427 co = 57 1 428 428 1 429 429 /* For use with REHAB typicals */ 1 430 430 Proposed Undercut 1 431 431 soil type = PavedShoulder 1 432 432 roadway exc mult factor = 0.00001 1 433 433 subsoil exc mult factor = 0.00001 1 434 434 fill mult factor = 0.00001 1 435 435 type = line, line_string 1 436 436 lvname = x_p_pave_shd_backfill 1 437 437 co = 58 1 438 438 1 439 439 /* For use with REHAB typicals */ 1 440 440 Proposed Undercut 1 441 441 soil type = PreLevel 1 442 442 roadway exc mult factor = 0.00001 1 443 443 subsoil exc mult factor = 0.00001 1 444 444 fill mult factor = 0.00001 1 445 445 type = line, line_string 1 446 446 lvname = x_p_rehab_prelevel 1 447 447 co = 59 1 448 448 1 449 449 /* For use with CFL Type 3 curb special aggregate shoulder backfill (.x30 criteria)*/ 1 450 450 Proposed Undercut 1 451 451 soil type = ShoulderBackfill 1 452 452 roadway exc mult factor = 0.00001 1 453 453 subsoil exc mult factor = 0.00001 1 454 454 fill mult factor = 0.00001 1 455 455 type = line, line_string 1 456 456 lvname = x_p_shoulder_backfill 1 457 457 co = 72 1 458 458 1 459 459 /* For use with CFL paved ditches (.x30 criteria)*/ 1 460 460 Proposed Undercut
Page: 7
1 461 461 soil type = PavedDitchBackfill 1 462 462 roadway exc mult factor = 0.00001 1 463 463 subsoil exc mult factor = 0.00001 1 464 464 fill mult factor = 0.00001 1 465 465 type = line, line_string 1 466 466 lvname = x_p_pave_ditch_layer_1 1 467 467 co = 27 1 468 468 1 469 469 /* For use with soil nail wall (.x30 criteria)*/ 1 470 470 Proposed Undercut 1 471 471 soil type = BackfillMaterial 1 472 472 roadway exc mult factor = 0.000001 1 473 473 subsoil exc mult factor = 0.000001 1 474 474 fill mult factor = 0.00001 1 475 475 type = line, line_string 1 476 476 lvname = x_p_sn_wall_backfill 1 477 477 co = 55,175 1 478 478 1 479 479 /* For use with soil nail wall (.x30 criteria)*/ 1 480 480 Proposed Undercut 1 481 481 soil type = Concrete 1 482 482 roadway exc mult factor = 0.000001 1 483 483 subsoil exc mult factor = 0.000001 1 484 484 fill mult factor = 0.00001 1 485 485 type = line, line_string 1 486 486 lvname = x_p_sn_wall_back 1 487 487 co = 53 1 488 488 1 489 489 /* For use with soil nail wall (.x30 criteria)*/ 1 490 490 Proposed Undercut 1 491 491 soil type = BackfillMaterial 1 492 492 roadway exc mult factor = 0.000001 1 493 493 subsoil exc mult factor = 0.000001 1 494 494 fill mult factor = 0.00001 1 495 495 type = line, line_string 1 496 496 lvname = x_p_sn_wall_curb_backfill 1 497 497 co = 16,175 1 498 498 1 499 499 /* For use with soil nail wall (.x30 criteria)*/ 1 500 500 Proposed Undercut 1 501 501 soil type = SNFoundationFill 1 502 502 roadway exc mult factor = 0.000001 1 503 503 subsoil exc mult factor = 0.000001 1 504 504 fill mult factor = 0.00001 1 505 505 type = line, line_string 1 506 506 lvname = x_p_sn_foundation_backfill 1 507 507 co = 58 1 508 508 1 509 509 /* For use with rockery wall (.x30 criteria)*/ 1 510 510 Proposed Undercut 1 511 511 soil type = WallBackfill 1 512 512 roadway exc mult factor = 0.000001 1 513 513 subsoil exc mult factor = 0.000001 1 514 514 fill mult factor = 0.00001 1 515 515 type = line, line_string 1 516 516 lvname = x_p_rk_wall_backfill 1 517 517 co = 55,175 1 518 518 1 519 519 /* For use with rockery wall (.x30 criteria)*/ 1 520 520 Proposed Undercut 1 521 521 soil type = Rock 1 522 522 roadway exc mult factor = 0.000001 1 523 523 subsoil exc mult factor = 0.000001 1 524 524 fill mult factor = 0.00001 1 525 525 type = line, line_string 1 526 526 lvname = x_p_rk_wall_back
Page: 8
1 527 527 co = 45 1 528 528 1 529 529 /* For use with rockery wall (.x30 criteria)*/ 1 530 530 Proposed Undercut 1 531 531 soil type = FoundationFill 1 532 532 roadway exc mult factor = 0.000001 1 533 533 subsoil exc mult factor = 0.000001 1 534 534 fill mult factor = 0.00001 1 535 535 type = line, line_string 1 536 536 lvname = x_p_rk_foundation_backfill 1 537 537 co = 58 1 538 538 1 539 539 /* For use with Rockery Wall, (.x30 criteria)) */ 1 540 540 Proposed Undercut 1 541 541 soil type = GranularRockBd 1 542 542 roadway exc mult factor = 0.000001 1 543 543 subsoil exc mult factor = 0.000001 1 544 544 fill mult factor = 0.00001 1 545 545 Do not include in mass ordinate 1 546 546 type = line, line_string 1 547 547 lvname = x_p_rk_wall_backfill2 1 548 548 co = 52 1 549 549 1 550 550 /* For use with guardwall (.x30 criteria)*/ 1 551 551 Proposed Undercut 1 552 552 soil type = StructuralBackfill 1 553 553 roadway exc mult factor = 0.000001 1 554 554 subsoil exc mult factor = 0.000001 1 555 555 fill mult factor = 0.00001 1 556 556 type = line, line_string 1 557 557 lvname = x_p_gd_wall_backfill1 1 558 558 co = 50 1 559 559 1 560 560 /* For use with guardwall (.x30 criteria)*/ 1 561 561 Proposed Undercut 1 562 562 soil type = BackfillMaterial 1 563 563 roadway exc mult factor = 0.000001 1 564 564 subsoil exc mult factor = 0.000001 1 565 565 fill mult factor = 0.00001 1 566 566 type = line, line_string 1 567 567 lvname = x_p_gd_wall_backfill2 1 568 568 co = 55 1 569 569 1 570 570 /* For use with Prop GFMSE Walls (.x30 criteria) */ 1 571 571 Proposed Undercut 1 572 572 soil type = GabionRock 1 573 573 roadway exc mult factor = 0.000001 1 574 574 subsoil exc mult factor = 0.000001 1 575 575 fill mult factor = 0.00001 1 576 576 type = line, line_string 1 577 577 lvname = x_p_gfmse_wall_gabion 1 578 578 co = 78 1 579 579 1 580 580 /* For use with Prop GFMSE Walls (.x30 criteria) */ 1 581 581 Proposed Undercut 1 582 582 soil type = SelectWallBackfill 1 583 583 roadway exc mult factor = 0.000001 1 584 584 subsoil exc mult factor = 0.000001 1 585 585 fill mult factor = 0.00001 1 586 586 type = line, line_string 1 587 587 lvname = x_p_gfmse_wall_backfill1 1 588 588 co = 6 1 589 589 1 590 590 /* For use with Prop GFMSE Walls (.x30 criteria) */ 1 591 591 Proposed Undercut 1 592 592 soil type = GranularBackfill
Page: 9
1 593 593 roadway exc mult factor = 0.000001 1 594 594 subsoil exc mult factor = 0.000001 1 595 595 fill mult factor = 0.00001 1 596 596 type = line, line_string 1 597 597 lvname = x_p_gfmse_wall_backfill2 1 598 598 co = 36 1 599 599 1 600 600 /* For use with Prop GFMSE Walls (.x30 criteria) */ 1 601 601 Proposed Undercut 1 602 602 soil type = GranularBackfill 1 603 603 roadway exc mult factor = 0.000001 1 604 604 subsoil exc mult factor = 0.000001 1 605 605 fill mult factor = 0.00001 1 606 606 type = line, line_string 1 607 607 lvname = x_p_gfmse_wall_embedment_slope 1 608 608 lvname = x_p_gfmse_wall_backfill3 1 609 609 co = 16,100 1 610 610 1 611 611 /* For use with Prop_SMSE_Wall (mse wall facing, (.x30 criteria)) */ 1 612 612 Proposed Undercut 1 613 613 soil type = WallFacing 1 614 614 roadway exc mult factor = 0.000001 1 615 615 subsoil exc mult factor = 0.000001 1 616 616 fill mult factor = 0.00001 1 617 617 Do not include in mass ordinate 1 618 618 type = line, line_string 1 619 619 lvname = x_p_mse_wall_facing 1 620 620 1 621 621 /* For use with all walls with Foundation Fill adhoc, (.x30 criteria)) */ 1 622 622 Proposed Undercut 1 623 623 soil type = FoundationFill 1 624 624 roadway exc mult factor = 0.000001 1 625 625 subsoil exc mult factor = 0.000001 1 626 626 fill mult factor = 0.00001 1 627 627 Do not include in mass ordinate 1 628 628 type = line, line_string 1 629 629 lvname = x_p_mse_wall_foundation 1 630 630 co = 58 1 631 631 1 632 632 Excavation Limits 1 633 633 type = line 1 634 634 lvname = x_p_exc_limit 1 635 635 co = 0 1 636 636 1 637 637 /* 1 638 638 Skip Areas 1 639 639 from 0+00.00 R 1 to 0+00.00 R 1 1 640 640 1 641 641 */ 1 642 642 1 643 643 Write Earthwork Shapes 1 644 644 plot param 1 645 645 lvname = x_ew_shapes 1 646 646 co = 0 1 647 647 wt = 0 1 648 648 lc = 0 1 649 649 Stratify Shape Color 1 650 650 1 651 651 Combine common exc + subgrade exc 1 652 652 1 653 653 Add Accumulated Unadjusted Volume Column 1 654 654 1 655 655 End Area Decimal Places = 2 1 656 656 1 657 657
Page: 10
1 658 658 1 659 659 /************ The following code creates a column based ASCII file for importing 1 660 660 /************ into an Excel spreadsheet initially created by S. Pratt 3/24/2006 1 661 661 /************ The name of this file is ^WFL_earthwork.xls^ and can be found on 1 662 662 /************ under the WFL server X:\V8i_Resource\X_30\Standards\Bin 1 663 663 /************ Instructions for using the spreadsheet can be found on it's 1st tab 1 664 664 /************ The syntax and spreadsheet is used for creating SUBTOTALS of various 1 665 665 /************ volumes for placement at the bottom of Plan/Profile sheets.
1 666 666 /************ The code below is WFL specific. FOR .X30 CRITERIA USAGE!
1 667 667 /************ The file that gets created is named ^earthwork.txt^ 1 668 668 1 669 669 1 670 670 1 671 671 write column base ascii file = DYEA_EARTHWORK.txt 1 672 672 1 673 673 column 2 formula = abs( ["RdwyExc", Common Exc, Unadjusted Volumes] + 1 674 674 ["RdwyExc", Subgrade Exc, Unadjusted Volumes] ) 1 675 675 column 2 number of decimal place = 2 1 676 676 column 2 total length = 10 1 677 677 1 678 678 column 3 formula = abs( ["RdwyExc", Fill, Unadjusted Volumes] ) 1 679 679 column 3 number of decimal place = 2 1 680 680 column 3 total length = 10 1 681 681 1 682 682 column 4 formula = abs( ["Subexcavation", Common Exc, Unadjusted Volumes] + 1 683 683 ["Subexcavation", Subgrade Exc, Unadjusted Volumes] + 1 684 684 ["Subexcavation", Subsoil Exc, Unadjusted Volumes] ) 1 685 685 column 4 number of decimal place = 2 1 686 686 column 4 total length = 10 1 687 687 1 688 688 column 5 formula = abs( ["SubExBackfill", Fill, Unadjusted Volumes] ) 1 689 689 column 5 number of decimal place = 2 1 690 690 column 5 total length = 10 1 691 691 1 692 692 column 6 formula = abs( ["Topsoil", Common Exc, Unadjusted Volumes] + 1 693 693 ["Topsoil", Subgrade Exc, Unadjusted Volumes] + 1 694 694 ["Topsoil", Subsoil Exc, Unadjusted Volumes] ) 1 695 695 column 6 number of decimal place = 2 1 696 696 column 6 total length = 10 1 697 697 1 698 698 Process Earthwork for Baseline = PR_DYEA 1 699 699 job number = 001 1 700 700 1 701 701 beg sta = 3+40 R 1 1 702 702 end sta = 72+94.00 R 1
0 0 703 END_OF_FILE
COMPUTING EARTHWORKS FOR BASELINE = PR_DYEA
COMPUTING EARTHWORKS FOR JOB = 001
FORMING LIST OF XSCELLS
BEGINNING EARTHWORKS COMPUTATION
Page: 11
Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol
(sq. ft.) (cu. yd.) (cu. yd.) (cu. yd.)
3+40.00 RDWYEXC
Excavation 5.85 0 0 1.10 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 0 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.92 0 0 0.00 0 0
3+50.00 RDWYEXC
Excavation 0.00 1 1 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.17 0 0 1.00 1 0
EXISTPAVEMENT
Excavation 3.48 1 1 1.00 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 1 0 Mass ordinate for EXISTPAVEMENT = 1
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.00 2 0 0.00 1 2
3+61.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.99 0 0 1.00 1 0
EXISTPAVEMENT
Excavation 2.69 1 1 1.00 2 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 1 0 Mass ordinate for EXISTPAVEMENT = 2
TOPSOIL
Excavation 0.18 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 1 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.85 3 0 0.00 1 5
3+75.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 3.00 1 1 1.00 0 1
EXISTPAVEMENT
Excavation 1.18 1 1 1.00 3 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 0 0 Mass ordinate for EXISTPAVEMENT = 3
TOPSOIL
Excavation 0.56 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 0 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 15.80 6 0 0.00 0 11
Page: 12
3+93.00 RDWYEXC
Excavation 0.27 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 6.54 3 3 1.00 ‐3 4
EXISTPAVEMENT
Excavation 0.05 0 0 1.00 3 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐3 0 Mass ordinate for EXISTPAVEMENT = 3
TOPSOIL
Excavation 1.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 ‐3 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 22.59 13 0 0.00 ‐3 24
4+00.00 RDWYEXC
Excavation 0.25 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 6.87 2 2 1.00 ‐5 6
EXISTPAVEMENT
Excavation 0.00 0 0 1.00 3 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐5 0 Mass ordinate for EXISTPAVEMENT = 3
TOPSOIL
Excavation 0.95 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 ‐5 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 22.96 6 0 0.00 ‐5 30
4+07.00 RDWYEXC
Excavation 0.22 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 6.44 2 2 1.00 ‐7 8
TOPSOIL
Excavation 1.04 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 ‐7 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.49 6 0 0.00 ‐7 36
4+25.00 RDWYEXC
Excavation 0.20 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 5.21 4 4 1.00 ‐11 12
TOPSOIL
Excavation 1.09 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 ‐11 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.38 15 0 0.00 ‐11 51
Page: 13
4+50.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 9.58 7 7 1.00 ‐18 19
TOPSOIL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 ‐18 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.75 15 0 0.00 ‐18 66
4+56.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 10.09 2 2 1.00 ‐20 21
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.90 3 0 0.00 ‐20 69
4+75.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 14.50 9 9 1.00 ‐29 30
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 7 0 0.00 ‐29 76
5+00.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 20.28 16 16 1.00 ‐45 46
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 9 0 0.00 ‐45 85
5+25.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 24.45 21 21 1.00 ‐66 67
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 9 0 0.00 ‐66 94
5+50.00 RDWYEXC
Excavation 0.04 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 25.86 23 23 1.00 ‐89 90
TOPSOIL
Excavation 1.25 1 0 0.00 1 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 ‐89 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 9 0 0.00 ‐89 103
5+75.00 RDWYEXC
Excavation 0.00 0 0 1.10 1
Page: 14
Subsoil Exc 0.00 0 0 1.00 0 Fill 22.81 23 23 1.00 ‐112 113
TOPSOIL
Excavation 0.00 1 0 0.00 2 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 ‐112 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 9 0 0.00 ‐112 112
6+00.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 22.45 21 21 1.00 ‐133 134
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 9 0 0.00 ‐133 121
6+25.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 22.85 21 21 1.00 ‐154 155
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 9 0 0.00 ‐154 130
6+50.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 22.43 21 21 1.00 ‐175 176
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 9 0 0.00 ‐175 139
6+75.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 21.28 20 20 1.00 ‐195 196
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 9 0 0.00 ‐195 148
7+00.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 21.66 20 20 1.00 ‐215 216
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 9 0 0.00 ‐215 157
7+25.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 23.57 21 21 1.00 ‐236 237
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 9 0 0.00 ‐236 166
Page: 15
7+50.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 24.55 22 22 1.00 ‐258 259
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 9 0 0.00 ‐258 175
7+75.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 23.35 22 22 1.00 ‐280 281
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 9 0 0.00 ‐280 184
8+00.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 21.89 21 21 1.00 ‐301 302
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 9 0 0.00 ‐301 193
8+25.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 19.57 19 19 1.00 ‐320 321
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 9 0 0.00 ‐320 202
8+50.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 16.63 17 17 1.00 ‐337 338
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 9 0 0.00 ‐337 211
8+75.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 14.90 15 15 1.00 ‐352 353
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 9 0 0.00 ‐352 220
9+00.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 13.16 13 13 1.00 ‐365 366
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 9 0 0.00 ‐365 229
9+50.00 RDWYEXC
Excavation 0.00 0 0 1.10 1
Page: 16
Fill 12.32 24 24 1.00 ‐389 390
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 18 0 0.00 ‐389 247
9+75.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 12.57 12 12 1.00 ‐401 402
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 9 0 0.00 ‐401 256
10+00.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 10.66 11 11 1.00 ‐412 413
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 9 0 0.00 ‐412 265
10+25.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 9.79 9 9 1.00 ‐421 422
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 9 0 0.00 ‐421 274
10+50.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 8.61 9 9 1.00 ‐430 431
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 9 0 0.00 ‐430 283
10+75.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 7.60 8 8 1.00 ‐438 439
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 9 0 0.00 ‐438 292
11+00.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 6.16 6 6 1.00 ‐444 445
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 9 0 0.00 ‐444 301
11+25.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 4.94 5 5 1.00 ‐449 450
LAYER1
Excavation 0.00 0 0 0.00 0
Page: 17
Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 9 0 0.00 ‐449 310
11+50.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 4.79 5 5 1.00 ‐454 455
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 9 0 0.00 ‐454 319
11+75.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 4.92 4 4 1.00 ‐458 459
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 9 0 0.00 ‐458 328
12+00.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 5.59 5 5 1.00 ‐463 464
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 9 0 0.00 ‐463 337
12+25.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 7.26 6 6 1.00 ‐469 470
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 9 0 0.00 ‐469 346
12+50.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 8.33 7 7 1.00 ‐476 477
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 9 0 0.00 ‐476 355
12+75.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 9.87 8 8 1.00 ‐484 485
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 9 0 0.00 ‐484 364
13+00.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 11.84 10 10 1.00 ‐494 495
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 9 0 0.00 ‐494 373
Page: 18
13+25.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 12.59 11 11 1.00 ‐505 506
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 9 0 0.00 ‐505 382
13+38.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 18.59 8 8 1.00 ‐513 514
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.15 7 0 0.00 ‐513 389
13+50.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 19.29 8 8 1.00 ‐521 522
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.78 9 0 0.00 ‐521 398
13+75.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 24.52 20 20 1.00 ‐541 542
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.89 19 0 0.00 ‐541 417
14+00.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 22.91 22 22 1.00 ‐563 564
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.99 18 0 0.00 ‐563 435
14+25.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 20.32 20 20 1.00 ‐583 584
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.18 17 0 0.00 ‐583 452
14+50.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 20.65 19 19 1.00 ‐602 603
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.73 17 0 0.00 ‐602 469
14+60.00 RDWYEXC
Excavation 0.00 0 0 1.10 1
Page: 19
Fill 22.60 8 8 1.00 ‐610 611
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.94 8 0 0.00 ‐610 477
14+68.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 23.77 7 7 1.00 ‐617 618
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 26.85 7 0 0.00 ‐617 484
14+75.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 21.55 6 6 1.00 ‐623 624
EXISTPAVEMENT
Excavation 0.58 0 0 1.00 3 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐623 0 Mass ordinate for EXISTPAVEMENT = 3
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 34.35 8 0 0.00 ‐623 492
14+83.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 23.57 7 7 1.00 ‐630 631
EXISTPAVEMENT
Excavation 1.27 0 0 1.00 3 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐630 0 Mass ordinate for EXISTPAVEMENT = 3
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 43.92 12 0 0.00 ‐630 504
14+95.00 RDWYEXC
Excavation 0.13 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 24.07 11 11 1.00 ‐641 642
EXISTPAVEMENT
Excavation 0.00 0 0 1.00 3 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐641 0 Mass ordinate for EXISTPAVEMENT = 3
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 42.68 19 0 0.00 ‐641 523
15+00.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 25.14 5 5 1.00 ‐646 647
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 33.87 7 0 0.00 ‐646 530
Page: 20
15+25.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 17.92 20 20 1.00 ‐666 667
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.99 24 0 0.00 ‐666 554
15+29.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 15.06 2 2 1.00 ‐668 669
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.80 2 0 0.00 ‐668 556
15+50.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 10.40 10 10 1.00 ‐678 679
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.03 11 0 0.00 ‐678 567
15+75.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 4.45 7 7 1.00 ‐685 686
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.03 13 0 0.00 ‐685 580
16+00.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.32 3 3 1.00 ‐688 689
EXISTPAVEMENT
Excavation 0.65 0 0 1.00 3 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐688 0 Mass ordinate for EXISTPAVEMENT = 3
TOPSOIL
Excavation 0.38 0 0 0.00 2 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 ‐688 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.03 13 0 0.00 ‐688 593
16+25.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 2.66 2 2 1.00 ‐690 691
EXISTPAVEMENT
Excavation 0.06 0 0 1.00 3 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐690 0 Mass ordinate for EXISTPAVEMENT = 3
TOPSOIL
Excavation 0.71 0 0 0.00 2
Page: 21
Fill 0.00 0 0 0.00 ‐690 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.03 13 0 0.00 ‐690 606
16+46.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 4.30 3 3 1.00 ‐693 694
EXISTPAVEMENT
Excavation 0.00 0 0 1.00 3 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐693 0 Mass ordinate for EXISTPAVEMENT = 3
TOPSOIL
Excavation 0.06 0 0 0.00 2 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 ‐693 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.02 11 0 0.00 ‐693 617
16+50.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 3.98 1 1 1.00 ‐694 695
TOPSOIL
Excavation 0.14 0 0 0.00 2 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 ‐694 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.13 2 0 0.00 ‐694 619
16+75.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 3.12 3 3 1.00 ‐697 698
EXISTPAVEMENT
Excavation 0.08 0 0 1.00 3 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐697 0 Mass ordinate for EXISTPAVEMENT = 3
TOPSOIL
Excavation 0.00 0 0 0.00 2 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 ‐697 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 10 0 0.00 ‐697 629
17+00.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 4.37 3 3 1.00 ‐700 701
EXISTPAVEMENT
Excavation 0.00 0 0 1.00 3
Page: 22
Fill 0.00 0 0 1.00 ‐700 0 Mass ordinate for EXISTPAVEMENT = 3
TOPSOIL
Excavation 0.06 0 0 0.00 2 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 ‐700 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 9 0 0.00 ‐700 638
17+25.00 RDWYEXC
Excavation 0.04 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 4.25 4 4 1.00 ‐704 705
EXISTPAVEMENT
Excavation 0.01 0 0 1.00 3 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐704 0 Mass ordinate for EXISTPAVEMENT = 3
TOPSOIL
Excavation 0.57 0 0 0.00 2 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 ‐704 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 9 0 0.00 ‐704 647
17+50.00 RDWYEXC
Excavation 0.02 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 4.10 4 4 1.00 ‐708 709
EXISTPAVEMENT
Excavation 0.00 0 0 1.00 3 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐708 0 Mass ordinate for EXISTPAVEMENT = 3
TOPSOIL
Excavation 0.51 0 0 0.00 2 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 ‐708 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 9 0 0.00 ‐708 656
17+75.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 6.25 5 5 1.00 ‐713 714
TOPSOIL
Excavation 0.19 0 0 0.00 2 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 ‐713 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 9 0 0.00 ‐713 665
18+00.00 RDWYEXC
Page: 23
Excavation 0.06 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 7.55 6 6 1.00 ‐719 720
TOPSOIL
Excavation 0.45 0 0 0.00 2 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 ‐719 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 9 0 0.00 ‐719 674
18+25.00 RDWYEXC
Excavation 0.38 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 7.47 7 7 1.00 ‐726 727
TOPSOIL
Excavation 0.85 1 0 0.00 3 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 ‐726 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 9 0 0.00 ‐726 683
18+50.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 8.01 7 7 1.00 ‐733 734
TOPSOIL
Excavation 0.00 0 0 0.00 3 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 ‐733 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 9 0 0.00 ‐733 692
18+75.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 8.39 8 8 1.00 ‐741 742
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 9 0 0.00 ‐741 701
19+00.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 9.04 8 8 1.00 ‐749 750
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 9 0 0.00 ‐749 710
19+25.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 9.22 8 8 1.00 ‐757 758
LAYER1
Excavation 0.00 0 0 0.00 0
Page: 24
Fill 9.53 9 0 0.00 ‐757 719
19+50.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 9.17 9 9 1.00 ‐766 767
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 9 0 0.00 ‐766 728
19+75.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 9.74 9 9 1.00 ‐775 776
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.11 9 0 0.00 ‐775 737
19+86.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 17.09 5 5 1.00 ‐780 781
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.94 6 0 0.00 ‐780 743
20+00.00 RDWYEXC
Excavation 1.03 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 11.46 7 7 1.00 ‐787 788
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.66 10 0 0.00 ‐787 753
20+04.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 11.33 2 2 1.00 ‐789 790
EXISTPAVEMENT
Excavation 0.84 0 0 1.00 3 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐789 0 Mass ordinate for EXISTPAVEMENT = 3
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.63 3 0 0.00 ‐789 756
20+25.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 8.76 8 8 1.00 ‐797 798
EXISTPAVEMENT
Excavation 0.00 0 0 1.00 3 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐797 0 Mass ordinate for EXISTPAVEMENT = 3
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 11 0 0.00 ‐797 767
Page: 25
20+50.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 9.65 9 9 1.00 ‐806 807
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 9 0 0.00 ‐806 776
20+75.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 9.62 9 9 1.00 ‐815 816
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 9 0 0.00 ‐815 785
21+00.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 9.36 9 9 1.00 ‐824 825
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 9 0 0.00 ‐824 794
21+25.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 9.04 9 9 1.00 ‐833 834
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 9 0 0.00 ‐833 803
21+50.00 RDWYEXC
Excavation 0.00 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 8.56 8 8 1.00 ‐841 842
TOPSOIL
Excavation 0.22 0 0 0.00 3 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 ‐841 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 9 0 0.00 ‐841 812
21+75.00 RDWYEXC
Excavation 0.03 0 0 1.10 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 7.94 8 8 1.00 ‐849 850
TOPSOIL
Excavation 0.63 0 0 0.00 3 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 ‐849 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.53 9 0 0.00 ‐849 821
22+00.00 RDWYEXC
Excavation 0.00 0 0 1.10 1
Page: 26
Fill 7.86 7 7 1.00 ‐856 857
TOPSOIL
Excavation 0.00 0 0 0.00 3
Fill 0.00 0 0 0.00
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .