Lost Earthwork

View the file

Other files

File Type Posted
BidSum_Dyea.pdf PDF
A001_AK_NPS_KLGO_10(1).pdf PDF
Q A_02_25.pdf PDF
Final_Dyea_Rd_Plan_Set.pdf PDF
SWPPP_DYEA_Flat_Road_Project_AK_NPS_KLGO_10(1).pdf PDF
Geotechnical_GM16-15.pdf PDF
Final_XS_Slide_Lost_Lake_Rds.pdf PDF
DYEA_EARTHWORK.pdf PDF
IFB_DYEA.pdf PDF
Final_XS_Dyea_Flats_Rd.pdf PDF
Lost_Trail_Existing_Bridge_Information.pdf PDF
Plan_Request_form_DYEA.pdf PDF
PROJECT_DESCRIPTION.pdf PDF
Notice_to_Prospective_Bidders.pdf PDF
80__Dyea_Rd_Plan_Set.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

File: c:\myfiles\pw_production\d0211179\Lost_EARTHWORK.log 11/4/2015, 2:31:02 PM

Input File: pw:\Alaska\Skagway\AK_NPS_KLGO_10(1)\Development\CADD\Design\Lost_EARTHWORK.inp Output File: LOST_EARTHWORK.LOG 1 1 1 1 2 2 1 3 3 Earthwork 1 4 4 1 5 5 /* For use with the .x30 criteria files and TYPICAL SECTIONS */ 1 6 6 /* BELOW (tolerance setting)... use 0.001 for Metric projects and .03 for English projects */ 1 7 7 1 8 8 1 9 9 tolerance = 0.03 1 10 10 1 11 11 xs dgn = klgo01001xa.dgn 1 12 12 1 13 13 Existing Ground Line 1 14 14 soil type = RdwyExc 1 15 15 roadway exc mult factor = 1.10 1 16 16 subsoil exc mult factor = 1.00 1 17 17 fill mult factor = 1.00 1 18 18 type = line, line_string 1 19 19 lvname = x_e_ground_xs 1 20 20 co = 8 1 21 21 1 22 22 /* For use with subex type 1 */ 1 23 23 Existing Suitable Material 1 24 24 soil type = RdwyExc 1 25 25 roadway exc mult factor = 1.00 1 26 26 subsoil exc mult factor = 1.00 1 27 27 fill mult factor = 1.00 1 28 28 type = line, line_string 1 29 29 lvname = x_p_subex_exc1 1 30 30 co = 30 1 31 31 1 32 32 /* For use with sidewalks */ 1 33 33 Existing Suitable Material 1 34 34 soil type = SidewalkExc 1 35 35 roadway exc mult factor = 1.00 1 36 36 subsoil exc mult factor = 1.00 1 37 37 fill mult factor = 1.00 1 38 38 type = line, line_string 1 39 39 lvname = x_p_sidewalk_exc 1 40 40 co = 31 1 41 41 1 42 42 /* For use with Prop_MSE_Wall1 (mse fill wall) */ 1 43 43 Existing Suitable Material 1 44 44 soil type = MseWallExc 1 45 45 roadway exc mult factor = 1.00 1 46 46 subsoil exc mult factor = 1.00 1 47 47 fill mult factor = 1.00 1 48 48 type = line, line_string 1 49 49 lvname = x_p_mse_wall_exc 1 50 50 co = 32 1 51 51 1 52 52 /* For use with subex types 1 and 2 */ 1 53 53 Existing Unsuitable Material 1 54 54 soil type = Subexcavation 1 55 55 roadway exc mult factor = 1.00 1 56 56 subsoil exc mult factor = 1.00 1 57 57 fill mult factor = 1.00 1 58 58 type = line, line_string 1 59 59 lvname = x_p_subex_exc2 1 60 60 co = 20 1 61 61 1 62 62 /* For use with all Concrete Retaining Walls */ 1 63 63 Existing Unsuitable Material 1 64 64 soil type = ConcWallStrucExc

Page: 1

1 65 65 roadway exc mult factor = 1.00 1 66 66 subsoil exc mult factor = 1.00 1 67 67 fill mult factor = 1.00 1 68 68 type = line, line_string 1 69 69 lvname = x_p_conc_wall_str_exc 1 70 70 co = 21 1 71 71 1 72 72 /* For use with REHAB typicals */ 1 73 73 Existing Unsuitable Material 1 74 74 soil type = ColdRecycle 1 75 75 roadway exc mult factor = 1.00 1 76 76 subsoil exc mult factor = 1.00 1 77 77 fill mult factor = 1.00 1 78 78 type = line, line_string 1 79 79 lvname = x_p_milling_exc 1 80 80 co = 22 1 81 81 1 82 82 /* For use with Existing Features typicals */ 1 83 83 Existing Unsuitable Material 1 84 84 soil type = ExistPavement 1 85 85 roadway exc mult factor = 1.00 1 86 86 subsoil exc mult factor = 1.00 1 87 87 fill mult factor = 1.00 1 88 88 type = line, line_string 1 89 89 lvname = x_e_pave_surface 1 90 90 co = 1 1 91 91 1 92 92 /* For use with Existing Features typicals (.x30 criteria)*/ 1 93 93 Existing Unsuitable Material 1 94 94 soil type = ExistPavementLayer2 1 95 95 roadway exc mult factor = 1.00 1 96 96 subsoil exc mult factor = 1.00 1 97 97 fill mult factor = 1.00 1 98 98 type = line, line_string 1 99 99 lvname = x_e_pave_surface2 1 100 100 co = 2 1 101 101 1 102 102 /* For use with Existing Features typicals (.x30 criteria)*/ 1 103 103 Existing Unsuitable Material 1 104 104 soil type = ExistGravel 1 105 105 roadway exc mult factor = 1.00 1 106 106 subsoil exc mult factor = 1.00 1 107 107 fill mult factor = 1.00 1 108 108 type = line, line_string 1 109 109 lvname = x_e_gravel_surface 1 110 110 co = 3 1 111 111 1 112 112 Existing Unsuitable Material 1 113 113 soil type = Topsoil 1 114 114 roadway exc mult factor = 0.000001 1 115 115 subsoil exc mult factor = 0.000001 1 116 116 fill mult factor = 0.000001 1 117 117 type = line, line_string 1 118 118 lvname = x_e_topsoil_layer 1 119 119 co = 23 1 120 120 1 121 121 /* For use with soil nail wall (.x30 criteria)*/ 1 122 122 Existing Unsuitable Material 1 123 123 soil type = SnWallStrExc 1 124 124 roadway exc mult factor = 1.00 1 125 125 subsoil exc mult factor = 1.00 1 126 126 fill mult factor = 1.00 1 127 127 type = line, line_string 1 128 128 lvname = x_p_sn_wall_str_exc 1 129 129 co = 57 1 130 130

Page: 2

1 131 131 /* For use with rockery wall (.x30 criteria)*/ 1 132 132 Existing Unsuitable Material 1 133 133 soil type = RockeryWallStrExc 1 134 134 roadway exc mult factor = 1.00 1 135 135 subsoil exc mult factor = 1.00 1 136 136 fill mult factor = 1.00 1 137 137 type = line, line_string 1 138 138 lvname = x_p_rk_wall_str_exc 1 139 139 co = 88 1 140 140 1 141 141 /* For use with guardwall (.x30 criteria)*/ 1 142 142 Existing Unsuitable Material 1 143 143 soil type = GuardwallStrucExc 1 144 144 roadway exc mult factor = 1.00 1 145 145 subsoil exc mult factor = 1.00 1 146 146 fill mult factor = 1.00 1 147 147 type = line, line_string 1 148 148 lvname = x_p_gd_wall_str_exc 1 149 149 co = 90 1 150 150 1 151 151 /* For use with Prop GFMSE Walls (.x30 criteria) */ 1 152 152 Existing Suitable Material 1 153 153 soil type = GfmseWallExc 1 154 154 roadway exc mult factor = 1.00 1 155 155 subsoil exc mult factor = 1.00 1 156 156 fill mult factor = 1.00 1 157 157 type = line, line_string 1 158 158 lvname = x_p_gfmse_wall_excav 1 159 159 co = 208 1 160 160 1 161 161 1 162 162 1 163 163 1 164 164 /* color 15 is used for the concrete footing for Prop_Cut_Wall1 and */ 1 165 165 /* color 15,0 are used for the stem for Prop_Cut_Wall1 */ 1 166 166 /* color 0 are used for the "face" of the wall for 3D models */ 1 167 167 /* color 0 is used for the Curb Surface Symbology */ 1 168 168 1 169 169 Proposed Finish Grade 1 170 170 soil type = RdwyExc 1 171 171 roadway exc mult factor = 1.00 1 172 172 subsoil exc mult factor = 1.00 1 173 173 fill mult factor = 1.00 1 174 174 type = line, line_string 1 175 175 lvname = x_p_cutslope 1 176 176 lvname = x_p_ditchslope 1 177 177 lvname = x_p_fillslope 1 178 178 lvname = x_p_foreslope 1 179 179 lvname = x_p_pave_layer_top 1 180 180 lvname = x_p_pave_layer_top_curb3_c 1 181 181 lvname = x_p_pave_layer_top_curb3_e 1 182 182 lvname = x_p_conc_wall_below 1 183 183 lvname = x_p_conc_wall_above 1 184 184 lvname = x_p_conc_wall_gutter 1 185 185 lvname = x_p_conc_wall_front 1 186 186 lvname = x_p_curb_top 1 187 187 lvname = x_p_curb_bottom 1 188 188 lvname = x_p_curb3_top 1 189 189 lvname = x_p_curb3_back_c 1 190 190 lvname = x_p_curb3_back_e 1 191 191 lvname = x_p_curb3_face 1 192 192 lvname = x_p_curb3_under_c 1 193 193 lvname = x_p_curb3_under_e 1 194 194 lvname = x_p_parkway_top 1 195 195 lvname = x_p_sidewalk_layer_top 1 196 196 lvname = x_p_sn_wall_face

Page: 3

1 197 197 lvname = x_p_sn_wall_top 1 198 198 lvname = x_p_rk_wall_face 1 199 199 lvname = x_p_rk_wall_top 1 200 200 lvname = x_p_gd_wall_above 1 201 201 lvname = x_p_gd_wall_below 1 202 202 lvname = x_p_conc_median_top 1 203 203 lvname = x_p_conc_median_bottom 1 204 204 lvname = x_p_mse_wall_front 1 205 205 lvname = x_p_mse_wall_veneer 1 206 206 lvname = x_p_wall_top 1 207 207 lvname = x_p_gfmse_wall_pfg 1 208 208 lvname = x_p_rk_wall_tier 1 209 209 /* lvname = x_p_gfmse_wall_embedment_slope */ 1 210 210 1 211 211 1 212 212 /* co = 0,1,15,29,40,42,43,44,49,51,52,54,82,128,178,229,233,234,235,236,247 */ 1 213 213 1 214 214 Proposed Undercut 1 215 215 soil type = Topsoil 1 216 216 roadway exc mult factor = 0.000001 1 217 217 subsoil exc mult factor = 0.000001 1 218 218 fill mult factor = 0.000001 1 219 219 type = line, line_string 1 220 220 lvname=x_p_topsoil_backfill 1 221 221 co = 20 1 222 222 1 223 223 Proposed Undercut 1 224 224 soil type = Layer1 1 225 225 roadway exc mult factor = 0.000001 1 226 226 subsoil exc mult factor = 0.000001 1 227 227 fill mult factor = 0.000001 1 228 228 type = line, line_string 1 229 229 lvname = x_p_pave_layer_1 1 230 230 co = 22 1 231 231 1 232 232 Proposed Undercut 1 233 233 soil type = Layer2 1 234 234 roadway exc mult factor = 0.000001 1 235 235 subsoil exc mult factor = 0.000001 1 236 236 fill mult factor = 0.000001 1 237 237 type = line, line_string 1 238 238 lvname = x_p_pave_layer_2 1 239 239 co = 23 1 240 240 1 241 241 Proposed Undercut 1 242 242 soil type = Layer3 1 243 243 roadway exc mult factor = 0.000001 1 244 244 subsoil exc mult factor = 0.000001 1 245 245 fill mult factor = 0.000001 1 246 246 type = line, line_string 1 247 247 lvname = x_p_pave_layer_3 1 248 248 co = 24 1 249 249 1 250 250 Proposed Undercut 1 251 251 soil type = Layer4 1 252 252 roadway exc mult factor = 0.000001 1 253 253 subsoil exc mult factor = 0.000001 1 254 254 fill mult factor = 0.000001 1 255 255 type = line, line_string 1 256 256 lvname = x_p_pave_layer_4 1 257 257 co = 25 1 258 258 1 259 259 Proposed Undercut 1 260 260 soil type = Layer5 1 261 261 roadway exc mult factor = 0.000001 1 262 262 subsoil exc mult factor = 0.000001

Page: 4

1 263 263 fill mult factor = 0.000001 1 264 264 type = line, line_string 1 265 265 lvname = x_p_pave_layer_5 1 266 266 co = 26 1 267 267 1 268 268 /* For use with x20 sidewalks */ 1 269 269 Proposed Undercut 1 270 270 soil type = SidewalkLayer1 1 271 271 roadway exc mult factor = 0.000001 1 272 272 subsoil exc mult factor = 0.000001 1 273 273 fill mult factor = 0.000001 1 274 274 type = line, line_string 1 275 275 lvname = x_p_sidewalk_layer_1 1 276 276 co = 35 1 277 277 1 278 278 /* For use with x20 sidewalks */ 1 279 279 Proposed Undercut 1 280 280 soil type = SidewalkLayer2 1 281 281 roadway exc mult factor = 0.000001 1 282 282 subsoil exc mult factor = 0.000001 1 283 283 fill mult factor = 0.000001 1 284 284 type = line, line_string 1 285 285 lvname = x_p_sidewalk_layer_2 1 286 286 co = 36 1 287 287 1 288 288 /* For use with x20 sidewalks */ 1 289 289 Proposed Undercut 1 290 290 soil type = SidewalkLayer3 1 291 291 roadway exc mult factor = 0.000001 1 292 292 subsoil exc mult factor = 0.000001 1 293 293 fill mult factor = 0.000001 1 294 294 type = line, line_string 1 295 295 lvname = x_p_sidewalk_layer_3 1 296 296 co = 37 1 297 297 1 298 298 /* For use with x20 sidewalks */ 1 299 299 Proposed Undercut 1 300 300 soil type = SidewalkLayer4 1 301 301 roadway exc mult factor = 0.000001 1 302 302 subsoil exc mult factor = 0.000001 1 303 303 fill mult factor = 0.000001 1 304 304 type = line, line_string 1 305 305 lvname = x_p_sidewalk_layer_4 1 306 306 co = 38 1 307 307 1 308 308 /* For use with x20 subex criteria */ 1 309 309 Proposed Undercut 1 310 310 soil type = SubExBackfill 1 311 311 roadway exc mult factor = 0.000001 1 312 312 subsoil exc mult factor = 0.000001 1 313 313 fill mult factor = 0.00001 1 314 314 type = line, line_string 1 315 315 lvname = x_p_subex_backfill1 1 316 316 co = 40 1 317 317 1 318 318 /* For use with subex type 2 */ 1 319 319 Proposed Undercut 1 320 320 soil type = RdwyExc 1 321 321 roadway exc mult factor = 0.000001 1 322 322 subsoil exc mult factor = 0.000001 1 323 323 fill mult factor = 0.00001 1 324 324 type = line, line_string 1 325 325 lvname = x_p_subex_backfill2 1 326 326 co = 41 1 327 327 1 328 328 /* For use with Prop_MSE_Wall1 (mse fill wall) */

Page: 5

1 329 329 Proposed Undercut 1 330 330 soil type = SelectWallBackfill 1 331 331 roadway exc mult factor = 0.000001 1 332 332 subsoil exc mult factor = 0.000001 1 333 333 fill mult factor = 0.00001 1 334 334 type = line, line_string 1 335 335 lvname = x_p_mse_wall_backfill1 1 336 336 co = 51 1 337 337 1 338 338 /* For use with Prop_MSE_Wall1 (mse fill wall) */ 1 339 339 Proposed Undercut 1 340 340 soil type = SelectWallBackfill 1 341 341 roadway exc mult factor = 0.000001 1 342 342 subsoil exc mult factor = 0.000001 1 343 343 fill mult factor = 0.00001 1 344 344 type = line, line_string 1 345 345 lvname = x_p_mse_wall_backfill2 1 346 346 co = 52 1 347 347 1 348 348 /* For use with Prop_MSE_Wall1 (mse fill wall) */ 1 349 349 Proposed Undercut 1 350 350 soil type = GranularBackfill 1 351 351 roadway exc mult factor = 0.000001 1 352 352 subsoil exc mult factor = 0.000001 1 353 353 fill mult factor = 0.00001 1 354 354 type = line, line_string 1 355 355 lvname = x_p_mse_wall_backfill3 1 356 356 co = 53 1 357 357 1 358 358 /* For use with Prop_MSE_Wall1 (mse fill wall) */ 1 359 359 Proposed Undercut 1 360 360 soil type = LevelingPad 1 361 361 roadway exc mult factor = 0.000001 1 362 362 subsoil exc mult factor = 0.000001 1 363 363 fill mult factor = 0.00001 1 364 364 type = line, line_string 1 365 365 lvname = x_p_mse_wall_backfill4 1 366 366 co = 56 1 367 367 1 368 368 /* For use with Prop_MSE_Wall1 (mse fill wall) */ 1 369 369 Proposed Undercut 1 370 370 soil type = RdwyExc 1 371 371 roadway exc mult factor = 0.000001 1 372 372 subsoil exc mult factor = 0.000001 1 373 373 fill mult factor = 0.00001 1 374 374 type = line, line_string 1 375 375 lvname = x_p_mse_wall_backfill5 1 376 376 co = 57 1 377 377 1 378 378 /* For use with all Concrete Retaining Walls */ 1 379 379 Proposed Undercut 1 380 380 soil type = Pervious 1 381 381 roadway exc mult factor = 0.000001 1 382 382 subsoil exc mult factor = 0.000001 1 383 383 fill mult factor = 0.00001 1 384 384 type = line, line_string 1 385 385 lvname = x_p_conc_wall_backfill 1 386 386 co = 54 1 387 387 1 388 388 /* For use with all Concrete Retaining Walls */ 1 389 389 Proposed Undercut 1 390 390 soil type = FoundationFill 1 391 391 roadway exc mult factor = 0.000001 1 392 392 subsoil exc mult factor = 0.000001 1 393 393 fill mult factor = 0.00001 1 394 394 type = line, line_string

Page: 6

1 395 395 lvname = x_p_conc_wall_foundation 1 396 396 co = 58 1 397 397 1 398 398 /* For use with CFL Parapet Wall */ 1 399 399 Proposed Undercut 1 400 400 soil type = SelectWallBackfill 1 401 401 roadway exc mult factor = 0.000001 1 402 402 subsoil exc mult factor = 0.000001 1 403 403 fill mult factor = 0.00001 1 404 404 type = line, line_string 1 405 405 lvname = x_p_conc_wall_backfill2 1 406 406 co = 52 1 407 407 1 408 408 /* For use with all Parapet Walls */ 1 409 409 Proposed Undercut 1 410 410 soil type = Pervious /* CFL ‐ Use ‐ WallBackfill */ 1 411 411 roadway exc mult factor = 0.000001 1 412 412 subsoil exc mult factor = 0.000001 1 413 413 fill mult factor = 0.00001 1 414 414 type = line, line_string 1 415 415 lvname = x_p_conc_wall_backfill 1 416 416 co = 56 1 417 417 1 418 418 1 419 419 /* For use with REHAB typicals */ 1 420 420 Proposed Undercut 1 421 421 soil type = ColdRecycle 1 422 422 roadway exc mult factor = 0.00001 1 423 423 subsoil exc mult factor = 0.00001 1 424 424 fill mult factor = 0.00001 1 425 425 type = line, line_string 1 426 426 lvname = x_p_milling_backfill 1 427 427 co = 57 1 428 428 1 429 429 /* For use with REHAB typicals */ 1 430 430 Proposed Undercut 1 431 431 soil type = PavedShoulder 1 432 432 roadway exc mult factor = 0.00001 1 433 433 subsoil exc mult factor = 0.00001 1 434 434 fill mult factor = 0.00001 1 435 435 type = line, line_string 1 436 436 lvname = x_p_pave_shd_backfill 1 437 437 co = 58 1 438 438 1 439 439 /* For use with REHAB typicals */ 1 440 440 Proposed Undercut 1 441 441 soil type = PreLevel 1 442 442 roadway exc mult factor = 0.00001 1 443 443 subsoil exc mult factor = 0.00001 1 444 444 fill mult factor = 0.00001 1 445 445 type = line, line_string 1 446 446 lvname = x_p_rehab_prelevel 1 447 447 co = 59 1 448 448 1 449 449 /* For use with CFL Type 3 curb special aggregate shoulder backfill (.x30 criteria)*/ 1 450 450 Proposed Undercut 1 451 451 soil type = ShoulderBackfill 1 452 452 roadway exc mult factor = 0.00001 1 453 453 subsoil exc mult factor = 0.00001 1 454 454 fill mult factor = 0.00001 1 455 455 type = line, line_string 1 456 456 lvname = x_p_shoulder_backfill 1 457 457 co = 72 1 458 458 1 459 459 /* For use with CFL paved ditches (.x30 criteria)*/ 1 460 460 Proposed Undercut

Page: 7

1 461 461 soil type = PavedDitchBackfill 1 462 462 roadway exc mult factor = 0.00001 1 463 463 subsoil exc mult factor = 0.00001 1 464 464 fill mult factor = 0.00001 1 465 465 type = line, line_string 1 466 466 lvname = x_p_pave_ditch_layer_1 1 467 467 co = 27 1 468 468 1 469 469 /* For use with soil nail wall (.x30 criteria)*/ 1 470 470 Proposed Undercut 1 471 471 soil type = BackfillMaterial 1 472 472 roadway exc mult factor = 0.000001 1 473 473 subsoil exc mult factor = 0.000001 1 474 474 fill mult factor = 0.00001 1 475 475 type = line, line_string 1 476 476 lvname = x_p_sn_wall_backfill 1 477 477 co = 55,175 1 478 478 1 479 479 /* For use with soil nail wall (.x30 criteria)*/ 1 480 480 Proposed Undercut 1 481 481 soil type = Concrete 1 482 482 roadway exc mult factor = 0.000001 1 483 483 subsoil exc mult factor = 0.000001 1 484 484 fill mult factor = 0.00001 1 485 485 type = line, line_string 1 486 486 lvname = x_p_sn_wall_back 1 487 487 co = 53 1 488 488 1 489 489 /* For use with soil nail wall (.x30 criteria)*/ 1 490 490 Proposed Undercut 1 491 491 soil type = BackfillMaterial 1 492 492 roadway exc mult factor = 0.000001 1 493 493 subsoil exc mult factor = 0.000001 1 494 494 fill mult factor = 0.00001 1 495 495 type = line, line_string 1 496 496 lvname = x_p_sn_wall_curb_backfill 1 497 497 co = 16,175 1 498 498 1 499 499 /* For use with soil nail wall (.x30 criteria)*/ 1 500 500 Proposed Undercut 1 501 501 soil type = SNFoundationFill 1 502 502 roadway exc mult factor = 0.000001 1 503 503 subsoil exc mult factor = 0.000001 1 504 504 fill mult factor = 0.00001 1 505 505 type = line, line_string 1 506 506 lvname = x_p_sn_foundation_backfill 1 507 507 co = 58 1 508 508 1 509 509 /* For use with rockery wall (.x30 criteria)*/ 1 510 510 Proposed Undercut 1 511 511 soil type = WallBackfill 1 512 512 roadway exc mult factor = 0.000001 1 513 513 subsoil exc mult factor = 0.000001 1 514 514 fill mult factor = 0.00001 1 515 515 type = line, line_string 1 516 516 lvname = x_p_rk_wall_backfill 1 517 517 co = 55,175 1 518 518 1 519 519 /* For use with rockery wall (.x30 criteria)*/ 1 520 520 Proposed Undercut 1 521 521 soil type = Rock 1 522 522 roadway exc mult factor = 0.000001 1 523 523 subsoil exc mult factor = 0.000001 1 524 524 fill mult factor = 0.00001 1 525 525 type = line, line_string 1 526 526 lvname = x_p_rk_wall_back

Page: 8

1 527 527 co = 45 1 528 528 1 529 529 /* For use with rockery wall (.x30 criteria)*/ 1 530 530 Proposed Undercut 1 531 531 soil type = FoundationFill 1 532 532 roadway exc mult factor = 0.000001 1 533 533 subsoil exc mult factor = 0.000001 1 534 534 fill mult factor = 0.00001 1 535 535 type = line, line_string 1 536 536 lvname = x_p_rk_foundation_backfill 1 537 537 co = 58 1 538 538 1 539 539 /* For use with Rockery Wall, (.x30 criteria)) */ 1 540 540 Proposed Undercut 1 541 541 soil type = GranularRockBd 1 542 542 roadway exc mult factor = 0.000001 1 543 543 subsoil exc mult factor = 0.000001 1 544 544 fill mult factor = 0.00001 1 545 545 Do not include in mass ordinate 1 546 546 type = line, line_string 1 547 547 lvname = x_p_rk_wall_backfill2 1 548 548 co = 52 1 549 549 1 550 550 /* For use with guardwall (.x30 criteria)*/ 1 551 551 Proposed Undercut 1 552 552 soil type = StructuralBackfill 1 553 553 roadway exc mult factor = 0.000001 1 554 554 subsoil exc mult factor = 0.000001 1 555 555 fill mult factor = 0.00001 1 556 556 type = line, line_string 1 557 557 lvname = x_p_gd_wall_backfill1 1 558 558 co = 50 1 559 559 1 560 560 /* For use with guardwall (.x30 criteria)*/ 1 561 561 Proposed Undercut 1 562 562 soil type = BackfillMaterial 1 563 563 roadway exc mult factor = 0.000001 1 564 564 subsoil exc mult factor = 0.000001 1 565 565 fill mult factor = 0.00001 1 566 566 type = line, line_string 1 567 567 lvname = x_p_gd_wall_backfill2 1 568 568 co = 55 1 569 569 1 570 570 /* For use with Prop GFMSE Walls (.x30 criteria) */ 1 571 571 Proposed Undercut 1 572 572 soil type = GabionRock 1 573 573 roadway exc mult factor = 0.000001 1 574 574 subsoil exc mult factor = 0.000001 1 575 575 fill mult factor = 0.00001 1 576 576 type = line, line_string 1 577 577 lvname = x_p_gfmse_wall_gabion 1 578 578 co = 78 1 579 579 1 580 580 /* For use with Prop GFMSE Walls (.x30 criteria) */ 1 581 581 Proposed Undercut 1 582 582 soil type = SelectWallBackfill 1 583 583 roadway exc mult factor = 0.000001 1 584 584 subsoil exc mult factor = 0.000001 1 585 585 fill mult factor = 0.00001 1 586 586 type = line, line_string 1 587 587 lvname = x_p_gfmse_wall_backfill1 1 588 588 co = 6 1 589 589 1 590 590 /* For use with Prop GFMSE Walls (.x30 criteria) */ 1 591 591 Proposed Undercut 1 592 592 soil type = GranularBackfill

Page: 9

1 593 593 roadway exc mult factor = 0.000001 1 594 594 subsoil exc mult factor = 0.000001 1 595 595 fill mult factor = 0.00001 1 596 596 type = line, line_string 1 597 597 lvname = x_p_gfmse_wall_backfill2 1 598 598 co = 36 1 599 599 1 600 600 /* For use with Prop GFMSE Walls (.x30 criteria) */ 1 601 601 Proposed Undercut 1 602 602 soil type = GranularBackfill 1 603 603 roadway exc mult factor = 0.000001 1 604 604 subsoil exc mult factor = 0.000001 1 605 605 fill mult factor = 0.00001 1 606 606 type = line, line_string 1 607 607 lvname = x_p_gfmse_wall_embedment_slope 1 608 608 lvname = x_p_gfmse_wall_backfill3 1 609 609 co = 16,100 1 610 610 1 611 611 /* For use with Prop_SMSE_Wall (mse wall facing, (.x30 criteria)) */ 1 612 612 Proposed Undercut 1 613 613 soil type = WallFacing 1 614 614 roadway exc mult factor = 0.000001 1 615 615 subsoil exc mult factor = 0.000001 1 616 616 fill mult factor = 0.00001 1 617 617 Do not include in mass ordinate 1 618 618 type = line, line_string 1 619 619 lvname = x_p_mse_wall_facing 1 620 620 1 621 621 /* For use with all walls with Foundation Fill adhoc, (.x30 criteria)) */ 1 622 622 Proposed Undercut 1 623 623 soil type = FoundationFill 1 624 624 roadway exc mult factor = 0.000001 1 625 625 subsoil exc mult factor = 0.000001 1 626 626 fill mult factor = 0.00001 1 627 627 Do not include in mass ordinate 1 628 628 type = line, line_string 1 629 629 lvname = x_p_mse_wall_foundation 1 630 630 co = 58 1 631 631 1 632 632 Excavation Limits 1 633 633 type = line 1 634 634 lvname = x_p_exc_limit 1 635 635 co = 0 1 636 636 1 637 637 /* 1 638 638 Skip Areas 1 639 639 from 0+00.00 R 1 to 0+00.00 R 1 1 640 640 1 641 641 */ 1 642 642 1 643 643 Write Earthwork Shapes 1 644 644 plot param 1 645 645 lvname = x_ew_shapes 1 646 646 co = 0 1 647 647 wt = 0 1 648 648 lc = 0 1 649 649 Stratify Shape Color 1 650 650 1 651 651 Combine common exc + subgrade exc 1 652 652 1 653 653 Add Accumulated Unadjusted Volume Column 1 654 654 1 655 655 End Area Decimal Places = 2 1 656 656 1 657 657

Page: 10

1 658 658 1 659 659 /************ The following code creates a column based ASCII file for importing 1 660 660 /************ into an Excel spreadsheet initially created by S. Pratt 3/24/2006 1 661 661 /************ The name of this file is ^WFL_earthwork.xls^ and can be found on 1 662 662 /************ under the WFL server X:\V8i_Resource\X_30\Standards\Bin 1 663 663 /************ Instructions for using the spreadsheet can be found on it's 1st tab 1 664 664 /************ The syntax and spreadsheet is used for creating SUBTOTALS of various 1 665 665 /************ volumes for placement at the bottom of Plan/Profile sheets.

1 666 666 /************ The code below is WFL specific. FOR .X30 CRITERIA USAGE!

1 667 667 /************ The file that gets created is named ^earthwork.txt^ 1 668 668 1 669 669 1 670 670 1 671 671 write column base ascii file = Lost_EARTHWORK.txt 1 672 672 1 673 673 column 2 formula = abs( ["RdwyExc", Common Exc, Unadjusted Volumes] + 1 674 674 ["RdwyExc", Subgrade Exc, Unadjusted Volumes] ) 1 675 675 column 2 number of decimal place = 2 1 676 676 column 2 total length = 10 1 677 677 1 678 678 column 3 formula = abs( ["RdwyExc", Fill, Unadjusted Volumes] ) 1 679 679 column 3 number of decimal place = 2 1 680 680 column 3 total length = 10 1 681 681 1 682 682 column 4 formula = abs( ["Subexcavation", Common Exc, Unadjusted Volumes] + 1 683 683 ["Subexcavation", Subgrade Exc, Unadjusted Volumes] + 1 684 684 ["Subexcavation", Subsoil Exc, Unadjusted Volumes] ) 1 685 685 column 4 number of decimal place = 2 1 686 686 column 4 total length = 10 1 687 687 1 688 688 column 5 formula = abs( ["SubExBackfill", Fill, Unadjusted Volumes] ) 1 689 689 column 5 number of decimal place = 2 1 690 690 column 5 total length = 10 1 691 691 1 692 692 column 6 formula = abs( ["Topsoil", Common Exc, Unadjusted Volumes] + 1 693 693 ["Topsoil", Subgrade Exc, Unadjusted Volumes] + 1 694 694 ["Topsoil", Subsoil Exc, Unadjusted Volumes] ) 1 695 695 column 6 number of decimal place = 2 1 696 696 column 6 total length = 10 1 697 697 1 698 698 Process Earthwork for Baseline = PR_LOST 1 699 699 job number = 001 1 700 700 1 701 701 beg sta = 200+09 R 1 1 702 702 end sta = 249+40 R 1

0 0 703 END_OF_FILE

COMPUTING EARTHWORKS FOR BASELINE = PR_LOST

COMPUTING EARTHWORKS FOR JOB = 001

FORMING LIST OF XSCELLS

BEGINNING EARTHWORKS COMPUTATION

Page: 11

Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol

(sq. ft.) (cu. yd.) (cu. yd.) (cu. yd.)

200+09.00 RDWYEXC

Excavation 0.00 0 0 1.10 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 101.80 0 0 1.00 0 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 27.85 0 0 0.00 0 0

200+25.00 RDWYEXC

Excavation 0.00 0 0 1.10 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 53.05 46 46 1.00 ‐46 46

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.80 13 0 0.00 ‐46 13

200+50.00 RDWYEXC

Excavation 0.00 0 0 1.10 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 24.70 36 36 1.00 ‐82 82

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.71 10 0 0.00 ‐82 23

200+75.00 RDWYEXC

Excavation 0.00 0 0 1.10 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 15.24 18 18 1.00 ‐100 100

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.50 7 0 0.00 ‐100 30

201+00.00 RDWYEXC

Excavation 0.00 0 0 1.10 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 8.19 11 11 1.00 ‐111 111

TOPSOIL

Excavation 0.10 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 ‐111 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.50 7 0 0.00 ‐111 37

201+25.00 RDWYEXC

Excavation 0.00 0 0 1.10 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 8.34 8 8 1.00 ‐119 119

TOPSOIL

Excavation 0.17 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 ‐119 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0

Page: 12

Subsoil Exc 0.00 0 0 0.00 0 Fill 7.50 7 0 0.00 ‐119 44

201+50.00 RDWYEXC

Excavation 0.00 0 0 1.10 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 9.79 8 8 1.00 ‐127 127

TOPSOIL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 ‐127 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.50 7 0 0.00 ‐127 51

201+75.00 RDWYEXC

Excavation 0.00 0 0 1.10 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 11.46 10 10 1.00 ‐137 137

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.50 7 0 0.00 ‐137 58

202+00.00 RDWYEXC

Excavation 0.00 0 0 1.10 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 12.19 11 11 1.00 ‐148 148

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.50 7 0 0.00 ‐148 65

202+25.00 RDWYEXC

Excavation 0.00 0 0 1.10 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 12.48 11 11 1.00 ‐159 159

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.50 7 0 0.00 ‐159 72

202+50.00 RDWYEXC

Excavation 0.85 0 0 1.10 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 10.92 11 11 1.00 ‐170 170

TOPSOIL

Excavation 0.99 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 ‐170 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.50 7 0 0.00 ‐170 79

202+75.00 RDWYEXC

Excavation 0.08 0 0 1.10 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 13.18 11 11 1.00 ‐181 181

TOPSOIL

Excavation 0.42 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 ‐181 0

Page: 13

Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.83 7 0 0.00 ‐181 86

203+00.00 RDWYEXC

Excavation 0.00 0 0 1.10 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 22.44 16 16 1.00 ‐197 197

TOPSOIL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 ‐197 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.53 7 0 0.00 ‐197 93

203+25.00 RDWYEXC

Excavation 0.00 0 0 1.10 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 16.08 18 18 1.00 ‐215 215

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.53 7 0 0.00 ‐215 100

203+50.00 RDWYEXC

Excavation 0.00 0 0 1.10 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 13.99 14 14 1.00 ‐229 229

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.53 7 0 0.00 ‐229 107

203+75.00 RDWYEXC

Excavation 0.00 0 0 1.10 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 12.12 12 12 1.00 ‐241 241

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.53 7 0 0.00 ‐241 114

204+00.00 RDWYEXC

Excavation 0.00 0 0 1.10 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 9.27 10 10 1.00 ‐251 251

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.53 7 0 0.00 ‐251 121

204+25.00 RDWYEXC

Excavation 0.00 0 0 1.10 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 7.44 8 8 1.00 ‐259 259

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.53 7 0 0.00 ‐259 128

204+50.00 RDWYEXC

Page: 14

Excavation 0.00 0 0 1.10 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 5.32 6 6 1.00 ‐265 265

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.53 7 0 0.00 ‐265 135

204+75.00 RDWYEXC

Excavation 0.00 0 0 1.10 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 3.86 4 4 1.00 ‐269 269

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.53 7 0 0.00 ‐269 142

205+00.00 RDWYEXC

Excavation 0.00 0 0 1.10 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 2.26 3 3 1.00 ‐272 272

EXISTPAVEMENT

Excavation 0.04 0 0 1.00 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐272 0 Mass ordinate for EXISTPAVEMENT = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.53 7 0 0.00 ‐272 149

205+25.00 RDWYEXC

Excavation 0.00 0 0 1.10 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 3.68 3 3 1.00 ‐275 275

EXISTPAVEMENT

Excavation 0.06 0 0 1.00 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐275 0 Mass ordinate for EXISTPAVEMENT = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.53 7 0 0.00 ‐275 156

205+75.00 RDWYEXC

Excavation 0.09 0 0 1.10 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 2.87 6 6 1.00 ‐281 281

EXISTPAVEMENT

Excavation 0.00 0 0 1.00 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐281 0 Mass ordinate for EXISTPAVEMENT = 0

TOPSOIL

Excavation 0.70 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 ‐281 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.53 14 0 0.00 ‐281 170

206+00.00 RDWYEXC

Excavation 0.00 0 0 1.10 0

Page: 15

Subsoil Exc 0.00 0 0 1.00 0 Fill 5.39 4 4 1.00 ‐285 285

TOPSOIL

Excavation 0.20 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 ‐285 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.53 7 0 0.00 ‐285 177

206+25.00 RDWYEXC

Excavation 0.00 0 0 1.10 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 9.17 7 7 1.00 ‐292 292

TOPSOIL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 ‐292 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.53 7 0 0.00 ‐292 184

206+50.00 RDWYEXC

Excavation 0.00 0 0 1.10 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 10.45 9 9 1.00 ‐301 301

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.53 7 0 0.00 ‐301 191

206+75.00 RDWYEXC

Excavation 0.00 0 0 1.10 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 12.74 11 11 1.00 ‐312 312

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.53 7 0 0.00 ‐312 198

207+00.00 RDWYEXC

Excavation 0.00 0 0 1.10 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 15.61 13 13 1.00 ‐325 325

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.53 7 0 0.00 ‐325 205

207+25.00 RDWYEXC

Excavation 0.00 0 0 1.10 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 18.58 16 16 1.00 ‐341 341

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.53 7 0 0.00 ‐341 212

207+50.00 RDWYEXC

Excavation 0.00 0 0 1.10 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 20.37 18 18 1.00 ‐359 359

Page: 16

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.27 7 0 0.00 ‐359 219

207+75.00 RDWYEXC

Excavation 0.00 0 0 1.10 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 16.43 17 17 1.00 ‐376 376

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.27 7 0 0.00 ‐376 226

208+01.00 RDWYEXC

Excavation 8.69 4 5 1.10 4 Subsoil Exc 0.00 0 0 1.00 0 Fill 10.05 13 13 1.00 ‐384 389

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 26.72 16 0 0.00 ‐384 242

208+25.00 RDWYEXC

Excavation 2.72 5 6 1.10 9 Subsoil Exc 0.00 0 0 1.00 0 Fill 8.78 8 8 1.00 ‐386 397

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 25.98 23 0 0.00 ‐386 265

208+50.00 RDWYEXC

Excavation 0.00 1 1 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 7.72 8 8 1.00 ‐393 405

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.77 14 0 0.00 ‐393 279

208+75.00 RDWYEXC

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 9.01 8 8 1.00 ‐401 413

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.00 5 0 0.00 ‐401 284

208+82.00 RDWYEXC

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 8.28 2 2 1.00 ‐403 415

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.00 1 0 0.00 ‐403 285

209+00.00 RDWYEXC

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 9.23 6 6 1.00 ‐409 421

LAYER1

Excavation 0.00 0 0 0.00 0

Page: 17

Fill 5.00 3 0 0.00 ‐409 288

209+25.00 RDWYEXC

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 11.56 10 10 1.00 ‐419 431

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.00 5 0 0.00 ‐419 293

209+50.00 RDWYEXC

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 10.32 10 10 1.00 ‐429 441

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.00 5 0 0.00 ‐429 298

209+75.00 RDWYEXC

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 7.97 8 8 1.00 ‐437 449

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.00 5 0 0.00 ‐437 303

210+00.00 RDWYEXC

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 6.95 7 7 1.00 ‐444 456

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.00 5 0 0.00 ‐444 308

210+25.00 RDWYEXC

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 6.54 6 6 1.00 ‐450 462

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.00 5 0 0.00 ‐450 313

210+50.00 RDWYEXC

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 6.88 6 6 1.00 ‐456 468

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.00 5 0 0.00 ‐456 318

210+75.00 RDWYEXC

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 2.06 4 4 1.00 ‐460 472

EXISTPAVEMENT

Excavation 0.09 0 0 1.00 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐460 0 Mass ordinate for EXISTPAVEMENT = 0

LAYER1

Page: 18

Subsoil Exc 0.00 0 0 0.00 0 Fill 5.00 5 0 0.00 ‐460 323

211+00.00 RDWYEXC

Excavation 0.12 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.35 1 1 1.00 ‐461 473

EXISTPAVEMENT

Excavation 0.56 0 0 1.00 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐461 0 Mass ordinate for EXISTPAVEMENT = 0

TOPSOIL

Excavation 0.65 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 ‐461 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.96 5 0 0.00 ‐461 328

211+13.13 RDWYEXC

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.22 0 0 1.00 ‐461 473

EXISTPAVEMENT

Excavation 1.11 0 0 1.00 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐461 0 Mass ordinate for EXISTPAVEMENT = 0

TOPSOIL

Excavation 0.24 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 ‐461 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.19 2 0 0.00 ‐461 330

211+25.00 RDWYEXC

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 5.61 1 1 1.00 ‐462 474

EXISTPAVEMENT

Excavation 1.44 0 0 1.00 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐462 0 Mass ordinate for EXISTPAVEMENT = 0

TOPSOIL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 ‐462 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.01 3 0 0.00 ‐462 333

211+30.00 RDWYEXC

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 8.96 1 1 1.00 ‐463 475

EXISTPAVEMENT

Page: 19

Excavation 1.54 0 0 1.00 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐463 0 Mass ordinate for EXISTPAVEMENT = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.50 2 0 0.00 ‐463 335

211+50.00 RDWYEXC

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 2.98 4 4 1.00 ‐467 479

EXISTPAVEMENT

Excavation 0.69 1 1 1.00 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐467 0 Mass ordinate for EXISTPAVEMENT = 1

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.54 7 0 0.00 ‐467 342

211+66.87 RDWYEXC

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 2.00 2 2 1.00 ‐469 481

EXISTPAVEMENT

Excavation 0.00 0 0 1.00 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐469 0 Mass ordinate for EXISTPAVEMENT = 1

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.00 5 0 0.00 ‐469 347

211+75.00 RDWYEXC

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.83 1 1 1.00 ‐470 482

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.00 2 0 0.00 ‐470 349

212+00.00 RDWYEXC

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.53 1 1 1.00 ‐471 483

EXISTPAVEMENT

Excavation 0.22 0 0 1.00 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐471 0 Mass ordinate for EXISTPAVEMENT = 1

TOPSOIL

Excavation 0.08 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 ‐471 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.95 5 0 0.00 ‐471 354

212+25.00 RDWYEXC

Page: 20

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.61 1 1 1.00 ‐472 484

EXISTPAVEMENT

Excavation 0.67 0 0 1.00 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐472 0 Mass ordinate for EXISTPAVEMENT = 1

TOPSOIL

Excavation 0.15 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 ‐472 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.15 5 0 0.00 ‐472 359

212+50.00 RDWYEXC

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.02 1 1 1.00 ‐473 485

EXISTPAVEMENT

Excavation 0.00 0 0 1.00 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐473 0 Mass ordinate for EXISTPAVEMENT = 1

TOPSOIL

Excavation 0.05 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 ‐473 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.00 5 0 0.00 ‐473 364

212+75.00 RDWYEXC

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.20 1 1 1.00 ‐474 486

EXISTPAVEMENT

Excavation 0.21 0 0 1.00 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐474 0 Mass ordinate for EXISTPAVEMENT = 1

TOPSOIL

Excavation 0.07 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 ‐474 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.00 5 0 0.00 ‐474 369

213+00.00 RDWYEXC

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.23 1 1 1.00 ‐475 487

EXISTPAVEMENT

Excavation 0.47 0 0 1.00 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐475 0 Mass ordinate for EXISTPAVEMENT = 1

TOPSOIL

Page: 21

Excavation 0.06 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 ‐475 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.00 5 0 0.00 ‐475 374

213+25.00 RDWYEXC

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.69 1 1 1.00 ‐476 488

EXISTPAVEMENT

Excavation 0.68 0 0 1.00 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐476 0 Mass ordinate for EXISTPAVEMENT = 1

TOPSOIL

Excavation 0.07 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 ‐476 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.00 5 0 0.00 ‐476 379

213+50.00 RDWYEXC

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 4.98 3 3 1.00 ‐479 491

EXISTPAVEMENT

Excavation 0.00 0 0 1.00 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐479 0 Mass ordinate for EXISTPAVEMENT = 1

TOPSOIL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 ‐479 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.00 5 0 0.00 ‐479 384

213+75.00 RDWYEXC

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 11.10 7 7 1.00 ‐486 498

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.00 5 0 0.00 ‐486 389

214+00.00 RDWYEXC

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 12.25 11 11 1.00 ‐497 509

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.00 5 0 0.00 ‐497 394

214+25.00 RDWYEXC

Page: 22

Subsoil Exc 0.00 0 0 1.00 0 Fill 10.54 11 11 1.00 ‐508 520

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.00 5 0 0.00 ‐508 399

214+50.00 RDWYEXC

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 9.26 9 9 1.00 ‐517 529

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.00 5 0 0.00 ‐517 404

214+75.00 RDWYEXC

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 10.12 9 9 1.00 ‐526 538

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.00 5 0 0.00 ‐526 409

215+00.00 RDWYEXC

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 11.65 10 10 1.00 ‐536 548

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.00 5 0 0.00 ‐536 414

215+25.00 RDWYEXC

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 9.34 10 10 1.00 ‐546 558

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.00 5 0 0.00 ‐546 419

215+34.54 RDWYEXC

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 9.38 3 3 1.00 ‐549 561

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.00 2 0 0.00 ‐549 421

215+50.75 RDWYEXC

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 12.44 7 7 1.00 ‐556 568

TOPSOIL

Excavation 0.76 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 ‐556 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.50 4 0 0.00 ‐556 425

Page: 23

215+68.25 RDWYEXC

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 19.35 10 10 1.00 ‐566 578

TOPSOIL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 ‐566 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.50 6 0 0.00 ‐566 431

215+84.61 RDWYEXC

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 12.33 10 10 1.00 ‐576 588

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.00 4 0 0.00 ‐576 435

216+00.00 RDWYEXC

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 11.30 7 7 1.00 ‐583 595

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.00 3 0 0.00 ‐583 438

216+25.00 RDWYEXC

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 10.66 10 10 1.00 ‐593 605

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.00 5 0 0.00 ‐593 443

216+50.00 RDWYEXC

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 10.20 10 10 1.00 ‐603 615

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.00 5 0 0.00 ‐603 448

216+75.00 RDWYEXC

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 12.51 11 11 1.00 ‐614 626

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.00 5 0 0.00 ‐614 453

217+00.00 RDWYEXC

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 13.42 12 12 1.00 ‐626 638

LAYER1

Page: 24

Fill 5.00 5 0 0.00 ‐626 458

217+25.00 RDWYEXC

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 12.00 12 12 1.00 ‐638 650

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.00 5 0 0.00 ‐638 463

217+50.00 RDWYEXC

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 11.15 11 11 1.00 ‐649 661

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.00 5 0 0.00 ‐649 468

217+75.00 RDWYEXC

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 11.95 11 11 1.00 ‐660 672

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.00 5 0 0.00 ‐660 473

218+00.00 RDWYEXC

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 12.03 11 11 1.00 ‐671 683

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.00 5 0 0.00 ‐671 478

218+25.00 RDWYEXC

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 9.57 10 10 1.00 ‐681 693

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.00 5 0 0.00 ‐681 483

218+50.00 RDWYEXC

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 7.94 8 8 1.00 ‐689 701

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.00 5 0 0.00 ‐689 488

218+75.00 RDWYEXC

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 8.96 8 8 1.00 ‐697 709

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.00 5 0 0.00 ‐697 493

Page: 25

218+84.23 RDWYEXC

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 9.61 3 3 1.00 ‐700 712

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.00 2 0 0.00 ‐700 495

219+00.89 RDWYEXC

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 11.04 6 6 1.00 ‐706 718

TOPSOIL

Excavation 0.45 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 ‐706 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.83 5 0 0.00 ‐706 500

219+19.46 RDWYEXC

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 10.36 7 7 1.00 ‐713 725

EXISTPAVEMENT

Excavation 0.00 0 0 1.00 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐713 0 Mass ordinate for EXISTPAVEMENT = 1

TOPSOIL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 ‐713 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.50 7 0 0.00 ‐713 507

219+25.00 RDWYEXC

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 12.66 2 2 1.00 ‐715 727

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.89 2 0 0.00 ‐715 509

219+36.48 RDWYEXC

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 9.02 5 5 1.00 ‐720 732

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.00 3 0 0.00 ‐720 512

219+50.00 RDWYEXC

Excavation 0.00 0 0 1.10 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 8.91 4 4 1.00 ‐724 736

LAYER1

Page: 26

Fill 5.00 3 0 0.00 ‐724 515

219+75.00 RDWYEXC

Subsoil Exc 0.00 0 0 1.00 0