Russian_River_Earthwork_O_LINE.pdf
PDF 118 KB Posted
- Attached to
- AK FS CNF 1015(1), Russian River Campground Access, Phase 1 Federal contract opportunity
- Solicitation number
- DTFH70-15-B-00021
About this file
Russian River_Earthwork_O LINE
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q&A_10-25-17.pdf | ||
| A002.pdf | ||
| Q&A_10-23-17.pdf | ||
| A001.pdf | ||
| Plan_Request_form_Russian_River.pdf | ||
| O_Line_XSections.pdf | ||
| Russian_River_Earthwork_L_LINE.pdf | ||
| I_Line_XSections.pdf | ||
| AK_FS_CNF_1015(1)_Plans_100_.pdf | ||
| Russian_River_Earthwork_I_Line.pdf | ||
| L_Line_XSections.pdf | ||
| IFB_RussianRiver.pdf | ||
| SWPPP_Russian_River_Campground_Road,_AK_FS_CNF_1015(1)_Kenai_Peninsula_County,_Alaska.pdf | ||
| PROJECT_DESCRIPTION.pdf | ||
| Russian_River_CG_Phase_I_Notice_to_Bidders.pdf | ||
| RRCP1_Pre-Ad_Plans.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FEDERAL HIGHWAY ADMINISTRATION
PROJECT
AK FS CNF 1015(1)
RUSSIAN RIVER CAMPGROUND
ACCESS PHASE 1
O LINE
EARTHWORK
10+13.39 TO 22+46.29
CHUGACH NATIONAL FOREST
KENAI PENINSULA BOROUGH, ALASKA
File: H:\Russian River Campground\Phase 1\Physical Data\Earthwork\V8_EW_OLine_7- -26-16_No EP.log 8/17/2016, 10:17:01 AM
COMPUTING EARTHWORKS FOR BASELINE = OLINE
COMPUTING EARTHWORKS FOR JOB = 151
FORMING LIST OF XSCELLS
BEGINNING EARTHWORKS COMPUTATION
Page: 1
Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol
(sq. ft.) (cu. yd.) (cu. yd.)
(cu. yd.)
SKIP STATION RANGE = 0+00.00 to 0+00.00
10+13.69 RDWYEXC
Excavation 263.41 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 0
TOPSOIL
Excavation 24.22 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 0 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 41.19 0 0 0.00 0
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 84.19 0 0 0.00 0
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 136.71 0 0 0.00 0
10+20.00 RDWYEXC
Excavation 137.69 47 47 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 47
TOPSOIL
Page: 2
Excavation 23.07 6 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 47 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 26.10 8 0 0.00 47
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 53.44 16 0 0.00 47
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 91.99 27 0 0.00 47
10+25.00 RDWYEXC
Excavation 107.32 23 23 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 16.62 2 2 1.00 68
TOPSOIL
Excavation 12.04 3 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 68 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 21.21 4 0 0.00 68
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00
Page: 3
Fill 43.68 9 0 0.00 68
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 77.29 16 0 0.00 68
10+40.00 RDWYEXC
Excavation 85.74 53 53 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 4.04 6 6 1.00 115
TOPSOIL
Excavation 9.42 6 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 115 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 13.08 10 0 0.00 115
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 27.65 20 0 0.00 115
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 52.12 36 0 0.00 115
10+50.00 RDWYEXC
Excavation 67.80 28 28 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 13.81 3 3 1.00 140
Page: 4
TOPSOIL
Excavation 4.49 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 140 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 10.40 4 0 0.00 140
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 22.11 9 0 0.00 140
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 44.16 18 0 0.00 140
10+58.59 RDWYEXC
Excavation 64.65 21 21 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 10.14 4 4 1.00 157
TOPSOIL
Excavation 4.64 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 157 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 9.21 3 0 0.00 157
LAYER2
Excavation 0.00 0 0 0.00
Page: 5
Subsoil Exc 0.00 0 0 0.00 Fill 20.76 7 0 0.00 157
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 40.14 13 0 0.00 157
10+59.74 RDWYEXC
Excavation 64.25 3 3 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 9.63 0 0 1.00 160
TOPSOIL
Excavation 4.62 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 160 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 9.15 0 0 0.00 160
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 19.89 1 0 0.00 160
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 40.68 2 0 0.00 160
10+73.24 RDWYEXC
Excavation 60.64 31 31 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 6.71 4 4 1.00 187
Page: 6
TOPSOIL
Excavation 3.98 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 187 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 9.02 5 0 0.00 187
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.32 10 0 0.00 187
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 39.89 20 0 0.00 187
10+75.00 RDWYEXC
Excavation 60.21 4 4 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 6.71 0 0 1.00 191
TOPSOIL
Excavation 3.87 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 191 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 9.02 1 0 0.00 191
LAYER2
Excavation 0.00 0 0 0.00
Page: 7
Subsoil Exc 0.00 0 0 0.00 Fill 20.26 1 0 0.00 191
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 39.95 3 0 0.00 191
11+00.00 RDWYEXC
Excavation 56.89 54 54 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 2.02 4 4 1.00 241
TOPSOIL
Excavation 4.06 3 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 241 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 9.02 8 0 0.00 241
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 19.41 18 0 0.00 241
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 40.81 37 0 0.00 241
11+25.00 RDWYEXC
Excavation 45.60 47 47 1.00 Subsoil Exc 0.00 0 0 1.00
Page: 8
Fill 3.24 2 2 1.00 286
TOPSOIL
Excavation 4.24 3 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 286 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 9.01 8 0 0.00 286
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 19.19 18 0 0.00 286
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 40.97 38 0 0.00 286
11+50.00 RDWYEXC
Excavation 37.56 39 39 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 8.09 5 5 1.00 320
TOPSOIL
Excavation 3.09 3 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 320 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.84 8 0 0.00 320
LAYER2
Page: 9
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.95 18 0 0.00 320
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 40.41 38 0 0.00 320
11+61.65 RDWYEXC
Excavation 35.03 16 16 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 11.40 4 4 1.00 332
TOPSOIL
Excavation 2.59 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 332 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.77 4 0 0.00 332
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.81 8 0 0.00 332
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 40.16 17 0 0.00 332
11+75.00 RDWYEXC
Excavation 33.16 17 17 1.00 Subsoil Exc 0.00 0 0 1.00
Page: 10
Fill 14.11 6 6 1.00 343
TOPSOIL
Excavation 2.47 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 343 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.68 4 0 0.00 343
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.54 9 0 0.00 343
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 39.87 20 0 0.00 343
11+76.65 RDWYEXC
Excavation 32.84 2 2 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 14.38 1 1 1.00 344
TOPSOIL
Excavation 2.46 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 344 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.67 1 0 0.00 344
Page: 11
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.52 1 0 0.00 344
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 39.83 2 0 0.00 344
11+92.97 RDWYEXC
Excavation 32.22 20 20 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 13.31 8 8 1.00 356
TOPSOIL
Excavation 2.59 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 356 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.70 5 0 0.00 356
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.59 11 0 0.00 356
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 39.93 24 0 0.00 356
12+00.00 RDWYEXC
Excavation 32.34 8 8 1.00
Page: 12
Subsoil Exc 0.00 0 0 1.00 Fill 13.20 3 3 1.00 361
TOPSOIL
Excavation 2.53 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 361 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.86 2 0 0.00 361
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.90 5 0 0.00 361
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 40.40 10 0 0.00 361
12+25.00 RDWYEXC
Excavation 32.06 30 30 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 13.62 12 12 1.00 379
TOPSOIL
Excavation 2.37 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 379 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 9.41 8 0 0.00 379
Page: 13
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.01 18 0 0.00 379
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 42.06 38 0 0.00 379
12+50.00 RDWYEXC
Excavation 32.08 30 30 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 14.03 13 13 1.00 396
TOPSOIL
Excavation 2.36 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 396 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 9.97 9 0 0.00 396
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 21.19 19 0 0.00 396
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 43.66 40 0 0.00 396
12+75.00 RDWYEXC
Excavation 32.09 30 30 1.00
Page: 14
Subsoil Exc 0.00 0 0 1.00 Fill 14.51 13 13 1.00 413
TOPSOIL
Excavation 2.32 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 413 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 10.52 9 0 0.00 413
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 22.28 20 0 0.00 413
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 45.35 41 0 0.00 413
13+00.00 RDWYEXC
Excavation 33.43 30 30 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 15.51 14 14 1.00 429
TOPSOIL
Excavation 1.85 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 429 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00
Page: 15
Fill 11.08 10 0 0.00 429
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 50.62 34 0 0.00 429
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 19.78 30 0 0.00 429
13+25.00 RDWYEXC
Excavation 35.78 32 32 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 12.55 13 13 1.00 448
TOPSOIL
Excavation 3.46 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 448 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.63 11 0 0.00 448
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.46 35 0 0.00 448
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.73 32 0 0.00 448
13+27.27 RDWYEXC
Page: 16
Excavation 36.07 3 3 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 12.24 1 1 1.00 450
TOPSOIL
Excavation 3.48 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 450 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 1 0 0.00 450
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 2 0 0.00 450
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.87 4 0 0.00 450
13+50.00 RDWYEXC
Excavation 47.75 35 35 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 11.00 10 10 1.00 475
TOPSOIL
Excavation 0.75 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 475 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00
Page: 17
Fill 11.68 10 0 0.00 475
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 21 0 0.00 475
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.87 41 0 0.00 475
13+75.00 RDWYEXC
Excavation 53.90 47 47 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 3.82 7 7 1.00 515
TOPSOIL
Excavation 1.52 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 515 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 11 0 0.00 515
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 25.11 23 0 0.00 515
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.31 45 0 0.00 515
Page: 18
14+00.00 RDWYEXC
Excavation 54.13 50 50 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 2.27 3 3 1.00 562
TOPSOIL
Excavation 1.10 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 562 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 11 0 0.00 562
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 25.36 23 0 0.00 562
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.06 45 0 0.00 562
14+25.00 RDWYEXC
Excavation 35.92 41 41 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 13.50 7 7 1.00 596
TOPSOIL
Excavation 2.45 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 596 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00
Page: 19
Subsoil Exc 0.00 0 0 0.00 Fill 11.68 11 0 0.00 596
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 23 0 0.00 596
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.87 45 0 0.00 596
14+29.30 RDWYEXC
Excavation 34.10 6 6 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 15.35 2 2 1.00 600
TOPSOIL
Excavation 3.02 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 600 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 2 0 0.00 600
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 4 0 0.00 600
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.87 8 0 0.00 600
Page: 20
14+35.30 RDWYEXC
Excavation 33.46 8 8 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 14.79 3 3 1.00 605
TOPSOIL
Excavation 3.25 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 605 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 3 0 0.00 605
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 5 0 0.00 605
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.87 11 0 0.00 605
14+42.80 RDWYEXC
Excavation 31.79 9 9 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 12.50 4 4 1.00 610
TOPSOIL
Excavation 2.88 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 610 Mass ordinate for TOPSOIL = 0
LAYER1
Page: 21
Subsoil Exc 0.00 0 0 0.00 Fill 11.68 3 0 0.00 610
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 7 0 0.00 610
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.92 14 0 0.00 610
14+50.00 RDWYEXC
Excavation 30.12 8 8 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 12.13 3 3 1.00 615
TOPSOIL
Excavation 2.89 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 615 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 3 0 0.00 615
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 7 0 0.00 615
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.92 13 0 0.00 615
Page: 22
14+75.00 RDWYEXC
Excavation 24.23 25 25 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 18.61 14 14 1.00 626
TOPSOIL
Excavation 1.92 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 626 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 11 0 0.00 626
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.59 23 0 0.00 626
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.88 45 0 0.00 626
15+00.00 RDWYEXC
Excavation 23.64 22 22 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 22.97 19 19 1.00 629
TOPSOIL
Excavation 1.62 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 629 Mass ordinate for TOPSOIL = 0
LAYER1
Page: 23
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 11 0 0.00 629
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 23 0 0.00 629
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.92 45 0 0.00 629
15+25.00 RDWYEXC
Excavation 20.40 20 20 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 22.83 21 21 1.00 628
TOPSOIL
Excavation 1.77 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 628 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 11 0 0.00 628
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 23 0 0.00 628
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00
Page: 24
Fill 48.92 45 0 0.00 628
15+35.00 RDWYEXC
Excavation 18.37 7 7 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 22.78 8 8 1.00 627
TOPSOIL
Excavation 1.60 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 627 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 4 0 0.00 627
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 9 0 0.00 627
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.92 18 0 0.00 627
15+50.00 RDWYEXC
Excavation 18.34 10 10 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 22.49 13 13 1.00 624
TOPSOIL
Excavation 1.30 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 624 Mass ordinate for TOPSOIL = 0
Page: 25
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 6 0 0.00 624
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 14 0 0.00 624
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.92 27 0 0.00 624
15+55.81 RDWYEXC
Excavation 18.66 4 4 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 22.80 5 5 1.00 623
TOPSOIL
Excavation 1.39 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 623 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 3 0 0.00 623
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 5 0 0.00 623
LAYER3
Excavation 0.00 0 0 0.00
Page: 26
Fill 48.92 11 0 0.00 623
15+75.00 RDWYEXC
Excavation 21.29 14 14 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 20.84 16 16 1.00 621
TOPSOIL
Excavation 2.00 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 621 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 8 0 0.00 621
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 17 0 0.00 621
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.92 35 0 0.00 621
15+85.00 RDWYEXC
Excavation 23.74 8 8 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 18.62 7 7 1.00 622
TOPSOIL
Excavation 2.28 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 622
Page: 27
Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 4 0 0.00 622
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 9 0 0.00 622
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.92 18 0 0.00 622
16+00.00 RDWYEXC
Excavation 27.67 14 14 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 16.04 10 10 1.00 626
TOPSOIL
Excavation 2.72 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 626 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 6 0 0.00 626
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 14 0 0.00 626
LAYER3
Excavation 0.00 0 0 0.00
Page: 28
Subsoil Exc 0.00 0 0 0.00 Fill 48.92 27 0 0.00 626
16+16.12 RDWYEXC
Excavation 30.43 17 17 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 13.82 9 9 1.00 634
TOPSOIL
Excavation 3.07 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 634 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 7 0 0.00 634
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 15 0 0.00 634
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.92 29 0 0.00 634
16+25.00 RDWYEXC
Excavation 30.81 10 10 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 14.85 5 5 1.00 639
TOPSOIL
Excavation 3.28 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 639
Page: 29
Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 4 0 0.00 639
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.56 8 0 0.00 639
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.87 16 0 0.00 639
16+29.62 RDWYEXC
Excavation 30.96 5 5 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 15.68 3 3 1.00 641
TOPSOIL
Excavation 3.42 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 641 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 2 0 0.00 641
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 4 0 0.00 641
LAYER3
Page: 30
Subsoil Exc 0.00 0 0 0.00 Fill 48.86 8 0 0.00 641
16+50.00 RDWYEXC
Excavation 32.15 24 24 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 20.13 14 14 1.00 651
TOPSOIL
Excavation 3.26 3 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 651 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 9 0 0.00 651
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 19 0 0.00 651
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.80 37 0 0.00 651
16+75.00 RDWYEXC
Excavation 32.14 30 30 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 22.87 20 20 1.00 661
TOPSOIL
Excavation 3.15 3 0 0.00 Subsoil Exc 0.00 0 0 0.00
Page: 31
Fill 0.00 0 0 0.00 661 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 11 0 0.00 661
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 23 0 0.00 661
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.77 45 0 0.00 661
17+00.00 RDWYEXC
Excavation 30.16 29 29 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 27.56 23 23 1.00 667
TOPSOIL
Excavation 2.58 3 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 667 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 11 0 0.00 667
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 23 0 0.00 667
LAYER3
Page: 32
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.78 45 0 0.00 667
17+25.00 RDWYEXC
Excavation 25.69 26 26 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 33.87 28 28 1.00 665
TOPSOIL
Excavation 1.83 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 665 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 11 0 0.00 665
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 23 0 0.00 665
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.84 45 0 0.00 665
17+37.14 RDWYEXC
Excavation 22.68 11 11 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 41.51 17 17 1.00 659
TOPSOIL
Excavation 1.52 1 0 0.00
Page: 33
Fill 0.00 0 0 0.00 659 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 5 0 0.00 659
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 11 0 0.00 659
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.89 22 0 0.00 659
17+50.00 RDWYEXC
Excavation 18.95 10 10 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 49.80 22 22 1.00 647
TOPSOIL
Excavation 1.55 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 647 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 6 0 0.00 647
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 12 0 0.00 647
Page: 34
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.95 23 0 0.00 647
17+53.64 RDWYEXC
Excavation 17.99 2 2 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 51.78 7 7 1.00 642
TOPSOIL
Excavation 1.66 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 642 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 2 0 0.00 642
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 3 0 0.00 642
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.97 7 0 0.00 642
17+75.00 RDWYEXC
Excavation 15.83 13 13 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 41.20 37 37 1.00 618
TOPSOIL
Excavation 1.49 1 0 0.00
Page: 35
Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 618 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 9 0 0.00 618
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 19 0 0.00 618
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.97 39 0 0.00 618
18+00.00 RDWYEXC
Excavation 17.87 16 16 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 46.34 41 41 1.00 593
TOPSOIL
Excavation 1.12 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 593 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 11 0 0.00 593
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 23 0 0.00 593
Page: 36
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.99 45 0 0.00 593
18+05.00 RDWYEXC
Excavation 17.91 3 3 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 46.01 9 9 1.00 587
TOPSOIL
Excavation 1.13 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 587 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 2 0 0.00 587
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 5 0 0.00 587
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.97 9 0 0.00 587
18+24.73 RDWYEXC
Excavation 15.89 12 12 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 41.66 32 32 1.00 567
TOPSOIL
Excavation 1.36 1 0 0.00
Page: 37
Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 567 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 9 0 0.00 567
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 18 0 0.00 567
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.97 36 0 0.00 567
18+25.00 RDWYEXC
Excavation 15.89 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 41.68 0 0 1.00 567
TOPSOIL
Excavation 1.35 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 567 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 0 0 0.00 567
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00
Page: 38
Fill 24.55 0 0 0.00 567
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.97 0 0 0.00 567
18+50.00 RDWYEXC
Excavation 14.97 14 14 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 39.63 38 38 1.00 543
TOPSOIL
Excavation 1.45 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 543 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 11 0 0.00 543
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 23 0 0.00 543
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.97 45 0 0.00 543
18+55.00 RDWYEXC
Excavation 14.53 3 3 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 41.41 8 8 1.00 538
Page: 39
Excavation 1.52 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 538 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 2 0 0.00 538
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 5 0 0.00 538
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.97 9 0 0.00 538
18+75.00 RDWYEXC
Excavation 12.35 10 10 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 46.91 33 33 1.00 515