Russian_River_Earthwork_O_LINE.pdf

PDF 118 KB Posted

Attached to
AK FS CNF 1015(1), Russian River Campground Access, Phase 1 Federal contract opportunity
Solicitation number
DTFH70-15-B-00021
Issued by
Department of Transportation Federal Highway Administration

About this file

Russian River_Earthwork_O LINE

View the file

Other files for this federal contract opportunity

Other files attached to AK FS CNF 1015(1), Russian River Campground Access, Phase 1, newest first.
File Type Posted
Q&A_10-25-17.pdf PDF
A002.pdf PDF
Q&A_10-23-17.pdf PDF
A001.pdf PDF
Plan_Request_form_Russian_River.pdf PDF
O_Line_XSections.pdf PDF
Russian_River_Earthwork_L_LINE.pdf PDF
I_Line_XSections.pdf PDF
AK_FS_CNF_1015(1)_Plans_100_.pdf PDF
Russian_River_Earthwork_I_Line.pdf PDF
L_Line_XSections.pdf PDF
IFB_RussianRiver.pdf PDF
SWPPP_Russian_River_Campground_Road,_AK_FS_CNF_1015(1)_Kenai_Peninsula_County,_Alaska.pdf PDF
PROJECT_DESCRIPTION.pdf PDF
Russian_River_CG_Phase_I_Notice_to_Bidders.pdf PDF
RRCP1_Pre-Ad_Plans.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FEDERAL HIGHWAY ADMINISTRATION

PROJECT

AK FS CNF 1015(1)

RUSSIAN RIVER CAMPGROUND

ACCESS PHASE 1

O LINE

EARTHWORK

10+13.39 TO 22+46.29

CHUGACH NATIONAL FOREST

KENAI PENINSULA BOROUGH, ALASKA

File: H:\Russian River Campground\Phase 1\Physical Data\Earthwork\V8_EW_OLine_7- -26-16_No EP.log 8/17/2016, 10:17:01 AM

COMPUTING EARTHWORKS FOR BASELINE = OLINE

COMPUTING EARTHWORKS FOR JOB = 151

FORMING LIST OF XSCELLS

BEGINNING EARTHWORKS COMPUTATION

Page: 1

Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol

(sq. ft.) (cu. yd.) (cu. yd.)

(cu. yd.)

SKIP STATION RANGE = 0+00.00 to 0+00.00

10+13.69 RDWYEXC

Excavation 263.41 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 0

TOPSOIL

Excavation 24.22 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 41.19 0 0 0.00 0

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 84.19 0 0 0.00 0

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 136.71 0 0 0.00 0

10+20.00 RDWYEXC

Excavation 137.69 47 47 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 47

TOPSOIL

Page: 2

Excavation 23.07 6 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 47 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 26.10 8 0 0.00 47

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 53.44 16 0 0.00 47

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 91.99 27 0 0.00 47

10+25.00 RDWYEXC

Excavation 107.32 23 23 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 16.62 2 2 1.00 68

TOPSOIL

Excavation 12.04 3 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 68 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 21.21 4 0 0.00 68

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00

Page: 3

Fill 43.68 9 0 0.00 68

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 77.29 16 0 0.00 68

10+40.00 RDWYEXC

Excavation 85.74 53 53 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 4.04 6 6 1.00 115

TOPSOIL

Excavation 9.42 6 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 115 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 13.08 10 0 0.00 115

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 27.65 20 0 0.00 115

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 52.12 36 0 0.00 115

10+50.00 RDWYEXC

Excavation 67.80 28 28 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 13.81 3 3 1.00 140

Page: 4

TOPSOIL

Excavation 4.49 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 140 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 10.40 4 0 0.00 140

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 22.11 9 0 0.00 140

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 44.16 18 0 0.00 140

10+58.59 RDWYEXC

Excavation 64.65 21 21 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 10.14 4 4 1.00 157

TOPSOIL

Excavation 4.64 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 157 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 9.21 3 0 0.00 157

LAYER2

Excavation 0.00 0 0 0.00

Page: 5

Subsoil Exc 0.00 0 0 0.00 Fill 20.76 7 0 0.00 157

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 40.14 13 0 0.00 157

10+59.74 RDWYEXC

Excavation 64.25 3 3 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 9.63 0 0 1.00 160

TOPSOIL

Excavation 4.62 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 160 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 9.15 0 0 0.00 160

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 19.89 1 0 0.00 160

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 40.68 2 0 0.00 160

10+73.24 RDWYEXC

Excavation 60.64 31 31 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 6.71 4 4 1.00 187

Page: 6

TOPSOIL

Excavation 3.98 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 187 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 9.02 5 0 0.00 187

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.32 10 0 0.00 187

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 39.89 20 0 0.00 187

10+75.00 RDWYEXC

Excavation 60.21 4 4 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 6.71 0 0 1.00 191

TOPSOIL

Excavation 3.87 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 191 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 9.02 1 0 0.00 191

LAYER2

Excavation 0.00 0 0 0.00

Page: 7

Subsoil Exc 0.00 0 0 0.00 Fill 20.26 1 0 0.00 191

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 39.95 3 0 0.00 191

11+00.00 RDWYEXC

Excavation 56.89 54 54 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 2.02 4 4 1.00 241

TOPSOIL

Excavation 4.06 3 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 241 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 9.02 8 0 0.00 241

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 19.41 18 0 0.00 241

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 40.81 37 0 0.00 241

11+25.00 RDWYEXC

Excavation 45.60 47 47 1.00 Subsoil Exc 0.00 0 0 1.00

Page: 8

Fill 3.24 2 2 1.00 286

TOPSOIL

Excavation 4.24 3 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 286 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 9.01 8 0 0.00 286

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 19.19 18 0 0.00 286

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 40.97 38 0 0.00 286

11+50.00 RDWYEXC

Excavation 37.56 39 39 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 8.09 5 5 1.00 320

TOPSOIL

Excavation 3.09 3 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 320 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.84 8 0 0.00 320

LAYER2

Page: 9

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.95 18 0 0.00 320

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 40.41 38 0 0.00 320

11+61.65 RDWYEXC

Excavation 35.03 16 16 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 11.40 4 4 1.00 332

TOPSOIL

Excavation 2.59 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 332 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.77 4 0 0.00 332

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.81 8 0 0.00 332

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 40.16 17 0 0.00 332

11+75.00 RDWYEXC

Excavation 33.16 17 17 1.00 Subsoil Exc 0.00 0 0 1.00

Page: 10

Fill 14.11 6 6 1.00 343

TOPSOIL

Excavation 2.47 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 343 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.68 4 0 0.00 343

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.54 9 0 0.00 343

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 39.87 20 0 0.00 343

11+76.65 RDWYEXC

Excavation 32.84 2 2 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 14.38 1 1 1.00 344

TOPSOIL

Excavation 2.46 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 344 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.67 1 0 0.00 344

Page: 11

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.52 1 0 0.00 344

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 39.83 2 0 0.00 344

11+92.97 RDWYEXC

Excavation 32.22 20 20 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 13.31 8 8 1.00 356

TOPSOIL

Excavation 2.59 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 356 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.70 5 0 0.00 356

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.59 11 0 0.00 356

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 39.93 24 0 0.00 356

12+00.00 RDWYEXC

Excavation 32.34 8 8 1.00

Page: 12

Subsoil Exc 0.00 0 0 1.00 Fill 13.20 3 3 1.00 361

TOPSOIL

Excavation 2.53 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 361 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.86 2 0 0.00 361

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.90 5 0 0.00 361

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 40.40 10 0 0.00 361

12+25.00 RDWYEXC

Excavation 32.06 30 30 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 13.62 12 12 1.00 379

TOPSOIL

Excavation 2.37 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 379 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 9.41 8 0 0.00 379

Page: 13

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.01 18 0 0.00 379

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 42.06 38 0 0.00 379

12+50.00 RDWYEXC

Excavation 32.08 30 30 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 14.03 13 13 1.00 396

TOPSOIL

Excavation 2.36 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 396 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 9.97 9 0 0.00 396

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 21.19 19 0 0.00 396

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 43.66 40 0 0.00 396

12+75.00 RDWYEXC

Excavation 32.09 30 30 1.00

Page: 14

Subsoil Exc 0.00 0 0 1.00 Fill 14.51 13 13 1.00 413

TOPSOIL

Excavation 2.32 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 413 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 10.52 9 0 0.00 413

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 22.28 20 0 0.00 413

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 45.35 41 0 0.00 413

13+00.00 RDWYEXC

Excavation 33.43 30 30 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 15.51 14 14 1.00 429

TOPSOIL

Excavation 1.85 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 429 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00

Page: 15

Fill 11.08 10 0 0.00 429

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 50.62 34 0 0.00 429

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 19.78 30 0 0.00 429

13+25.00 RDWYEXC

Excavation 35.78 32 32 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 12.55 13 13 1.00 448

TOPSOIL

Excavation 3.46 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 448 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.63 11 0 0.00 448

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.46 35 0 0.00 448

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.73 32 0 0.00 448

13+27.27 RDWYEXC

Page: 16

Excavation 36.07 3 3 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 12.24 1 1 1.00 450

TOPSOIL

Excavation 3.48 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 450 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 1 0 0.00 450

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 2 0 0.00 450

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.87 4 0 0.00 450

13+50.00 RDWYEXC

Excavation 47.75 35 35 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 11.00 10 10 1.00 475

TOPSOIL

Excavation 0.75 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 475 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00

Page: 17

Fill 11.68 10 0 0.00 475

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 21 0 0.00 475

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.87 41 0 0.00 475

13+75.00 RDWYEXC

Excavation 53.90 47 47 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 3.82 7 7 1.00 515

TOPSOIL

Excavation 1.52 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 515 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 11 0 0.00 515

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 25.11 23 0 0.00 515

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.31 45 0 0.00 515

Page: 18

14+00.00 RDWYEXC

Excavation 54.13 50 50 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 2.27 3 3 1.00 562

TOPSOIL

Excavation 1.10 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 562 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 11 0 0.00 562

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 25.36 23 0 0.00 562

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.06 45 0 0.00 562

14+25.00 RDWYEXC

Excavation 35.92 41 41 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 13.50 7 7 1.00 596

TOPSOIL

Excavation 2.45 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 596 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00

Page: 19

Subsoil Exc 0.00 0 0 0.00 Fill 11.68 11 0 0.00 596

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 23 0 0.00 596

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.87 45 0 0.00 596

14+29.30 RDWYEXC

Excavation 34.10 6 6 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 15.35 2 2 1.00 600

TOPSOIL

Excavation 3.02 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 600 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 2 0 0.00 600

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 4 0 0.00 600

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.87 8 0 0.00 600

Page: 20

14+35.30 RDWYEXC

Excavation 33.46 8 8 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 14.79 3 3 1.00 605

TOPSOIL

Excavation 3.25 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 605 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 3 0 0.00 605

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 5 0 0.00 605

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.87 11 0 0.00 605

14+42.80 RDWYEXC

Excavation 31.79 9 9 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 12.50 4 4 1.00 610

TOPSOIL

Excavation 2.88 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 610 Mass ordinate for TOPSOIL = 0

LAYER1

Page: 21

Subsoil Exc 0.00 0 0 0.00 Fill 11.68 3 0 0.00 610

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 7 0 0.00 610

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.92 14 0 0.00 610

14+50.00 RDWYEXC

Excavation 30.12 8 8 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 12.13 3 3 1.00 615

TOPSOIL

Excavation 2.89 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 615 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 3 0 0.00 615

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 7 0 0.00 615

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.92 13 0 0.00 615

Page: 22

14+75.00 RDWYEXC

Excavation 24.23 25 25 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 18.61 14 14 1.00 626

TOPSOIL

Excavation 1.92 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 626 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 11 0 0.00 626

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.59 23 0 0.00 626

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.88 45 0 0.00 626

15+00.00 RDWYEXC

Excavation 23.64 22 22 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 22.97 19 19 1.00 629

TOPSOIL

Excavation 1.62 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 629 Mass ordinate for TOPSOIL = 0

LAYER1

Page: 23

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 11 0 0.00 629

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 23 0 0.00 629

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.92 45 0 0.00 629

15+25.00 RDWYEXC

Excavation 20.40 20 20 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 22.83 21 21 1.00 628

TOPSOIL

Excavation 1.77 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 628 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 11 0 0.00 628

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 23 0 0.00 628

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00

Page: 24

Fill 48.92 45 0 0.00 628

15+35.00 RDWYEXC

Excavation 18.37 7 7 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 22.78 8 8 1.00 627

TOPSOIL

Excavation 1.60 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 627 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 4 0 0.00 627

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 9 0 0.00 627

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.92 18 0 0.00 627

15+50.00 RDWYEXC

Excavation 18.34 10 10 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 22.49 13 13 1.00 624

TOPSOIL

Excavation 1.30 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 624 Mass ordinate for TOPSOIL = 0

Page: 25

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 6 0 0.00 624

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 14 0 0.00 624

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.92 27 0 0.00 624

15+55.81 RDWYEXC

Excavation 18.66 4 4 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 22.80 5 5 1.00 623

TOPSOIL

Excavation 1.39 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 623 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 3 0 0.00 623

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 5 0 0.00 623

LAYER3

Excavation 0.00 0 0 0.00

Page: 26

Fill 48.92 11 0 0.00 623

15+75.00 RDWYEXC

Excavation 21.29 14 14 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 20.84 16 16 1.00 621

TOPSOIL

Excavation 2.00 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 621 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 8 0 0.00 621

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 17 0 0.00 621

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.92 35 0 0.00 621

15+85.00 RDWYEXC

Excavation 23.74 8 8 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 18.62 7 7 1.00 622

TOPSOIL

Excavation 2.28 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 622

Page: 27

Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 4 0 0.00 622

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 9 0 0.00 622

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.92 18 0 0.00 622

16+00.00 RDWYEXC

Excavation 27.67 14 14 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 16.04 10 10 1.00 626

TOPSOIL

Excavation 2.72 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 626 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 6 0 0.00 626

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 14 0 0.00 626

LAYER3

Excavation 0.00 0 0 0.00

Page: 28

Subsoil Exc 0.00 0 0 0.00 Fill 48.92 27 0 0.00 626

16+16.12 RDWYEXC

Excavation 30.43 17 17 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 13.82 9 9 1.00 634

TOPSOIL

Excavation 3.07 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 634 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 7 0 0.00 634

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 15 0 0.00 634

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.92 29 0 0.00 634

16+25.00 RDWYEXC

Excavation 30.81 10 10 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 14.85 5 5 1.00 639

TOPSOIL

Excavation 3.28 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 639

Page: 29

Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 4 0 0.00 639

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.56 8 0 0.00 639

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.87 16 0 0.00 639

16+29.62 RDWYEXC

Excavation 30.96 5 5 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 15.68 3 3 1.00 641

TOPSOIL

Excavation 3.42 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 641 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 2 0 0.00 641

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 4 0 0.00 641

LAYER3

Page: 30

Subsoil Exc 0.00 0 0 0.00 Fill 48.86 8 0 0.00 641

16+50.00 RDWYEXC

Excavation 32.15 24 24 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 20.13 14 14 1.00 651

TOPSOIL

Excavation 3.26 3 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 651 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 9 0 0.00 651

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 19 0 0.00 651

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.80 37 0 0.00 651

16+75.00 RDWYEXC

Excavation 32.14 30 30 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 22.87 20 20 1.00 661

TOPSOIL

Excavation 3.15 3 0 0.00 Subsoil Exc 0.00 0 0 0.00

Page: 31

Fill 0.00 0 0 0.00 661 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 11 0 0.00 661

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 23 0 0.00 661

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.77 45 0 0.00 661

17+00.00 RDWYEXC

Excavation 30.16 29 29 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 27.56 23 23 1.00 667

TOPSOIL

Excavation 2.58 3 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 667 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 11 0 0.00 667

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 23 0 0.00 667

LAYER3

Page: 32

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.78 45 0 0.00 667

17+25.00 RDWYEXC

Excavation 25.69 26 26 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 33.87 28 28 1.00 665

TOPSOIL

Excavation 1.83 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 665 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 11 0 0.00 665

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 23 0 0.00 665

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.84 45 0 0.00 665

17+37.14 RDWYEXC

Excavation 22.68 11 11 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 41.51 17 17 1.00 659

TOPSOIL

Excavation 1.52 1 0 0.00

Page: 33

Fill 0.00 0 0 0.00 659 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 5 0 0.00 659

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 11 0 0.00 659

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.89 22 0 0.00 659

17+50.00 RDWYEXC

Excavation 18.95 10 10 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 49.80 22 22 1.00 647

TOPSOIL

Excavation 1.55 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 647 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 6 0 0.00 647

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 12 0 0.00 647

Page: 34

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.95 23 0 0.00 647

17+53.64 RDWYEXC

Excavation 17.99 2 2 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 51.78 7 7 1.00 642

TOPSOIL

Excavation 1.66 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 642 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 2 0 0.00 642

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 3 0 0.00 642

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.97 7 0 0.00 642

17+75.00 RDWYEXC

Excavation 15.83 13 13 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 41.20 37 37 1.00 618

TOPSOIL

Excavation 1.49 1 0 0.00

Page: 35

Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 618 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 9 0 0.00 618

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 19 0 0.00 618

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.97 39 0 0.00 618

18+00.00 RDWYEXC

Excavation 17.87 16 16 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 46.34 41 41 1.00 593

TOPSOIL

Excavation 1.12 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 593 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 11 0 0.00 593

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 23 0 0.00 593

Page: 36

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.99 45 0 0.00 593

18+05.00 RDWYEXC

Excavation 17.91 3 3 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 46.01 9 9 1.00 587

TOPSOIL

Excavation 1.13 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 587 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 2 0 0.00 587

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 5 0 0.00 587

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.97 9 0 0.00 587

18+24.73 RDWYEXC

Excavation 15.89 12 12 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 41.66 32 32 1.00 567

TOPSOIL

Excavation 1.36 1 0 0.00

Page: 37

Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 567 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 9 0 0.00 567

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 18 0 0.00 567

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.97 36 0 0.00 567

18+25.00 RDWYEXC

Excavation 15.89 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 41.68 0 0 1.00 567

TOPSOIL

Excavation 1.35 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 567 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 0 0 0.00 567

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00

Page: 38

Fill 24.55 0 0 0.00 567

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.97 0 0 0.00 567

18+50.00 RDWYEXC

Excavation 14.97 14 14 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 39.63 38 38 1.00 543

TOPSOIL

Excavation 1.45 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 543 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 11 0 0.00 543

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 23 0 0.00 543

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.97 45 0 0.00 543

18+55.00 RDWYEXC

Excavation 14.53 3 3 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 41.41 8 8 1.00 538

Page: 39

Excavation 1.52 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 538 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.68 2 0 0.00 538

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.55 5 0 0.00 538

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 48.97 9 0 0.00 538

18+75.00 RDWYEXC

Excavation 12.35 10 10 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 46.91 33 33 1.00 515

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .