Russian_River_Earthwork_I_Line.pdf
PDF 76 KB Posted
- Attached to
- AK FS CNF 1015(1), Russian River Campground Access, Phase 1 Federal contract opportunity
- Solicitation number
- DTFH70-15-B-00021
About this file
Russian River_Earthwork_I Line
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q&A_10-25-17.pdf | ||
| A002.pdf | ||
| Q&A_10-23-17.pdf | ||
| A001.pdf | ||
| AK_FS_CNF_1015(1)_Plans_100_.pdf | ||
| L_Line_XSections.pdf | ||
| IFB_RussianRiver.pdf | ||
| Plan_Request_form_Russian_River.pdf | ||
| O_Line_XSections.pdf | ||
| SWPPP_Russian_River_Campground_Road,_AK_FS_CNF_1015(1)_Kenai_Peninsula_County,_Alaska.pdf | ||
| Russian_River_Earthwork_O_LINE.pdf | ||
| Russian_River_Earthwork_L_LINE.pdf | ||
| I_Line_XSections.pdf | ||
| Russian_River_CG_Phase_I_Notice_to_Bidders.pdf | ||
| RRCP1_Pre-Ad_Plans.pdf | ||
| PROJECT_DESCRIPTION.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FEDERAL HIGHWAY ADMINISTRATION
PROJECT
AK FS CNF 1015(1)
RUSSIAN RIVER CAMPGROUND
ACCESS PHASE 1
I LINE
EARTHWORK
30+13.24 TO 38+24.54
CHUGACH NATIONAL FOREST
KENAI PENINSULA BOROUGH, ALASKA
File: H:\Russian River Campground\Phase 1\Physical Data\Earthwork\V8_EW_ILine_7- -26-16_No EP.log 7/26/2016, 11:21:49 AM
COMPUTING EARTHWORKS FOR BASELINE = ILINE3
COMPUTING EARTHWORKS FOR JOB = 151
FORMING LIST OF XSCELLS
BEGINNING EARTHWORKS COMPUTATION
Page: 1
Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol
(sq. ft.) (cu. yd.) (cu. yd.)
(cu. yd.)
SKIP STATION RANGE = 0+00.00 to 0+00.00
30+13.24 RDWYEXC
Excavation 268.86 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 38.43 0 0 0.00 0
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 79.07 0 0 0.00 0
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 130.55 0 0 0.00 0
30+20.00 RDWYEXC
Excavation 123.55 49 49 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 49
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 23.66 8 0 0.00 49
LAYER2
Excavation 0.00 0 0 0.00
Page: 2
Subsoil Exc 0.00 0 0 0.00 Fill 48.70 16 0 0.00 49
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 84.62 27 0 0.00 49
30+24.13 RDWYEXC
Excavation 98.47 17 17 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 5.99 0 0 1.00 66
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 19.67 3 0 0.00 66
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 40.65 7 0 0.00 66
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 72.67 12 0 0.00 66
30+25.00 RDWYEXC
Excavation 94.41 3 3 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 9.92 0 0 1.00 69
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.96 1 0 0.00 69
Page: 3
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 39.19 1 0 0.00 69
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 70.58 2 0 0.00 69
30+50.00 RDWYEXC
Excavation 40.28 62 62 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 14.12 11 11 1.00 120
TOPSOIL
Excavation 3.62 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 120 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.36 13 0 0.00 120
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 17.89 26 0 0.00 120
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 38.79 51 0 0.00 120
30+57.50 RDWYEXC
Excavation 36.36 11 11 1.00
Page: 4
Subsoil Exc 0.00 0 0 1.00 Fill 14.77 4 4 1.00 127
TOPSOIL
Excavation 3.98 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 127 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 7.40 2 0 0.00 127
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 15.97 5 0 0.00 127
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 35.91 10 0 0.00 127
30+75.00 RDWYEXC
Excavation 33.15 23 23 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 14.29 9 9 1.00 141
TOPSOIL
Excavation 3.55 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 141 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00
Page: 5
Fill 7.18 5 0 0.00 141
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 15.55 10 0 0.00 141
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 35.28 23 0 0.00 141
31+00.00 RDWYEXC
Excavation 31.87 30 30 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 12.21 12 12 1.00 159
TOPSOIL
Excavation 3.08 3 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 159 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 7.48 7 0 0.00 159
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 16.13 15 0 0.00 159
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 36.20 33 0 0.00 159
31+02.50 RDWYEXC
Page: 6
Excavation 31.40 3 3 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 11.94 1 1 1.00 161
TOPSOIL
Excavation 2.96 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 161 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 7.51 1 0 0.00 161
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 16.19 1 0 0.00 161
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 36.30 3 0 0.00 161
31+10.00 RDWYEXC
Excavation 29.92 9 9 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 11.39 3 3 1.00 167
TOPSOIL
Excavation 2.94 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 167 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00
Page: 7
Fill 7.59 2 0 0.00 167
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 16.36 5 0 0.00 167
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 36.58 10 0 0.00 167
31+15.10 RDWYEXC
Excavation 29.32 6 6 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 10.54 2 2 1.00 171
TOPSOIL
Excavation 3.29 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 171 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 7.65 1 0 0.00 171
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 16.48 3 0 0.00 171
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 36.78 7 0 0.00 171
Page: 8
31+17.06 RDWYEXC
Excavation 29.00 2 2 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 10.35 1 1 1.00 172
TOPSOIL
Excavation 3.63 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 172 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 7.68 1 0 0.00 172
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 16.53 1 0 0.00 172
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 36.86 3 0 0.00 172
31+20.69 RDWYEXC
Excavation 28.40 4 4 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 10.41 1 1 1.00 175
TOPSOIL
Excavation 4.38 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 175 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00
Page: 9
Subsoil Exc 0.00 0 0 0.00 Fill 7.72 1 0 0.00 175
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 16.61 2 0 0.00 175
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 37.02 5 0 0.00 175
31+25.00 RDWYEXC
Excavation 27.58 4 4 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 10.57 2 2 1.00 177
TOPSOIL
Excavation 5.29 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 177 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 7.77 1 0 0.00 177
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 16.72 3 0 0.00 177
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 37.21 6 0 0.00 177
Page: 10
31+35.69 RDWYEXC
Excavation 24.97 10 10 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 10.17 4 4 1.00 183
TOPSOIL
Excavation 7.34 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 183 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 7.85 3 0 0.00 183
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 16.88 7 0 0.00 183
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 37.58 15 0 0.00 183
31+50.00 RDWYEXC
Excavation 21.30 12 12 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 3.93 4 4 1.00 191
TOPSOIL
Excavation 6.68 4 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 191 Mass ordinate for TOPSOIL = 0
LAYER1
Page: 11
Subsoil Exc 0.00 0 0 0.00 Fill 7.85 4 0 0.00 191
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 16.88 9 0 0.00 191
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 37.57 20 0 0.00 191
31+70.00 RDWYEXC
Excavation 8.00 11 11 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 9.45 5 5 1.00 197
TOPSOIL
Excavation 2.72 4 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 197 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 7.85 6 0 0.00 197
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 16.87 13 0 0.00 197
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 37.59 28 0 0.00 197
Page: 12
31+75.00 RDWYEXC
Excavation 3.67 1 1 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 15.90 2 2 1.00 196
TOPSOIL
Excavation 1.56 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 196 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 7.79 1 0 0.00 196
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 16.75 3 0 0.00 196
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 37.38 7 0 0.00 196
32+00.00 RDWYEXC
Excavation 0.00 2 2 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 53.08 32 32 1.00 166
TOPSOIL
Excavation 0.00 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 166 Mass ordinate for TOPSOIL = 0
LAYER1
Page: 13
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 6.80 7 0 0.00 166
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 14.78 15 0 0.00 166
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 34.42 33 0 0.00 166
32+25.00 RDWYEXC
Excavation 0.00 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 68.76 56 56 1.00 110
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 5.82 6 0 0.00 110
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 12.81 13 0 0.00 110
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 31.48 31 0 0.00 110
32+50.00 RDWYEXC
Excavation 0.00 0 0 1.00 Subsoil Exc 0.00 0 0 1.00
Page: 14
Fill 28.29 45 45 1.00 65
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 4.84 5 0 0.00 65
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 10.85 11 0 0.00 65
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.53 28 0 0.00 65
32+58.87 RDWYEXC
Excavation 1.54 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 16.45 7 7 1.00 58
TOPSOIL
Excavation 2.72 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 58 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 4.50 2 0 0.00 58
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 10.17 3 0 0.00 58
LAYER3
Page: 15
Subsoil Exc 0.00 0 0 0.00 Fill 27.51 9 0 0.00 58
32+60.00 RDWYEXC
Excavation 3.56 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 14.74 1 1 1.00 57
TOPSOIL
Excavation 2.96 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 57 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 4.45 0 0 0.00 57
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 10.07 0 0 0.00 57
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 27.35 1 0 0.00 57
32+73.87 RDWYEXC
Excavation 23.56 7 7 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 6.23 5 5 1.00 59
TOPSOIL
Excavation 3.27 2 0 0.00 Subsoil Exc 0.00 0 0 0.00
Page: 16
Fill 0.00 0 0 0.00 59 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.90 2 0 0.00 59
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 9.26 5 0 0.00 59
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 25.24 14 0 0.00 59
32+75.00 RDWYEXC
Excavation 24.97 1 1 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 5.94 0 0 1.00 60
TOPSOIL
Excavation 3.17 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 60 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.89 0 0 0.00 60
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 9.15 0 0 0.00 60
LAYER3
Page: 17
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 25.10 1 0 0.00 60
32+79.46 RDWYEXC
Excavation 30.53 5 5 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 4.46 1 1 1.00 64
TOPSOIL
Excavation 2.62 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 64 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.85 1 0 0.00 64
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 9.22 2 0 0.00 64
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 25.03 4 0 0.00 64
32+90.00 RDWYEXC
Excavation 42.74 14 14 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 1 1 1.00 77
TOPSOIL
Excavation 1.98 1 0 0.00
Page: 18
Fill 0.00 0 0 0.00 77 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.93 2 0 0.00 77
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 9.31 4 0 0.00 77
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.87 10 0 0.00 77
33+00.00 RDWYEXC
Excavation 51.14 17 17 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 94
TOPSOIL
Excavation 0.71 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 94 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.89 1 0 0.00 94
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 9.25 3 0 0.00 94
Page: 19
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.96 9 0 0.00 94
33+25.00 RDWYEXC
Excavation 57.66 50 50 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 144
TOPSOIL
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 144 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.85 4 0 0.00 144
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 9.11 9 0 0.00 144
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 25.14 23 0 0.00 144
33+50.00 RDWYEXC
Excavation 46.27 48 48 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 192
LAYER1
Excavation 0.00 0 0 0.00
Page: 20
Subsoil Exc 0.00 0 0 0.00 Fill 3.85 4 0 0.00 192
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 9.74 9 0 0.00 192
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.51 23 0 0.00 192
33+75.00 RDWYEXC
Excavation 41.58 41 41 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 233
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.85 4 0 0.00 233
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 9.19 9 0 0.00 233
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 25.05 23 0 0.00 233
34+00.00 RDWYEXC
Excavation 49.88 43 43 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 276
Page: 21
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.95 4 0 0.00 276
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 9.40 9 0 0.00 276
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.75 23 0 0.00 276
34+25.00 RDWYEXC
Excavation 58.85 50 50 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 326
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.86 4 0 0.00 326
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 9.10 9 0 0.00 326
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 25.14 23 0 0.00 326
34+50.00 RDWYEXC
Excavation 60.48 56 56 1.00 Subsoil Exc 0.00 0 0 1.00
Page: 22
Fill 0.00 0 0 1.00 382
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.85 4 0 0.00 382
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 9.07 8 0 0.00 382
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 25.18 23 0 0.00 382
34+75.00 RDWYEXC
Excavation 61.00 56 56 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 438
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.85 4 0 0.00 438
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 9.07 8 0 0.00 438
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 25.18 23 0 0.00 438
35+00.00 RDWYEXC
Page: 23
Excavation 59.26 56 56 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 494
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.85 4 0 0.00 494
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 9.11 8 0 0.00 494
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 25.13 23 0 0.00 494
35+25.00 RDWYEXC
Excavation 54.76 53 53 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 547
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.87 4 0 0.00 547
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 9.32 9 0 0.00 547
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.92 23 0 0.00 547
Page: 24
35+50.00 RDWYEXC
Excavation 49.60 48 48 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 595
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.93 4 0 0.00 595
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 9.56 9 0 0.00 595
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.61 23 0 0.00 595
35+75.00 RDWYEXC
Excavation 47.10 45 45 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 640
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.85 4 0 0.00 640
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 9.71 9 0 0.00 640
LAYER3
Excavation 0.00 0 0 0.00
Page: 25
Subsoil Exc 0.00 0 0 0.00 Fill 24.54 23 0 0.00 640
36+00.00 RDWYEXC
Excavation 21.02 32 32 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 1.16 1 1 1.00 671
TOPSOIL
Excavation 4.81 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 671 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.85 4 0 0.00 671
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 9.41 9 0 0.00 671
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.84 23 0 0.00 671
36+25.00 RDWYEXC
Excavation 0.00 9 9 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 6.44 4 4 1.00 676
TOPSOIL
Excavation 0.00 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 676
Page: 26
Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.85 4 0 0.00 676
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.88 8 0 0.00 676
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 25.37 23 0 0.00 676
36+30.63 RDWYEXC
Excavation 0.00 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 7.60 1 1 1.00 675
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.85 1 0 0.00 675
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.88 2 0 0.00 675
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 25.37 5 0 0.00 675
36+50.00 RDWYEXC
Excavation 0.00 0 0 1.00
Page: 27
Subsoil Exc 0.00 0 0 1.00 Fill 9.00 6 6 1.00 669
TOPSOIL
Excavation 0.04 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 669 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 3.86 3 0 0.00 669
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.88 6 0 0.00 669
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 25.28 18 0 0.00 669
36+60.00 RDWYEXC
Excavation 0.00 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 6.38 3 3 1.00 666
TOPSOIL
Excavation 0.96 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 666 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00
Page: 28
Fill 3.97 1 0 0.00 666
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 9.12 3 0 0.00 666
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 25.63 9 0 0.00 666
36+75.00 RDWYEXC
Excavation 3.74 1 1 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 3.95 3 3 1.00 664
TOPSOIL
Excavation 4.46 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 664 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 4.15 2 0 0.00 664
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 9.47 5 0 0.00 664
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 26.23 14 0 0.00 664
36+95.04 RDWYEXC
Page: 29
Excavation 19.92 9 9 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 3.91 3 3 1.00 670
TOPSOIL
Excavation 1.70 3 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 670 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 4.39 3 0 0.00 670
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 10.41 7 0 0.00 670
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 26.57 20 0 0.00 670
37+00.00 RDWYEXC
Excavation 23.58 4 4 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 3.86 1 1 1.00 673
TOPSOIL
Excavation 1.39 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 673 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00
Page: 30
Fill 4.45 1 0 0.00 673
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 10.54 2 0 0.00 673
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 26.78 5 0 0.00 673
37+10.04 RDWYEXC
Excavation 26.46 9 9 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 5.01 2 2 1.00 680
TOPSOIL
Excavation 2.52 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 680 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 4.52 2 0 0.00 680
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.61 4 0 0.00 680
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 26.17 10 0 0.00 680
Page: 31
37+25.00 RDWYEXC
Excavation 8.49 10 10 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.48 2 2 1.00 688
TOPSOIL
Excavation 2.81 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 688 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 4.52 3 0 0.00 688
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.09 6 0 0.00 688
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 26.69 15 0 0.00 688
37+50.00 RDWYEXC
Excavation 10.20 8 8 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 3.96 2 2 1.00 694
TOPSOIL
Excavation 1.17 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 694 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00
Page: 32
Subsoil Exc 0.00 0 0 0.00 Fill 4.52 4 0 0.00 694
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.10 10 0 0.00 694
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 26.68 25 0 0.00 694
37+53.18 RDWYEXC
Excavation 12.28 1 1 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 3.01 0 0 1.00 695
TOPSOIL
Excavation 1.34 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 695 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 4.52 1 0 0.00 695
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.09 1 0 0.00 695
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 26.69 3 0 0.00 695
Page: 33
37+68.18 RDWYEXC
Excavation 17.25 8 8 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 6.59 3 3 1.00 700
TOPSOIL
Excavation 1.87 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 700 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 4.52 3 0 0.00 700
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 10.21 6 0 0.00 700
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 27.44 15 0 0.00 700
37+75.00 RDWYEXC
Excavation 18.54 4 4 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 8.34 2 2 1.00 702
TOPSOIL
Excavation 2.03 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 702 Mass ordinate for TOPSOIL = 0
LAYER1
Page: 34
Subsoil Exc 0.00 0 0 0.00 Fill 4.52 1 0 0.00 702
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 10.21 3 0 0.00 702
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 27.39 7 0 0.00 702
38+00.00 RDWYEXC
Excavation 29.79 22 22 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 10.03 9 9 1.00 715
TOPSOIL
Excavation 0.96 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 715 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 7.01 5 0 0.00 715
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 15.19 12 0 0.00 715
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 34.75 29 0 0.00 715
Page: 35
38+24.54 RDWYEXC
Excavation 72.23 46 46 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 28.92 18 18 1.00 743
TOPSOIL
Excavation 5.69 3 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 743 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 30.75 17 0 0.00 743
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 62.75 35 0 0.00 743
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 106.04 64 0 0.00 743
Page: 36
G R A N D S U M M A R Y T O T A L S Material Name Unadjusted Adjusted Mult Volumes Volumes Factor
(cu. yd.) (cu. yd.)
RDWYEXC
Excavation 1012 1012 1.00 Subsoil Exc 0 0 1.00 Fill 269 269 1.00
TOPSOIL
Excavation 43 0 0.00 Subsoil Exc 0 0 0.00 Fill 0 0 0.00
LAYER1
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 185 0 0.00
LAYER2
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 398 0 0.00
LAYER3
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 940 0 0.00
Page: 37
S P L I T S U M M A R Y T O T A L S XS Quant XS Quant Add/Sub Quant Add/Sub Quant Material Name Unadjusted Adjusted Unadjusted Adjusted Mult Volume Volume Volume Volume Factor
(cu. yd.) (cu. yd.) (cu. yd.) (cu.
yd.)
RDWYEXC
Excavation 1012 1012 0 0 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 269 269 0 0 1.00
TOPSOIL
Excavation 43 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00
LAYER1
Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 185 0 0 0 0.00
LAYER2
Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 398 0 0 0 0.00
LAYER3
Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 940 0 0 0 0.00
Page: 38
File details come from the government source that posted it. Updated .