AK FS CNF 1015(1), Russian River Campground Access, Phase 1 Federal contract opportunity
Solicitation number
DTFH70-15-B-00021
Issued by
Department of Transportation Federal Highway Administration

About this file

Amendment A001

View the file

Other files for this federal contract opportunity

Other files attached to AK FS CNF 1015(1), Russian River Campground Access, Phase 1, newest first.
File Type Posted
Q&A_10-25-17.pdf PDF
A002.pdf PDF
Q&A_10-23-17.pdf PDF
AK_FS_CNF_1015(1)_Plans_100_.pdf PDF
Russian_River_Earthwork_I_Line.pdf PDF
L_Line_XSections.pdf PDF
IFB_RussianRiver.pdf PDF
Plan_Request_form_Russian_River.pdf PDF
O_Line_XSections.pdf PDF
Russian_River_Earthwork_L_LINE.pdf PDF
I_Line_XSections.pdf PDF
SWPPP_Russian_River_Campground_Road,_AK_FS_CNF_1015(1)_Kenai_Peninsula_County,_Alaska.pdf PDF
Russian_River_Earthwork_O_LINE.pdf PDF
PROJECT_DESCRIPTION.pdf PDF
Russian_River_CG_Phase_I_Notice_to_Bidders.pdf PDF
RRCP1_Pre-Ad_Plans.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A001 10/20/2017 N/A See Block 14

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X

DTFH70-15-B-00021

9B. DATED (SEE ITEM 11)

09/27/2017

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers (__ ) is extended, ( x ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

N/A

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

N/A

D OTHER (Specify type of modification and authority) N/A

E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

AK FS CNF 1015(1), Russian River Campground Access, Phase 1

Amendment A001 is issued to revise the following:

See Page 2

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Amendment No. A001, dated 10/20/2017 AK FS CNF 1015(1), Solicitation No. DTFH70-15-B-00021 Russian River Campground Access, Phase 1

REVISIONS ARE AS FOLLOWS:

SPECIAL CONTRACT REQUIREMENTS

Page E-39, Subsection 156.09, Traffic Control Supervisor. Deletes a qualification restriction.

Page F-15, Subsection 635.24 Measurement. Deletes special contract requirements.

ENCLOSURES

Pages:

E-39 F-15

E-39 DIVISION 150

Special Contract Requirements Project: AK FS CNF 1015(1), Russian River Campground Access Phase 1

156.09 Traffic Control Supervisor. Amend as follows:

Delete the second sentence of the first paragraph.

Add the following:

(l) Transport personnel, construction signs, barricades, drums, cones, tubular markers, and other traffic control devices.

Revised by Amendment A001

F-15 DIVISION 600

Special Contract Requirements Project: AK FS CNF 1015(1), Russian River Campground Access Phase 1

635.23 Acceptance. Delete the first paragraph and substitute the following:

Material for temporary traffic control devices will be evaluated under Subsections 106.02 and

106.03. Do not provide a copy of the certifications for temporary traffic control materials to the CO, unless otherwise directed by the CO.

Measurement

635.24 Add the following:

Measure Traffic Control Supervisor by the day for the work described in Subsection 156.09.

A day will be measured when:

(a) Construction operations require a Traffic Control Supervisor during the normal working days;

(b) The Traffic Control Supervisor makes normal checks during nonwork hours; or

(c) The Traffic Control Supervisor is called out during nonwork hours.

Do not measure flagging performed by the Traffic Control Supervisor when there is a pay item in the bid schedule for Traffic Control Supervisor.

Revised by Amendment A001

SF30
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
A001
Amd_Page_2_Master
E-39 A001
F-15 A001

File details come from the government source that posted it. Updated .