Russian_River_Earthwork_L_LINE.pdf

PDF 60 KB Posted

Attached to
AK FS CNF 1015(1), Russian River Campground Access, Phase 1
Solicitation number
DTFH70-15-B-00021
Issued by

About this file

Russian River_Earthwork_L LINE

View the file

Other files

File Type Posted
Q&A_10-25-17.pdf PDF
A002.pdf PDF
Q&A_10-23-17.pdf PDF
A001.pdf PDF
IFB_RussianRiver.pdf PDF
Russian_River_Earthwork_O_LINE.pdf PDF
SWPPP_Russian_River_Campground_Road,_AK_FS_CNF_1015(1)_Kenai_Peninsula_County,_Alaska.pdf PDF
Russian_River_Earthwork_I_Line.pdf PDF
AK_FS_CNF_1015(1)_Plans_100_.pdf PDF
I_Line_XSections.pdf PDF
L_Line_XSections.pdf PDF
Plan_Request_form_Russian_River.pdf PDF
O_Line_XSections.pdf PDF
Russian_River_CG_Phase_I_Notice_to_Bidders.pdf PDF
PROJECT_DESCRIPTION.pdf PDF
RRCP1_Pre-Ad_Plans.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FEDERAL HIGHWAY ADMINISTRATION

PROJECT

AK FS CNF 1015(1)

RUSSIAN RIVER CAMPGROUND

ACCESS PHASE 1

L LINE

EARTHWORK

50+19.99 TO 54+50.00

CHUGACH NATIONAL FOREST

KENAI PENINSULA BOROUGH, ALASKA

File: H:\Russian River Campground\Phase 1\Physical Data\Earthwork\V8_EW_LLine_7- -26-16_No EP.log 7/26/2016, 12:51:11 PM

COMPUTING EARTHWORKS FOR BASELINE = LLINE2

COMPUTING EARTHWORKS FOR JOB = 151

FORMING LIST OF XSCELLS

BEGINNING EARTHWORKS COMPUTATION

Page: 1

Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol

(sq. ft.) (cu. yd.) (cu. yd.)

(cu. yd.)

SKIP STATION RANGE = 0+00.00 to 0+00.00

50+19.99 RDWYEXC

Excavation 57.54 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 32.67 0 0 1.00 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.21 0 0 0.00 0

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 41.06 0 0 0.00 0

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 66.58 0 0 0.00 0

50+25.00 RDWYEXC

Excavation 45.56 10 10 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 15.56 4 4 1.00 6

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 12.98 3 0 0.00 6

LAYER2

Excavation 0.00 0 0 0.00

Page: 2

Subsoil Exc 0.00 0 0 0.00 Fill 26.59 6 0 0.00 6

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 44.89 10 0 0.00 6

50+27.84 RDWYEXC

Excavation 40.69 5 5 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 14.81 2 2 1.00 9

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.29 1 0 0.00 9

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 23.20 3 0 0.00 9

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 39.82 4 0 0.00 9

50+40.00 RDWYEXC

Excavation 90.55 29 29 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 6.71 5 5 1.00 33

TOPSOIL

Excavation 5.31 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 33

Page: 3

Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 16.62 6 0 0.00 33

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 34.60 13 0 0.00 33

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 63.76 23 0 0.00 33

50+50.00 RDWYEXC

Excavation 53.03 26 26 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 5.15 2 2 1.00 57

TOPSOIL

Excavation 4.48 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 57 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.96 5 0 0.00 57

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 25.10 11 0 0.00 57

LAYER3

Page: 4

Subsoil Exc 0.00 0 0 0.00 Fill 49.86 21 0 0.00 57

50+70.00 RDWYEXC

Excavation 21.38 28 28 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 16.57 8 8 1.00 77

TOPSOIL

Excavation 1.36 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 77 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.40 8 0 0.00 77

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 17.99 16 0 0.00 77

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 39.03 33 0 0.00 77

50+75.00 RDWYEXC

Excavation 17.18 4 4 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 24.21 4 4 1.00 77

TOPSOIL

Excavation 0.84 0 0 0.00 Subsoil Exc 0.00 0 0 0.00

Page: 5

Fill 0.00 0 0 0.00 77 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.60 2 0 0.00 77

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 19.92 4 0 0.00 77

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 36.58 7 0 0.00 77

50+78.54 RDWYEXC

Excavation 14.30 2 2 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 30.59 4 4 1.00 75

TOPSOIL

Excavation 0.58 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 75 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.61 1 0 0.00 75

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 19.92 3 0 0.00 75

LAYER3

Page: 6

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 36.58 5 0 0.00 75

51+00.00 RDWYEXC

Excavation 5.00 8 8 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 33.58 26 26 1.00 57

TOPSOIL

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 57 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 12.97 9 0 0.00 57

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.66 19 0 0.00 57

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 49.68 34 0 0.00 57

51+15.75 RDWYEXC

Excavation 6.32 3 3 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 34.04 20 20 1.00 40

TOPSOIL

Excavation 0.37 0 0 0.00 Subsoil Exc 0.00 0 0 0.00

Page: 7

Fill 0.00 0 0 0.00 40 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 13.93 8 0 0.00 40

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 30.59 17 0 0.00 40

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 52.69 30 0 0.00 40

51+25.00 RDWYEXC

Excavation 11.39 3 3 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 38.13 12 12 1.00 31

TOPSOIL

Excavation 0.90 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 31 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 13.80 5 0 0.00 31

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 30.34 10 0 0.00 31

Page: 8

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 52.19 18 0 0.00 31

51+50.00 RDWYEXC

Excavation 18.39 14 14 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 66.17 48 48 1.00 -3

TOPSOIL

Excavation 1.21 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -3 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 14.84 13 0 0.00 -3

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 32.42 29 0 0.00 -3

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 55.31 50 0 0.00 -3

51+75.00 RDWYEXC

Excavation 26.27 21 21 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 100.09 77 77 1.00 -59

TOPSOIL

Excavation 1.68 1 0 0.00

Page: 9

Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -59 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.48 16 0 0.00 -59

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 43.71 35 0 0.00 -59

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 72.24 59 0 0.00 -59

51+84.11 RDWYEXC

Excavation 30.17 10 10 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 111.12 36 36 1.00 -85

TOPSOIL

Excavation 2.02 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -85 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 23.13 7 0 0.00 -85

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 49.02 16 0 0.00 -85

Page: 10

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 80.20 26 0 0.00 -85

52+00.00 RDWYEXC

Excavation 36.18 20 20 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 136.49 73 73 1.00 -138

TOPSOIL

Excavation 2.32 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -138 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 29.52 15 0 0.00 -138

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 61.82 33 0 0.00 -138

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 99.40 53 0 0.00 -138

52+10.73 RDWYEXC

Excavation 38.17 15 15 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 147.29 56 56 1.00 -179

TOPSOIL

Excavation 3.47 1 0 0.00

Page: 11

Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -179 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 33.84 13 0 0.00 -179

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 70.46 26 0 0.00 -179

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 112.36 42 0 0.00 -179

52+25.00 RDWYEXC

Excavation 36.59 20 20 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 182.73 87 87 1.00 -246

TOPSOIL

Excavation 3.87 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -246 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 37.72 19 0 0.00 -246

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00

Page: 12

Fill 78.24 39 0 0.00 -246

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 124.01 62 0 0.00 -246

52+30.32 RDWYEXC

Excavation 38.06 7 7 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 186.44 36 36 1.00 -275

TOPSOIL

Excavation 3.51 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -275 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 38.62 8 0 0.00 -275

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 80.03 16 0 0.00 -275

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 126.70 25 0 0.00 -275

52+50.00 RDWYEXC

Excavation 57.68 35 35 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 182.82 135 135 1.00 -375

TOPSOIL

Page: 13

Excavation 3.23 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -375 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 39.33 28 0 0.00 -375

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 81.46 59 0 0.00 -375

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 128.84 93 0 0.00 -375

52+62.88 RDWYEXC

Excavation 60.98 28 28 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 185.58 88 88 1.00 -435

TOPSOIL

Excavation 3.06 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -435 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 38.74 19 0 0.00 -435

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00

Page: 14

Fill 80.29 39 0 0.00 -435

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 127.08 61 0 0.00 -435

52+75.00 RDWYEXC

Excavation 62.03 28 28 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 187.30 84 84 1.00 -491

TOPSOIL

Excavation 2.97 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -491 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 38.74 17 0 0.00 -491

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 80.28 36 0 0.00 -491

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 127.08 57 0 0.00 -491

53+00.00 RDWYEXC

Excavation 44.44 49 49 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 218.04 188 188 1.00 -630

Page: 15

TOPSOIL

Excavation 3.31 3 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -630 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 38.74 36 0 0.00 -630

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 80.35 74 0 0.00 -630

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 127.01 118 0 0.00 -630

53+25.00 RDWYEXC

Excavation 68.31 52 52 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 145.72 168 168 1.00 -746

TOPSOIL

Excavation 1.63 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -746 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 38.74 36 0 0.00 -746

LAYER2

Excavation 0.00 0 0 0.00

Page: 16

Subsoil Exc 0.00 0 0 0.00 Fill 80.29 74 0 0.00 -746

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 127.08 118 0 0.00 -746

53+50.00 RDWYEXC

Excavation 79.29 68 68 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 154.21 139 139 1.00 -817

TOPSOIL

Excavation 1.65 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -817 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 38.74 36 0 0.00 -817

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 80.28 74 0 0.00 -817

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 127.08 118 0 0.00 -817

53+75.00 RDWYEXC

Excavation 64.68 67 67 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 182.12 156 156 1.00 -906

Page: 17

TOPSOIL

Excavation 2.34 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -906 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 38.74 36 0 0.00 -906

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 80.28 74 0 0.00 -906

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 127.08 118 0 0.00 -906

53+93.57 RDWYEXC

Excavation 55.01 41 41 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 177.18 124 124 1.00 -989

TOPSOIL

Excavation 2.53 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -989 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 38.74 27 0 0.00 -989

LAYER2

Page: 18

Subsoil Exc 0.00 0 0 0.00 Fill 80.28 55 0 0.00 -989

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 127.08 87 0 0.00 -989

54+00.00 RDWYEXC

Excavation 55.04 13 13 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 168.90 41 41 1.00 -1017

TOPSOIL

Excavation 2.55 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -1017 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 36.15 9 0 0.00 -1017

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 75.02 18 0 0.00 -1017

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 133.37 31 0 0.00 -1017

54+25.00 RDWYEXC

Excavation 66.10 56 56 1.00 Subsoil Exc 0.00 0 0 1.00

Page: 19

Fill 159.47 152 152 1.00 -1113

TOPSOIL

Excavation 2.70 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -1113 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 29.64 30 0 0.00 -1113

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 62.01 63 0 0.00 -1113

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 136.43 125 0 0.00 -1113

54+36.77 RDWYEXC

Excavation 79.32 32 32 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 137.91 65 65 1.00 -1146

TOPSOIL

Excavation 2.43 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -1146 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 35.34 14 0 0.00 -1146

LAYER2

Page: 20

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 73.41 30 0 0.00 -1146

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 134.76 59 0 0.00 -1146

54+50.00 RDWYEXC

Excavation 93.85 42 42 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 114.47 62 62 1.00 -1166

TOPSOIL

Excavation 3.24 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -1166 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 38.37 18 0 0.00 -1166

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 79.54 37 0 0.00 -1166

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 125.96 64 0 0.00 -1166

Page: 21

G R A N D S U M M A R Y T O T A L S Material Name Unadjusted Adjusted Mult Volumes Volumes Factor

(cu. yd.) (cu. yd.)

RDWYEXC

Excavation 736 736 1.00 Subsoil Exc 0 0 1.00 Fill 1902 1902 1.00

TOPSOIL

Excavation 34 0 0.00 Subsoil Exc 0 0 0.00 Fill 0 0 0.00

LAYER1

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 445 0 0.00

LAYER2

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 929 0 0.00

LAYER3

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 1551 0 0.00

Page: 22

S P L I T S U M M A R Y T O T A L S XS Quant XS Quant Add/Sub Quant Add/Sub Quant Material Name Unadjusted Adjusted Unadjusted Adjusted Mult Volume Volume Volume Volume Factor

(cu. yd.) (cu. yd.) (cu. yd.) (cu.

yd.)

RDWYEXC

Excavation 736 736 0 0 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 1902 1902 0 0 1.00

TOPSOIL

Excavation 34 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

LAYER1

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 445 0 0 0 0.00

LAYER2

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 929 0 0 0 0.00

LAYER3

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 1551 0 0 0 0.00

Page: 23

B A L A N C E P O I N T S U M M A R Y Material Name Cumulative Incremental Mult Unadjusted Adjusted Unadjusted Adjusted Factor Volumes Volumes Volumes Volumes (cu.

yd.) (cu. yd.) (cu. yd.) (cu. yd.)

Station = 51+47.79

RDWYEXC

Excavation 131 131 131 131 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 131 131 131 131 1.00

SIDEWALKEXC

Excavation 0 0 0 0 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 0 0 0 0 1.00

MSEWALLEXC

Excavation 0 0 0 0 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 0 0 0 0 1.00

SUBEXCAVATION

Excavation 0 0 0 0 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 0 0 0 0 1.00

CONCWALLSTRUCEXC

Excavation 0 0 0 0 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 0 0 0 0 1.00

COLDRECYCLE

Excavation 0 0 0 0 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 0 0 0 0 1.00

EXISTPAVEMENT

Excavation 0 0 0

Page: 24

0 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 0 0 0 0 1.00

EXISTPAVEMENTLAYER2

Excavation 0 0 0 0 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 0 0 0 0 1.00

EXISTGRAVEL

Excavation 0 0 0 0 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 0 0 0 0 1.00

TOPSOIL

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

SNWALLSTREXC

Excavation 0 0 0 0 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 0 0 0 0 1.00

ROCKERYWALLSTREXC

Excavation 0 0 0 0 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 0 0 0 0 1.00

GUARDWALLSTRUCEXC

Excavation 0 0 0 0 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 0 0 0 0 1.00

GFMSEWALLEXC

Excavation 0 0 0 0 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 0 0 0 0 1.00

LAYER1

Page: 25

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

LAYER2

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

LAYER3

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

LAYER4

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

LAYER5

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

SIDEWALKLAYER1

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

SIDEWALKLAYER2

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

SIDEWALKLAYER3

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0

Page: 26

SIDEWALKLAYER4

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

SUBEXBACKFILL

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

SELECTWALLBACKFILL

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

GRANULARBACKFILL

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

LEVELINGPAD

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

PERVIOUS

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

FOUNDATIONFILL

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

PAVEDSHOULDER

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0

Page: 27

0 0.00

PRELEVEL

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

SHOULDERBACKFILL

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

PAVEDDITCHBACKFILL

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

BACKFILLMATERIAL

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

CONCRETE

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

SNFOUNDATIONFILL

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

WALLBACKFILL

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

ROCK

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0

Page: 28

Fill 0 0 0 0 0.00

GRANULARROCKBD

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

STRUCTURALBACKFILL

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

GABIONROCK

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

WALLFACING

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0

Page: 29