Russian_River_Earthwork_L_LINE.pdf
PDF 60 KB Posted
- Attached to
- AK FS CNF 1015(1), Russian River Campground Access, Phase 1 Federal contract opportunity
- Solicitation number
- DTFH70-15-B-00021
About this file
Russian River_Earthwork_L LINE
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q&A_10-25-17.pdf | ||
| A002.pdf | ||
| Q&A_10-23-17.pdf | ||
| A001.pdf | ||
| Plan_Request_form_Russian_River.pdf | ||
| O_Line_XSections.pdf | ||
| I_Line_XSections.pdf | ||
| AK_FS_CNF_1015(1)_Plans_100_.pdf | ||
| Russian_River_Earthwork_I_Line.pdf | ||
| L_Line_XSections.pdf | ||
| IFB_RussianRiver.pdf | ||
| SWPPP_Russian_River_Campground_Road,_AK_FS_CNF_1015(1)_Kenai_Peninsula_County,_Alaska.pdf | ||
| Russian_River_Earthwork_O_LINE.pdf | ||
| PROJECT_DESCRIPTION.pdf | ||
| Russian_River_CG_Phase_I_Notice_to_Bidders.pdf | ||
| RRCP1_Pre-Ad_Plans.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FEDERAL HIGHWAY ADMINISTRATION
PROJECT
AK FS CNF 1015(1)
RUSSIAN RIVER CAMPGROUND
ACCESS PHASE 1
L LINE
EARTHWORK
50+19.99 TO 54+50.00
CHUGACH NATIONAL FOREST
KENAI PENINSULA BOROUGH, ALASKA
File: H:\Russian River Campground\Phase 1\Physical Data\Earthwork\V8_EW_LLine_7- -26-16_No EP.log 7/26/2016, 12:51:11 PM
COMPUTING EARTHWORKS FOR BASELINE = LLINE2
COMPUTING EARTHWORKS FOR JOB = 151
FORMING LIST OF XSCELLS
BEGINNING EARTHWORKS COMPUTATION
Page: 1
Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol
(sq. ft.) (cu. yd.) (cu. yd.)
(cu. yd.)
SKIP STATION RANGE = 0+00.00 to 0+00.00
50+19.99 RDWYEXC
Excavation 57.54 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 32.67 0 0 1.00 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.21 0 0 0.00 0
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 41.06 0 0 0.00 0
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 66.58 0 0 0.00 0
50+25.00 RDWYEXC
Excavation 45.56 10 10 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 15.56 4 4 1.00 6
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 12.98 3 0 0.00 6
LAYER2
Excavation 0.00 0 0 0.00
Page: 2
Subsoil Exc 0.00 0 0 0.00 Fill 26.59 6 0 0.00 6
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 44.89 10 0 0.00 6
50+27.84 RDWYEXC
Excavation 40.69 5 5 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 14.81 2 2 1.00 9
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.29 1 0 0.00 9
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 23.20 3 0 0.00 9
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 39.82 4 0 0.00 9
50+40.00 RDWYEXC
Excavation 90.55 29 29 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 6.71 5 5 1.00 33
TOPSOIL
Excavation 5.31 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 33
Page: 3
Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 16.62 6 0 0.00 33
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 34.60 13 0 0.00 33
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 63.76 23 0 0.00 33
50+50.00 RDWYEXC
Excavation 53.03 26 26 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 5.15 2 2 1.00 57
TOPSOIL
Excavation 4.48 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 57 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.96 5 0 0.00 57
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 25.10 11 0 0.00 57
LAYER3
Page: 4
Subsoil Exc 0.00 0 0 0.00 Fill 49.86 21 0 0.00 57
50+70.00 RDWYEXC
Excavation 21.38 28 28 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 16.57 8 8 1.00 77
TOPSOIL
Excavation 1.36 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 77 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.40 8 0 0.00 77
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 17.99 16 0 0.00 77
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 39.03 33 0 0.00 77
50+75.00 RDWYEXC
Excavation 17.18 4 4 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 24.21 4 4 1.00 77
TOPSOIL
Excavation 0.84 0 0 0.00 Subsoil Exc 0.00 0 0 0.00
Page: 5
Fill 0.00 0 0 0.00 77 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.60 2 0 0.00 77
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 19.92 4 0 0.00 77
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 36.58 7 0 0.00 77
50+78.54 RDWYEXC
Excavation 14.30 2 2 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 30.59 4 4 1.00 75
TOPSOIL
Excavation 0.58 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 75 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.61 1 0 0.00 75
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 19.92 3 0 0.00 75
LAYER3
Page: 6
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 36.58 5 0 0.00 75
51+00.00 RDWYEXC
Excavation 5.00 8 8 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 33.58 26 26 1.00 57
TOPSOIL
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 57 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 12.97 9 0 0.00 57
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.66 19 0 0.00 57
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 49.68 34 0 0.00 57
51+15.75 RDWYEXC
Excavation 6.32 3 3 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 34.04 20 20 1.00 40
TOPSOIL
Excavation 0.37 0 0 0.00 Subsoil Exc 0.00 0 0 0.00
Page: 7
Fill 0.00 0 0 0.00 40 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 13.93 8 0 0.00 40
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 30.59 17 0 0.00 40
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 52.69 30 0 0.00 40
51+25.00 RDWYEXC
Excavation 11.39 3 3 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 38.13 12 12 1.00 31
TOPSOIL
Excavation 0.90 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 31 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 13.80 5 0 0.00 31
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 30.34 10 0 0.00 31
Page: 8
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 52.19 18 0 0.00 31
51+50.00 RDWYEXC
Excavation 18.39 14 14 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 66.17 48 48 1.00 -3
TOPSOIL
Excavation 1.21 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -3 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 14.84 13 0 0.00 -3
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 32.42 29 0 0.00 -3
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 55.31 50 0 0.00 -3
51+75.00 RDWYEXC
Excavation 26.27 21 21 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 100.09 77 77 1.00 -59
TOPSOIL
Excavation 1.68 1 0 0.00
Page: 9
Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -59 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.48 16 0 0.00 -59
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 43.71 35 0 0.00 -59
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 72.24 59 0 0.00 -59
51+84.11 RDWYEXC
Excavation 30.17 10 10 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 111.12 36 36 1.00 -85
TOPSOIL
Excavation 2.02 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -85 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 23.13 7 0 0.00 -85
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 49.02 16 0 0.00 -85
Page: 10
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 80.20 26 0 0.00 -85
52+00.00 RDWYEXC
Excavation 36.18 20 20 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 136.49 73 73 1.00 -138
TOPSOIL
Excavation 2.32 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -138 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 29.52 15 0 0.00 -138
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 61.82 33 0 0.00 -138
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 99.40 53 0 0.00 -138
52+10.73 RDWYEXC
Excavation 38.17 15 15 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 147.29 56 56 1.00 -179
TOPSOIL
Excavation 3.47 1 0 0.00
Page: 11
Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -179 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 33.84 13 0 0.00 -179
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 70.46 26 0 0.00 -179
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 112.36 42 0 0.00 -179
52+25.00 RDWYEXC
Excavation 36.59 20 20 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 182.73 87 87 1.00 -246
TOPSOIL
Excavation 3.87 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -246 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 37.72 19 0 0.00 -246
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00
Page: 12
Fill 78.24 39 0 0.00 -246
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 124.01 62 0 0.00 -246
52+30.32 RDWYEXC
Excavation 38.06 7 7 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 186.44 36 36 1.00 -275
TOPSOIL
Excavation 3.51 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -275 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 38.62 8 0 0.00 -275
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 80.03 16 0 0.00 -275
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 126.70 25 0 0.00 -275
52+50.00 RDWYEXC
Excavation 57.68 35 35 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 182.82 135 135 1.00 -375
TOPSOIL
Page: 13
Excavation 3.23 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -375 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 39.33 28 0 0.00 -375
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 81.46 59 0 0.00 -375
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 128.84 93 0 0.00 -375
52+62.88 RDWYEXC
Excavation 60.98 28 28 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 185.58 88 88 1.00 -435
TOPSOIL
Excavation 3.06 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -435 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 38.74 19 0 0.00 -435
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00
Page: 14
Fill 80.29 39 0 0.00 -435
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 127.08 61 0 0.00 -435
52+75.00 RDWYEXC
Excavation 62.03 28 28 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 187.30 84 84 1.00 -491
TOPSOIL
Excavation 2.97 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -491 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 38.74 17 0 0.00 -491
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 80.28 36 0 0.00 -491
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 127.08 57 0 0.00 -491
53+00.00 RDWYEXC
Excavation 44.44 49 49 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 218.04 188 188 1.00 -630
Page: 15
TOPSOIL
Excavation 3.31 3 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -630 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 38.74 36 0 0.00 -630
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 80.35 74 0 0.00 -630
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 127.01 118 0 0.00 -630
53+25.00 RDWYEXC
Excavation 68.31 52 52 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 145.72 168 168 1.00 -746
TOPSOIL
Excavation 1.63 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -746 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 38.74 36 0 0.00 -746
LAYER2
Excavation 0.00 0 0 0.00
Page: 16
Subsoil Exc 0.00 0 0 0.00 Fill 80.29 74 0 0.00 -746
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 127.08 118 0 0.00 -746
53+50.00 RDWYEXC
Excavation 79.29 68 68 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 154.21 139 139 1.00 -817
TOPSOIL
Excavation 1.65 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -817 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 38.74 36 0 0.00 -817
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 80.28 74 0 0.00 -817
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 127.08 118 0 0.00 -817
53+75.00 RDWYEXC
Excavation 64.68 67 67 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 182.12 156 156 1.00 -906
Page: 17
TOPSOIL
Excavation 2.34 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -906 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 38.74 36 0 0.00 -906
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 80.28 74 0 0.00 -906
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 127.08 118 0 0.00 -906
53+93.57 RDWYEXC
Excavation 55.01 41 41 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 177.18 124 124 1.00 -989
TOPSOIL
Excavation 2.53 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -989 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 38.74 27 0 0.00 -989
LAYER2
Page: 18
Subsoil Exc 0.00 0 0 0.00 Fill 80.28 55 0 0.00 -989
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 127.08 87 0 0.00 -989
54+00.00 RDWYEXC
Excavation 55.04 13 13 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 168.90 41 41 1.00 -1017
TOPSOIL
Excavation 2.55 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -1017 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 36.15 9 0 0.00 -1017
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 75.02 18 0 0.00 -1017
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 133.37 31 0 0.00 -1017
54+25.00 RDWYEXC
Excavation 66.10 56 56 1.00 Subsoil Exc 0.00 0 0 1.00
Page: 19
Fill 159.47 152 152 1.00 -1113
TOPSOIL
Excavation 2.70 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -1113 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 29.64 30 0 0.00 -1113
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 62.01 63 0 0.00 -1113
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 136.43 125 0 0.00 -1113
54+36.77 RDWYEXC
Excavation 79.32 32 32 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 137.91 65 65 1.00 -1146
TOPSOIL
Excavation 2.43 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -1146 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 35.34 14 0 0.00 -1146
LAYER2
Page: 20
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 73.41 30 0 0.00 -1146
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 134.76 59 0 0.00 -1146
54+50.00 RDWYEXC
Excavation 93.85 42 42 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 114.47 62 62 1.00 -1166
TOPSOIL
Excavation 3.24 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -1166 Mass ordinate for TOPSOIL = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 38.37 18 0 0.00 -1166
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 79.54 37 0 0.00 -1166
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 125.96 64 0 0.00 -1166
Page: 21
G R A N D S U M M A R Y T O T A L S Material Name Unadjusted Adjusted Mult Volumes Volumes Factor
(cu. yd.) (cu. yd.)
RDWYEXC
Excavation 736 736 1.00 Subsoil Exc 0 0 1.00 Fill 1902 1902 1.00
TOPSOIL
Excavation 34 0 0.00 Subsoil Exc 0 0 0.00 Fill 0 0 0.00
LAYER1
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 445 0 0.00
LAYER2
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 929 0 0.00
LAYER3
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 1551 0 0.00
Page: 22
S P L I T S U M M A R Y T O T A L S XS Quant XS Quant Add/Sub Quant Add/Sub Quant Material Name Unadjusted Adjusted Unadjusted Adjusted Mult Volume Volume Volume Volume Factor
(cu. yd.) (cu. yd.) (cu. yd.) (cu.
yd.)
RDWYEXC
Excavation 736 736 0 0 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 1902 1902 0 0 1.00
TOPSOIL
Excavation 34 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00
LAYER1
Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 445 0 0 0 0.00
LAYER2
Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 929 0 0 0 0.00
LAYER3
Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 1551 0 0 0 0.00
Page: 23
B A L A N C E P O I N T S U M M A R Y Material Name Cumulative Incremental Mult Unadjusted Adjusted Unadjusted Adjusted Factor Volumes Volumes Volumes Volumes (cu.
yd.) (cu. yd.) (cu. yd.) (cu. yd.)
Station = 51+47.79
RDWYEXC
Excavation 131 131 131 131 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 131 131 131 131 1.00
SIDEWALKEXC
Excavation 0 0 0 0 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 0 0 0 0 1.00
MSEWALLEXC
Excavation 0 0 0 0 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 0 0 0 0 1.00
SUBEXCAVATION
Excavation 0 0 0 0 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 0 0 0 0 1.00
CONCWALLSTRUCEXC
Excavation 0 0 0 0 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 0 0 0 0 1.00
COLDRECYCLE
Excavation 0 0 0 0 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 0 0 0 0 1.00
EXISTPAVEMENT
Excavation 0 0 0
Page: 24
0 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 0 0 0 0 1.00
EXISTPAVEMENTLAYER2
Excavation 0 0 0 0 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 0 0 0 0 1.00
EXISTGRAVEL
Excavation 0 0 0 0 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 0 0 0 0 1.00
TOPSOIL
Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00
SNWALLSTREXC
Excavation 0 0 0 0 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 0 0 0 0 1.00
ROCKERYWALLSTREXC
Excavation 0 0 0 0 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 0 0 0 0 1.00
GUARDWALLSTRUCEXC
Excavation 0 0 0 0 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 0 0 0 0 1.00
GFMSEWALLEXC
Excavation 0 0 0 0 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 0 0 0 0 1.00
LAYER1
Page: 25
Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00
LAYER2
Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00
LAYER3
Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00
LAYER4
Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00
LAYER5
Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00
SIDEWALKLAYER1
Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00
SIDEWALKLAYER2
Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00
SIDEWALKLAYER3
Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0
Page: 26
SIDEWALKLAYER4
Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00
SUBEXBACKFILL
Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00
SELECTWALLBACKFILL
Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00
GRANULARBACKFILL
Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00
LEVELINGPAD
Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00
PERVIOUS
Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00
FOUNDATIONFILL
Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00
PAVEDSHOULDER
Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0
Page: 27
0 0.00
PRELEVEL
Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00
SHOULDERBACKFILL
Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00
PAVEDDITCHBACKFILL
Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00
BACKFILLMATERIAL
Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00
CONCRETE
Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00
SNFOUNDATIONFILL
Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00
WALLBACKFILL
Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00
ROCK
Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0
Page: 28
Fill 0 0 0 0 0.00
GRANULARROCKBD
Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00
STRUCTURALBACKFILL
Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00
GABIONROCK
Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00
WALLFACING
Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0
Page: 29
File details come from the government source that posted it. Updated .