Russian_River_Earthwork_L_LINE.pdf

PDF 60 KB Posted

Attached to
AK FS CNF 1015(1), Russian River Campground Access, Phase 1 Federal contract opportunity
Solicitation number
DTFH70-15-B-00021
Issued by
Department of Transportation Federal Highway Administration

About this file

Russian River_Earthwork_L LINE

View the file

Other files for this federal contract opportunity

Other files attached to AK FS CNF 1015(1), Russian River Campground Access, Phase 1, newest first.
File Type Posted
Q&A_10-25-17.pdf PDF
A002.pdf PDF
Q&A_10-23-17.pdf PDF
A001.pdf PDF
Plan_Request_form_Russian_River.pdf PDF
O_Line_XSections.pdf PDF
I_Line_XSections.pdf PDF
AK_FS_CNF_1015(1)_Plans_100_.pdf PDF
Russian_River_Earthwork_I_Line.pdf PDF
L_Line_XSections.pdf PDF
IFB_RussianRiver.pdf PDF
SWPPP_Russian_River_Campground_Road,_AK_FS_CNF_1015(1)_Kenai_Peninsula_County,_Alaska.pdf PDF
Russian_River_Earthwork_O_LINE.pdf PDF
PROJECT_DESCRIPTION.pdf PDF
Russian_River_CG_Phase_I_Notice_to_Bidders.pdf PDF
RRCP1_Pre-Ad_Plans.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FEDERAL HIGHWAY ADMINISTRATION

PROJECT

AK FS CNF 1015(1)

RUSSIAN RIVER CAMPGROUND

ACCESS PHASE 1

L LINE

EARTHWORK

50+19.99 TO 54+50.00

CHUGACH NATIONAL FOREST

KENAI PENINSULA BOROUGH, ALASKA

File: H:\Russian River Campground\Phase 1\Physical Data\Earthwork\V8_EW_LLine_7- -26-16_No EP.log 7/26/2016, 12:51:11 PM

COMPUTING EARTHWORKS FOR BASELINE = LLINE2

COMPUTING EARTHWORKS FOR JOB = 151

FORMING LIST OF XSCELLS

BEGINNING EARTHWORKS COMPUTATION

Page: 1

Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol

(sq. ft.) (cu. yd.) (cu. yd.)

(cu. yd.)

SKIP STATION RANGE = 0+00.00 to 0+00.00

50+19.99 RDWYEXC

Excavation 57.54 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 32.67 0 0 1.00 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.21 0 0 0.00 0

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 41.06 0 0 0.00 0

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 66.58 0 0 0.00 0

50+25.00 RDWYEXC

Excavation 45.56 10 10 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 15.56 4 4 1.00 6

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 12.98 3 0 0.00 6

LAYER2

Excavation 0.00 0 0 0.00

Page: 2

Subsoil Exc 0.00 0 0 0.00 Fill 26.59 6 0 0.00 6

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 44.89 10 0 0.00 6

50+27.84 RDWYEXC

Excavation 40.69 5 5 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 14.81 2 2 1.00 9

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.29 1 0 0.00 9

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 23.20 3 0 0.00 9

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 39.82 4 0 0.00 9

50+40.00 RDWYEXC

Excavation 90.55 29 29 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 6.71 5 5 1.00 33

TOPSOIL

Excavation 5.31 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 33

Page: 3

Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 16.62 6 0 0.00 33

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 34.60 13 0 0.00 33

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 63.76 23 0 0.00 33

50+50.00 RDWYEXC

Excavation 53.03 26 26 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 5.15 2 2 1.00 57

TOPSOIL

Excavation 4.48 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 57 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.96 5 0 0.00 57

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 25.10 11 0 0.00 57

LAYER3

Page: 4

Subsoil Exc 0.00 0 0 0.00 Fill 49.86 21 0 0.00 57

50+70.00 RDWYEXC

Excavation 21.38 28 28 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 16.57 8 8 1.00 77

TOPSOIL

Excavation 1.36 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 77 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.40 8 0 0.00 77

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 17.99 16 0 0.00 77

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 39.03 33 0 0.00 77

50+75.00 RDWYEXC

Excavation 17.18 4 4 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 24.21 4 4 1.00 77

TOPSOIL

Excavation 0.84 0 0 0.00 Subsoil Exc 0.00 0 0 0.00

Page: 5

Fill 0.00 0 0 0.00 77 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.60 2 0 0.00 77

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 19.92 4 0 0.00 77

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 36.58 7 0 0.00 77

50+78.54 RDWYEXC

Excavation 14.30 2 2 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 30.59 4 4 1.00 75

TOPSOIL

Excavation 0.58 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 75 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.61 1 0 0.00 75

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 19.92 3 0 0.00 75

LAYER3

Page: 6

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 36.58 5 0 0.00 75

51+00.00 RDWYEXC

Excavation 5.00 8 8 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 33.58 26 26 1.00 57

TOPSOIL

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 57 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 12.97 9 0 0.00 57

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.66 19 0 0.00 57

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 49.68 34 0 0.00 57

51+15.75 RDWYEXC

Excavation 6.32 3 3 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 34.04 20 20 1.00 40

TOPSOIL

Excavation 0.37 0 0 0.00 Subsoil Exc 0.00 0 0 0.00

Page: 7

Fill 0.00 0 0 0.00 40 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 13.93 8 0 0.00 40

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 30.59 17 0 0.00 40

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 52.69 30 0 0.00 40

51+25.00 RDWYEXC

Excavation 11.39 3 3 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 38.13 12 12 1.00 31

TOPSOIL

Excavation 0.90 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 31 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 13.80 5 0 0.00 31

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 30.34 10 0 0.00 31

Page: 8

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 52.19 18 0 0.00 31

51+50.00 RDWYEXC

Excavation 18.39 14 14 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 66.17 48 48 1.00 -3

TOPSOIL

Excavation 1.21 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -3 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 14.84 13 0 0.00 -3

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 32.42 29 0 0.00 -3

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 55.31 50 0 0.00 -3

51+75.00 RDWYEXC

Excavation 26.27 21 21 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 100.09 77 77 1.00 -59

TOPSOIL

Excavation 1.68 1 0 0.00

Page: 9

Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -59 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.48 16 0 0.00 -59

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 43.71 35 0 0.00 -59

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 72.24 59 0 0.00 -59

51+84.11 RDWYEXC

Excavation 30.17 10 10 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 111.12 36 36 1.00 -85

TOPSOIL

Excavation 2.02 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -85 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 23.13 7 0 0.00 -85

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 49.02 16 0 0.00 -85

Page: 10

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 80.20 26 0 0.00 -85

52+00.00 RDWYEXC

Excavation 36.18 20 20 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 136.49 73 73 1.00 -138

TOPSOIL

Excavation 2.32 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -138 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 29.52 15 0 0.00 -138

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 61.82 33 0 0.00 -138

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 99.40 53 0 0.00 -138

52+10.73 RDWYEXC

Excavation 38.17 15 15 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 147.29 56 56 1.00 -179

TOPSOIL

Excavation 3.47 1 0 0.00

Page: 11

Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -179 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 33.84 13 0 0.00 -179

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 70.46 26 0 0.00 -179

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 112.36 42 0 0.00 -179

52+25.00 RDWYEXC

Excavation 36.59 20 20 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 182.73 87 87 1.00 -246

TOPSOIL

Excavation 3.87 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -246 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 37.72 19 0 0.00 -246

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00

Page: 12

Fill 78.24 39 0 0.00 -246

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 124.01 62 0 0.00 -246

52+30.32 RDWYEXC

Excavation 38.06 7 7 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 186.44 36 36 1.00 -275

TOPSOIL

Excavation 3.51 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -275 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 38.62 8 0 0.00 -275

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 80.03 16 0 0.00 -275

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 126.70 25 0 0.00 -275

52+50.00 RDWYEXC

Excavation 57.68 35 35 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 182.82 135 135 1.00 -375

TOPSOIL

Page: 13

Excavation 3.23 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -375 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 39.33 28 0 0.00 -375

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 81.46 59 0 0.00 -375

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 128.84 93 0 0.00 -375

52+62.88 RDWYEXC

Excavation 60.98 28 28 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 185.58 88 88 1.00 -435

TOPSOIL

Excavation 3.06 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -435 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 38.74 19 0 0.00 -435

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00

Page: 14

Fill 80.29 39 0 0.00 -435

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 127.08 61 0 0.00 -435

52+75.00 RDWYEXC

Excavation 62.03 28 28 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 187.30 84 84 1.00 -491

TOPSOIL

Excavation 2.97 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -491 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 38.74 17 0 0.00 -491

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 80.28 36 0 0.00 -491

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 127.08 57 0 0.00 -491

53+00.00 RDWYEXC

Excavation 44.44 49 49 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 218.04 188 188 1.00 -630

Page: 15

TOPSOIL

Excavation 3.31 3 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -630 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 38.74 36 0 0.00 -630

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 80.35 74 0 0.00 -630

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 127.01 118 0 0.00 -630

53+25.00 RDWYEXC

Excavation 68.31 52 52 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 145.72 168 168 1.00 -746

TOPSOIL

Excavation 1.63 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -746 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 38.74 36 0 0.00 -746

LAYER2

Excavation 0.00 0 0 0.00

Page: 16

Subsoil Exc 0.00 0 0 0.00 Fill 80.29 74 0 0.00 -746

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 127.08 118 0 0.00 -746

53+50.00 RDWYEXC

Excavation 79.29 68 68 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 154.21 139 139 1.00 -817

TOPSOIL

Excavation 1.65 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -817 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 38.74 36 0 0.00 -817

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 80.28 74 0 0.00 -817

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 127.08 118 0 0.00 -817

53+75.00 RDWYEXC

Excavation 64.68 67 67 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 182.12 156 156 1.00 -906

Page: 17

TOPSOIL

Excavation 2.34 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -906 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 38.74 36 0 0.00 -906

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 80.28 74 0 0.00 -906

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 127.08 118 0 0.00 -906

53+93.57 RDWYEXC

Excavation 55.01 41 41 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 177.18 124 124 1.00 -989

TOPSOIL

Excavation 2.53 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -989 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 38.74 27 0 0.00 -989

LAYER2

Page: 18

Subsoil Exc 0.00 0 0 0.00 Fill 80.28 55 0 0.00 -989

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 127.08 87 0 0.00 -989

54+00.00 RDWYEXC

Excavation 55.04 13 13 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 168.90 41 41 1.00 -1017

TOPSOIL

Excavation 2.55 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -1017 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 36.15 9 0 0.00 -1017

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 75.02 18 0 0.00 -1017

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 133.37 31 0 0.00 -1017

54+25.00 RDWYEXC

Excavation 66.10 56 56 1.00 Subsoil Exc 0.00 0 0 1.00

Page: 19

Fill 159.47 152 152 1.00 -1113

TOPSOIL

Excavation 2.70 2 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -1113 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 29.64 30 0 0.00 -1113

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 62.01 63 0 0.00 -1113

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 136.43 125 0 0.00 -1113

54+36.77 RDWYEXC

Excavation 79.32 32 32 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 137.91 65 65 1.00 -1146

TOPSOIL

Excavation 2.43 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -1146 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 35.34 14 0 0.00 -1146

LAYER2

Page: 20

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 73.41 30 0 0.00 -1146

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 134.76 59 0 0.00 -1146

54+50.00 RDWYEXC

Excavation 93.85 42 42 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 114.47 62 62 1.00 -1166

TOPSOIL

Excavation 3.24 1 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 -1166 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 38.37 18 0 0.00 -1166

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 79.54 37 0 0.00 -1166

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 125.96 64 0 0.00 -1166

Page: 21

G R A N D S U M M A R Y T O T A L S Material Name Unadjusted Adjusted Mult Volumes Volumes Factor

(cu. yd.) (cu. yd.)

RDWYEXC

Excavation 736 736 1.00 Subsoil Exc 0 0 1.00 Fill 1902 1902 1.00

TOPSOIL

Excavation 34 0 0.00 Subsoil Exc 0 0 0.00 Fill 0 0 0.00

LAYER1

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 445 0 0.00

LAYER2

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 929 0 0.00

LAYER3

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 1551 0 0.00

Page: 22

S P L I T S U M M A R Y T O T A L S XS Quant XS Quant Add/Sub Quant Add/Sub Quant Material Name Unadjusted Adjusted Unadjusted Adjusted Mult Volume Volume Volume Volume Factor

(cu. yd.) (cu. yd.) (cu. yd.) (cu.

yd.)

RDWYEXC

Excavation 736 736 0 0 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 1902 1902 0 0 1.00

TOPSOIL

Excavation 34 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

LAYER1

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 445 0 0 0 0.00

LAYER2

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 929 0 0 0 0.00

LAYER3

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 1551 0 0 0 0.00

Page: 23

B A L A N C E P O I N T S U M M A R Y Material Name Cumulative Incremental Mult Unadjusted Adjusted Unadjusted Adjusted Factor Volumes Volumes Volumes Volumes (cu.

yd.) (cu. yd.) (cu. yd.) (cu. yd.)

Station = 51+47.79

RDWYEXC

Excavation 131 131 131 131 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 131 131 131 131 1.00

SIDEWALKEXC

Excavation 0 0 0 0 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 0 0 0 0 1.00

MSEWALLEXC

Excavation 0 0 0 0 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 0 0 0 0 1.00

SUBEXCAVATION

Excavation 0 0 0 0 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 0 0 0 0 1.00

CONCWALLSTRUCEXC

Excavation 0 0 0 0 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 0 0 0 0 1.00

COLDRECYCLE

Excavation 0 0 0 0 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 0 0 0 0 1.00

EXISTPAVEMENT

Excavation 0 0 0

Page: 24

0 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 0 0 0 0 1.00

EXISTPAVEMENTLAYER2

Excavation 0 0 0 0 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 0 0 0 0 1.00

EXISTGRAVEL

Excavation 0 0 0 0 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 0 0 0 0 1.00

TOPSOIL

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

SNWALLSTREXC

Excavation 0 0 0 0 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 0 0 0 0 1.00

ROCKERYWALLSTREXC

Excavation 0 0 0 0 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 0 0 0 0 1.00

GUARDWALLSTRUCEXC

Excavation 0 0 0 0 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 0 0 0 0 1.00

GFMSEWALLEXC

Excavation 0 0 0 0 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 0 0 0 0 1.00

LAYER1

Page: 25

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

LAYER2

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

LAYER3

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

LAYER4

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

LAYER5

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

SIDEWALKLAYER1

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

SIDEWALKLAYER2

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

SIDEWALKLAYER3

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0

Page: 26

SIDEWALKLAYER4

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

SUBEXBACKFILL

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

SELECTWALLBACKFILL

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

GRANULARBACKFILL

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

LEVELINGPAD

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

PERVIOUS

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

FOUNDATIONFILL

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

PAVEDSHOULDER

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0

Page: 27

0 0.00

PRELEVEL

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

SHOULDERBACKFILL

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

PAVEDDITCHBACKFILL

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

BACKFILLMATERIAL

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

CONCRETE

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

SNFOUNDATIONFILL

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

WALLBACKFILL

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

ROCK

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0

Page: 28

Fill 0 0 0 0 0.00

GRANULARROCKBD

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

STRUCTURALBACKFILL

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

GABIONROCK

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0 0 0.00

WALLFACING

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 0 0 0

Page: 29

File details come from the government source that posted it. Updated .