AK_FS_CNF_1015(1)_Plans_100_.pdf
PDF 14 MB Posted
- Attached to
- AK FS CNF 1015(1), Russian River Campground Access, Phase 1 Federal contract opportunity
- Solicitation number
- DTFH70-15-B-00021
About this file
Plans
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q&A_10-25-17.pdf | ||
| A002.pdf | ||
| Q&A_10-23-17.pdf | ||
| A001.pdf | ||
| Russian_River_Earthwork_I_Line.pdf | ||
| L_Line_XSections.pdf | ||
| IFB_RussianRiver.pdf | ||
| Plan_Request_form_Russian_River.pdf | ||
| O_Line_XSections.pdf | ||
| SWPPP_Russian_River_Campground_Road,_AK_FS_CNF_1015(1)_Kenai_Peninsula_County,_Alaska.pdf | ||
| Russian_River_Earthwork_O_LINE.pdf | ||
| Russian_River_Earthwork_L_LINE.pdf | ||
| I_Line_XSections.pdf | ||
| Russian_River_CG_Phase_I_Notice_to_Bidders.pdf | ||
| RRCP1_Pre-Ad_Plans.pdf | ||
| PROJECT_DESCRIPTION.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FEDERAL HIGHWAY ADMINISTRATION
U. S. DEPARTMENT OF TRANSPORTATION
Project Location
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
TYPE OF CONSTRUCTION:
DESIGN DESIGNATION:
SPECIFICATION:
PROJECT MANAGER
VANCOUVER, WASHINGTON
WESTERN FEDERAL LANDS HIGHWAY DIVISION
PLANS PREPARED BY
PLANS FOR PROPOSED PROJECT
COMMITMENT TO EXCELLENCE
FEDERAL LANDS HIGHWAY
R
E N
O R
A I
N
N
ST F
R
I
D
D E P A
T
NTOFT A SP
T T
O
U
TE
ATESO
AM
E R
IC
A
M on Federal Highway Projects, FP-14
Construction of Roads and Bridges
Standard Specifications for
AK FS CNF 1015(1)
CAMPGROUND ACCESS PHASE 1
RUSSIAN RIVER
SCALE IN MILES
0 2 4 62 1
CEAN
OCITCRA
i r e B n g ea S
PACIFIC OCEAN
Gulf of A la k a s
Dillingham
Bethel ANCHORAGE
Homer
King Salmon
Kodiak
Valdez
Tok YUKON
WHITEHORSE
JUNEAU
Unalaska
Kotzebue
Nome
FAIRBANKS
Barrow
S
IB
E R
IA
C A
N A
D A
U N I T
E D S
T A
T E S
BC
PARK
NATIONAL
DENALI
NAT'L PARK
ST. ELIAS
WRANGELL-
NAT'L PARK
LAKE CLARK
N.P.
FJORDS
KENAI
NAT'L PARK
THE ARCTIC
GATES OF
N.P.
VALLEY
KOBUK
PRESERVE
KATMAI N.P.
NAT'L PARK
GLACIER BAY
ALASKA KEY MAP
k u
Y o n
R
UNI
TE
D
STATE
S
RUSS
IA
N
LAKE
RUSSIAN
UPPER
LAKE
COOPER
KENAI LAKE
LAKE
GRANT
TRAIL LAKE
UPPER
K E
N A I N
A T
IO
N A
L
M O
O S
E
R
A N
G E
B
O U
N D
A R
Y
F O R E S T
N A T I O N A L
C H U G A C H
LAKE
TROUT
LAKE
JUNEAU
LAKE
CARTER
Scenic Byw ay
Highway
Sterling Hig hway
KENAI
RIVER
Island
Porcupine
Lakeview
Mountain
Sleeping Sister
Adair
Mount
Lake
Vogt
St er lin g
LAKE
KENAI
Mile 40 Pit
Mountain
Wrong
Rock Source
See Sheet A.4 for Vicinity Map
PROJECT LOCATION
Sew ard Highw ay
Airport
Quartz Creek
ALASKA
KENAI PENINSULA BOROUGH
CHUGACH NATIONAL FOREST
R. JOHNSON
e (max)
V
ADT (2035)
ADT (2015)
0.040
20 MPH
<400
<400
DATE
DATE
DATE
APPROVED:
See Sheet A.2 for Index to Sheets
LENGTH 0.49 MILES
Paving, grading, and entrance station
U.S. Forest Service
Regional Director of Recreation
U.S. Forest Service
Regional Director of Engineering
A.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft
D c m y fi le s p w p r o d u c ti o n d a k f-c n r f1 a a .d g n
AK FS CNF 1015(1)
S e p te m b e r
K
H A
R R I S
N
B
S T
O K
E S
C h e c k e d b y
D e s ig n e d b y
Western Federal Lands Highway Division
Chief of Engineering, /s/ James King
/s/ Sam Carlson
11/21/16
11/21/16
/s/ Robert B. Lale III 9/07/16
INDEX TO SHEETS
INDEX TO SHEETS INDEX TO SHEETS
RESERVED
EROSION CONTROL STANDARD DETAILS
EROSION AND SEDIMENT CONTROL PLAN
TABULATION OF EROSION CONTROL QUANTITIES
PARKING LOT LAYOUT INFORMATION
PLAN AND PROFILE
TABULATION OF PARKING AREA QUANTITIES
SURVEY CONTROL
PLAN AND PROFILE
TABULATION OF PLAN QUANTITIES
TYPICAL CROSS SECTIONS
TABULATION OF TYPICAL SECTION QUANTITIES
SUMMARY OF QUANTITIES
PROJECT SITE PLAN
VICINITY MAP
PLAN SYMBOLS AND ABBREVIATIONS
INDEX TO SHEETS
TITLE SHEET
G. DRAINAGE
F. EROSION CONTROL
E. APPROACH ROADS AND PARKING AREAS
D. PLAN-PROFILE
C. TYPICAL SECTION(S)
B. SUMMARIES
A. GENERAL INFORMATION
G.1
F.3
F.2
F.1
E.3
E.2
E.1
D.5
D.2-4
D.1
C.2-4
C.1
B.1-3
A.5
A.4
A.3
A.2
A.1
J. ROADSIDE DEVELOPMENT
I. PERMANENT TRAFFIC CONTROL PLAN
H. TEMPORARY TRAFFIC CONTROL PLAN
CONCRETE WHEELSTOP DETAIL
ENTRANCE STATION DETAILS
ENTRANCE STATION LAYOUT
GENERAL NOTES
QUANTITIES
TABULATION OF ROADSIDE DEVELOPMENT
DRAWINGS
PERMANENT TRAFFIC CONTROL STANDARD
DETAILS
PERMANENT TRAFFIC CONTROL SPECIAL SIGN
SIGNING AND PAVEMENT MARKING PLAN
SIGN SYSTEMS
TABULATION OF PERMANENT TRAFFIC CONTROL
QUANTITIES
TABULATION OF PERMANENT TRAFFIC CONTROL
DRAWINGS
TEMPORARY TRAFFIC CONTROL STANDARD
QUANTITIES
TABULATION OF TEMPORARY TRAFFIC CONTROL
J.15
J.4-14
J.3
J.2
J.1
I.8-9
I.6
I.3-5
I.2
I.1
H.2-4
H.1
A.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d a k f-c n r f1 a b .d g n
AK FS CNF 1015(1)
u g u s t
H A
R R I S
S T
O K
C h e c k e d b y
D e s ig n e d b y
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009 10/2014
W101-1
AND ABBREVIATIONS
PLAN SYMBOLS
W west drwg(s).
dist.
diaph.
diag.
dia.
DHV
D exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish jt.
ID
joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material
O c to b e r
U
C m y fi le s p w p r o d u c ti o n d a k f-c n r f1 a c .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
A.3 FS CNF 1015(1) AK
BH
CP GPS
JH
TP
DI
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
RIP
G G
W W
DI
T T
NOTE:
NO SCALE
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend 1.
Property Line w/Found Property Corner
Section Corner (Found, Projected)16
Section Line16
Section Corner (Found, Projected)4
Section Line4
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub θs Ø
∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
bearing bridge balance point bench mark back brg.
br.
BP
BM
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line
M.P.
M.L.
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use,
- no symbol -
EXISTING PROPOSED
Transition
Toe of Fill
Top of Cut wall face
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
Fiber Roll or Wattle
RESURREC
T I O
N
Quartz Creek
Landing Strip
16 Miles t o rock res ources
H a n n is fo rd D r.
d
R yrre b e n a
B
.t
C sll a F niwT yaW ta l ko
T
Upper Trails Ct.
VICINITY MAP
SCALE IN MILES
N
SCALE IN MILES
0 1 21
Cooper Landing
Moose Pass
Area
Wildlife Viewing
Guard Station Broadview
K
EN
AI
LA
K E
SCALE IN MILES
IANEK
REVI
R
Sterling Highway
Bend
Schooner ya wy
B ci ne cS
Distance from Project to Rock Source is approximately 16 miles.
1 4
Mountain
Right
Moose Pass
Mountain
Wrong
Trail
Carter Lake ya wh gi H dr a we S
Scenic Byway
Lake
Tern
Channel
Fish
Creek
Daves
Crescent Creek
Creek Trail
Crescent
STE
RLI
NG
H
IG
H W
A Y
Quartz Creek
HIGHWAY
STERLING
S S
A P Bean Creek
Creek Trail
Bean
KENAI RIVER
FS Weather Station
Creek
Quartz
To Sterling, AK
30 Miles
To Sew ard, AK
34 M iles
ROCK SOURCE
MP 35
I Line
L Line
O Line
PROJECT LOCATION
Project Site Plan
See Sheet A.5 for
A.4
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d a k f-c n r f1 a d .d g n
AK FS CNF 1015(1)
P
F e b r u a r y
H A
R R I S
S T
O K
C h e c k e d b y
D e s ig n e d b y
ROCK SOURCE
MP 33
y a wh gi
H dr awe S
Crescent Lake
EL. 4400
Mountain
Cecil Rhode
UP
UPT
EM
N
15010050025
Scale in feet
75 50
STERLING HIGHWAY
e niL
O
3- 2.
D st e e h
S e e eniL I e ni L
L
2.
E t e e h S e e
S e ni
L O
3- 2.
D st e e h S e e
S
PHASE 1
RUSSIAN RIVER CAMPGROUND
AK FS CNF 1015(1)
BEGIN PROJECT
PHASE 1
RUSSIAN RIVER CAMPGROUND
AK FS CNF 1015(1)
END PROJECT
PROJECT SITE PLAN
See J Sheets
New entrance station overflow parking lot
Edge of existing
EXIT ENTRANCE
Existing entrance station
4.D teehS eeS parking lot
Edge of new overflow prior to construction
Utilities relocated by others prior to construction
Utilities relocated by others
A.5
STATE PROJECT
NUMBER
SHEET
u g u s t
P h a s e O p ti o n a c m y fi le s p w p r o d u c ti o n d a k f-c n r f1 a e .d g n
AK FS CNF 1015(1)
H A
R R I S
S T
O K
C h e c k e d b y
D e s ig n e d b
Sheet and Description
Section C Section D Section E Section F Section G Section H Section I Section J
Typical Section
Plan & Profile
Approach Roads & Parking Areas
Erosion Control Drainage
Temporary Traffic Control
Permanent Traffic Control
Roadside Development ALLOWANCE Bid
Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
A0060 15301-0010 CONTRACTOR QUALITY CONTROL
AND ASSURANCE LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15705-1400 SOIL EROSION CONTROL, FIBER
ROLL LNFT 2,110 150 2,260
A0140 15801-0000 WATERING FOR DUST CONTROL MGAL 50 10 60
A0160 20101-0000 CLEARING AND GRUBBING ACRE 1.6 0.9 0.2 2.7
A0180 20301-1100 REMOVAL OF GATE EACH 2 2
A0200 20301-2400 REMOVAL OF SIGN EACH 16 16
A0220 20301-2800 REMOVAL OF STRUCTURES AND
OBSTRUCTIONS EACH 1 1
A0240 20401-0000 ROADWAY EXCAVATION CUYD 2,987 818 195 4,000
A0260 20403-0000 UNCLASSIFIED BORROW CUYD 530 30 560
A0280 20411-0000 SELECT BORROW TON 9,070 430 9,500
A0300 20701-0300 SEPARATION-STABILIZATION
GEOTEXTILE, CLASS 1, TYPE C SQYD 11,065 535 11,600
A0320 21101-1000 ROADWAY OBLITERATION, METHOD 1 SQYD 3,950 200 4,150
A0340 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 4,917 243 5,160
A0360 40301-0100 ASPHALT CONCRETE PAVEMENT,
TYPE 1 TON 2,274 116 2,390
A0380 41201-0000 TACK COAT TON 5 1 6
A0400 60902-1000 CURB AND GUTTER, CONCRETE,
12-INCH DEPTH LNFT 62 3 65
A0420 60915-1000 WHEELSTOP, CONCRETE EACH 28 28
A0440 61501-0100 SIDEWALK, CONCRETE (4-INCH
DEPTH) SQYD 22 3 25
A0460 62201-0250 DUMP TRUCK, 10 CUBIC YARD
MINIMUM CAPACITY HOUR 40
A0480 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT
MINIMUM RATED CAPACITY
BUCKET, 18-INCH WIDTH HOUR 40
4- Ja n-
:3
A M c:
\m yf ile s\ pw
_p ro du ct io n\ d0
AK
F S C
N F
(1
Es tim at e-
_1
2-
-1 6.
xl sx
]S he et
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
STATE PROJECT
B.1FS CNF 1015(1)AK
NUMBER
Typical Section
Plan & Profile
Approach Roads & Parking Areas
Erosion Control Drainage
Temporary Traffic Control
Permanent Traffic Control
Roadside Development ALLOWANCE Bid
Schedule
A0500 62201-0900 WHEEL LOADER, 2 CUBIC YARD
MINIMUM RATED CAPACITY HOUR 40
A0520 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM
BLADE HOUR 20
A0540 62201-3150 HYDRAULIC EXCAVATOR, CRAWLER
MOUNTED, 1.0 CUBIC YARD
MINIMUM CAPACITY WITH THUMB
ATTACHMENT HOUR 40
A0560 62301-0000 GENERAL LABOR HOUR 40
A0580 62406-0100 PLACING CONSERVED TOPSOIL,
2-INCH DEPTH ACRE 1.6 0.5 0.2 2.3
A0600 62501-0000 TURF ESTABLISHMENT ACRE 2.1 0.2 2.3
A0620 63302-0000 SIGN SYSTEM SQFT 196 196
A0640 63316-1000 REMOVE AND RESET SIGN EACH 1 1
A0660 63401-0300 PAVEMENT MARKINGS, TYPE B,
SOLID (STOP BAR) LNFT 804 46 850
A0680 63401-0300 PAVEMENT MARKINGS, TYPE B,
SOLID (DOUBLE YELLOW) LNFT 5,412 148 5,560
A0700 63401-0300 PAVEMENT MARKINGS, TYPE B,
SOLID (WHITE) LNFT 13,825 225 14,050
A0720 63401-0300 PAVEMENT MARKINGS, TYPE B,
SOLID (YELLOW) LNFT 520 100 620
A0740 63401-0400 PAVEMENT MARKINGS, TYPE B,
BROKEN (WHITE) LNFT 1,742 158 1,900
A0760 63401-1500 PAVEMENT MARKINGS, TYPE H,
SOLID (WHITE) LNFT 576 44 620
A0780 63405-0500 PAVEMENT MARKINGS, TYPE B,
TURN ARROW EACH 5 5
A0800 63405-0850 PAVEMENT MARKINGS, TYPE B,
ACCESSIBILITY SYMBOL EACH 2 2
A0820 63502-0600 TEMPORARY TRAFFIC CONTROL,
BARRICADE TYPE 3 EACH 1 1
A0840 63502-0700 TEMPORARY TRAFFIC CONTROL,
CONE EACH 50 50
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
4- Ja n-
:3
A M c:
\m yf ile s\ pw
_p ro du ct io n\ d0
AK
F S C
N F
(1
Es tim at e-
_1
2-
-1 6.
xl sx
]S he et
2)
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.2FS CNF 1015(1)AK
Typical Section
Plan & Profile
Approach Roads & Parking Areas
Erosion Control Drainage
Temporary Traffic Control
Permanent Traffic Control
Roadside Development ALLOWANCE Bid
Schedule
A0860 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 176 24 200
A0880 63509-1000 TEMPORARY TRAFFIC CONTROL,
FLAGGER FXHR 600 100 700
A0900 63601-1000 SYSTEM INSTALLATION, TRAFFIC
SIGNAL LPSM ALL
A0920 63703-0000 RESIDENTIAL HOUSING EACH 1
A0940 63704-0000 VEHICLE EACH 1
A0960 64605-1000 FIXTURE, KIOSK (ENTRANCE
STATION) LPSM ALL
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
4- Ja n-
:3
A M c:
\m yf ile s\ pw
_p ro du ct io n\ d0
AK
F S C
N F
(1
Es tim at e-
_1
2-
-1 6.
xl sx
]S he et
3)
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.3FS CNF 1015(1)AK
TYPICAL SECTION
TABULATION OF
S T
O K
H A
R R I S
C.1
STATE PROJECT
AK
FS CNF 1015(1)
J u ly
U
S S u r ft m y fi le s p w p r o d u c ti o n d a k f-c n f1 c a .d g n
C h e c k e d b y
D e s ig n e d b
NO SCALE
Va ria ble
S lo p e s ta k e
ROUNDING DETAIL
FILL SLOPE
C le a r in g l im it
5'5'
0.25D
D
1:4
Va ria ble
Lane Lane Lane
0.5'
ShoulderShoulder
1:4 1:4 Va ria ble
C le a r in g l im it
5'
Min.
C le a r in g l im it
Va ria ble
5'
Min.
See Safety Edge Detail (typ.)
TYPICAL SECTION A
2% Crown
LC
Unclassified borrow
Lane Lane
0.5'
ShoulderShoulder
1:4 1:4
LC
2% 2%
C le a r in g l im it
Va ria ble
5'
Min.
Unclassified borrow
Va ria ble
C le a r in g l im it
5'
Min.
Varies 0'-10'
TYPICAL SECTION B
Varies 10'-16' Varies 10'-16'
Varies 0-10'Varies 5'-10'
ROUNDING DETAIL
CUT SLOPE
C le a r in g l im it
5'10'
Slope stake
0.25D
D
See Safety Edge Detail (typ.)
FOOTNOTE:
Centerline is point of rotation for superelevation.
Staking Report Data Listing.
Construct slopes as shown on the cross sections and in the plan and profile curve data.
Superelevate roadway on curves at the rate 'e' as indicated on the
Existing ground
4'
O Line: 21+20.42 to 22+46.29
O Line: 10+00 to 20+97.42
0.5'
I Line: 30+00 to 38+48.55
S T
O K
H A
R R I S
SAFETY EDGE DETAIL
Second lift of asphalt
First lift of asphalt
Roadway aggregate, method 2
Red top in survey notes Point available to cover safety edge Pull aggregate base
30°
Tack coat (between pavement lifts) tnemhsilbatse fruT tnemhsilbatse fruT tnemhsilbatse fruT tnemhsilbatse fruT
C.2
STATE PROJECT
u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d a k f-c n f1 c b .d g n
C h e c k e d b y
D e s ig n e d b y
NOTE:
1.
of Subsection 704.06 and 704.07 of the SCRs.
Unclassified Borrow or Select Borrow if it meets the requirements
Material excavated from the existing roadway may be used as
[2]
[1]
[2]
[2
[2]
[2]
[2
[2]
[1] [1]
[1]
Existing ground ground
Existing
Existing ground
Existing ground
1' beyond edge of pavement type C (woven) geotextile, class 1, Separation-stabilization
4" Asphalt concrete pavement, type 1, placed in two equal lifts
Tack coat (between lifts)
12" Select borrow
8" Roadway aggregate, method 2
1' beyond edge of pavement type C (woven) geotextile, class 1, Separation-stabilization
4" Asphalt concrete pavement, type 1, placed in two equal lifts
Tack coat (between lifts)
12" Select borrow
8" Roadway aggregate, method 2
Existing ground
[3]
[3]
Va ria ble
S lo p e s ta k e
ROUNDING DETAIL
FILL SLOPE
C le a r in g l im it
5'5'
0.25D
D
Va ria ble
TYPICAL SECTION D
Lane Lane
1:4 1:4
2% Crown
LC
10'Varies 4'-20'
Parking Area
10' Varies 0.5'-101'
Parking Area
C le a r in g l im it
Va ria ble
5'
Min.
Unclassified borrow
Va ria ble
C le a r in g l im it
5'
Min.
ROUNDING DETAIL
CUT SLOPE
C le a r in g l im it
5'10'
Slope stake
0.25D
D
Lane Lane
0.5'
Shoulder
1:4 C le a r in g l im it
Va ria ble
5'
Min.
2% Crown
LC
Unclassified borrow
Median
10' 9'
Shoulder
1:4 Va ria ble
C le a r in g l im it
5'
Min.
See Sheet J.12 for details concrete, 12" depth.
Construct curb and gutter, See Sheet J.12 for details concrete, 12" depth.
Construct curb and gutter, TYPICAL SECTION C
O Line: 20+97.42 to 21+20.42
See Sheet C.2
See Safety Edge Detail (typ.)
L Line: 50+00 to 53+89.32
FOOTNOTE:
Centerline is point of rotation for superelevation.
Staking Report Data Listing.
Construct slopes as shown on the cross sections and in the plan and profile curve data.
Superelevate roadway on curves at the rate 'e' as indicated on the
Existing ground
Varies 10'-13.4' 4'
H A
R R I S
S T
O K
L Line: 54+40.61 to 55+00 tnemhsilbatse fruT tnemhsilbatse fruT tnemhsilbatse fruT
See J Sheets for details
Concrete, sidewalk 4" depth
NOTE:
1.
of Subsection 704.06 and 704.07 of the SCRs.
Unclassified Borrow or Select Borrow if it meets the requirements
Material excavated from the existing roadway may be used as
C.3
STATE PROJECT
e p te m b e r
U
S S u r ft m y fi le s p w p r o d u c ti o n d a k f-c n f1 c c .d g n
C h e c k e d b y
D e s ig n e d b y
[2]
[2
[2]
[1] ground
Existing
Existing ground
[2]
[1] pivot point
Profile grade & [2
Existing ground
[2] type C (woven) geotextile, class 1, Separation-stabilization
4" Asphalt concrete pavement, type 1, placed in two equal lifts
Tack coat (between lifts)
12" Select borrow
8" Roadway aggregate, method 2
Existing ground
1' beyond edge of pavement type C (woven) geotextile, class 1, Separation-stabilization
4" Asphalt concrete pavement, type 1, placed in two equal lifts
Tack coat (between lifts)
12" Select borrow
8" Roadway aggregate, method 2
Existing ground
[1]
[2]
[3]
[3]
1' beyond edge of pavement
Va ria ble
S lo p e s ta k e
ROUNDING DETAIL
FILL SLOPE
C le a r in g l im it
5'5'
0.25D
D
Va ria ble
ROUNDING DETAIL
CUT SLOPE
C le a r in g l im it
5'10'
Slope stake
0.25D
D
Existing ground
TYPICAL SECTION E
Lane Lane
1:4
1:4
LC
14' 10'
C le a r in g l im it
Va ria ble
5'
Min.
Unclassified borrow
2'
Shld.
Varies 0'-36'
Shld. Parking Area
51'
2% 2%
2'
2%
C le a r in g l im it
Variable
5'
Min.
Unclassified borrow
-10%
L Line: 53+89.32 to 54+40.61
10%
FOOTNOTE:
Staking Report Data Listing.
Construct slopes as shown on the cross sections and in the
H A
R R I S
S T
O K tn emh sil bat se fr uT
Turf establishment
C.4
STATE PROJECT
u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d a k f-c n f1 c d .d g n
C h e c k e d b y
D e s ig n e d b y
NOTE:
1.
of Subsection 704.06 and 704.07 of the SCRs.
Unclassified Borrow or Select Borrow if it meets the requirements
Material excavated from the existing roadway may be used as
[2] ground
Existing
[1]
Existing ground
[1]
[2]
[1] type C (woven) geotextile, class 1, Separation-stabilization
4" Asphalt concrete pavement, type 1, placed in two equal lifts
Tack coat (between lifts)
12" Select borrow
8" Roadway aggregate, method 2
4" Asphalt concrete pavement, type 1, placed in two equal lifts
Tack coat (between lifts)
12" Select borrow
8" Roadway aggregate, method 2
Select borrow
1' min.
FOOTNOTE:
NOTE:
PLAN QUANTITIES
1. See Sheet E.1 for parking lot quantities.
H A
R R I S
S T
O K of Subsection 704.06 and 704.07 of the SCRs.
Unclassified Borrow or Select Borrow if it meets the requirements
Material from Roadway Obliteration, Method 1 may be used as areas.
Based on conserved topsoil depth of 6 inches in excavation
Based on 75% of roadway excavation being suitable.
Includes conserved topsoil.
D.1
STATE PROJECT
u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d a k f-c n f1 fa .d g n
C h e c k e d b y
D e s ig n e d b y
2.
of Subsection 704.06 and 704.07 of the SCRs.
Unclassified Borrow or Select Borrow if it meets the requirements
Material excavated from the existing roadway may be used as
[1]
[2]
[3]
[4]
BEGIN PROJECT
EL=398.61
E=1651708.44
N=2368397.88
D
R= 150.00'
T= 60.73'
L= 115.41'
Profile grade
Existing ground
CP
CP
CP
N
10+00.00
O LINE
AK FS CNF 1015(1)
D
R= 300.00'
T= 104.05'
L= 200.31' e= 3.0% e = 2.4%
PAVEMENT TRANSITION
BEGINNING AND ENDING
(No Scale)
Existing Roadway Saw cut pavement
PAVEMENT TRANSITION
BEGINNING AND ENDING
(No Scale) pavement structurefor
See sheets C.2 and C.3 e ni
L I
4.
D t e e h S e e
S
Line to be constructed
R = 30'
R = 50'
R = 50'
R = 50'
Remove gate
Slope stake limitsSlope stake limits
W=2' RT
Roadway obliteration, method 1 method 1
Roadway obliteration, method 1
Roadway obliteration, CUYD
EXC.
CUYD
EMB.
16+0014+0013+0011+0010+00
385 385
400 400
405 405
D.2
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d a k f-c n f1 fb .d g n
AK FS CNF 1015(1)
J u ly
H A
R R I S
S T
O K
C h e c k e d b y
D e s ig n e d b y
12+00 15+00
P O T .0
P C .7
P T
.1
P C
.3
K = 21
20' VC
-0.4000%
50' VC
K = 45
.5
.2
-1.3494%
.6
.1
50' VC
K = 29
SSD = 655'
+0.7127%
EL=393.20
E=1650525.77
N=2367735.21
D
R= 180.00'
T= 91.36'
L= 169.08'
D
R= 200.00'
T= 63.01'
L= 122.09'
CP
CP
CP
CP
Line to be constructed
END PROJECT
Profile grade
Existing ground
N
22+46.29
O LINE
AK FS CNF 1015(1)
D
R= 300.00'
T= 104.05'
L= 200.31' e = 2.4% e= 2.8% e= 2.8%
R = 50'
R = 46' e ni
L L
2.
E t e e h S e e
S
Slope stake limitsSlope stake limits
Remove entrance station
See J Sheets
Construct entrance station prior to construction
Utilities relocated by others
CUYD
EXC.
CUYD
EMB.
25+0023+0022+0020+0019+0017+0016+00
385 385
405 405
D.3
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d a k f-c n f1 fc .d g n
AK FS CNF 1015(1)
u g u s t
H A
R R I S
S T
O K
C h e c k e d b y
D e s ig n e d b y
18+00 21+00 24+00
UP
UPT
EM
395395
P T
.6
P C
.1
P T
.2
P C
.5
P T
.6
P O
T
.2
-1.2292%
40' VC
K = 20
-3.2577%
.4
SSD = 1115'
K = 20
20' VC
50' VC
K = 13
SSD = 308'
.5
-2.2814%+1.533 9%
.9
K = 20
50' VC
.4
-1.0000%
.1
EL=390.88
E=1650898.92
N=2368598.33
N
Line to be constructed
D
R= 100.00'
T= 96.18'
L= 153.19'
CP
CP
CP
30+00.00
I Line
AK FS CNF 1015(1)
R = 50'
BEGIN WORK
Existing ground
Profile grade
EL=398.90
E=1651444.02
N=2368133.50
END WORK
O LINE 13+92.29
38+48.55 =
I LINE
Slope stake limits
R = 50'
D
R= 100.00'
T= 38.29'
L= 73.13' e ni
L L
2.
E t e e h S e e
S e ni
L O
2.
D t e e h S e e
S e= 3.4%
W= 2' LT
e= 3.4%
W= 2' RT R = 30'
R = 50'
Remove gate
Remove gate method 1
Roadway obliteration, method 1
Roadway obliteration, method 1
Roadway obliteration, CUYD
EXC.
CUYD
EMB.
37+0036+0034+0033+0031+00
380 380
395 395
D.4
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d a k f-c n f1 fd .d g n
AK FS CNF 1015(1)
J u ly
H A
R R I S
S T
O K
C h e c k e d b y
D e s ig n e d b y
32+00 35+00 38+00
30+00
POT 30+00.00
PC 31+20.69
P T
.8
P C
.0
P T
.1
P O T
.5
.8
.0
+0.4784% -3.0000%
30' VC
K = 9
SSD = 325'
.6
45' VC
K = 17
.4
-0.4000%
+3.0
60' VC
K = 18
.5
+0.5000%
30' VC
K = 12
SSD = 447' 3
.5
+2.00
00%40' VC
K = 27
.9
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION NOTE:
1 2367983.895 1650672.459 390.259 60°28'54.369" N 149°56'35.321" W 425.1966 0.99987984 (SRD3135) 3-1/4" DIAM. USDA ALUM. CAP 1.
2 2367811.709 1650541.533 391.193 60°28'52.674" N 149°56'37.937" W 426.1306 0.99987979 (SRD3134) 3-1/4" DIAM. USDA ALUM. CAP
3 2367440.934 1650405.731 396.608 60°28'49.024" N 149°56'40.653" W 431.5587 0.99987953 1/2" X 2" MAGNAIL
4 2367266.214 1650130.471 388.120 60°28'47.305" N 149°56'46.149" W 423.0642 0.99987993 1/2" X 2" MAGNAIL
5 2367147.727 1649586.518 388.540 60°28'46.142" N 149°56'57.006" W 423.4579 0.9998799 1/2" X 2" MAGNAIL
6 2367335.926 1649247.849 394.919 60°28'47.999" N 149°57'03.762" W 429.8107 0.99987959 1/2" X 2" MAGNAIL
7 2367319.972 1648778.434 420.811 60°28'47.845" N 149°57'13.130" W 455.6764 0.99987834 1/2" X 2" MAGNAIL
8 2367232.031 1648175.988 443.425 60°28'46.983" N 149°57'25.154" W 478.2609 0.99987726 1/2" X 2" MAGNAIL
9 2367179.603 1647794.718 448.212 60°28'46.469" N 149°57'32.763" W 483.0282 0.99987702 1/2" X 2" MAGNAIL
10 2366880.587 1647414.477 456.899 60°28'43.526" N 149°57'40.355" W 491.7054 0.9998766 1/2" X 2" MAGNAIL
11 2366767.285 1647132.227 455.945 60°28'42.412" N 149°57'45.989" W 490.7415 0.99987664 1/2" X 2" MAGNAIL
12 2366711.288 1646619.838 420.355 60°28'41.863" N 149°57'56.214" W 455.122 0.99987833 1/2" X 2" MAGNAIL
13 2366745.320 1646475.915 418.366 60°28'42.199" N 149°57'59.086" W 453.1231 0.99987843 (SRD3133) 3-1/4" DIAM. USDA ALUM. CAP
14 2366813.810 1646170.210 418.561 60°28'42.875" N 149°58'05.185" W 453.2985 0.99987842 (SRD3132) 3-1/4" DIAM. USDA ALUM. CAP
15 2367173.494 1645904.804 426.565 60°28'46.419" N 149°58'10.478" W 461.2697 0.99987803 1/2" X 2-1/2" DURANAIL
16 2367665.316 1645819.535 421.750 60°28'51.263" N 149°58'12.176" W 456.4284 0.99987826 5/8" X 30" REBAR w/YELLOW FS CAP
17 2367852.596 1645605.981 415.655 60°28'53.108" N 149°58'16.436" W 450.3137 0.99987855 1/2" X 2-1/2" DURANAIL
18 2368027.716 1645495.672 413.311 60°28'54.834" N 149°58'18.636" W 447.9566 0.99987866 1/2" X 2-1/2" DURANAIL
19 2368331.536 1645487.834 412.091 60°28'57.826" N 149°58'18.790" W 446.7268 0.99987872 1/2" X 2-1/2" DURANAIL
20 2368582.755 1645424.530 412.671 60°29'00.301" N 149°58'20.051" W 447.2936 0.99987869 1/2" X 2-1/2" DURANAIL
21 2369144.197 1645040.394 414.770 60°29'05.832" N 149°58'27.713" W 449.3533 0.99987859 (SRD3177) 3-1/4" DIAM. USDA ALUM. CAP
22 2369184.028 1644806.950 414.696 60°29'06.225" N 149°58'32.372" W 449.2629 0.99987859 (SRD3178) 3-1/4" DIAM. USDA ALUM. CAP
23 2368894.252 1644587.578 413.342 60°29'03.372" N 149°58'36.753" W 447.9056 0.99987866 5/8" X 30" REBAR w/YELLOW FS CAP
24 2368966.726 1644259.157 409.949 60°29'04.087" N 149°58'43.308" W 444.4929 0.99987881 1/2" X 2-1/2" DURANAIL
25 2368940.953 1644006.493 406.239 60°29'03.834" N 149°58'48.351" W 440.7698 0.99987899 1/2" X 2-1/2" DURANAIL
26 2368986.099 1643774.768 402.501 60°29'04.279" N 149°58'52.975" W 437.0154 0.99987917 (SRD3176) 1/2" X 2-1/2" DURANAIL
31 2368336.656 1651429.000 396.349 60°28'57.837" N 149°56'20.216" W 431.3096 0.99987956 1/2" X 2" MAGNAIL
32 2368305.882 1651131.564 394.331 60°28'57.536" N 149°56'26.153" W 429.2784 0.99987965 (SRD3174) 1/2" X 2" MAGNAIL
33 2368337.351 1650838.273 392.008 60°28'57.849" N 149°56'32.006" W 426.939 0.99987976 (SRD3175) 1/2" X 2" MAGNAIL
34 2368578.560 1650867.142 389.797 60°29'00.224" N 149°56'31.425" W 424.7182 0.99987987 3/4" X 6-1/2" SPIKE
35 2368361.775 1651754.828 396.219 60°28'58.081" N 149°56'13.713" W 431.196 0.99987958 5/8" X 30" REBAR w/YELLOW FS CAP
36 2368085.997 1651381.940 398.428 60°28'55.369" N 149°56'21.160" W 433.3984 0.99987946 1/2" X 2" MAGNAIL
37 2368071.667 1651002.927 396.441 60°28'55.231" N 149°56'28.724" W 431.3917 0.99987955 1/2" X 2" MAGNAIL
38 2367907.476 1650795.453 396.788 60°28'53.615" N 149°56'32.868" W 431.7354 0.99987953 1/2" X 2" MAGNAIL
40 2367677.868 1650610.874 399.246 60°28'51.356" N 149°56'36.555" W 434.1934 0.99987941 5/8" X 36" REBAR w/YELLOW FS CAP
41 2367631.433 1650785.950 404.641 60°28'50.897" N 149°56'33.062" W 439.6016 0.99987915 3/4" X 6-1/2" SPIKE (STEEL)
42 2367510.238 1650712.401 411.609 60°28'49.704" N 149°56'34.532" W 446.5728 0.99987882 5/8" X 36" REBAR w/YELLOW FS CAP
43 2367528.841 1650620.605 413.002 60°28'49.888" N 149°56'36.364" W 447.9593 0.99987875 5/8" X 36" REBAR w/YELLOW FS CAP
45 2368027.861 1645312.728 411.448 60°28'54.836" N 149°58'22.287" W 446.0838 0.99987875 (SRD3094) 1/2" X 2" MAGNAIL
46 2367893.670 1645395.642 412.464 60°28'53.514" N 149°58'20.633" W 447.1096 0.9998787 (SRD3095) 1/2" X 2" MAGNAIL
PROJECT : Russian River Campground
PROJECT UNITS : US SURVEY FOOT
COORDINATE SYSTEM :Alaska Zone 4 SPCS NAD83 (2011)
EPOCH DATE : 2010.0000
VERTICAL DATUM : NAVD88 based on Geoid 12A
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
H
R us si an
R iv er C am pg ro un d\ Ph as e
1\ [R us si an R iv er _C
G _c on tr ol sh ee t.
xl sx
]S he et 4-
N ov
-2
3:
P
M A
D es ig ne r
D
C he ck er
D es ig ne d by
C he ck ed b y:
STATE PROJECT
D.5
SHEET
NUMBER
FS CNF 1015(1)AK
SURVEY CONTROL
FOOTNOTE:
areas.
Based on conserved topsoil depth of 6 inches in excavation
CUYD of suitable excavation from O Line and I Line.
Based on 75% of roadway excavation being suitable, and 813
Includes conserved topsoil.
H A
R R I S
S T
O K
PARKING AREA QUANTITIES
E.1
STATE PROJECT
u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d a k f-c n f1 g a .d g n
C h e c k e d b y
D e s ig n e d b y
NOTE:
1.
of Subsection 704.06 and 704.07 of the SCRs.
Unclassified Borrow or Select Borrow if it meets the requirements
Material excavated from the existing roadway may be used as
[1]
[2]
C P
C P
P O
T
.0
P C
.7
P T
.1
P O
T
.0
.7
.6
-1.9993%
-0.4000%
30' VC
K = 19
.8
EL=391.84
E=1650841.70
N=2368366.62
EL=394.72
E=1650717.85
N=2367904.50
D
R= 100.00' T= 35.58'
L= 68.36'
Line to be constructed
N
Profile grade
Existing ground
55+00.00
L LINE
AK FS CNF 1015(1)
R = 46'
R = 50'
R = 30'
R = 20'
R = 20'
R = 20'
R = 20'
R = 20' R = 130'
R = 20'
R = 20'
50+00.00 = O LINE 21+86.28
L LINE
AK FS CNF 1015(1)
e= -2.0% e ni
L O
3.
D t e e h S e e
S
Slope stake limits
Slope stake limits
BEGIN WORK
END WORKL1
L2
L3
L4
L5
L6
L7
L8
L9 L10
L11
L12
L13L14
L15
L16
L17
L18
L19
L20
L21
L22 L23
R = 3'
R = 8'
NOTE:
1. See Sheet E.3 for parking lot layout points.
for details
See Typical Section D method 1
Roadway obliteration, method 1
Roadway obliteration, CUYD
EXC.
CUYD
EMB.
55+0054+0052+0051+00
380 380
395 395
E.2
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d a k f-c n f1 g b .d g n
AK FS CNF 1015(1)
J u ly
H A
R R I S
S T
O K
C h e c k e d b y
D e s ig n e d b y
50+00 53+00
LAYOUT INFORMATION
PARKING LOT
E.3
STATE PROJECT
e b r u a r y
U
S S u r ft m y fi le s p w p r o d u c ti o n d a k f-c n f1 g c .d g n
C h e c k e d b y
D e s ig n e d b
H A
R R I S
S T
O K
EROSION CONTROL
TABULATION OF
F.1
STATE PROJECT
NUMBER
SHEET
AK FS CNF 1015(1)
u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d a k f-c n f1 fa .d g n
K
H A
R R I S
O N
B
S T
O K
E S
C h e c k e d b y
D e s ig n e d b
395 40
N
STERLING HIGHWAY
LEGEND:
NOTE:
PLAN
SEDIMENT CONTROL
EROSION AND
Fiber Rolls
2. See Sheet F.3 for fiber rolls Detail.
field as approved by the CO.
1. Final location of erosion control devices to be determined in the
F.2
STATE PROJECT
NUMBER
SHEET
e b r u a r y
P h a s e O p ti o n a c m y fi le s p w p r o d u c ti o n d a k f-c n f1 fb .d g n
H A
R R I S
S T
O K
C h e c k e d b y
D e s ig n e d b y
Clearing limits
Clearing limits
Clearing limits
Clearing limits
BEGIN PROJECT
END PROJECT
Install fiber rolls
Install fiber rolls
Install fiber rolls
Install fiber rolls
O LINE 10+00.00
O LINE 22+46.29
Clearing limitsClearing limits eniL I e niL
O e ni
L O e ni
Drive stakes at each end and at 4' spacing
(ft)
(ft)
Excavate trench 2"
REVISED:
DETAIL APPROVED FOR USE 10/2014
FIBER ROLL
W157-21
3' min.
3' min. or m in
M in t o
1" x 1" Wood stake
3" to 5" o v e m b e r
U m y fi le s p w p r o d u c ti o n d a k f-c n f1 fc .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
F.3 FS CNF 1015(1) AK
Fl ow
T o e o f fi ll s lo p e
ELEVATION
PLAN
ELEVATION
Direction of runoff Fi ll slo pe
Flow
PLAN
Spacing Slope
STAKES REQUIRED
disturbed areas
Runoff from
1:1
1:2
1:3
1:4 or flatter as specified in plans
2.
1.
DRAINAGE DITCH INSTALLATION
INSTALLATION BEYOND TOE OF SLOPE
INSTALLATION ALONG SLOPES
Fiber roll length for each roll
Stakes required
FIBER ROLL SPACINGStep 2: Backfill soil against fiber rolls and install fiber rolls
Step 1: Excavate trench
FIBER ROLL STAKING DETAIL
conditions.
Use drainage ditch installation only in low flow permanent installations.
roll while staking. Live stakes may be used for until fiber roll is secure to slope. Do not crush
PROPERLY STAKED AND ENTRENCHED FIBER ROLL
NOTE:
NO SCALE
Fiber roll larger than fiber roll
Existing ground (typ.)
Stagger joints (typ.)
Existing ground
Fiber roll along contours.
Install fiber rolls
Flow direction to end, without overlapping the ends
Abut adjacent fiber rolls tightly, end
Install fiber rolls snugly into trench.
soil to ground level
Backfilled and compacted
Slope
Stake and entrench fiber roll water from flowing around the fiber roll
Provide sufficient length to prevent sp ac in g ch ar t
S ee f ib er r ol l
Direction of runof f from distur bed area s
TEMPORARY TRAFFIC CONTROL
TABULATION OF
FOOTNOTE:
material sources on the Seward Highway.
Signs to be placed at the entrance of the MP 33 and MP 35
H.1
STATE PROJECT
NUMBER
SHEET
AK FS CNF 1015(1)
u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d a k f-c n f1 n a .d g n
K
H A
R R I S
O N
B
S T
O K
E S
C h e c k e d b y
D e s ig n e d b y
[1]
SIGNS IN FEET
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
For work zones that are 2 miles or more in length, install G20-1 signs at signs "B" feet apart according to the Sign Spacing Table.
sign when approach speeds exceed 50 MPH. When used place the two W20-1
STANDARD APPROVED FOR USE 6/2005
DRAFT: 6/2014
REVISED:
635-1
TEMPORARY TRAFFIC CONTROL
ADVANCE SIGNING
STATE PROJECT
NUMBER
SHEET
H.2
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY STANDARD
STANDARD
J u ly
U m y fi le s p w p r o d u c ti o n d a k f-c n f1 n b .d g n
FS CNF 1015(1) AK
G20-2
G20-2
G20-2
See Note 11
G20-1
See Note 11
G20-1
M in o r R o a d
M a jo r R o a d
See Note 10
W20-1
See Note 10
W20-1
See Note 9
W16-8P
W20-1 over
See Note 9
W16-8P
W20-1 over
W20-1
Ro ad N am e
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
14.
13.
12.
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
ROAD WORK
END
WORK
ROAD
AHEAD
ROAD WORK
END
ROAD WORK
END
ROAD WORK
END
WORK
ROAD
AHEAD
WORK
ROAD
AHEAD
See Note 10
W20-1
See Note 10
W20-1
G20-2
NOTE:
NO SCALE
the distance to the work area in feet or in miles. Install an additional W20-1
The message on the W20-1 signs may be "ROAD WORK AHEAD" or may specify of the road on which the construction does occur (applies to major roads only).
construction work occurs, include a supplementary plaque indicating the name
If W20-1 is placed on a roadway other than that on which the actual post-mounted signs when not applicable.
Do not store traffic control devices along the roadway when not in use. Cover
Maintain two-way traffic during all non-work hours except as approved by the CO.
NCHRP-350 or MASH for crashworthiness.
Ensure all sign supports exposed to impact by traffic meet the requirements of indicate a maximum recommended speed through the construction area.
Install advisory speed plates under the W20 series warning signs as needed to construction conditions.
Additional or different message signs may be required to fit the actual messages as required.
locate the warning signs as determined by the CO for best results. Vary
Where advance warning signs, placed as shown, interfere with permanent signs, traffic control plan as necessary to accommodate actual operations.
to this project. The Contractor may add or delete information and details in this
Not all details shown on the temporary traffic control sheets may be applicable
Erect all project advance warning signs before starting construction work.
retroreflective sheeting types.
Refer to the Section 635 of the Special Contract Requirements for allowable
State standards may be used as an alternative if approved by the CO.
that an encroachment permit has been obtained.
If signing on a roadway under a jurisdiction other than the client agency, verify whole mile.
each end of the project. Show the distance on the G20-1 sign to the nearest
Expressway / Freeway
A
B
C
(S ee S ig n
Sp ac in g
Ta bl e)
ADVANCE
W
ARNI
NG
AREA
as d et er m in ed b y th e
CO
W or k zo ne A re a of In flu en ce
Pr oj ec t L im its
A
A
(S ee S ig n
Sp ac in g
Ta bl e)
ADVANCE
W
ARNI
NG
AREA
A
A
ROAD NAME
ROAD NAME
ROAD WORK
NEXT xx MILES
WORK
ROAD
xxxxxxx
WORK
ROAD
xxxxx
WORK
ROAD
xxxxxxx
WORK
ROAD
xxxxxxx
ROAD WORK
NEXT xx MILES
(optional)
W13-1P
(optional)
W13-1P xx
MPH
xx
MPH
MPH
SPACING IN FEET
FEET
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
SINGLE LANE CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
(WITH FLAGGERS)
STANDARD APPROVED FOR USE 6/2005
DRAFT: 8/2013
REVISED:
635-6
STATE PROJECT
NUMBER
SHEET
H.3
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY STANDARD
STANDARD
o v e m b e r
U m y fi le s p w p r o d u c ti o n d a k f-c n f1 n c .d g n
FS CNF 1015(1) AK
LENGTH AND SPACING TABLE
SPEED*
APPROACH
AREA
TAPER
SPACE
BUFFER
SPACE
WORK
CHANNELIZING DEVICE
not the advisory speed.
Approach speed based on the regulatory posted speed, *
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
LENGTH
BUFFER SPACE
NO SCALE
Expressway / Freeway
WORK
ROAD
AHEAD
ONE LANE
ROAD
AHEAD
xx
MPH
xxx
FEET
ROAD WORK
END
50' - 100' (optional)50' - 100'
See Note 6
10' min.
Traffic flow
Traffic flow
See Note 4
W20-1 W20-7W20-4
See Note 4
G20-2
Spacing Table)
(See Length and
(optional)
WORK SPACE (optional)(optional)
(optional)
W13-1P
(optional)
W16-2P
7.
6.
5.
4.
3.
2.
1.
the buffer space.
Do not allow equipment, materials, or vehicles to be parked or stored in
Requirements, Section 156.
For project specific minimum width, refer to the Special Contract
For night time flagging operation, provide floodlighting at flagger stations.
WORK AHEAD" (W20-1) and "END ROAD WORK" (G20-2) signs.
If closure is completely within the project limits, eliminate the "ROAD name of the contractor on the pilot car.
a conspicuous location on the rear of vehicle. Prominently display the
For pilot car operation, mount the PILOT CAR FOLLOW ME (G20-4) sign at conditions as approved by the CO.
Final location and spacing of signs and devices may be changed to fit field those depicted for the opposite direction of travel.
Signs are shown for one direction of travel only. Place devices similar to
NOTE:
Channelizing devices
Flagger location
Flagger location
ATAPER AREABUFFER SPACEVARIABLEBUFFER SPACETAPER AREAABC
(See Length and Spacing Table)ADVANCE WARNING AREA (See Sign Spacing Table) TERMINATION AREA
Device spacing
BUFFER SPACE
Diamond ≤ 48"
> 30'
> 17'
12' - 16'
> 13'
< 10
65 - 95
65 - 95
50 - 65
50 - 65
20 - 50
10 - 20
10 - 20
6 x 6
4 x 6
4 x 6
6 x 6
4 x 6
4 x 4
6 x 6
4 x 6
4 x 4
(INCH) (INCH)
(INCH)
1.5
1.5
1.5
(SQFT)
STANDARD APPROVED FOR USE 6/2005
DRAFT: 9/2014
REVISED:
635-14
TEMPORARY TRAFFIC CONTROL
WOOD POSTS
SIGN INSTALLATION
200' m in m in
6' - 12'
Other Shapes ≤ 48" Diamond ≤ 36"
Other Shapes ≤ 12' Diamond ≤ 48"
" dia. bolts 4 1Attach sign panels with a minimum of 2 -
6" x 6" or larger.
Use 7' minimum spacing between posts for sign posts and 6' minimum mounting height for secondary sign.
use 7' minimum mounting height for main sign a minimum lateral distance of 1' behind the face of lateral offset of 2' may be used. In areas with curbs, STATE PROJECT
NUMBER
SHEET
H.4
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY STANDARD
STANDARD
J u ly
U m y fi le s p w p r o d u c ti o n d a k f-c n f1 n d .d g n
FS CNF 1015(1) AK
NOTE:
NO SCALE
"X"
WIDTH AREA
OF POSTS
NUMBER POST SIZE D HOLE SIZE
WOOD POST SELECTION TABLE
Post
See table for hole size parallel to sign face.
Field drill holes through post
Local tangent
Bottom of sign panel
X
H
H
D
H
0.75X
X
X
H
Y D
H
0.2X
0.6X
0.2X
SINGLE POST SIGN TWO POST SIGN
SIGN INSTALLATION ANGLE
POST DETAIL
D
See post detail (typ.)
Break-away holes.
S e e N o te
S e e N o te
7.
6.
5.
4.
3.
2.
1.
by the CO.
State standards may be used as an alternative if approved
See Note 4 E d g e o f tr a v e le d w a y
E d g e o f p a v e d s h o u ld e r
CL
Long side of post
D
90°
93°
In areas where lateral distance is limited, a minimum
D = Post embedment depth for average soil conditions.
Select post lengths to fit field conditions.
H1 and H2 = Overall post length.
per post.
In pedestrian locations, or in areas with obstructed views, the curb may be used.
PERMANENT TRAFFIC CONTROL
TABULATION OF
NOTE:
FOOTNOTE:
Stationing is approximate, field adjust with CO approval as needed.1.
then doubled for two coats.
Total reflects the length of a 4-inch wide line doubled for 8" wide line, then doubled for two coats.
Total reflects the length of a 4-inch wide line tripled for 12" wide line, Total reflects the length of a 4-inch wide line doubled for two coats.
for two coats.
Total reflects the length of two 4-inch wide lines that are doubled
I.1
STATE PROJECT
NUMBER
SHEET
AK FS CNF 1015(1)
J u ly
U
S S u r ft m y fi le s p w p r o d u c ti o n d a k f-c n f1 p a .d g n
K
H A
R R I S
O N
B
S T
O K
E S
C h e c k e d b y
D e s ig n e d b y
[1]
[2]
NOTE:
Stationing is approximate, field adjust with CO approval as needed.1.
SIGN SYSTEMS
PERMANENT TRAFFIC CONTROL
TABULATION OF
FOOTNOTE:
of the SCRs for details.
Traffic Signal will be installed within sign Spec-3. See Section 636
I.2
STATE PROJECT
NUMBER
SHEET
AK FS CNF 1015(1)
M a r c h
U
S S u r ft m y fi le s p w p r o d u c ti o n d a k f-c n f1 p b .d g n
K
H A
R R I S
O N
B
S T
O K
E S
C h e c k e d b y
D e s ig n e d b y
PLANS - O LINE
TRAFFIC CONTROL
PERMANENT
BEGIN PROJECT
END PROJECT
L L in e O Line 20+57
R1-1
STOP
WRONG
WAY
R5-1a
Install sign system
21+00 LT
R1-1STOP
O Line 21+07 for details
See Sheet I.8
12" Wide stop bar
Install sign system
12+70 RT, LT
Install sign system
12+70 RT, LT
Entrance)
(Dump Station & Campground
Remove sign
13+50 RT
DO NOT
ENTER
R5-1
Install sign system
13+40 LT, RT
Install sign system
13+40 LT, RT
(Stop)
Remove sign
21+40 RT
(Exit)
Remove sign
21+90 LT
O LINE 22+46.29
O LINE 10+00.00
Install sign system
13+40 RT
R1-1STOP
DO NOT
BLOCK
INTERSECTION
ONLY
Install sign system
10+90 RT
Install sign system
10+90 LT
R3-5L
R10-7 symbols (turn arrow)
Pavement markings, 14+40 LT
4" Solid white line4" Solid white line
4" Broken white line
4" Solid white line4" Solid white line
O Line 14+30 for details
See Sheet I.8
12" Wide stop bar at 24" spacing line hatching
4" Solid white
Install sign system
16+70 RT
(Reservations Left)
Remove sign
16+42 RT
4" Solid white line4" Solid white line yellow on centerline
4" Solid double for details
See Sheet I.8
12" Wide stop bar
4" Broken white line at 18" spacing line hatching
4" Solid yellow
O Line 13+40
Reset adjacent to existing location
Chugach National Forest Logo)
(Russian River Campground &
Remove and reset sign
10+30 RT
for details
See Sheet I.8
12" Wide stop bar
I L in e
S e e S h e e t I .4
S e e S h e e t I .5 white line
8" Solid
FOOTNOTE:
of the SCRs for details.
Traffic Signal will be installed within sign Spec-3. See Section 636
Spec-1
Spec-2
Spec-1
Spec-2
Spec-3
STOP
HERE ON
RED
R10-6
Install sign system
20+57 RT
Install sign system
21+06 CL
River Campground)
(Welcome to Russian
Remove sign
20+25 RT
4" Solid double yellow line centerline yellow on
4" Solid double white line
4" Broken
Spec-4 system
Install sign
15+50 LT
system
Install sign
12+00 LT,RT
system
Install sign
12+00 LT,RT
system
Install sign
14+25 LT
Spec-5
ALL WAY
ALL WAY R1-3P
R1-3P
I.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d a k f-c n f1 p c .d g n
AK FS CNF 1015(1)
J a n u a r y
H A
R R I S
S T
O K
C h e c k e d b y
D e s ig n e d b y
10' 10'
N
(No campfires)
Remove sign
34+58 LT
(No campfires)
Remove sign
35+88 LT
(No parking)
Remove sign
33+07 RT
BEGIN WORK
END WORK
(Wrong way)
Remove sign
30+87 LT
(Do not enter)
Remove sign
30+34 RT
(Do not enter & Stop)
Remove sign
30+30 LT
(Overflow parking)
Remove sign
32+25 RT
I Line 30+00.00
38+48.55 = O LINE 13+92.29
I LINE
(No parking & Exit)
Remove sign
37+36 RT
WRONG
WAY
R5-1a
DO NOT
ENTER
R5-1
R1-1STOP
Install sign system
30+30 RT, LT
Install sign system
30+30 RT, LT
Install sign system
30+80 RT, LT
Install sign system
30+80 RT, LT
4" Solid white line4" Solid white line symbols (turn arrow)
Pavement markings, 31+65 LT, RT symbols (turn arrow)
Pavement markings, 31+65 LT, RT
I Line 30+25 for details
See Sheet I.7
12" Wide stop bar symbols (turn arrow)
Pavement markings, 30+30 LT, RT symbols (turn arrow)
Pavement markings, 30+30 LT, RT
8" Solid white line
Crosswalk
38+20
2'
1'
Lane Lane
Roadway
LC
Lane
Solid white, typ.
Edge of pavement
Edge of traveled way
Edge of pavement
Edge of traveled way
CROSSWALK LAYOUT DETAIL
3'3'
FOOTNOTE:
Inlay crosswalk at 125 mils.
(No parking)
Remove sign
37+23 LT
PLANS - I LINE
TRAFFIC CONTROL
PERMANENT
I.4
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d a k f-c n f1 p d .d g n
AK FS CNF 1015(1)
a n u a r y
H A
R R I S
S T
O K
C h e c k e d b y
D e s ig n e d b y
ONE WAY
ONE WAY R6-1R
R6-1L
Install sign system
37+95 RT
Install sign system
37+95 LT
eniL O
10' 10'
(Messages)
Remove sign
50+65 LT
Install sign system
50+25 LT
R1-1 e ni
L O
Solid white
Parking space striping
Solid white
Parking space striping
Solid white
Parking space striping
R = 10'
R = 5'
10'
See Sheet J.9 for details
Wheelstop, concrete
RESERVED
PARKING
RESERVED
PARKING
Install sign system
51+28 LT
Install sign system
51+08 LT
type B, solid white
Pavement markings, 45° ty p ty p typ.
typ.
4"
10'
Disabled access
10'
PARKING DETAIL
ACCESSIBLE AISLE AND
BEGIN WORK
END WORK
.7
Symbol) symbols (accessibility
Pavement markings, 50+00.00 = O LINE 21+86.28
L LINE
L LINE 55+00.00
for details
See Sheet I.8
12" Wide stop bar
L Line 50+40
2'
1'
Lane Lane
Roadway
LC
Lane
Solid white, typ.
Edge of pavement
Edge of traveled way
Edge of pavement
Edge of traveled way
CROSSWALK LAYOUT DETAIL
3'3'
FOOTNOTE:
Inlay crosswalk at 125 mils.
4" Solid white line4" Solid white line
See sheet J.9 for details
Wheelstop, concrete yellow on centerline
4" Solid double
Crosswalk
50+30
4" Solid white line
R7-8
R7-8
NO
PARKING
ANY
TIME
NO
PARKING
ANY
TIME
NO
PARKING
ANY
TIME
Install sign system
54+70 RT
Install sign system
51+95 RT
Install sign system
53+50 LT
R7-1
R7-1
R7-1
STOP
PLANS - L LINE
TRAFFIC CONTROL
PERMANENT
I.5
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d a k f-c n f1 p e .d g n
AK FS CNF 1015(1)
M a r c h
H A
R R I S
S T
O K
C h e c k e d b y
D e s ig n e d b y
273/4" 01/4" 20"
4'-0"
3"
4"B
4"
4"B
4"
5"
4"
5"
3"
3"
4"B
4"
4"B
4"
5"
4"
5"
3"
BORDER
R=23/4"
TH=01/2"
SPECIAL SIGN DETAILS
TRAFFIC CONTROL
PERMANENT
3'-0"
21/2" 4"C
4"
4"C
3"
4"C 21/2"
BORDER
R=13/4"
TH=01/2"
3'-0"
4"C
4"C
4"C
BORDER
R=13/4"
TH=01/2"
21/2"
21/2"
31/2"
31/2"
FOOTNOTE:
NOTE:
1. Signs will have white lettering on a brown background.
Spec-3
Spec-2Spec-1 behind sign
Traffic Signal mounted behind sign
Traffic Signal mounted
See Section 636 of the SCRs for details.
4'-0"
6"
6"C
6"
6"C
6"
BORDER
R=21/4"
TH=03/4"
4'-0"
6"
6"C
6"
6"C
6"
BORDER
R=21/4"
TH=03/4"
I.6
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d a k f-c n f1 p f.
d g n
AK FS CNF 1015(1)
M a r c h
H A
R R I S
S T
O K
C h e c k e d b y
D e s ig n e d b y
Spec-4 Spec-5
[1]
REVISED:
W633-7
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 10/2009
6" x 8" when located within the clear zone or if the
WOOD POSTS
INSTALLATION
PERMANENT SIGN
Product of X-Y-Z in CUFT(inch)
8 x 12
8 x 10
6 x 10
6 x 8
6 x 6
4 x 6
4 x 4
6'-0"
5'-0"
5'-0"
4'-0"
4'-0"
4'-0"
3'-0"
"4
"4
"2
7 ft
5 ft6 ft
2 ft
For all retroflectorized signs where W > 25' all around (typ.)
3" minimum all around (typ.)
3" minimum all around (typ.)
3" minimum all around (typ.)
3" minimum maximum
X=5 ft to 12 ft (max.)
X=4 ft (min.)
18 ft (max.)
X=10 ft (min.) to
22 ft (max.)
X=14 ft (min.) to
V may be reduced by 1 foot in rural districts for
" lock nut16
" oversized washer16
" bolt16
" bolt thru the post8
" outside dia.) 4 1(1 oversized washer
" nonmetallic16 e b r u a r y
U m y fi le s p w p r o d u c ti o n d a k f-c n f1 p h .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
I.7 FS CNF 1015(1) AK
SINGLE POST SIGNS
POST DETAIL
THREE POST SIGNS FOUR POST SIGNS
MINIMUM DISTANCE TO SIGN
SIGN INSTALLATION ANGLE
SIGNS WITHOUT ANGLES
TYPICAL MOUNTING FOR
WOOD POST SELECTION TABLE
Direction of traffic flow
SIZE
POST NUMBER OF POSTS
1 2 3 4 D diameter and hole depth
Notch from curb
Offset (W)
Lateral
Height (V)
Mounting
NOTE:
NO SCALE
0.6X0.2X 0.2X
W
.5
Y
Z ty p
D
V Y
H
5.
4.
3.
2.
1. Traffic barrier protection is required for all posts larger than
H
TWO POST SIGNS
of traveled way
Elevation at edge of traveled way
Elevation at edge of traveled way
Elevation at edge of traveled way
Elevation at edge
E d g e o f s h o u ld e r
E d g e o f tr a v e le d w a y
E d g e o f s h o u ld e r
E d g e o f tr a v e le d w a y
E d g e o f tr a v e le d w a y
E d g e o f s h o u ld e r
Long side of post single post installations of post. Omit notch for
Saw cut notch full width
(See Post Selection table)
Notch depth (where required)
W
0.15X0.35X0.35X0.15X
0.125X0.25X0.25X0.25X0.125X
Same post size
V Y ty p
DBackfill material ty p
Z
.5
Y
.5
Y Z
V Y
H
H
H 1
H
H
H
H
Location
Rural Districts
Residence Districts
Business or
W
W
V Y
.5
Y
Z ty p
D
H
CL
Bottom of sign post
See table for hole size post, parallel to sign face.
Field drill holes through
Finish ground line
Same post size
Backfill materialBackfill material
Same post size
Backfill material a secondary sign mounted below another sign.
exceeds the limit for the largest post, use steel post installation.
Values shown are the maximum permitted. If the product of XYZ
E d g e o f tr a v e le d w a y
E d g e o f s h o u ld e r rectangle enclosing all the signs.
- Multiple sign installations: X and Y are the dimensions of a dimensions of the signs.
- Single sign, or back to back signs: X and Y are the overall
For the purpose of post selection X and Y are as follows:
longest post.
Z is the height from ground line to mid-height of sign at the conditions. See Wood Post Selection Table below.
D is the minimum post embedment depth for average soil to fit field conditions.
indicate overall post length. Select post lengths 4 thru H1H clear zone.
post is vulnerable to being struck when placed outside the
4" solid double
4" solid white edge
Locate 12" wide stop line to
NOTE:
NO SCALE
L a n e
L a n e
LC
LC
TYPICAL PAVEMENT MARKING APPLICATIONS
CENTERLINE DETAIL
CENTERLINE MODIFICATION FOR CURVES WITH WIDENING APPLIED ON INSIDE
See Note 2 for treatment of curves when widening "w" is split equally on both sides of centerline
Major approach road yellow centerline line when specified in plans
Edge of pavement markings when specified
Approach road pavement required by the maintaining agency when specified in the plans or when
Increase spacing between parallel lines
Edge line when specified in plans s L
L s
Transition
Curve widening
Transition
Des…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .