Amendment A008 corrects Amendment A007 which was the incorrect file upload. Please use the Bid Schedule in this file as the most current Bid Schedule. FBO does not allow us to delete and re-upload; therefore, a new Amendment was created. Thank you for your understanding.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Jeremiah.Rogers Typewritten Text
Jeremiah.Rogers Typewritten Text
Jeremiah.Rogers Typewritten Text
B I D S C H E D U L E Schedule A Account: ALL
Project No: Hawaii HI STP SR11(1) AND HI STP SR11(
Name: NINOLE STREAM BRIDGE AND HILEA STREAM BRIDGE CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount
15101-0000
Line A0020 ALL LPSM $
15201-0000
Line A0040 ALL LPSM $
15301-0000
Line A0060 ALL LPSM $
15401-0000
Line A0080 ALL LPSM $
15501-0000
Line A0100 ALL LPSM $
15705-0100
Line A0120 550 LNFT $ $
15706-0200
Line A0140 22 EACH $ $
15706-1600
Line A0160 2 EACH $ $
15802-0000
Line A0180 ALL LPSM $
20304-1000
Line A0200 ALL LPSM $
20401-0000
Line A0220 6,700 CUYD $ $
20435-2000
Line A0240 1,680 CUYD $ $
20720-0300
Line A0260 7,300 SQYD $ $
20801-0000
Line A0280 3,550 CUYD (CQ) $ $
20803-0000
Line A0300 10 CUYD $ $
20803-0000
Line A0320 185 CUYD (CQ) $ $
25101-2100
Line A0340 12 CUYD $ $
25101-2200
MOBILIZATION
CONSTRUCTION SURVEY AND STAKING
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, SILT FENCE
REINFORCEMENT GEOSYNTHETIC, TYPE 3
STRUCTURE EXCAVATION
STRUCTURAL BACKFILL(SLOPE PAVING, CLASS A CONCRETE)
SOIL EROSION CONTROL, CHECK DAM
SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT
WATERING FOR DUST CONTROL
REMOVAL OF STRUCTURES AND OBSTRUCTIONS
ROADWAY EXCAVATION
BACKFILL, GRANULAR
STRUCTURAL BACKFILL(CLASS A CONCRETE)
PLACED RIPRAP, METHOD B, CLASS 1
PLACED RIPRAP, METHOD B, CLASS 2
Schedule Total: _________________________
Submitted by: ___________________________
Amendment A008 1/23/2018
A-8
Project No: Hawaii HI STP SR11(1) AND HI STP SR11(
Name: NINOLE STREAM BRIDGE AND HILEA STREAM BRIDGE CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount
Schedule Total: _________________________
Submitted by: ___________________________
Line A0360 65 CUYD $ $
25120-2100
Line A0380 530 LNFT $ $
26101-0000
Line A0400 1,580 SQFT $ $
30202-2000
Line A0420 1,400 TON $ $
40301-0000
Line A0440 800 TON $ $
55201-1500
Line A0460 800 CUYD (CQ) $ $
55201-1500
Line A0480 450 CUYD (CQ) $ $
55302-3200
Line A0500 728 LNFT (CQ) $ $
55302-3500
Line A0520 635 LNFT (CQ) $ $
55401-1000
Line A0540 409,615 LB (CQ) $ $
55401-2000
Line A0560 1,000 LB (CQ) $ $
55601-0600
Line A0580 507 LNFT (CQ) $ $
58401-0000
Line A0600 215 LB (CQ) $ $
61701-1500
Line A0620 650 LNFT $ $
61702-0800
Line A0640 8 EACH $ $
61707-0000
Line A0660 200 LNFT (CQ) $ $
62201-0200
Line A0680 100 HOUR $ $
62201-0900
Line A0700 100 HOUR $ $
GUARDRAIL SYSTEM G4, TYPE 3, CLASS A STEEL POSTS
TERMINAL SECTION TYPE TANGENT
STRUCTURE TRANSITION RAILING
RIPRAP DITCH, METHOD B, CLASS 1
REINFORCED SOIL SLOPE(ROCK FACED)
ROADWAY AGGREGATE, METHOD 2
PRECAST, PRESTRESSED CONCRETE GIRDER(WASHINGTON WF36G)
PRECAST, PRESTRESSED CONCRETE SLAB(48" (19" SOLID))
REINFORCING STEEL
REINFORCING STEEL, EPOXY COATED
BRIDGE RAILING, CONCRETE, BEAM RAIL(WITH PEDESTRIAN HANDRAIL)
GLASS FIBER REINFORCED POLYMER (GFRP) REINFORCING BARS
ASPHALT CONCRETE PAVEMENT
STRUCTURAL CONCRETE, CLASS STATEDOT(CLASS D)
STRUCTURAL CONCRETE, CLASS STATEDOT(CLASS E)
DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY
WHEEL LOADER, 2 CUBIC YARD MINIMUM RATED CAPACITY
Amendment A008
A-9
Project No: Hawaii HI STP SR11(1) AND HI STP SR11(
Name: NINOLE STREAM BRIDGE AND HILEA STREAM BRIDGE CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount
Schedule Total: _________________________
Submitted by: ___________________________
62201-2850
Line A0720 100 HOUR $ $
62201-3000
Line A0740 100 HOUR $ $
62301-0000
Line A0760 180 HOUR $ $
62302-1000
Line A0780 140 HOUR $ $
62302-1100
Line A0800 100 HOUR $ $
62510-1000
Line A0820 1.4 ACRE $ $
62515-1000
Line A0840 1.4 ACRE $ $
62902-1100
Line A0860 1.4 ACRE $ $
63301-0000
Line A0880 26 EACH $ $
63401-1500
Line A0900 2,900 LNFT $ $
63406-0000
Line A0920 150 EACH $ $
63501-0000
Line A0940 ALL LPSM $
63701-0000
Line A0960 1 EACH $ $
65001-1000
Line A0980 ALL LPSM $
HYDRAULIC EXCAVATOR
GENERAL LABOR
SPECIAL LABOR, HIRED TECHNICAL SERVICES
SPECIAL LABOR, HIRED SURVEY SERVICES
SEEDING, DRY METHOD
MULCHING, DRY METHOD
MOTOR GRADER, 12 FOOT MINIMUM BLADE
CONSTRUCT AND MAINTAIN DIVERSION(ROADWAY BYPASS)
ROLLED EROSION CONTROL PRODUCT, TYPE 4
SIGN SYSTEM
PAVEMENT MARKINGS, TYPE H, SOLID
RAISED PAVEMENT MARKER
TEMPORARY TRAFFIC CONTROL
FIELD OFFICE
Amendment A008
A-10
BID SCHEDULE
Schedule A Project: HI STP SR11(1) & SR11(2) Project Name: Hilea & Ninole Stream Bridge
Schedule A (A + B Equation)
Part A Part A Total (Construction Cost)
Schedule A – Construction Cost (from Bid schedule) = Part B
# of Calendar Days * (Min
– Max )
Road User/Administrative Cost $5,200.00 per day
Part B Total (Days * Road User Cost)
(A+B) Total for Schedule A= (Total of Part A and B above)
*The number of calendar days used shall include all weekends, holidays, periods of inclement weather, winter shutdown periods, and all other days during which work may or may not be performed.
Amendment A008
| Full Appendix B.pdf |
| APPENDIX B.pdf |
| subcontractingplan |
| HileaNinole-Revised-Highlight_171222.pdf |
| HileaNinole-Revised_171221.pdf |
| HileaNinole KSF Plans 1.pdf |
| HileaNinole KSF Plans 1 |
| REVISED Hilea Ninole Rev Sheets |
| HileaNinole KSF Plans 1 |
REVISED Hilea Ninole Rev Sheets
| Text1: |
| Text2: |
| 0: 1 |
| 1: 5 |
| Text3: |
| 0: A008 |
| 1: 1/23/2018 |
| 2: |
| 0: |
| 1: HI STP SR11(1) & SR11(2) |
| Text4: |
| 0: |
| 0: FEDERAL HIGHWAY ADMINISTRATION |
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 WEST DAKOTA AVENUE, SUITE 360
LAKEWOOD, COLORADO 80228
ATTENTION: SHERI MUEHL
1:
| 1: |
| 0: |
| Text6: |
| 0: DTFH68-17-B-00024 |
| 1: 11/29/2017 |
| 2: |
| 3: |
| Check Box7: |
| 0: Yes |
| 2: Yes |
| 1: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Yes |
| Check Box9: |
| 1: Off |
| 2: Off |
| 0: |
| 0: Off |
| 1: Off |
| Text10: 0* |
| Text11: |
| 0: |
| 1: |
| Text12: * See Item 14 Below |
| Text13: INVITATION FOR BID- BID SCHEDULE CORRECTION |
Remove BID SCHEDULE pages A-8 through A-11 and replace with new BID SCHEDULE pages A-8 through A-11 dated 1/23/2018:
*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN BLOCK 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO ITEM 11.)
| Text14: |
| 0: |
| 1: |
| Text15: |
| 1: |
| 0: |
| 1: |
| 0: |
| 0: |
| 1: |
| Text16: |
| 0: |
| 1: |
| Text17: |
| Text5: |
| 0: 6905001 |
| 1: |
| Check Box1: |
| 0: Off |
| 1: Off |
File details come from the government source that posted it.