Amend_A007_bid_schedule_1.22.2018.pdf

PDF 24 KB Posted

Attached to
HI STP SR11(1) & SR11(2) Hilea & Ninole Stream Bridges
Solicitation number
DTFH6817B00024
Issued by

About this file

Amendment A007 Bid Schedule

View the file

Other files

Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B I D S C H E D U L E Schedule A Account: ALL

Project No: Hawaii HI STP SR11(1) AND HI STP SR11(

Name: NINOLE STREAM BRIDGE AND HILEA STREAM BRIDGE CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount

15101-0000

Line A0020 ALL LPSM $

15201-0000

Line A0040 ALL LPSM $

15301-0000

Line A0060 ALL LPSM $

15401-0000

Line A0080 ALL LPSM $

15501-0000

Line A0100 ALL LPSM $

15705-0100

Line A0120 550 LNFT $ $

15706-0200

Line A0140 22 EACH $ $

15706-1600

Line A0160 2 EACH $ $

15802-0000

Line A0180 ALL LPSM $

20304-1000

Line A0200 ALL LPSM $

20401-0000

Line A0220 6,700 CUYD $ $

20435-2000

Line A0240 2,910 CUYD $ $

20720-0300

Line A0260 7,300 SQYD $ $

20801-0000

Line A0280 3,500 CUYD (CQ) $ $

20803-0000

Line A0300 10 CUYD $ $

20803-0000

Line A0320 185 CUYD (CQ) $ $

25101-2100

Line A0340 12 CUYD $ $

25101-2200

MOBILIZATION

CONSTRUCTION SURVEY AND STAKING

CONTRACTOR QUALITY CONTROL

CONTRACTOR TESTING

CONSTRUCTION SCHEDULE

SOIL EROSION CONTROL, SILT FENCE

REINFORCEMENT GEOSYNTHETIC, TYPE 3

STRUCTURE EXCAVATION

STRUCTURAL BACKFILL(SLOPE PAVING, CLASS A CONCRETE)

SOIL EROSION CONTROL, CHECK DAM

SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT

WATERING FOR DUST CONTROL

REMOVAL OF STRUCTURES AND OBSTRUCTIONS

ROADWAY EXCAVATION

BACKFILL, GRANULAR

STRUCTURAL BACKFILL(CLASS A CONCRETE)

PLACED RIPRAP, METHOD B, CLASS 1

PLACED RIPRAP, METHOD B, CLASS 2

Schedule Total: _________________________

Submitted by: ___________________________

File details come from the government source that posted it.