B I D S C H E D U L E Schedule A Account: ALL
Project No: Hawaii HI STP SR11(1) AND HI STP SR11(
Name: NINOLE STREAM BRIDGE AND HILEA STREAM BRIDGE CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount
15101-0000
Line A0020 ALL LPSM $
15201-0000
Line A0040 ALL LPSM $
15301-0000
Line A0060 ALL LPSM $
15401-0000
Line A0080 ALL LPSM $
15501-0000
Line A0100 ALL LPSM $
15705-0100
Line A0120 550 LNFT $ $
15706-0200
Line A0140 22 EACH $ $
15706-1600
Line A0160 2 EACH $ $
15802-0000
Line A0180 ALL LPSM $
20304-1000
Line A0200 ALL LPSM $
20401-0000
Line A0220 6,700 CUYD $ $
20435-2000
Line A0240 2,910 CUYD $ $
20720-0300
Line A0260 7,300 SQYD $ $
20801-0000
Line A0280 3,500 CUYD (CQ) $ $
20803-0000
Line A0300 10 CUYD $ $
20803-0000
Line A0320 185 CUYD (CQ) $ $
25101-2100
Line A0340 12 CUYD $ $
25101-2200
MOBILIZATION
CONSTRUCTION SURVEY AND STAKING
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, SILT FENCE
REINFORCEMENT GEOSYNTHETIC, TYPE 3
STRUCTURE EXCAVATION
STRUCTURAL BACKFILL(SLOPE PAVING, CLASS A CONCRETE)
SOIL EROSION CONTROL, CHECK DAM
SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT
WATERING FOR DUST CONTROL
REMOVAL OF STRUCTURES AND OBSTRUCTIONS
ROADWAY EXCAVATION
BACKFILL, GRANULAR
STRUCTURAL BACKFILL(CLASS A CONCRETE)
PLACED RIPRAP, METHOD B, CLASS 1
PLACED RIPRAP, METHOD B, CLASS 2
Schedule Total: _________________________