Amendment_A002_SF30_12.7.17.pdf
PDF 993 KB Posted
- Solicitation number
- DTFH6817B00024
About this file
Amendment A002
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Jeremiah.Rogers Typewritten Text
Jeremiah.Rogers Typewritten Text
Jeremiah.Rogers Typewritten Text
A-4
Bid Schedule Instructions
BIDDERS, PLEASE NOTE: This Bid Proposal is comprised of one schedule. Before preparing the bid, carefully read the Solicitation Provisions and the following:
• Insert a numeric unit bid price for each pay item for which a quantity appears in the bid schedule. Unit bid prices should be quoted no more precisely than the nearest cent (2 decimal places). Unit bid prices quoted more precisely will be rounded up to the nearest cent by the Government
• Multiply the unit price by the quantity for each pay item and show the amount bid.
When the words “Lump Sum” appear as a unit bid price, insert an amount for each lump sum pay item.
• Total all amounts bid for each pay item and show the Construction Cost Total on the space provided on the last page of each schedule or option.
• Also show the Construction Cost Total for each schedule/option as well as the combined Total of each Schedule and the Option in the spaces provided on the Bid Summary page.
A+B Bidding
• When completing the bid schedules, provide the number of calendar days necessary to complete all contract work from the Notice to Proceed until the day of final construction completion, both dates included. The total number of calendar days bid will become the basis for determining the fixed contract completion date (see Subsection 108.01). It is against this date that liquidated damages would be assessed according to Subsection 108.04.
The number of calendar days bid must fall within these ranges:
Minimum Calendar Days Maximum Calendar Days Schedule A 154 220
• Multiply the number of days bid by the Road User/Administrative Cost of $5,200.00 per day to determine the Road User/Administrative Cost Subtotal (Part B) for each schedule.
• Add the Construction Cost Subtotal (Part A) to the Road User/Administrative Cost Subtotal (Part B) to determine each schedule’s Project Total (Part A+B). See bid schedule.
NOTE: If the amount bid for a pay item is inconsistent with the product of the unit price provided by the bidder and the quantity provided by the Government, the unit price will govern and the Government will determine a corrected amount bid for the pay item by multiplying the unit price by the quantity.
Amendment A002 12/7/2017
336 486
Sheri.Muehl Line
Sheri.Muehl Line
BID SCHEDULE
Schedule A Project: HI STP SR11(1) & SR11(2) Project Name: Hilea & Ninole Stream Bridge
Schedule A (A + B Equation)
Part A Part A Total (Construction Cost)
Schedule A – Construction Cost (from Bid schedule) = Part B
# of Calendar Days * (Min 154 – Max 220)
Road User/Administrative Cost $5,200.00 per day
Part B Total (Days * Road User Cost)
(A+B) Total for Schedule A= (Total of Part A and B above)
*The number of calendar days used shall include all weekends, holidays, periods of inclement weather, winter shutdown periods, and all other days during which work may or may not be performed.
A-11 Amendment A002 12/7/2017
Min 336 - Max 486
Sheri.Muehl Line
Sheri.Muehl Line
| Full Appendix B.pdf |
| APPENDIX B.pdf |
| subcontractingplan |
| Text1: |
| Text2: |
| 0: 1 |
| 1: 3 |
| Text3: |
| 0: A002 |
| 1: 12/7/2017 |
| 2: |
| 0: |
| 1: HI STP SR11(1) & SR11(2) |
| Text4: |
| 0: |
| 0: FEDERAL HIGHWAY ADMINISTRATION |
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 WEST DAKOTA AVENUE, SUITE 360
LAKEWOOD, COLORADO 80228
ATTENTION: SHERI MUEHL
1:
| 1: |
| 0: |
| Text6: |
| 0: DTFH68-17-B-00024 |
| 1: 11/29/2017 |
| 2: |
| 3: |
| Check Box7: |
| 0: Yes |
| 2: Off |
| 1: |
| 0: |
| 0: Yes |
| 1: Off |
| 2: Yes |
| Check Box9: |
| 1: Off |
| 2: Off |
| 0: |
| 0: Off |
| 1: Off |
| Text10: 0* |
| Text11: |
| 0: |
| 1: |
| Text12: * See Item 14 Below |
| Text13: INVITATION FOR BID- A-Section |
Remove and replace page A-4 with new page A-4 dated 12/7/2017.
Remove and replace page A-11 with new page A-11 dated 12/7/2017.
*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN BLOCK 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO ITEM 11.)
| Text14: |
| 0: |
| 1: |
| Text15: |
| 1: |
| 0: |
| 1: |
| 0: |
| 0: |
| 1: |
| Text16: |
| 0: |
| 1: |
| Text17: |
| Text5: |
| 0: 6905001 |
| 1: |
| Check Box1: |
| 0: Off |
| 1: Off |
File details come from the government source that posted it.