Bid_Tabs_A.pdf

PDF 33 KB Posted

Attached to
TX FTNP PAIS 10(1) MAIN PARK ROAD Federal contract opportunity
Solicitation number
DTFH6816B00015
Issued by
Department of Transportation Federal Highway Administration

About this file

Schedule A

View the file

Other files for this federal contract opportunity

Other files attached to TX FTNP PAIS 10(1) MAIN PARK ROAD, newest first.
File Type Posted
Bid_Tabs_X.pdf PDF
Bid_Opening_Summary.pdf PDF
A002.pdf PDF
08_24_2016.pdf PDF
08_24_2016.pdf PDF
08_19_2016.pdf PDF
08_09_2016.pdf PDF
A001.pdf PDF
Pavements_Report_.pdf PDF
DTFH6816B00015.pdf PDF
Pavements_Report_Addendum.pdf PDF
Appendix_B.pdf PDF
Appendix_A.pdf PDF
Appendix_C.pdf PDF
Appendix_D.pdf PDF
Plans.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T A B U L A T I O N O F B I D S Schedule A

Project No : TX FTNP PAIS 10(1)

Project Name : Main Park Road Solcitation No:

State : TX County : Kleberg Federal Location : Padre Island National Seashore

Opened at:

Opened by:

Date:

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed:

Title:

Date:

Contract Awarded to: Award Date:

Contract Number: Data is Public

Contractor Comment Bid Amount Responsive

Engineer's Estimate 6,570,460.00$

Bay, Ltd. 5,562,593.25$

Haas-Anderson Constr 6,714,600.00$

DTFH6817C00001

$ 5,562,593.25

$ 6,714,600.00

Bay, Ltd.

9/16/2016 FHWA Confidential Page 1 of 1

Schedule A Total of Bid Items: 6,570,460.00$ -15.3% 5,562,593.25$ Project No: TX FTNP PAIS 10(1)

Project Name: Main Park Road CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount

15101-0000 Line A0020 ALL LPSM 687,462.50$ 687,462.50$ 458,000.00$

15210-3000 Line A0040 296.300 STA 75.00$ 22,222.50$ 5,926.00$

15215-1000 Line A0060 11 EACH 1,200.00$ 13,200.00$ 1,650.00$

15215-3000 Line A0080 5 EACH 1,500.00$ 7,500.00$ 750.00$

15215-7000 Line A0100 5 EACH 5,000.00$ 25,000.00$ 2,500.00$

15216-3000 Line A0120 14.500 STA 200.00$ 2,900.00$ 2,900.00$

15301-0000 Line A0140 ALL LPSM 180,000.00$ 180,000.00$ 105,800.00$

15401-0000 Line A0160 ALL LPSM 120,000.00$ 120,000.00$ 90,600.00$

15501-0000 Line A0180 ALL LPSM 90,000.00$ 90,000.00$ 12,000.00$

15705-1400 Line A0200 10,200 LNFT 16.00$ 163,200.00$ 83,640.00$

15706-1600 Line A0220 2 EACH 2,200.00$ 4,400.00$ 9,600.00$

15802-0000 Line A0240 ALL LPSM 75,000.00$ 75,000.00$ 24,500.00$

20101-0000 Line A0260 3.7 ACRE 3,500.00$ 12,950.00$ 29,230.00$

SURVEY AND STAKING, DRAINAGE STRUCTURE

150.00$

MOBILIZATION

CENTERLINE, VERIFICATION AND STAKING

SURVEY AND STAKING, APPROACH ROAD

CONTRACTOR QUALITY CONTROL

CONTRACTOR TESTING

CONSTRUCTION SCHEDULE

SOIL EROSION CONTROL, SEDIMENT LOG

SOIL EROSION CONTROL, STABILIZED CONSTRUCTION ENTRANCE

WATERING FOR DUST CONTROL

SURVEY AND STAKING, PARKING AREA

SURVEY AND STAKING, TEMPLATE CONTROL

CLEARING AND GRUBBING

Bay, Ltd.

20.00$

458,000.00$

500.00$

150.00$

90,600.00$

105,800.00$

200.00$

8.20$

12,000.00$

24,500.00$

4,800.00$

7,900.00$

Engineer's Estimate

9/16/2016 Page 1 of 12

Project No: TX FTNP PAIS 10(1)

Project Name: Main Park Road CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount

Bay, Ltd.Engineer's Estimate

20304-1000 Line A0280 ALL LPSM 100,000.00$ 100,000.00$ 24,500.00$

20401-0000 Line A0300 2,250 CUYD 20.00$ 45,000.00$ 45,000.00$

20402-0000 Line A0320 1,000 CUYD 70.00$ 70,000.00$ 140,000.00$

20425-1000 Line A0340 100 LNFT 20.00$ 2,000.00$ 3,000.00$

20441-0000 Line A0360 1,200 CUYD 25.00$ 30,000.00$ 18,300.00$

21101-1000 Line A0380 10,000 SQYD 9.00$ 90,000.00$ 56,000.00$

30306-2500 Line A0400 109,000 SQYD 4.00$ 436,000.00$ 414,200.00$

30802-2000 Line A0420 3,150 TON 45.00$ 141,750.00$ 154,350.00$

40101-5600 Line A0440 17,850 TON 140.00$ 2,499,000.00$ 2,142,000.00$

40920-1000 Line A0460 45 TON 800.00$ 36,000.00$ 22,500.00$

41002-2000 Line A0480 53,000 SQYD 4.00$ 212,000.00$ 280,900.00$

41103-0000 Line A0500 108,000 SQYD 1.50$ 162,000.00$ 64,800.00$

41105-0000 Line A0520 200 TON 40.00$ 8,000.00$ 32,000.00$

SUBEXCAVATION

DITCH, EXCAVATION

WASTE

PRIME COAT

BLOTTER

ROADWAY OBLITERATION, METHOD 1

PULVERIZING, 5-INCH DEPTH

ROADWAY AGGREGATE, METHOD 2

SUPERPAVE PAVEMENT, 1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL

FOG SEAL, EMULSIFIED ASPHALT GRADE CSS-1 OR CSS-1H, SS-1 OR SS-1H

MICRO-SURFACING, TYPE 2

REMOVAL OF STRUCTURES AND OBSTRUCTIONS

ROADWAY EXCAVATION

24,500.00$

140.00$

20.00$

15.25$

30.00$

3.80$

5.60$

120.00$

49.00$

5.30$

500.00$

160.00$

0.60$

9/16/2016 Page 2 of 12

Project No: TX FTNP PAIS 10(1)

Project Name: Main Park Road CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount

Bay, Ltd.Engineer's Estimate

41201-1000 Line A0540 45 TON 800.00$ 36,000.00$ 34,200.00$

41412-1000 Line A0560 5,300 LB 3.50$ 18,550.00$ 29,150.00$

42801-0150 Line A0580 700 SQYD 150.00$ 105,000.00$ 54,600.00$

50102-0900 Line A0600 2,700 SQYD 120.00$ 324,000.00$ 337,500.00$

60101-0000 Line A0620 25 CUYD 1,700.00$ 42,500.00$ 19,000.00$

60405-0000 Line A0640 3 EACH 1,500.00$ 4,500.00$ 6,000.00$

60413-0000 Line A0660 240 LNFT 225.00$ 54,000.00$ 134,400.00$

60704-0000 Line A0680 9 EACH 4,000.00$ 36,000.00$ 19,800.00$

60901-1200 Line A0700 370 LNFT 30.00$ 11,100.00$ 11,470.00$

60902-1000 Line A0720 760 LNFT 30.00$ 22,800.00$ 19,760.00$

61102-3200 Line A0740 150 LNFT 100.00$ 15,000.00$ 18,000.00$

61106-0000 Line A0760 3 EACH 3,000.00$ 9,000.00$ 3,900.00$

61108-1000 Line A0780 1 EACH 800.00$ 800.00$ 1,300.00$

PLAIN RIGID PAVEMENT, 8-INCH DEPTH, TYPE C SMOOTHNESS/ROUGHNESS

8-INCH WATERLINE, POLYVINYL CHLORIDE (PVC)

FIRE HYDRANT(NPS PROVIDED)

ADJUST WATER VALVE(COVER)

CONCRETE

MANHOLE ADJUSTMENT

TRENCH DRAIN

CLEANING CULVERT IN PLACE

CURB, CONCRETE, 14-INCH DEPTH

CURB AND GUTTER, CONCRETE, 12-INCH DEPTH

TACK COAT GRADE CSS-1, CSS-1H, SS-1, OR SS-1H

CRACKS, CLEANING AND SEALING

FLEXIBLE PAVEMENT, FULL DEPTH PATCH, TYPE 2

5.50$

760.00$

125.00$

78.00$

2,000.00$

760.00$

2,200.00$

560.00$

26.00$

31.00$

1,300.00$

120.00$

1,300.00$

9/16/2016 Page 3 of 12

Project No: TX FTNP PAIS 10(1)

Project Name: Main Park Road CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount

Bay, Ltd.Engineer's Estimate

61108-3000 Line A0800 1 EACH 800.00$ 800.00$ 1,200.00$

61501-0100 Line A0820 410 SQYD 120.00$ 49,200.00$ 41,000.00$

61503-1000 Line A0840 15 SQYD 120.00$ 1,800.00$ 2,550.00$

61505-1000 Line A0860 3 EACH 3,900.00$ 11,700.00$ 11,400.00$

61701-3900 Line A0880 180 LNFT 175.00$ 31,500.00$ 21,600.00$

61702-0510 Line A0900 2 EACH 5,500.00$ 11,000.00$ 7,200.00$

61902-1600 Line A0920 1 EACH 3,000.00$ 3,000.00$ 8,600.00$

61902-2200 Line A0940 3 EACH 3,500.00$ 10,500.00$ 25,800.00$

61904-0000 Line A0960 70 EACH 1,000.00$ 70,000.00$ 14,000.00$

61920-1000 Line A0980 60 EACH 70.00$ 4,200.00$ 15,000.00$

62201-0450 Line A1000 80 HOUR 100.00$ 8,000.00$ 3,600.00$

62201-0900 Line A1020 80 HOUR 115.00$ 9,200.00$ 5,680.00$

62201-2750 Line A1040 80 HOUR 150.00$ 12,000.00$ 9,600.00$

ADJUST WATER METER(COVER)

SIDEWALK, CONCRETE

MEDIAN, CONCRETE

REMOVE AND RESET BOLLARD POST

BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 18-INCH WIDTH

WHEEL LOADER, 2 CUBIC YARD MINIMUM RATED CAPACITY

MOTOR GRADER

ACCESSIBILITY RAMP, CONCRETE

GUARDRAIL SYSTEM SBTA

TERMINAL SECTION, TYPE SBT-FAT

GATE, METAL, 20 FEET WIDTH

GATE, METAL, 34 FEET WIDTH

BOLLARD POST

1,200.00$

170.00$

100.00$

120.00$

3,800.00$

8,600.00$

3,600.00$

200.00$

8,600.00$

45.00$

250.00$

120.00$

71.00$

9/16/2016 Page 4 of 12

Project No: TX FTNP PAIS 10(1)

Project Name: Main Park Road CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount

Bay, Ltd.Engineer's Estimate

62301-0000 Line A1060 160 HOUR 35.00$ 5,600.00$ 7,680.00$

62302-1000 Line A1080 40 HOUR 140.00$ 5,600.00$ 10,800.00$

62302-1100 Line A1100 40 HOUR 140.00$ 5,600.00$ 6,800.00$

62510-2000 Line A1120 4.0 ACRE 2,400.00$ 9,600.00$ 24,800.00$

62515-2000 Line A1140 4.0 ACRE 3,000.00$ 12,000.00$ 24,800.00$

63301-0000 Line A1160 100 EACH 400.00$ 40,000.00$ 33,000.00$

63308-2000 Line A1180 30 EACH 90.00$ 2,700.00$ 2,160.00$

63312-0000 Line A1200 6 EACH 1,500.00$ 9,000.00$ 21,000.00$

63313-0000 Line A1220 500 LNFT 1.00$ 500.00$ 3,000.00$

63316-1000 Line A1240 7 EACH 500.00$ 3,500.00$ 1,050.00$

63404-0200 Line A1260 700 GAL 55.00$ 38,500.00$ 39,900.00$

63405-0050 Line A1280 48 EACH 100.00$ 4,800.00$ 37,440.00$

63501-1000 Line A1300 ALL LPSM 50,000.00$ 50,000.00$ 136,800.00$ 136,800.00$

780.00$

57.00$

150.00$

GENERAL LABOR

SPECIAL LABOR, HIRED TECHNICAL SERVICES

RUMBLE STRIP

REMOVE AND RESET SIGN

PAVEMENT MARKINGS, TYPE B

PAVEMENT MARKINGS, SYMBOLS

TEMPORARY TRAFFIC CONTROL, TRAFFIC AND SAFETY SUPERVISOR

SPECIAL LABOR, HIRED SURVEY SERVICES

SEEDING, HYDRAULIC METHOD

MULCHING, HYDRAULIC METHOD

SIGN SYSTEM

OBJECT MARKER, TYPE 2

SPEED HUMP

270.00$

48.00$

6,200.00$

170.00$

330.00$

6,200.00$

6.00$

3,500.00$

72.00$

9/16/2016 Page 5 of 12

Project No: TX FTNP PAIS 10(1)

Project Name: Main Park Road CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount

Bay, Ltd.Engineer's Estimate

63502-0700 Line A1320 200 EACH 35.00$ 7,000.00$ 2,350.00$

63502-1300 Line A1340 400 EACH 100.00$ 40,000.00$ 8,400.00$

63502-1600 Line A1360 4 EACH 75.00$ 300.00$ 108.00$

63504-1000 Line A1380 279 SQFT 25.00$ 6,975.00$ 2,999.25$

63505-1000 Line A1400 6.3 MILE 2,500.00$ 15,750.00$ 42,210.00$

63506-0500 Line A1420 1,280 HOUR 35.00$ 44,800.00$ 30,720.00$

63506-0600 Line A1440 640 HOUR 90.00$ 57,600.00$ 22,400.00$

63602-6000 Line A1460 4 EACH 17,700.00$ 70,800.00$ 19,600.00$

63610-0000 Line A1480 30 LNFT 20.00$ 600.00$ 1,800.00$

63621-1000 Line A1500 2 EACH 750.00$ 1,500.00$ 1,820.00$ 910.00$

60.00$

4,900.00$

35.00$

24.00$

6,700.00$

10.75$

27.00$

21.00$

11.75$

TEMPORARY TRAFFIC CONTROL, CONE

SYSTEM INSTALLATION, TRAFFIC DETECTOR SYSTEM

CONDUIT

UTILITY BOX, PULLBOX

TEMPORARY TRAFFIC CONTROL, DRUM

TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B

TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS

TEMPORARY TRAFFIC CONTROL, FLAGGER

TEMPORARY TRAFFIC CONTROL, PILOT CAR

9/16/2016 Page 6 of 12

Schedule A Total of Bid Items:

Project No: TX FTNP PAIS 10(1)

Project Name: Main Park Road CQ = "Contract Quantity"

Item No. Quantity Unit

15101-0000 Line A0020 ALL LPSM

15210-3000 Line A0040 296.300 STA

15215-1000 Line A0060 11 EACH

15215-3000 Line A0080 5 EACH

15215-7000 Line A0100 5 EACH

15216-3000 Line A0120 14.500 STA

15301-0000 Line A0140 ALL LPSM

15401-0000 Line A0160 ALL LPSM

15501-0000 Line A0180 ALL LPSM

15705-1400 Line A0200 10,200 LNFT

15706-1600 Line A0220 2 EACH

15802-0000 Line A0240 ALL LPSM

20101-0000 Line A0260 3.7 ACRE

SURVEY AND STAKING, DRAINAGE STRUCTURE

MOBILIZATION

CENTERLINE, VERIFICATION AND STAKING

SURVEY AND STAKING, APPROACH ROAD

CONTRACTOR QUALITY CONTROL

CONTRACTOR TESTING

CONSTRUCTION SCHEDULE

SOIL EROSION CONTROL, SEDIMENT LOG

SOIL EROSION CONTROL, STABILIZED CONSTR

WATERING FOR DUST CONTROL

SURVEY AND STAKING, PARKING AREA

SURVEY AND STAKING, TEMPLATE CONTROL

CLEARING AND GRUBBING

2.2% 6,714,600.00$

Unit Price Amount

650,000.00$

118,520.00$

22,000.00$

10,000.00$

10,000.00$

40,600.00$

50,000.00$

250,000.00$

20,000.00$

102,000.00$

7,000.00$

50,000.00$

37,000.00$

2,000.00$

650,000.00$

Haas-Anderson Construction, Ltd.

2,000.00$

400.00$

2,000.00$

250,000.00$

50,000.00$

2,800.00$

10.00$

20,000.00$

50,000.00$

3,500.00$

10,000.00$

9/16/2016 Page 7 of 12

Project No: TX FTNP PAIS 10(1)

Project Name: Main Park Road CQ = "Contract Quantity"

Item No. Quantity Unit

20304-1000 Line A0280 ALL LPSM

20401-0000 Line A0300 2,250 CUYD

20402-0000 Line A0320 1,000 CUYD

20425-1000 Line A0340 100 LNFT

20441-0000 Line A0360 1,200 CUYD

21101-1000 Line A0380 10,000 SQYD

30306-2500 Line A0400 109,000 SQYD

30802-2000 Line A0420 3,150 TON

40101-5600 Line A0440 17,850 TON

40920-1000 Line A0460 45 TON

41002-2000 Line A0480 53,000 SQYD

41103-0000 Line A0500 108,000 SQYD

41105-0000 Line A0520 200 TON

SUBEXCAVATION

DITCH, EXCAVATION

WASTE

PRIME COAT

BLOTTER

ROADWAY OBLITERATION, METHOD 1

PULVERIZING, 5-INCH DEPTH

ROADWAY AGGREGATE, METHOD 2

SUPERPAVE PAVEMENT, 1/2-INCH OR 3/4-INCH NOMINAL

FOG SEAL, EMULSIFIED ASPHALT GRADE CSS-1

MICRO-SURFACING, TYPE 2

REMOVAL OF STRUCTURES AND OBSTRUCTIONS

ROADWAY EXCAVATION

2.2% 6,714,600.00$

Unit Price Amount

Haas-Anderson Construction, Ltd.

40,000.00$

45,000.00$

30,000.00$

4,000.00$

24,000.00$

50,000.00$

1,079,100.00$

204,750.00$

2,070,600.00$

18,000.00$

265,000.00$

199,800.00$

26,000.00$

40,000.00$

30.00$

20.00$

20.00$

40.00$

9.90$

5.00$

116.00$

65.00$

5.00$

400.00$

130.00$

1.85$

9/16/2016 Page 8 of 12

Project No: TX FTNP PAIS 10(1)

Project Name: Main Park Road CQ = "Contract Quantity"

Item No. Quantity Unit

41201-1000 Line A0540 45 TON

41412-1000 Line A0560 5,300 LB

42801-0150 Line A0580 700 SQYD

50102-0900 Line A0600 2,700 SQYD

60101-0000 Line A0620 25 CUYD

60405-0000 Line A0640 3 EACH

60413-0000 Line A0660 240 LNFT

60704-0000 Line A0680 9 EACH

60901-1200 Line A0700 370 LNFT

60902-1000 Line A0720 760 LNFT

61102-3200 Line A0740 150 LNFT

61106-0000 Line A0760 3 EACH

61108-1000 Line A0780 1 EACH

PLAIN RIGID PAVEMENT, 8-INCH DEPTH, TYPE C

8-INCH WATERLINE, POLYVINYL CHLORIDE (PVC

FIRE HYDRANT(NPS PROVIDED)

ADJUST WATER VALVE(COVER)

CONCRETE

MANHOLE ADJUSTMENT

TRENCH DRAIN

CLEANING CULVERT IN PLACE

CURB, CONCRETE, 14-INCH DEPTH

CURB AND GUTTER, CONCRETE, 12-INCH DEPTH

TACK COAT GRADE CSS-1, CSS-1H, SS-1, OR S

CRACKS, CLEANING AND SEALING

FLEXIBLE PAVEMENT, FULL DEPTH PATCH, TYPE

2.2% 6,714,600.00$

Unit Price Amount

Haas-Anderson Construction, Ltd.

27,540.00$

30,740.00$

55,300.00$

386,100.00$

26,250.00$

9,000.00$

96,000.00$

14,220.00$

14,430.00$

24,320.00$

29,100.00$

3,480.00$

1,270.00$

5.80$

612.00$

143.00$

79.00$

3,000.00$

1,050.00$

1,580.00$

400.00$

32.00$

39.00$

1,160.00$

194.00$

1,270.00$

9/16/2016 Page 9 of 12

Project No: TX FTNP PAIS 10(1)

Project Name: Main Park Road CQ = "Contract Quantity"

Item No. Quantity Unit

61108-3000 Line A0800 1 EACH

61501-0100 Line A0820 410 SQYD

61503-1000 Line A0840 15 SQYD

61505-1000 Line A0860 3 EACH

61701-3900 Line A0880 180 LNFT

61702-0510 Line A0900 2 EACH

61902-1600 Line A0920 1 EACH

61902-2200 Line A0940 3 EACH

61904-0000 Line A0960 70 EACH

61920-1000 Line A0980 60 EACH

62201-0450 Line A1000 80 HOUR

62201-0900 Line A1020 80 HOUR

62201-2750 Line A1040 80 HOUR

ADJUST WATER METER(COVER)

SIDEWALK, CONCRETE

MEDIAN, CONCRETE

REMOVE AND RESET BOLLARD POST

BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RA

WHEEL LOADER, 2 CUBIC YARD MINIMUM RATE

MOTOR GRADER

ACCESSIBILITY RAMP, CONCRETE

GUARDRAIL SYSTEM SBTA

TERMINAL SECTION, TYPE SBT-FAT

GATE, METAL, 20 FEET WIDTH

GATE, METAL, 34 FEET WIDTH

BOLLARD POST

2.2% 6,714,600.00$

Unit Price Amount

Haas-Anderson Construction, Ltd.

1,270.00$

55,760.00$

2,040.00$

8,160.00$

22,140.00$

15,100.00$

7,080.00$

22,980.00$

1,050.00$

5,820.00$

5,760.00$

7,360.00$

11,200.00$

1,270.00$

136.00$

136.00$

123.00$

2,720.00$

7,080.00$

7,550.00$

15.00$

7,660.00$

72.00$

97.00$

140.00$

92.00$

9/16/2016 Page 10 of 12

Project No: TX FTNP PAIS 10(1)

Project Name: Main Park Road CQ = "Contract Quantity"

Item No. Quantity Unit

62301-0000 Line A1060 160 HOUR

62302-1000 Line A1080 40 HOUR

62302-1100 Line A1100 40 HOUR

62510-2000 Line A1120 4.0 ACRE

62515-2000 Line A1140 4.0 ACRE

63301-0000 Line A1160 100 EACH

63308-2000 Line A1180 30 EACH

63312-0000 Line A1200 6 EACH

63313-0000 Line A1220 500 LNFT

63316-1000 Line A1240 7 EACH

63404-0200 Line A1260 700 GAL

63405-0050 Line A1280 48 EACH

63501-1000 Line A1300 ALL LPSM

GENERAL LABOR

SPECIAL LABOR, HIRED TECHNICAL SERVICES

RUMBLE STRIP

REMOVE AND RESET SIGN

PAVEMENT MARKINGS, TYPE B

PAVEMENT MARKINGS, SYMBOLS

TEMPORARY TRAFFIC CONTROL, TRAFFIC AND S

SPECIAL LABOR, HIRED SURVEY SERVICES

SEEDING, HYDRAULIC METHOD

MULCHING, HYDRAULIC METHOD

SIGN SYSTEM

OBJECT MARKER, TYPE 2

SPEED HUMP

2.2% 6,714,600.00$

Unit Price Amount

Haas-Anderson Construction, Ltd.

7,360.00$

9,280.00$

11,600.00$

18,680.00$

18,680.00$

31,900.00$

2,100.00$

26,940.00$

24,500.00$

1,015.00$

38,500.00$

36,240.00$

10,200.00$ 10,200.00$

755.00$

55.00$

145.00$

232.00$

46.00$

4,670.00$

290.00$

319.00$

4,670.00$

49.00$

4,490.00$

70.00$

9/16/2016 Page 11 of 12

Project No: TX FTNP PAIS 10(1)

Project Name: Main Park Road CQ = "Contract Quantity"

Item No. Quantity Unit

63502-0700 Line A1320 200 EACH

63502-1300 Line A1340 400 EACH

63502-1600 Line A1360 4 EACH

63504-1000 Line A1380 279 SQFT

63505-1000 Line A1400 6.3 MILE

63506-0500 Line A1420 1,280 HOUR

63506-0600 Line A1440 640 HOUR

63602-6000 Line A1460 4 EACH

63610-0000 Line A1480 30 LNFT

63621-1000 Line A1500 2 EACH

TEMPORARY TRAFFIC CONTROL, CONE

SYSTEM INSTALLATION, TRAFFIC DETECTOR SY

CONDUIT

UTILITY BOX, PULLBOX

TEMPORARY TRAFFIC CONTROL, DRUM

TEMPORARY TRAFFIC CONTROL, WARNING LIGH

TEMPORARY TRAFFIC CONTROL, CONSTRUCTIO

TEMPORARY TRAFFIC CONTROL, PAVEMENT MAR

TEMPORARY TRAFFIC CONTROL, FLAGGER

TEMPORARY TRAFFIC CONTROL, PILOT CAR

2.2% 6,714,600.00$

Unit Price Amount

Haas-Anderson Construction, Ltd.

2,200.00$

8,000.00$

112.00$

3,069.00$

43,974.00$

58,880.00$

32,000.00$

14,880.00$

690.00$

6,960.00$ 3,480.00$

23.00$

3,720.00$

50.00$

46.00$

6,980.00$

11.00$

28.00$

20.00$

11.00$

9/16/2016 Page 12 of 12

File details come from the government source that posted it. Updated .