08_19_2016.pdf

PDF 114 KB Posted

Attached to
TX FTNP PAIS 10(1) MAIN PARK ROAD Federal contract opportunity
Solicitation number
DTFH6816B00015
Issued by
Department of Transportation Federal Highway Administration

View the file

Other files for this federal contract opportunity

Other files attached to TX FTNP PAIS 10(1) MAIN PARK ROAD, newest first.
File Type Posted
Bid_Tabs_X.pdf PDF
Bid_Tabs_A.pdf PDF
Bid_Opening_Summary.pdf PDF
A002.pdf PDF
08_24_2016.pdf PDF
08_24_2016.pdf PDF
08_09_2016.pdf PDF
A001.pdf PDF
Appendix_A.pdf PDF
Appendix_C.pdf PDF
Appendix_D.pdf PDF
Appendix_B.pdf PDF
Pavements_Report_.pdf PDF
DTFH6816B00015.pdf PDF
Pavements_Report_Addendum.pdf PDF
Plans.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTFH6816B00015 08/19/2016

TX FTNP 10(1)

MAIN PARK ROAD

08/08/2016

Question #1: Bid Item Line A0460 SUPERPAVE PAVEMENT calls for Liquid asphalt PG70-10 to be used in the mix. PG70-10 is not available in the area of the project. TxDOT specifies PG64-22 and PG70-22.

Would the engineer consider changing asphalt type?

Response: Yes, the asphalt binder should be a PG 70-22. Refer to Amendment 1 for updated information.

Questions #2: What are the liquidated damages for the project?

Response: Please refer to FP-03, 108.04 Failure to Complete Work on Time.

08/19/2016

Question #3: Appendix D contains a sample Subcontracting Plan with blanks for % of total planned subcontracting dollars to various types of concerns: (SB, SDB, WOSB, HUB,VET/SDVET, LB)

Does the contract establish any goal for subcontracting with these types of subcontractors?

Response: No, they are tracked goals.

Question #4: It is noted that Section 623 of the specifications has modified General Labor to include two additional classifications. There is a pay item for the Surveying Services, but not for Office Technical Services. Are we are required to provide a Design Engineer by this specification, and if so how will it be paid?

Response: A pay item to include technical services will be included in a forthcoming Amendment 1.

Question #5: Is a field office or residential housing; described under Section 637 of the FP-03 specifications, required for this project?

Response: This does not apply. There is no 637 pay item.

Question#6: Is a field office or residential housing; described under Section 637 of the FP-03 specifications, required for this project?

Response: This does not apply. There is no 637 pay item.

Question #7: For the Subexcavation Item, the detail on sheet F1 of the plans indicates to ‘Backfill with material according to Section 204.’ However section 204 has many different kinds of materials shown under the materials list. What material exactly is intended for use in the backfill for the Subexcavation?

Response: Any material that meets requirements in FP-03 Section 703.06 may be used for this item.

Also minor hot asphalt concrete meeting FP-03 Section 404 may be used.

Question #8: We have a calibrated inertial profiler. What type of roughness index is required, 3 or 4?

Response: It is a Type III and V according the SCRs under Section 401.01

Question #9: Field density @1 ½” lift will be difficult to achieve with a 75 gyration requirement in the super pave mix. Can the gyration requirement be lowered to 50 gyrations in the super pave mix?

Response: No, the Superpave mix shall be a 75 gyration requirement.

Question #10: If 75 gyrations is still required may we lay a single 3” lift instead of 2 – 1 ½” lifts?

Response: No, 2-1 ½” will be required.