08_09_2016.pdf

PDF 84 KB Posted

Attached to
TX FTNP PAIS 10(1) MAIN PARK ROAD
Solicitation number
DTFH6816B00015
Issued by

View the file

Other files

File Type Posted
Bid_Tabs_X.pdf PDF
Bid_Tabs_A.pdf PDF
Bid_Opening_Summary.pdf PDF
A002.pdf PDF
08_24_2016.pdf PDF
08_24_2016.pdf PDF
08_19_2016.pdf PDF
A001.pdf PDF
Appendix_D.pdf PDF
Appendix_C.pdf PDF
Appendix_A.pdf PDF
Pavements_Report_.pdf PDF
Plans.pdf PDF
DTFH6816B00015.pdf PDF
Pavements_Report_Addendum.pdf PDF
Appendix_B.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTFH6816B00015 08/09/2016

TX FTNP 10(1)

MAIN PARK ROAD

08/08/2016

Question #1: Bid Item Line A0460 SUPERPAVE PAVEMENT calls for Liquid asphalt PG70-10 to be used in the mix. PG70-10 is not available in the area of the project. TxDOT specifies PG64-22 and PG70-22.

Would the engineer consider changing asphalt type?

Response: Yes, the asphalt binder should be a PG 70-22. Refer to Amendment 1 for updated information.

Questions #2: What are the liquidated damages for the project?

Response: Please refer to FP-03, 108.04 Failure to Complete Work on Time.

File details come from the government source that posted it. Updated .