A002.pdf
PDF 4 MB Posted
- Attached to
- TX FTNP PAIS 10(1) MAIN PARK ROAD Federal contract opportunity
- Solicitation number
- DTFH6816B00015
About this file
A002 updates to Bid Schedule Section E and plans.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Tabs_X.pdf | ||
| Bid_Tabs_A.pdf | ||
| Bid_Opening_Summary.pdf | ||
| 08_24_2016.pdf | ||
| 08_24_2016.pdf | ||
| 08_19_2016.pdf | ||
| 08_09_2016.pdf | ||
| A001.pdf | ||
| Plans.pdf | ||
| Pavements_Report_.pdf | ||
| DTFH6816B00015.pdf | ||
| Pavements_Report_Addendum.pdf | ||
| Appendix_B.pdf | ||
| Appendix_A.pdf | ||
| Appendix_C.pdf | ||
| Appendix_D.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B I D S C H E D U L E Schedule A Account: ALL
Project No: TX FTNP PAIS 10(1)
Name: Main Park Road CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount
15101-0000
Line A0020 ALL LPSM $
15210-3000
Line A0040 296.300 STA $ $
15215-1000
Line A0060 11 EACH $ $
15215-3000
Line A0080 5 EACH $ $
15215-7000
Line A0100 5 EACH $ $
15216-3000
Line A0120 14.500 STA $ $
15301-0000
Line A0140 ALL LPSM $
15401-0000
Line A0160 ALL LPSM $
15501-0000
Line A0180 ALL LPSM $
15705-1400
Line A0200 10,200 LNFT $ $
15706-1600
Line A0220 2 EACH $ $
15802-0000
Line A0240 ALL LPSM $
20101-0000
Line A0260 3.7 ACRE $ $
20304-1000
Line A0280 ALL LPSM $
20401-0000
Line A0300 2,250 CUYD $ $
20402-0000
Line A0320 1,000 CUYD $ $
20425-1000
Line A0340 100 LNFT $ $
MOBILIZATION
CENTERLINE, VERIFICATION AND STAKING
SURVEY AND STAKING, APPROACH ROAD
SURVEY AND STAKING, DRAINAGE STRUCTURE
SURVEY AND STAKING, PARKING AREA
SURVEY AND STAKING, TEMPLATE CONTROL
CLEARING AND GRUBBING
REMOVAL OF STRUCTURES AND OBSTRUCTIONS
ROADWAY EXCAVATION
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, SEDIMENT LOG
SOIL EROSION CONTROL, STABILIZED CONSTRUCTION ENTRANCE
WATERING FOR DUST CONTROL
SUBEXCAVATION
DITCH, EXCAVATION
Schedule Total: ________________________
Submitted by: _________________________
A-6 A002 08/25/2016
Project No: TX FTNP PAIS 10(1)
Name: Main Park Road CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount
Schedule Total: ________________________
Submitted by: _________________________
20441-0000
Line A0360 1,200 CUYD $ $
21101-1000
Line A0380 10,000 SQYD $ $
30306-2500
Line A0400 109,000 SQYD $ $
30802-2000
Line A0420 3,150 TON $ $
40101-5600
Line A0440 17,850 TON $ $
40920-1000
Line A0460 45 TON $ $
41002-2000
Line A0480 53,000 SQYD $ $
41103-0000
Line A0500 108,000 SQYD $ $
41105-0000
Line A0520 200 TON $ $
41201-1000
Line A0540 45 TON $ $
41412-1000
Line A0560 5,300 LB $ $
42801-0150
Line A0580 700 SQYD $ $
50102-0900
Line A0600 2,700 SQYD $ $
60101-0000
Line A0620 25 CUYD $ $
60405-0000
Line A0640 3 EACH $ $
60413-0000
Line A0660 240 LNFT $ $
60704-0000
Line A0680 9 EACH $ $
CONCRETE
MANHOLE ADJUSTMENT
TRENCH DRAIN
ROADWAY OBLITERATION, METHOD 1
PULVERIZING, 5-INCH DEPTH
ROADWAY AGGREGATE, METHOD 2
PRIME COAT
BLOTTER
TACK COAT GRADE CSS-1, CSS-1H, SS-1, OR SS-1H
CRACKS, CLEANING AND SEALING
FLEXIBLE PAVEMENT, FULL DEPTH PATCH, TYPE 2
PLAIN RIGID PAVEMENT, 8-INCH DEPTH, TYPE C SMOOTHNESS/ROUGHNESS
SUPERPAVE PAVEMENT, 1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL
FOG SEAL, EMULSIFIED ASPHALT GRADE CSS-1 OR CSS-1H, SS-1 OR SS-1H
MICRO-SURFACING, TYPE 2
WASTE
CLEANING CULVERT IN PLACE
A-7 A002
Project No: TX FTNP PAIS 10(1)
Name: Main Park Road CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount
Schedule Total: ________________________
Submitted by: _________________________
60901-1200
Line A0700 370 LNFT $ $
60902-1000
Line A0720 760 LNFT $ $
61102-3200
Line A0740 150 LNFT $ $
61106-0000
Line A0760 3 EACH $ $
61108-1000
Line A0780 1 EACH $ $
61108-3000
Line A0800 1 EACH $ $
61501-0100
Line A0820 410 SQYD $ $
61503-1000
Line A0840 15 SQYD $ $
61505-1000
Line A0860 3 EACH $ $
61701-3900
Line A0880 180 LNFT $ $
61702-0510
Line A0900 2 EACH $ $
61902-1600
Line A0920 1 EACH $ $
61902-2200
Line A0940 3 EACH $ $
61904-0000
Line A0960 70 EACH $ $
61920-1000
Line A0980 60 EACH $ $
62201-0450
Line A1000 80 HOUR $ $
62201-0900
Line A1020 80 HOUR $ $
8-INCH WATERLINE, POLYVINYL CHLORIDE (PVC)
FIRE HYDRANT(NPS PROVIDED)
ADJUST WATER VALVE(COVER)
ADJUST WATER METER(COVER)
SIDEWALK, CONCRETE
MEDIAN, CONCRETE
CURB, CONCRETE, 14-INCH DEPTH
CURB AND GUTTER, CONCRETE, 12-INCH DEPTH
REMOVE AND RESET BOLLARD POST
BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 18-INCH WIDTH
WHEEL LOADER, 2 CUBIC YARD MINIMUM RATED CAPACITY
ACCESSIBILITY RAMP, CONCRETE
GUARDRAIL SYSTEM SBTA
TERMINAL SECTION, TYPE SBT-FAT
GATE, METAL, 20 FEET WIDTH
GATE, METAL, 34 FEET WIDTH
BOLLARD POST
A-8 A002
Project No: TX FTNP PAIS 10(1)
Name: Main Park Road CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount
Schedule Total: ________________________
Submitted by: _________________________
62201-2750
Line A1040 80 HOUR $ $
62301-0000
Line A1060 160 HOUR $ $
62302-1000
Line A1080 40 HOUR $ $
62302-1100
Line A1100 40 HOUR $ $
62510-2000
Line A1120 4.0 ACRE $ $
62515-2000
Line A1140 4.0 ACRE $ $
63301-0000
Line A1160 100 EACH $ $
63308-2000
Line A1180 30 EACH $ $
63312-0000
Line A1200 6 EACH $ $
63313-0000
Line A1220 500 LNFT $ $
63316-1000
Line A1240 7 EACH $ $
63404-0200
Line A1260 700 GAL $ $
63405-0050
Line A1280 48 EACH $ $
63501-1000
Line A1300 ALL LPSM $
63502-0700
Line A1320 200 EACH $ $
63502-1300
Line A1340 400 EACH $ $
63502-1600
Line A1360 4 EACH $ $
MOTOR GRADER
GENERAL LABOR
SPECIAL LABOR, HIRED TECHNICAL SERVICES
RUMBLE STRIP
REMOVE AND RESET SIGN
PAVEMENT MARKINGS, TYPE B
PAVEMENT MARKINGS, SYMBOLS
TEMPORARY TRAFFIC CONTROL, TRAFFIC AND SAFETY SUPERVISOR
TEMPORARY TRAFFIC CONTROL, CONE
SPECIAL LABOR, HIRED SURVEY SERVICES
SEEDING, HYDRAULIC METHOD
MULCHING, HYDRAULIC METHOD
SIGN SYSTEM
OBJECT MARKER, TYPE 2
SPEED HUMP
TEMPORARY TRAFFIC CONTROL, DRUM
TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B
A-9 A002
Project No: TX FTNP PAIS 10(1)
Name: Main Park Road CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount
Schedule Total: ________________________
Submitted by: _________________________
63504-1000
Line A1380 279 SQFT $ $
63505-1000
Line A1400 6.3 MILE $ $
63506-0500
Line A1420 1,280 HOUR $ $
63506-0600
Line A1440 640 HOUR $ $
63602-6000
Line A1460 4 EACH $ $
63610-0000
Line A1480 30 LNFT $ $
63621-1000
Line A1500 2 EACH $ $
SYSTEM INSTALLATION, TRAFFIC DETECTOR SYSTEM
CONDUIT
UTILITY BOX, PULLBOX
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
TEMPORARY TRAFFIC CONTROL, FLAGGER
TEMPORARY TRAFFIC CONTROL, PILOT CAR
A-10 A002
Option X Account: ALL
Project No: TX FTNP PAIS 10(1)
Name: Main Park Road CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount
15101-0000
Line X0020 ALL LPSM $
15210-3000
Line X0040 78.080 STA $ $
15215-3000
Line X0060 2 EACH $ $
15301-0000
Line X0080 ALL LPSM $
15401-0000
Line X0100 ALL LPSM $
15501-0000
Line X0120 ALL LPSM $
15705-1400
Line X0140 330 LNFT $ $
15802-0000
Line X0160 ALL LPSM $
20101-0000
Line X0180 0.2 ACRE $ $
20304-1000
Line X0200 ALL LPSM $
20401-0000
Line X0220 70 CUYD $ $
30306-2500
Line X0240 18,000 SQYD $ $
30802-2000
Line X0260 560 TON $ $
40101-5600
Line X0280 3,000 TON $ $
40920-1000
Line X0300 8 TON $ $
41103-0000
Line X0320 18,000 SQYD $ $
41105-0000
Line X0340 30 TON $ $
Schedule Total: ________________________
Submitted by: _________________________
PRIME COAT
BLOTTER
MOBILIZATION
CENTERLINE, VERIFICATION AND STAKING
SURVEY AND STAKING, DRAINAGE STRUCTURE
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
ROADWAY AGGREGATE, METHOD 2
SUPERPAVE PAVEMENT, 1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL
FOG SEAL, EMULSIFIED ASPHALT GRADE CSS-1 OR CSS-1H, SS-1 OR SS-1H
SOIL EROSION CONTROL, SEDIMENT LOG
WATERING FOR DUST CONTROL
CLEARING AND GRUBBING
REMOVAL OF STRUCTURES AND OBSTRUCTIONS
ROADWAY EXCAVATION
PULVERIZING, 5-INCH DEPTH
A-11 A002
Project No: TX FTNP PAIS 10(1)
Name: Main Park Road CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount
Schedule Total: ________________________
Submitted by: _________________________
41201-1000
Line X0360 8 TON $ $
60201-0800
Line X0380 40 LNFT $ $
60210-0800
Line X0400 2 EACH $ $
60413-0000
Line X0420 45 LNFT $ $
62201-0450
Line X0440 10 HOUR $ $
62201-0900
Line X0460 10 HOUR $ $
62201-2750
Line X0480 10 HOUR $ $
62301-0000
Line X0500 20 HOUR $ $
62302-1000
Line X0520 5 HOUR $ $
62302-1100
Line X0540 5 HOUR $ $
62510-2000
Line X0560 0.1 ACRE $ $
62515-2000
Line X0580 0.1 ACRE $ $
63301-0000
Line X0600 10 EACH $ $
63308-2000
Line X0620 6 EACH $ $
63404-0200
Line X0640 155 GAL $ $
63405-0050
Line X0660 1 EACH $ $
63502-0700
Line X0680 50 EACH $ $
TEMPORARY TRAFFIC CONTROL, CONE
SEEDING, HYDRAULIC METHOD
MULCHING, HYDRAULIC METHOD
SIGN SYSTEM
BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 18-INCH WIDTH
WHEEL LOADER, 2 CUBIC YARD MINIMUM RATED CAPACITY
MOTOR GRADER
TACK COAT GRADE CSS-1, CSS-1H, SS-1, OR SS-1H
OBJECT MARKER, TYPE 2
PAVEMENT MARKINGS, TYPE B
PAVEMENT MARKINGS, SYMBOLS
24-INCH PIPE CULVERT
END SECTION FOR 24-INCH PIPE CULVERT
TRENCH DRAIN
GENERAL LABOR
SPECIAL LABOR, HIRED TECHNICAL SERVICES
SPECIAL LABOR, HIRED SURVEY SERVICES
A-12 A002
Project No: TX FTNP PAIS 10(1)
Name: Main Park Road CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount
Schedule Total: ________________________
Submitted by: _________________________
63502-1300
Line X0700 100 EACH $ $
63502-1600
Line X0720 4 EACH $ $
63505-1000
Line X0740 1.5 MILE $ $
63506-0500
Line X0760 320 HOUR $ $
63506-0600
Line X0780 160 HOUR $ $
63602-6000
Line X0800 1 EACH $ $
TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
TEMPORARY TRAFFIC CONTROL, FLAGGER
TEMPORARY TRAFFIC CONTROL, PILOT CAR
SYSTEM INSTALLATION, TRAFFIC DETECTOR SYSTEM
TEMPORARY TRAFFIC CONTROL, DRUM
TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B
A-13 A002
Schedule Awarded Initially Possibly Award Later
Schedule A
Option X
Totals
Bid Schedule Summary
A-14 A002
E-7 TX FTNP PAIS 10(1)
Main Park Road
NPS PMIS No. : 130117 Submit samples of materials for quality verification testing for materials required to conform to Sections 703, 704, and 705.
Materials containing petroleum-based solvents such as cutback asphalts and traffic paints may be restricted from use by local laws or ordinances in certain geographic areas. Upon presenting proof of such restrictions, alternate materials considered acceptable to the CO may be substituted for the materials specified in the contract.
105.02 Material Sources
(b) Contractor-located sources. Add the following to the end of the first paragraph:
For Contractor-located, non-commercial sources, secure environmental clearances according to Subsection 107.10.
(c) Government-listed sources.
Water may be available for purchase from the NPS. The Contractor is required to provide and install a meter to measure the water quantity used, an approved backflow device, and piping if necessary to access and extract water from the provided source. Track water use. Allow the CO to verify the meter reading on a monthly basis. Coordinate the cost, reporting of the water quantity used, and payment with the CO and the NPS.
105.04 Storing and Handling Material. Add the following after the third sentence of the second paragraph:
For Contractor-located, non-commercial staging, storing, and material handling areas, secure environmental clearances according to Subsection 107.10.
Add the following:
The Contractor may use the obliterated section of the water tank road and a portion of the Malaquite visitor center parking lot for staging and storage areas. Coordinate with CO for exact area to be used at the Malaquite Visitor Center parking lot prior to use.
Section 106. - ACCEPTANCE OF WORK
106.01 Conformity with Contract Requirements. Delete the text and substitute the following:
Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.
References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.
A002
E-8 TX FTNP PAIS 10(1)
NPS PMIS No. : 130117 Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.
Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is more strict.
Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.
When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.
The Government may inspect, sample, or test all work at any time before final acceptance of the project. When the Government tests work, copies of test reports are furnished to the Contractor upon request. Government tests may or may not be performed at the work site. If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.
The number of significant figures used in the calculations will be according to ASTM E 29, absolute method.
Acceptable work conforming to the contract will be paid for at the contract unit bid price. Four methods of determining conformity and accepting work are described in Subsections 106.02 to
106.05 inclusive. The primary method of acceptance is specified in each Section of work.
However, work may be rejected at any time it is found by any of the methods not to comply with the contract.
Remove and replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted, at no cost to the Government.
(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:
(1) Sampling method
(2) Number of samples
(3) Sample transport
(4) Test procedures
E-9 TX FTNP PAIS 10(1)
NPS PMIS No. : 130117
(5) Testing laboratories
(6) Reporting
(7) Estimated time and costs
(8) Validation process
(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:
(1) Have the work accepted at a reduced price; or
(2) Be given permission to perform corrective measures to bring the work into conformity.
The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.
Where sample/testing procedures make reference to AASHTO, ASTM, or other standards (designated as FLH T), the procedure as modified in the Materials Manual shall govern. Where the specifications make reference to AASHTO Test T11, “Procedure B - Washing Using a Wetting Agent” shall be the procedure followed.
Where the specifications make reference to AASHTO Test T310, “Direct Transmission Method of In-Place Nuclear Density and Moisture Content” shall be the procedure followed.
Reference to the Materials Manual means the Federal Lands Highway “Field Materials Manual, U.S. Department of Transportation, Federal Highway Administration,” dated October 2008, and all amendments and supplements thereto. Copies are available upon request by e-mail to cflcontracts@dot.gov, or fax to (720) 963-3360 and located on our website at http://www.cflhd.gov/materials.
106.03 Certification. Add the following after the second paragraph:
See Table 106-3 for schedule for full or partial acceptance by material certification. Submit certification and sample of material for testing as required.
106.05 Statistical Evaluation of Work and Determination of Pay Factor (Value of Work).
(b) Acceptance. Delete the last sentence of the second paragraph and substitute the following:
If a lot is concluded or terminated with fewer than three samples, the samples will be combined with those of an adjacent lot. In the event there is no adjacent lot, the material will be accepted according to Subsection 106.04.
(c) Statistical evaluation. Delete the second paragraph and substitute the following:
E-10 TX FTNP PAIS 10(1)
NPS PMIS No. : 130117 The number of significant figures used in the calculations will be according to ASTM E 29, absolute method.
Table 106-2 Pay Factor.
The Pay Factor 1.03, category I row: Delete the value 84 in the n=9 column and substitute the value 94.
The Pay Factor 0.75, category II row: Delete the value 35 in the n=3 column and substitute the value 25.
E-54 TX FTNP PAIS 10(1)
NPS PMIS No.: 130117
(1) Nonasphalt material. Delete the text and substitute the following:
Dispose of gravel, crushed stone, or other nonrigid surface, base, and subbase material. Where no regulations exist, dispose of the material as described in 211.02(a)(1).
Section 303. - ROAD RECONDITIONING
Delete Section 303 and substitute the following:
Section 303. - ROAD RECONDITIONING
Description
303.01 This work consists of pulverizing an existing pavement and base in-place, mixing these materials with fly ash or cement and water, and shaping and compacting the mix to produce a stabilized base. Include crushed aggregate in the mixture if required.
Material
303.02 Conform to the following Subsections:
Crushed aggregate 703.06 Fly ash, Type C 725.04(a) Hydraulic cement 107.01 Water 725.01
Construction Requirements
303.03 Composition of Job Mix Formula. Collect representative samples of the existing pavement and base from the project. Process and blend these materials to achieve a gradation representative of the final processed in-place pulverized material.
At a fly ash content of 7% by dry mass or cement content of 3% by dry mass, determine and submit the parameters in Table 303-1 and the information in (a) through (e). Submit this mix design information 30 days before production. Compressive strength, loss of mass, and volume change results are for information only.
Table 303-1 Design Parameters (information only)
Material or Property Unconfined compressive strength, ASTM D1633, Method A (1)
Loss in mass and volume change, AASHTO T 135
E-55 TX FTNP PAIS 10(1)
NPS PMIS No.: 130117
(1) At 7-day cure
(a) Maximum density and optimum moisture content at the design fly ash or cement content using a minimum of 4 points according to AASHTO T 134.
(b) Source of each component material.
(c) Results of all tests and applicable charts and graphs.
(d) Gradation used for mix design.
(e) Submit strength data for purposes and justification for opening to traffic. Additional compressive break data may be used to justify opening to traffic.
Begin production only after the mix design is approved. Furnish a new mix design if there is a change in a material source.
303.04 General
Establish profile and cross slope control according to Section 152. Maintain the existing cross slope or crown if none is established.
Before pulverizing, remove and dispose of unsuitable material as directed by the CO. Remove by blading away vegetation from the shoulder to a minimum of 18-inches prior to pulverizing.
Replace unsuitable material with crushed aggregate. Perform work according to Section 308.
Protect manholes, valve covers, and other buried structures from damage. Store fly ash or cement in waterproof containers.
Locate longitudinal joints to coincide with changes in cross-slope. Do not locate longitudinal joints within a lane width.
303.05 Production Start-Up Procedures.
(a) Pre-production conference. One to two weeks before the start of stabilizing operations and after the mix design has been approved, arrange for a pre-production conference. Coordinate attendance with CO and appropriate subcontractors. Submit and be prepared to discuss the following proposals for stabilizing operations:
(1) Proposed schedule of full depth reclamation operations.
(2) List of all equipment (reclaimer, haul, and compaction), and personnel used in the production and construction of the work.
E-56 TX FTNP PAIS 10(1)
NPS PMIS No.: 130117
(3) Proposed traffic control plan for reclamation operation including provisions for moving operations.
(4) Contractor quality control plan for reclamation, sampling and testing according to Section 153,
(5) Procedures for constructing the control strip including placing, finishing, and compacting procedures.
(6) Acceptance procedures according to Subsections 106.02 and 106.04; and
(7) Plan for curing and maintaining the finished surface before placement of next layer.
(b) Control strip. Provide 7 days notice before beginning production.
On the first day of production, stabilize a 1000-ft (300-meter) test strip, one-lane wide, at the designated lift thickness and mix design proportions. Construct the test strip on the project at an approved location.
Construct the test strip using construction procedures intended for the entire project.
Take nuclear density readings behind each roller pass to determine the roller pattern necessary to achieve the specification requirements in 303.10. Cease production after construction of the test strip until the stabilized base layer and the test strip are evaluated for acceptance.
Repeat the test strip process until an acceptable test strip is produced. See Subsection
106.01 for the disposition of material in unacceptable test strips. Accepted test strips may remain in place and will be accepted and measured as a part of the completed base.
When a test strip is accepted, full production may begin.
Use these start-up procedures when changing construction procedures, beginning of a new construction season or when resuming production after a termination of production due to unsatisfactory quality according to Subsection 106.04.
303.06 Adding Crushed Aggregate. If required, add crushed aggregate at no additional cost to the government to bring the finished surface to the established line, grade, and cross section.
303.07 Pulverizing. Furnish a road reclaimer that is:
(a) Self-propelled;
(b) Specifically manufactured for in-place reclamation;
(c) Capable of reducing the existing material to the required size;
(d) Equipped with at least an 8-foot (2.4-meter) cutting width;
E-57 TX FTNP PAIS 10(1)
NPS PMIS No.: 130117
(e) Equipped with standard automatic depth controls adjustable in increments of ½ inch (10 millimeters); and
(f) Equipped with sufficient horsepower to constantly pulverize to the required depth in a single pass.
Use the reclaimer to pulverize the existing roadway material, in-place until 100 percent passes the 2-inch (50-millimeter) sieve. Reprocess or remove larger particles and dispose of them according to Subsection 203.05.
303.08 Applying Fly Ash or Cement. Do not add fly ash or cement when the underlying surface is frozen, muddy, or when conditions allow for excessive loss to washing or blowing.
Begin fly ash or cement application when the air temperature is above 40 °F (5 °C) and is expected to stay above 40 °F (5 °C) for 48 hours. Apply fly ash or cement by one of the following methods:
(a) Dry method. Use a metered mechanical spreader to uniformly apply the fly ash or cement. Use canvas (or similar) skirts around the spreader box to minimize dust.
(b) Reclaimer method. Meter the fly ash or cement and water directly into the mixing chamber of a reclaimer conforming to Subsection 310.05.
303.09 Mixing. Begin mixing within 30 minutes after fly ash or cement application. Use a reclaimer conforming to Subsection 310.05. Add water as necessary to adjust the moisture content of the mixture to within 2% of optimum as indicated in the approved mix design.
Continue mixing until the fly ash or cement is uniformly distributed within the in-situ material creating a homogeneous full depth layer. Complete mixing within 1 hour of the fly ash or cement application.
303.10 Compacting and Finishing. Compact the processed material uniformly to a minimum of 95 percent of maximum density as determined from AASHTO T 134. Furnish rollers sized and configured to achieve the required compaction and finishing. Operate rollers according to the manufacturer's recommendations. Compact the processed material full width by rolling from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and all places not accessible to the roller, compact the material with approved tampers or compactors.
Determine the in-place density and moisture content according to AASHTO T 310 or other approved test procedures.
During compaction and final grading maintain the moisture content of the mixture to within 2 percent of optimum. Do not leave areas of stabilized material uncompacted or undisturbed for more than 30 minutes. Complete compaction within 2 hours from the start of mixing.
E-58 TX FTNP PAIS 10(1)
NPS PMIS No.: 130117
Finish the compacted surface according to Subsection 301.06 to produce a surface that is smooth, dense, and free of compaction planes, ridges, or loose material. Clean the compacted surface of all loose material, dirt, or other deleterious substances by approved methods.
Complete all finishing operations within 4 hours from the start of mixing including corrections to irregularities in the surface.
303.11 Construction Joints. When fly ash or cement application operations are delayed or stopped for more than 2 hours, make a transverse construction joint by cutting back into the completed work to form an approximately vertical face. Tie new work into the completed work by remixing approximately 2 feet (0.6 meters) of the completed course.
303.12 Curing. Keep the fly ash stabilized layer continuously moist until the next course is placed by one of the methods below.
(a) Water method. Keep the surface continuously moist by applying water under pressure through a spray bar equipped with nozzles producing a fine, uniform spray. During the first 24 hours of curing, use a water truck with side spray to avoid driving on the newly stabilized layer.
(b) Prime coat. Seal the surface by placing an inverted prime coat according to Subsection 411.06(b). Provide and maintain a continuous film over the surface.
303.13 Maintenance. Maintain the fly ash stabilized layer to the correct line, grade, and cross section until placing fly ash or cement of the next course. If the fly ash stabilized layer loses stability, density, or finish before placement of the next course, reprocess, recompact, and add fly ash or cement as necessary to restore the strength of the damaged material.
Overlay the recycled base within 14 days after reclaiming.
303.14 Acceptance. See Table 303-2 for sampling, testing, and acceptance requirements.
Construction of full depth reclamation with fly ash or cement will be evaluated under Subsections
106.02 and 106.04.
Crushed aggregate will be evaluated under 106.03 and 703.06.
Fly ash and cement will be evaluated under Subsections 106.02 and 106.03.
Prime coat will be evaluated under Section 411.
Measurement
303.15 Measure the Section 303 items listed in the bid schedule according to Subsection
109.02 and the following.
Measure prime coat under Section 411.
E-59 TX FTNP PAIS 10(1)
NPS PMIS No.: 130117
Measure removal and disposal of unsuitable material under Section 203.
Payment
303.16 The accepted quantities, measured as provided in Subsection 109.02, will be paid at the contract price per unit of measurement for the Section 303 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
Section 308. - Minor Crushed Aggregate
Description
308.01. Add the following:
The contractor may use pulverized material for aggregate base, according to Section 303.
308.06 Acceptance Delete the second paragraph and substitute the following:
Construction of roadway aggregate courses will be evaluated under Subsections 106.02 and
106.04. Method 2 compaction will be evaluated under Section 106.04. Sample material from the windrow or roadbed after processing but prior to compaction at the frequency shown in Table
E-60 TX FTNP PAIS 10(1)
NPS PMIS No.: 130117
308-1. Submit samples to the CO for verification. Materials that do not meet the approved certification will be considered unacceptable.
Delete Section 401 and substitute the following:
Section 401. - SUPERPAVE ASPHALT CONCRETE PAVEMENT
Description
401.01 This work consists of constructing one or more courses of asphalt concrete pavement using hot or warm mix asphalt (HMA or WMA).
The mix design method is designated as Superpave. Superpave HMA and WMA asphalt concrete pavement nominal maximum size aggregate size is designated as shown in Tables 401-
1. Equivalent single axle loads (ESAL) or number of gyrations at design (NDesign) is designated as shown in Tables 401-1.
A minimum of one percent lime is required in the asphalt concrete mixture.
Pavement roughness is type III and V as shown in Subsection 401.16.
Asphalt binder grade is PG 70-10. The Pressure Aging Vessel test temperature shall be 212°F.
401.02 Conform to the following Subsections:
Material
Aggregate 703.07 Antistrip additive 702.08 Asphalt binder 702.01 Mineral filler 725.05 Recycled asphalt pavement 703.19
Construction Requirements
401.03 Composition of Mix (Job-Mix Formula). Furnish mixes of aggregate, asphalt binder, recycled asphalt pavement (RAP), and additives that meet the applicable material requirements and the appropriate design parameters in Table 401-1 and are capable of being placed and compacted as specified.
Compact specimens with the gyratory effort corresponding to the design ESAL level of 0.3 to <3 million. Volumetric mix properties will be determined at Ndesign according to AASHTO T 312
E-61 TX FTNP PAIS 10(1)
NPS PMIS No.: 130117 and R 35. Use a gyratory compactor which meets the internal angle requirement according to
AASHTO T 312.
If more than 1.0 percent hydrated lime is proposed in the JMF provide AASHTO T 283 tests results showing the additional lime is necessary to meet the minimum tensile strength ratio requirements in Table 401-1.
Apply all mix design requirements for HMA to the development of the WMA mix design.
Submit modifications to the WMA technology according to the WMA Appendix of AASHTO R 35 for approval by the CO.
E-87 TX FTNP PAIS 10(1)
NPS PMIS No.: 130117
Section 409. - ASPHALT SURFACE TREATMENT
Construction Requirements
409.10 Fog Seal. Add the following after the first sentence:
Unless otherwise noted on the plans, dilute the specified emulsion one part water to one part emulsified asphalt.
Measurement
409.14 Add the following:
Measure fog seal including water added for dilution.
Indicate a breakdown of total emulsion and water added on the load invoices supplied to the CO for payment.
Section 410. – SLURRY SEAL
Delete the title and text of this Section and substitute the following:
Section 410. – MICRO SURFACING
Description
410.01 This work consists of applying a polymer modified microsurfacing mix on an existing pavement surface.
Micro surfacing as shown in Table 703-8 is to be used on this project. Use Type II or Type II (modified) shown in Table 703-8. The residual asphalt content specified is 7.5 ± 2 percent by dry total weight of aggregate.
410.02 Conform to the following Subsections:
Aggregate 703.11 Emulsified asphalt 702.03(e) Mineral Filler 725.05 Water 725.01(c)
Construction Requirements
410.03 Composition of Mix (Job-Mix Formula).
Submit a written job-mix formula for approval at least 14 days before production that meets the
E-88 TX FTNP PAIS 10(1)
NPS PMIS No.: 130117 mix design requirements in ISSA A143 for micro-surfacing. Submit the following:
(a) Aggregate gradation values. The representative value for each sieve size for the aggregate blend.
(b) Emulsified asphalt content. The residual asphalt content, as a percent by mass of dry aggregate.
(c) Polymer modifier. Type and amount of polymer modifier solids based on the residual asphalt content.
(d) Aggregate samples. 80-pound sample of each aggregate.
(e) Emulsified asphalt sample. Two 1-quart samples and a production certification according to Subsection 106.03(a) of emulsified asphalt from the same source and of the type to be used on the project.
(f) Mineral filler samples. 20-pound sample of each proposed mineral filler.
(g) Qualifications. Demonstrate satisfactory completion of at least 5 comparable projects.
Provide Superintendent or Foreman experience in micro surfacing on at least 5 comparable projects.
The job-mix formula will be evaluated for approval.
410.04 Equipment. Furnish with the following capabilities.
(a) Mixing equipment: Capable according to ISSA A143.
(b) Mechanical-type single squeegee spreader box.
(1) Attaches to the slurry seal mixer;
(2) Flexible squeegee in contact with the surface to prevent loss of slurry;
(3) Adjustable to ensure a uniform spread over varying grades and crowns;
(4) Adjustable in width with a flexible strike-off;
(5) Augers for uniform flow to edges.
(c) Sweeper. Furnish a vacuum sweeper with the following capabilities:
(1) Self-propelled;
E-89 TX FTNP PAIS 10(1)
NPS PMIS No.: 130117
(2) Equipped with a built in water spray system to reduce the dust generated during the sweeping process.
(3) Capable of controlling the vertical broom pressure;
(4) Capable of picking up and removing excess aggregate particles by vacuum.
(d) Auxiliary equipment. Furnish hand squeegees, shovels, and other equipment necessary to perform the work. Provide cleaning equipment including, but not limited to, power brooms, air compressors, water flushing equipment, and hand brooms for surface preparation.
(e) Other equipment. Other equipment of proven performance may be used in addition to or in lieu of the specified equipment when approved by the CO.
410.05 Surface Preparation. Clean the existing surface of all loose material, dirt, or other deleterious substances by approved methods. Deleterious and objectionable materials include raised pavement markers, tabs, and other pavement markers including striping (thermoplastic or other markings) that may be detrimental to the adhesion of the surface treatment.
Protect all service entrances such as manholes, valve boxes and drop inlets from the microsurfacing by a method suitable to the CO. Protect all concrete work, rock walls, stone curbs, wood curbs, historic features, rumble strips, wheel stops, and other objects from the micro surfacing with a method suitable to the CO.
410.06 Weather Limitations. Apply the mixture when the air temperature in the shade and the surface temperature are at least 45°F and rising and when the weather is not foggy, rainy, or overcast. Do not apply when there is a danger that the finished product will freeze within 24 hours.
410.07 Production Start-Up Procedures for Surface Treatments. Arrange for a pre-micro surfacing conference coordinating attendance with the CO and any applicable subcontractors.
Be prepared to discuss or submit the following:
(a) Proposed schedule of operations.
(b) Proposed traffic control plan.
(c) List of personnel involved in the production, construction, and testing of the work.
(d) List of equipment, quantity, and description to be used in the production, construction, and testing of the work.
(e) Discuss Section 153, process control sampling and testing to be performed by the Contractor.
E-90 TX FTNP PAIS 10(1)
NPS PMIS No.: 130117
(f) Discuss Subsections 410.10 and 410.11, measurement and payment, including sampling and testing Table 410-1, to be performed by the Contractor.
(g) Discuss spill prevention and safety contingency plan, and any required vehicle inspection.
Prior to starting application of micro surfacing, calibrate each mixing unit to be used on the project in accordance with ASTM D 6372 and ISSA 2010a in the presence of the CO or designated representative. Clean spreader box prior to start of each work shift.
On the first day of placement, construct a 300-foot test strip, one lane wide. The CO will approve the test strip before production begins. Coordinate location of the control strips with the CO.
Construct the control strip using material and lay-down procedures intended for the remainder of the micro-surfacing. Cease production after construction of the control strip until the material and the control strip are evaluated and accepted. Repeat the control strip process until an acceptable control strip is produced.
Acceptable control strips may remain in place and will be accepted as a part of the completed surface treatment.
410.08 Application. Provide the CO with a split certified shipping ticket for each separate load prior to mixing and application. Mix the materials using a micro-surfacing seal mixer and according to ISSA A143. Fog the surface with water immediately preceding the spreader.
Blend the additives with the aggregate using the fines feeders. Pre-wet the aggregate in the pugmill immediately before mixing with the polymer modified emulsion.
Ensure the mix is of the desired consistency as it leaves the mixer and conforms to the approved job-mix formula. Adjustment of the mineral filler and the emulsified asphalt content during construction may be approved to adjust for variations in field conditions.
Carry sufficient mix in the spreader to completely cover the surface. Spread the mix with a mechanical-type squeegee spreader box. In areas not accessible to the spreader box, use hand squeegees to work the mix.
Allow treated areas to completely cure before opening to traffic. For this project, unless otherwise approved by the CO, allow the treated areas to cure for one week before opening to traffic.
Transverse joints: Use a butt joint. Use building paper placed over previously placed micro surfacing or other suitable method to avoid double placement of micro surfacing. Ridges or bumps in the finished surface are not permitted.
Longitudinal joints: Place longitudinal joints on lane lines. Half passes and odd-width passes can be used only in turnouts and parking areas. When half passes are used, they shall not be the
E-91 TX FTNP PAIS 10(1)
NPS PMIS No.: 130117 last pass of any paved area. Overlap longitudinal joints no more than 3 inches. Keep elevation difference at joints less than ¼ inch.
Roll parking areas and turnouts with a self-propelled, 10-ton pneumatic roller with a tire pressure of 50 psi and equipped with a water spray system. Subject surfaced areas to a minimum of 2 full- coverage passes with the roller. Do not commence rolling until micro surfacing has cured to the point where it will not pick up on the tires of the roller. Complete rolling of these areas within 4 hours of placing the micro surfacing.
No streaks or transverse ripples as defined by ISSA A143 are allowed in the finished surface.
Ensure straight lines along curb and shoulders. No runoff on these areas is permitted. Mask off surface areas at the project start, end, and as directed by the CO to provide straight and neat starting and ending joints.
Clean up all material spills. On a daily basis remove all debris associated with the production of the work.
Vacuum sweep the micro surfacing one to two weeks after completion placement to remove loose or shedding material from the treated surface areas.
Perform a second vacuum sweeping three to four weeks after completion of the micro surfacing to remove any additional loose or shedding material from the treated surface areas.
410.09 Acceptance. Emulsified asphalt will be evaluated under Subsections 106.03, 106.04 and
702.09. Furnish a production certification with each load of emulsified asphalt.
Aggregate for surfacing mixture will be evaluated under Subsections 106.02 and
106.04. See Table 410-1 for sampling and testing requirements.
Construction of the polymer modified micro-surfacing will be evaluated under Subsections
106.02 and 106.04.
Measurement
410.10 Measure the Section 410 items listed in the bid schedule according to Subsection
109.02 for each day’s production.
Payment
410.11 The accepted quantities will be paid at the contract price per unit of measurement for the Section 410 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
E-92 TX FTNP PAIS 10(1)
NPS PMIS No.: 130117
Section 411. – PRIME COAT
Delete the Section and substitute the following:
Section 411. – PRIME COAT
Description
411.01 This work consists of applying a cut-back or emulsified asphalt prime coat.
Prime coat asphalt grade is designated as shown in AASHTO M 140 or AASHTO M 208 for emulsified asphalt; AASHTO M 81 or AASHTO M 82 for cut-back asphalt; or Subsection 702.03(f) for penetrating emulsified asphalts. Use Method 1 described in Subsection 411.06(a).
Material
411.02 Conform to the following Subsections:
Asphalt surface treatment aggregate 703.10 Blotter 703.13 Cut-back asphalt 702.02 Emulsified asphalt 702.03 Penetrating emulsified asphalt 702.03(f) Water 725.01(c)
Construction Requirements
411.03 Equipment. Use equipment conforming to Subsection 409.04.
411.04 Surface Preparation. Prepare the surface to be primed according to Subsection 301.05 and 301.06. When required, use sweeping or other approved method to remove loose dust and fine material and lightly spray the surface with water prior to application of the prime coat.
411.05 Weather Limitations. Apply prime coat on a dry or slightly damp surface when the air temperature in the shade and the surface temperature are at least 50 and rising and when the weather is not foggy or rainy.
411.06 Asphalt Application. Apply cut-back or emulsified asphalt according to Subsection
409.08 using method (1), (2), or (3) as described below.
E-93 TX FTNP PAIS 10(1)
NPS PMIS No.: 130117
(a) Method 1 (topical). Apply cut-back asphalt or undiluted emulsified asphalt formulated as a penetrating prime coat at a rate of 0.10 to 0.30 gallons per square yard. The CO will approve the exact application rate.
(b) Method 2 (inverted prime). Apply undiluted emulsified asphalt at a rate of 0.20 to 0.30 gallons per square yard. Immediately apply crushed aggregate meeting the requirements of Table 703-7, Grading F, at a uniform rate of 20 to 25 pounds per square yard using an aggregate spreader. The CO will approve the exact application rate. Operate the aggregate spreader so the asphalt is covered with aggregate before wheels pass over it. Immediately seat the aggregate using a roller. Operate rollers at a maximum speed of 5 miles per hour.
During part-width construction, leave a 6-inch wide uncovered strip of asphalt to permit an overlap of asphalt material.
(c) Method 3 (processed). Scarify the surface to a depth of 2 to 3 inches before applying the asphalt as a prime coat. Apply emulsified asphalt at an undiluted rate of 0.25 gallons per square yard per inch of scarification depth. Immediately, process, respread, and compact the material.
When required, dilute a slow-setting emulsified asphalt by adding water. Use of other methods to incorporate asphalt into aggregate may be used with approval of the CO.
411.07 Curing. Cure surfaces primed with emulsified asphalt for at least 24 hours and surfaces primed with cut-back asphalt at least 3 days before covering with the next course.
411.08 Maintenance. Until the next course is placed, maintain the primed surface by keeping it free of corrugations, potholing, and loose material. Remove all dirt or other deleterious material and repair all damaged areas.
To protect traffic or to minimize rain damage spread blotter to cover unabsorbed asphalt. Remove excess blotter after the asphalt is absorbed.
411.09 Acceptance. Emulsified asphalt and cut-back asphalt will be evaluated under Subsections
106.02 and 106.03.
Aggregate and blotter will be evaluated under Subsection 106.03.
Construction of the prime coat will be evaluated under Subsections 106.02.
Measurement
411.10 Measure the Section 411 items listed in the bid schedule according to Subsection 109.02 and the following as applicable.
Measure prime coat width including treated widenings. Measure the square yard length along the centerline of the roadway.
E-94 TX FTNP PAIS 10(1)
NPS PMIS No.: 130117
Do not measure water added for dilution. Indicate a breakdown of total emulsion and water added on the load invoices supplied to the CO.
Payment
411.11 The accepted quantities will be paid at the contract price per unit of measurement for the Section 411 pay items listed in the bid schedule. Payments will be full compensation for the work prescribed in this Section. See Subsection 109.05.
Section 412. - ASPHALT TACK COAT
Description
412.01 Delete the text and substitute the following:
This work consists of applying an emulsified asphalt or hot asphalt cement tack coat.
Tack coat emulsified asphalt grade will meet AASHTO M 140 or AASHTO M 208.
Tack coat asphalt cement grade will meet AASHTO M 20, M 226, or M 320
Measurement
412.08 Add the following after the second paragraph:
Indicate a breakdown of total emulsion and water added on the load invoices supplied to the CO for payment.
Add the following Section:
Section 428. - FLEXIBLE PAVEMENT RESTORATION
Description
428.01. This work consists of the restoration of asphalt concrete pavement by removal of the existing pavement and patching.
Material
428.02. Conform to the following Sections and Subsections:
Excavation and Embankment 204 Aggregate Base 308
E-95 TX FTNP PAIS 10(1)
NPS PMIS No.: 130117
Minor Hot Asphalt Concrete 404 Asphalt Tack Coat 412 Underdrains, Sheet Drains, and Pavement Edge Drains 605 Asphalt Material 702 Biaxial Geogrid 714.03(a)
Construction Requirements
428.03. General. Mill and remove existing asphalt concrete pavement according to Section 203 or sawcut. Remove all material not suitable for use on the project and dispose of legally off Government property. Place asphalt concrete pavement according to Section 404.
428.04. Personnel. Accomplish asphalt pavement restoration with personnel experienced in this type of work. The experience shall be relevant to anticipated conditions and special techniques required. Demonstrate to the satisfaction of the CO the techniques and equipment to be used and submit documentation of projects on which this type of work has been performed at the preconstruction conference.
428.05. Equipment. Use equipment and tools designed and built to perform the work and obtain approval from the CO for their use.
428.06. Asphalt pavement full depth patch, Type 1 (FDP-1). This work consists of repairing distressed areas of pavement by removing and replacing the pavement and the underlying material to a depth of 10 inches.
(a) Patch Areas. Extend the repair area one foot beyond the distressed area. If patch cuts are within 2 feet of the pavement edge, extend the patch limit to the pavement edge. Make the minimum width dimension of the patch ½ of a travel lane (5 feet) and the minimum length dimension of the patch 3 feet.
(b) Pavement Removal. Mill completely through the pavement thickness. Asphalt millings may be used for aggregate base course backfill material. If an asphalt pavement milling machine is not used, then make a neat sawcut completely through the pavement thickness, with one pass around the perimeter of the patch area as designated by the CO. Make sawcuts a minimum depth of 4 inches, perpendicular to the roadway surface and at right angles to each other. Remove the pavement to expose subbase or subgrade. Remove from the Park all existing pavement, aggregate base and subgrade material within the patch limits at no additional expense to the government.
(c) Undercut. Remove aggregate base and subgrade material to a depth of 6 inches.
(d) Patching. Place geogrid material at the locations and at the depths indicated in the plans before placing crushed aggregate. Overlap geogrid material a minimum of one foot. Use metal pins or hooks as necessary to retain the position of geogrid material. Tension the geogrid materials by hand during placement and take care to prevent damage during backfilling. Replace
E-96 TX FTNP PAIS 10(1)
NPS PMIS No.: 130117 geogrid damaged during placement by the Contractor at no additional expense to the government.
(e) Place and compact aggregate base in 1 lift, 4 inches thick. Apply a tack coat to all asphalt concrete surfaces within the patch area according to Section 412. Place and compact asphalt concrete pavement, in two lifts, so that the patched surface matches the same grade as the adjacent surface. Place a minimum asphalt concrete thickness of 6 inches in the patch.
428.07. Asphalt pavement full depth patch, Type 2 (FDP-2). This work consists of repairing distressed areas of pavement by removing and replacing the pavement and the underlying material to a depth of 4 inches.
(a) Patch Areas. Extend the repair area one foot beyond the distressed area. If patch cuts are within 2 feet of the pavement edge, extend the patch limit to the pavement edge. Make the minimum length and width dimensions of the patch 3 feet.
(b) Pavement Removal. Mill completely through the pavement thickness. Asphalt millings may be used for aggregate base course backfill material. If an asphalt pavement milling machine is not used, then make a neat sawcut completely through the pavement thickness, with one pass around the perimeter of the patch area as designated by the CO. Make sawcuts a minimum depth of 4 inches, perpendicular to the roadway surface and at right angles to each other. Remove the pavement to expose subbase or subgrade. Remove from the park all existing pavement, aggregate base and subgrade material within the patch limits at no additional expense to the government.
(c) Apply a tack coat to all asphalt concrete surfaces within the patch area according to Section
412. Place and compact asphalt concrete pavement, in two lifts, so that the patched surface matches the same grade as the adjacent surface.
428.08. Asphalt pavement patch, Type 3. This work consists of repairing distressed areas of pavement by removing the loose or failed material and replacing the pavement with hot asphalt pavement.
(a) Patch Areas. The patch areas will be designated by the CO.
(b) Pavement Removal. The patch area will be cleaned by sweeping or other acceptable method.
(c) Apply a tack coat to all asphalt concrete surfaces within the patch area according to Section
412. Place the asphalt material either by hand or with a blade.
(d)…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .